Text version
Defense Distribution Depot San Joaquin General Environmental Controls environmental controls 01-29-16.docx
General Environmental Controls
1. General: While performing work at Defense Distribution Depot San Joaquin the contractor shall comply with all Federal, State and Local environmental protection laws and regulations, the controls of this document, and all specific requirements stated elsewhere in contract specifications.
2. Environmental Permits: All permits must be obtained from the appropriate agency and paid for by the contractor. Installation Support San Joaquin Environmental Office shall be included in all notification correspondence. Some examples include, but are not limited to:
a. Installation and/or removal of underground storage tanks prior to the start of work.
b. Well drilling prior to the start of work.
c. Air emissions such as Volatile Organic Compounds (VOCs) and National Emission Standards for Hazardous Air Pollutants (NESHAPS) prior to the start of work
d. Demolition (Asbestos or Non-asbestos) 10 days prior to the start of work.
e. Renovations (Asbestos only) 10 days prior to the start of work.
f. General construction storm water permit prior to the start of work (coordinated through the DLA San Joaquin Environmental Office).
g. Authority to Construct/Permit to Operate air pollution source from SJVUAPCD
3. Sanitary/Storm Drainage Restrictions: Absolutely no materials are to be disposed of via the sanitary sewage or storm drain systems. Non-hazardous floor cleaning water may be disposed into the sanitary sewer system and is prohibited from being dumped into the storm drain system. A rule of thumb is “If you won’t drink it, it doesn’t belong in the storm system.
4. Backflow Prevention: Backflow is required prior to any connection to the water system. Authorization is obtained through the DDJC Fire Department. Contractors must provide their own backflow prevention device.
5. Discovery of Asbestos Containing Materials (ACM): If the contractor discovers ACM (not previously disclosed) during the performance of the contract, work in the area of the ACM shall immediately cease and the COR shall be notified.
6. Hazardous Waste Generation and Disposal: All handling and disposal of hazardous waste (as defined by Title 22, Chapter 11, California Code of Regulations) is a material and significant requirement of this contract. Hazardous waste generated in performance of a contract shall be the property of the contractor and shall be removed as part of the contract effort. All costs associated with its accumulation, storage, transportation, treatment and disposal are the responsibility of the contractor. On-site disposal of hazardous waste, including empty containers that previously contained hazardous materials, is strictly prohibited.
In addition, the contractor shall:
a. Notify the COR of the type, quantity and location of the hazardous waste to be accumulated.
b. Provide advance copies of the completed hazardous waste profile (supported by analysis), land disposal restriction/certification form, and the uniform hazardous waste manifest to the COR for review by the Environmental Protection Office at least 24 hours prior to shipment of a hazardous waste off-site.
c. Arrange with the COR for the Environmental Office to perform a transportation inspection and certify/sign the uniform hazardous waste manifest at the time of shipment.
d. Agree that any contract shall not be considered complete until all hazardous waste has been disposed of in accordance with Federal, State and Local laws and regulations and the terms the contract.
l2cocpc9 Text Box
APPENDIX 9
environmental controls 01-29-16.docx 2
7. Dust Control/PM10: Airborne particulates, including dust particles, from construction activities and processing and preparation of materials shall be controlled at all times, including weekends, holidays, and hours when work is not in progress. The contractor shall maintain all excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, disposal sites, borrow areas, and all other work areas free from airborne dust which would cause a hazard or nuisance.
8. Spill Notification: Any spills or releases of hazardous material or waste resulting from the contractors performance shall be reported immediately to Central Dispatch by calling *911. The contractor is responsible for all cleanup costs. The Contracting Officer may require the contractor to arrange for cleanup action by qualified contractor personnel of subcontractors. Cleanup must be to the satisfaction of the DDJC Environmental Protection Office and meet Federal, State and Local requirements.
9. Project Storage of Hazardous Materials: The contractor shall notify the COR prior to the on-site storage of any hazardous material (as defined by Title 49, Section 171.8 of the Code of Federal Regulations).
Notification shall include the quantity, location and a copy of the Material Safety Data Sheet (MSDS).
10. Refuse Disposal: The use of government dumpsters for disposal of contractor generated non-hazardous waste and refuse (i.e. wood, plastic, etc.) is prohibited. The contractor shall provide containers for disposal of non-hazardous waste and refuse generated as a result of the performance of work.
11. Archaeological Findings During Construction: There are no known archaeological remains noted at the Depot at this time. Should any skeletons, artifacts or other archaeological remains be uncovered, the contractor shall immediately stop work and contact the Contracting Officer’s Representative (COR) for further instructions.
12. Discovery of Unidentified Materials or Objects: The Tracy Site have been an active military support base since World War II. Thus, the potential exists for the discovery of hazardous materials, such as explosives, chemical (gas) weapons and toxic contaminants, during excavation and demolition operations. The following procedure is applicable:
a. Any suspect material found during construction activities shall be assumed hazardous. Excavated soils with unusual appearance or odor shall be considered suspect.
b. Site workers shall immediately secure in a safe condition any equipment being operated and leave the area of the material or object. Do not approach, examine or move the material or object.
c. The discovery shall be reported immediately to the Depot Fire Department by calling *911.
13. Environmental Management System (EMS): Contractors are to adhere to the EMS policy.
Responsible for owning their actions and performing them in an environmentally acceptable manner. Preventing pollution and complying with all applicable environmental policies, and legal regulations at Defense Distribution Depot San Joaquin. See attached copy.
environmental controls 01-29-16.docx 3
ENVIRONMENTAL POINTS OF CONTACT
NAME PROGRAM RESPONSIBILITIES
Chris Thornton 209-839-5537 chris.thornton@dla.mil
Environmental Program Manager /Supervisor
James Paslak 209-839-4081 james.paslak @dla.mil
Installation Restoration Program (IRP)
James Paslak 209-839-4081 james.paslak@dla.mil
Water Quality Program Natural and Cultural Resources Program NEPA Environmental Documentation
Ed McNair 209-839-5539 edward.mcnair@dla.mil
Hazardous Waste/Materials Management Program Toxics & Hazardous Substances Controls Program
Shannon Gutierrez 209-839-4862 shannon.gutierrez@dla.mil
Air Quality Program Pest & Pesticide Management Plan/Program Above and Underground Storage Tanks and Sumps
Robby Angus 209-839-5446 robby.angus@dla.mil
Recycling Program Coordinator
Please complete the below section to acknowledge receipt of and adherence to these rules.
Company Name/Identification: ___________________________________________________
Project # / description:___________________________________________________________________
General Contractor Representatives Name: ________________________________________
Signature & Date (Rcvd by): _____________________________________________________
Cell phone: ___________________________________________________________________
POC / COR: Name/Extension:___________________________________________________
Signature & Date (Rcvd by): ____________________________________________________
Phone Number: _______________________________________________________________ environmental controls 01-29-16.docx 4
Fiscal Year 2017 Environmental Management Data Call Solid Wst
Reporting Period: FY 2017 October 1, 2016 - September 30, 2017
Diverted (R) (Tons)
Disposed (L) (Tons)
Installation Population (P)
Diversion Rate Rx100 (R+L)
Per Capita Generation (tons per capita per year) R+L
P
Per Capita Generation (lbs per capita per year) R+L
P
Diverted (CDR) (Tons)
DLA Distribution San Joaquin, CA
Constru
DLA Location (Use Pick List if location is not listed)
Solid Waste Excluding Construction & Demolition Debris
FY 2017 DLA Envir Mgmt Data Call Pollution Prevention Page 1 of 3 l2cocpc9
Reporting Period:
DLA Distribution San Jo
DLA Location (Use Pick List if location is not listed)
Solid Waste and Construction & Demolition Debris
Disposed (CDL) (Tons)
Diversion Rate (CDRx100)
(CDR+CDL)
Overall Diversion Rate (R+CDR)x100
(R+L+CDR+CDL)
Actual Disposal
Cost (ADC)
Disposal Tipping
Fee (DTF) ($/ton) uction & Demolition Debris
FY 2017 DLA Envir Mgmt Data Call Pollution Prevention Page 2 of 3 l2cocpc9
DLA Distribution San Jo
DLA Location (Use Pick List if location is not listed) Diversion
Cost
(DC)
Gross Diversion Proceeds
(GDP) $
Potential Cost (PC)
($k)
Actual Cost (AC)
($k)
Diversion proceeds
(DP) (gross) $k
Economic Benefit ($k)
Using Tipping Fee
Economic Benefit Calculation Default Tipping Fee = $40/ton
FY 2017 DLA Envir Mgmt Data Call Pollution Prevention Page 3 of 3 l2cocpc9
Fiscal Year 2017 Environmental Management Data Call Haz Wst
Reporting Period: FY - 2017 October 1, 2016 - September 30, 2017
Remediation waste Chem demil waste PCB waste Conventional munitions for demil Universal waste
DLA Distribution San Joaquin, CA
Hazardous Waste
Category (Use Pick List)
DLA Location (Use Pick List)
HW Shipped Off-site in the U.S.
(thousands of pounds)
FY2017 DLA Envir Mgmt Data Call.xlsx Page 1 of 6 l2cocpc9
DLA Distribution San Joaquin, CA
DLA Location (Use Pick List) Other HW not included above Munitions lifecycle
HW
Other non-munitions lifecycle
HW
PCB waste Remediation waste Other HW not included above
HW treated On-site in the US (thousands of pounds)
HW shipped off-site, Overseas (thousands of pounds)
FY2017 DLA Envir Mgmt Data Call.xlsx Page 2 of 6 l2cocpc9
DLA Distribution San Joaquin, CA
DLA Location (Use Pick List)
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
List Significant EPA Waste Codes (e.g., D001, F005)
Total Other HW Off-site Disposal and On-site Treatment
FY2017 DLA Envir Mgmt Data Call.xlsx Page 3 of 6 l2cocpc9
Reporting Period: FY - 2017 October 1, 2016 - September 30, 2017
Remediation waste Chem demil waste PCB waste Conventional munitions for demil Universal waste
Hazardous Waste
Category (Use Pick List)
DLA Location (Use Pick List)
HW Shipped Off-site in the U.S.
(thousands of pounds)
FY2017 DLA Envir Mgmt Data Call.xlsx Page 4 of 6 l2cocpc9
DLA Location (Use Pick List) Other HW not included above Munitions lifecycle
HW
Other non-munitions lifecycle
HW
PCB waste Remediation waste Other HW not included above
HW treated On-site in the US (thousands of pounds)
HW shipped off-site, Overseas (thousands of pounds)
FY2017 DLA Envir Mgmt Data Call.xlsx Page 5 of 6 l2cocpc9
DLA Location (Use Pick List)
List Significant EPA Waste Codes (e.g., D001, F005)
Total Other HW Off-site Disposal and On-site Treatment
0.
0.
0.
0.
FY2017 DLA Envir Mgmt Data Call.xlsx Page 6 of 6 l2cocpc9
| Environmental Controls 01-29-16 |
| FY2016 DLA Envir Mgmt Data Call |
| Warehouse Flooring Expansion Joint Materials - Suspect Asbestos Containing Material (SACM) Laboratory Analytical Results (Warehouses 20 21 22 and 28 |