Appendix_5_-_Details.pdf

PDF 100 KB Posted

Attached to
Floor Repairs to Warehouses at DDJC Tracy, CA
Solicitation number
W9123817R0058
Issued by

About this file

Appendix 5 - Details

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3"

JOINT SEALANT

BOTTOM OF CONCRETE

3"

NEW EPOXY

2" MIN.

1. USE A SEPARATING MEDIUM TO MAINTAIN AND PROTECT JOINT. PLACE

EPOXY PATCHING MATERIAL. AFTER PATCH HAS CURED, REMOVE

SEPARATOR. CLEAN JOINT AND APPLY JOINT FILLER.

2. ALTERNATIVELY, PLACE THE PATCH ACROSS THE JOINT AND

THEN SAW TO THE FULL DEPTH OF THE PATCH. CLEAN JOINT

AND APPLY JOINT FILLER.

NEW EPOXY

JOINT FILLER

1/4" TO 3/8"

FILLER FLUSH

WITH SURFACE

EXISTING CONCRETE

l2cocpc9 Text Box

APPENDIX 5

File details come from the government source that posted it. Updated .