A2.1_W9123817R0058.pdf

PDF 446 KB Posted

Attached to
Floor Repairs to Warehouses at DDJC Tracy, CA
Solicitation number
W9123817R0058
Issued by

About this file

SF 1442, Warehouse Floor Repairs, DDJC Tracy

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Warehouse Floor Repairs, DDJC Tracy. See Section J for a List of Attachments.

This acquisition is restricted to Service-Disabled Veteran-Ow ned Small Businesses. Note that FAR 52.219-14(c)(4) Limitations on Subcontracting, Paragraph governs this acquisition.

NAICS 238110, Poured Concrete Foundation and Structure Contractors. SIC 1771 Concrete Work.

Construction Magnitude IAW FAR 36.204: Betw een $ 1,00,000.00 and $ 5,000,000.00.

See Section L for Site Visit details.

The Contracting Point of Contact for questions and proposal submittals is Christopher.L.Toso@usace.army.mil.

CHRISTOPHER L TOSO 916-557-7857

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

11-Aug-2017

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________240 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________11 Sep 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

09:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9123817R0058 121

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Floor Repairs at Warehouse 15

FFP

Reference the attached Statement of Work.

FOB: Destination

NET AMT

0002 1 Job Floor Repairs at Warehouse 17

FFP

Reference the attached SOW.

0003 1 Job Floor Repairs at Warehouse 18

FFP

0004 1 Job Floor Repairs at Warehouse 19

FFP

0005 1 Job Floor Repairs at Warehouse 20

FFP

0006 1 Job Floor Repairs at Warehouse 21

FFP

0007 1 Job Floor Repairs at Warehouse 22

FFP

0008 1 Job Floor Repairs at Warehouse 28

FFP

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed-Priced contract resulting from this solicitation.

(End of provision)

Section C - Descriptions and Specifications

STATEMENT OF WORK

Repair Floors at Warehouses 15, 17, 18, 19, 20, 21, 22 & 28 Defense Logistics Agency (DLA), Defense Distribution Depot

San Joaquin California (DDJC)

STATEMENT OF WORK

1 Aug 2017

SCOPE

The work involved in this contract is to repair concrete floors in Warehouses 15, 17, 18, 19, 20, 21, 22 & 28. Repairs include concrete grinding and saw cutting, remove/replace cracked concrete flooring; re-nosing damaged floor control joints; removal and replacement of damaged joint sealant at construction joints and at expansion joints, corner repair and crack repair, remove and replace damage epoxy floor coating (see Appendix 1 – WH 15 Drawings; Appendix 2 – WH 17 Drawings; Appendix 3 – WH 18 Drawings; Appendix 4 – WH 19 Drawings; Appendix 5 – Details; Appendix 6 – WH 20, 21, 22 & 28 Drawings and Appendix 11 – Division 1 Specifications for clarification and requirements of the above referenced repairs). Contractor shall provide all labor, materials, equipment, supplies and transportation to complete the work described herein.

1. INTERIOR FLOOR REPAIR WORK

1.1 Concrete Grinding:

Concrete grinding shall be done in a way such that the vertical elevation difference shall be less than ¼” in 5’ and ½” in 10’. Areas to grind shall follow the centerline of ridges and/or along the control joints in the general vicinity of those areas identified and listed in the drawings.

1.2 Concrete floor replacement:

Remove and replace cracked concrete floor as specified in the drawings. Saw cut, remove existing approximate 6” thick concrete floor and 8” of existing base/subgrade material. These materials shall be hauled off and disposed of off base. Re-compact existing subgrade, 6” below finish subgrade, place 6” new aggregate base and 8” new concrete slab. Aggregate base shall be compacted to 95% compaction. New concrete slab shall be reinforced with #5 rebar at 12” O.C.E.W. Concrete shall have 4,000 psi compressive strength at 28 days. Smooth 1” x 16” dowels shall be placed at 12” O.C.

(with 8” embedment) at construction joints between new and existing concrete slab.

Reestablish construction and contraction joints per Detail 2 sheet A-501 in Appendix 5 - Details and in Appendix 6 – WH 20, 21, 22 & 28 Drawings. Joint spacing shall not exceed L/W=1.25. Construction joint and contraction joint shall be sealed with

Metzger/McGuire MM-80 semi-rigid joint sealant or equal. Expansion joint along perimeter footing shall be reestablished with filler material and joint sealant. Filler materials shall be preformed conforming to ASTM D 1751 or ASTM D 1752 and joint sealant shall be preformed polychloroprene elastomeric type conforming to ASTM D 2628. See Appendix 8 – Supplemental Data Sheets for joint materials. Equal joint sealant products shall conform to salient characteristics described in Appendix 7 – Salient Characteristics of Metzger McGuire Products.

1.3 Re-nose damaged joints:

Re-nose damaged joints as specified in the drawings. Damaged joints shall be saw cut 3” on each side of joint to the depth of 2” as shown on Detail 1 sheet A-501 in Appendix 5 - Details. Carefully remove concrete within the saw cut area, clean and remove any loose material before installing new material. Repair material shall be Metzger/McGuire Armor-Hard concrete repair epoxy, or equal. Finish surface of repair joint shall be level to finish surface of adjacent concrete. After repair material is cured saw cut at the midpoint to reestablish the control joint per Detail 1 sheet A-501 in Appendix 5 – Details.

New control joint shall be filled with Metzger/McGuire Spal-Pro 2000 joint sealant, or equal. See Appendix 8 – Supplemental Data Sheets for joint materials. Equal joint sealant products shall conform to salient characteristics described in Appendix 7 – Salient Characteristics of Metzger McGuire Products.

1.4 Grind, remove and replace joint sealant:

Remove all damaged joint sealant and replace with new Government approved joint sealant. Joint sealant materials shall be preformed polychloroprene elastomeric type conform to ASTM D 2628. Surface of joint material and concrete repairs shall be flush with existing surface on both sides of joint. The Contractor shall grind concrete slab, remove and replace joint sealant as identified and listed in the drawings. For joints 1” or less new joint sealant shall be Metzger/McGuire MM-80 or equal. For joints greater than 1-1/4” new joint sealant shall be Metzger/McGuire MM-80 Silica-Modified or equal. The joint shall be installed per manufacturer’s recommendations. For joints greater than 1- 1/4”, see last page of Appendix 8 – Supplemental Data Sheets for joint materials. Equal joint sealant products shall conform to salient characteristics described in Appendix 7 – Salient Characteristics of Metzger McGuire Products.

1.5 Repair expansion joint at wall opening:

Remove all damaged expansion joint sealant and replace with new Government approved joint sealant as specified in the drawings. Expansion joint sealant materials shall be preformed polychloroprene elastomeric type conform to ASTM D 2628.

Remove any spalled concrete and repair with Metzger/McGuire Armor-Hard concrete repair epoxy or equal. Surface of joint material and concrete repairs shall be flush with existing surface on both sides of joint. See Appendix 8 – Supplemental Data Sheets for joint materials. Equal concrete repair epoxy products shall conform to salient characteristics described in Appendix 7 – Salient Characteristics of Metzger McGuire Products.

1.6 Corner Repair:

The Contractor shall provide corner repair at the following locations at the areas identified and listed in the drawings. The Contractor shall saw cut minimum 2” depth and 1” away from corner cracks; remove damaged concrete, install new concrete, then re-establish new joints to match existing.

1.7 Crack Repair:

The Contractor shall provide crack repair as identified and listed in the drawings. The Contractor shall rout and clean the cracks then fill crack with epoxy injection.

1.8 Remove and replace damaged epoxy floor coating:

Damaged and/or delaminated floor coating along the joint shall be removed to bare concrete. Prepare and clean floor surface per coating manufacturer. Recoat the floor with in-kind epoxy coating. See Appendix 6 - WH 20, 21, 22 & 28 Drawings.

2.0 APPLICABLE CODES AND STANDARDS

2.1 The Contractor shall conduct work according to the requirements specified in the current Unified Facilities Guide Specifications located at:

http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs and OSHA 29 CFR 1910, Army Corps of Engineers EM Regulation 385-1-1 (Safety); this SOW, all applicable local, state, and federal standards.

2.2 All work shall be in accordance with the latest editions of the following codes and standards:

a. UFC 3-250-08FA Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements (2004)

b. UFC 3-320-06A Concrete Floor Slabs on Grade Subjected to Heavy Loads (2005)

c. UFGS Specifications:

c1. UFGS 03 30 00 Cast-In-Place Concrete (2014) c2. UFGS 07 92 00 Joint Sealants (2016) c3. UFGS 32 13 73 Compression Joint Sealants for Concrete Pavements (2008)

3.0 GENERAL REQUIREMENTS

3.1 The Contractor shall be very careful to not cut or cross the existing wire guide when doing work such as saw cutting, concrete replacement, re-nosing and joint replacement. See Appendix 1 If the wire guide is cut, the Contractor shall repair the cut wire guide at no additional cost to the Government.

3.2 The Contractor shall coordinate and schedule work with COR prior to any work.

3.3 Any power outage required for electrical work shall require a three week notice and shall be done during the weekend, unless otherwise approved.

3.4 The job site shall be left in a clean and orderly condition during construction, and all construction debris and excess material shall be removed upon completion of the job. The Contractor shall not use Government trash cans, dumpsters, or other waste receptacles.

3.5 All work shall comply with the specifications of the basic contract including the Statement of Work.

3.6 Construction shall be in compliance with all applicable local, State and Federal standards.

3.7 The Contractor is subject to all Defense Distribution Depot San Joaquin health and safety regulations and DLA security requirements.

4.0 ENVIRONMENTAL COMPLIANCE

4.1 The Contractor shall comply with all Federal, State, and Local regulations including but not limited to the NEPA and DDJC General Environmental Controls requirements, as well as DLA and Host installation rules and policies regarding the use, storage, transport and disposal of hazardous materials and wastes. See Appendix 9 – Environmental Requirements and Appendix 10 – Environmental Checklist.

4.2 Hazardous work processes and hazardous materials utilized or generated in the performance of this contract shall be controlled and disposed of by the Contractor in a manner that is safe IAW the appropriate local, State and US Government laws and directives established for the control of those processes and materials.

4.3 The Contractor shall provide for clean-up of all hazardous and non-hazardous spills when they may occur in, around, or as a result of the Contractor’s operation. The Contractor shall also provide for transportation and disposal of all hazardous and non-hazardous waste products generated in the performance of this contract off of the Government’s facilities. The Contractor shall immediately notify the COR of any hazardous waste spills.

5.0 QUALITY CONTROL AND INSPECTIONS

Provide a Safety oversight team that includes a minimum of one person to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be at the work site at all times to implement and administer the Contractor's safety program and Government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled, Site Safety and Health Officer (SSHO), and all associated sub-paragraphs. The SSHO shall meet the requirements of EM 385-1-1 section 1 and shall ensure that the OSHA requirements of 29 CFR 1926.16, Rules of Construction shall be met for the project.

6.0 SUBMITTALS

Submittals are required for all materials to be utilized and/or installed and shall be in compliance with the specifications of the contract. All submittals shall be approved prior to commencement of work. Submittals shall include but are not limited to the following:

a. Task specific: Quality Control Plan, Hazard Analysis, Safety/Health Plan, environmental plan and Construction Schedule.

b. FY 2016 Environmental Management Data Call for Solid Waste and Hazardous

Waste.

c. As-built drawings: 1 set EA: D size and half size, and AutoCAD 2014 files.

6.1 Award Documents

The Contractor shall reproduce four hard copies, of all 8.5 x 11 specifications and miscellaneous contract documents from the award CD (Government will provide after award). On the drawing reproduction, the Contractor shall supply 4 (EA) half size (11x17) sets of all drawings. 6 CDs shall be created from the Award CD and shall also be included in the package. These documents and electronic files shall be delivered to the Sacramento Resident Office within 10 days after award of the contract, to the resident engineer’s address on the award documents.

7.0 PROJECT SCHEDULE AND TIME CONSTRAINTS

All work shall be completed within 240 calendar days after the contract award/Notice to Proceed (NTP) of the contract. The time stated for completion includes final clean-up of the premises. (FAR 52.211-10, Commencement, Prosecution, and Completion of Work). All work shall be accomplished during normal work hours, Monday through Friday, 0700 to 1530.

8.0 PRECONSTRUCTION MEETING

Prior to the start of work, a meeting will be held with the Contractor, US Army Corps of Engineers (USACE) Contracting Officer and DLA Installation Support Project Engineer to discuss matters of mutual interest concerning the general conditions, work schedule, phasing and coordination, security, safety, permits, and other matters pertinent to work accomplishments.

9.0 SECURITY REQUIREMENTS

9.1 All Contractors, including subs, shall complete the online Force Protection Training (http://jko.jten.mil/courses/atl1/launch.html) and provide certificates of completion to the Contracting Officer Representative (COR). All training requirements shall be completed before work is scheduled to start.

9.2 Contractor and subcontractor personnel or any representative of the Contractor entering DLA Defense Distribution San Joaquin to perform contract work shall abide by all security regulations and shall be subject to security checks. Contractor and subcontractor personnel and property are subject to search upon entry and while within the installation and any contraband/banned items are subject to seizure.

9.3 Contractor personnel shall behave in a professional and courteous manner at all times. The Contractor shall remove any individual from the site whose continued presence or employment on this contract is deemed by the COR to be contrary to the public interest, deemed to adversely affect health, morale, welfare, or good order and discipline on the installation, or inconsistent with the best interest of national security. In accordance with 18 USC 1382, the Installation Commander has authority to bar any individual from the installation. Removal of Contractor personnel from the installation shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services required by this SOW.

9.4 No Contractor personnel or any representative of the Contractor will be admitted to the site of work without first furnishing satisfactory proof of United States citizenship, or, if an alien, legal residence within the United States.

9.5 The Contractor shall ensure the physical security of all Government property furnished for the performance of this contract. This includes assurance that accountable property inventory utilized in the performance of this contract is secured and protected against theft or sabotage or other acts constituting illegal destruction. The Government bears no responsibility for damage to the Contractor’s supplies, materials, equipment, or property, or to any personal belongings of the Contractor’s or subcontractor’s employees that may be damaged or destroyed by fire, theft, accident or other incident.

9.6 Contractor’s Badge Requirements

9.6.1 The Prime Contractor shall submit a list of all prime and subcontractor employees, including any other personnel required to perform work on the installation, during the contract performance period no less than 7 days prior to entry and initiation of work on Tracy Facilities. The list will include:

9.6.1.1 Full Legal Name (with suffix if applicable)

9.6.1.2 Driver’s License Number and State of Issue, or State Issued ID

9.6.1.3 “A” Number on the Resident Alien Card (must carry card and/or work permit)

9.6.2 Badges will be generated at the Security Operations Pass & ID Office located in Building 29A adjacent to the installation main gate at the corner of Valpico and Chrisman road. If personnel are added or changed during the contract performance period, a revised list shall be submitted 3 working days prior to any new employees’ arrival for work.

9.6.3 Badges will be issued for the contract performance period not to exceed 179 day increments. A period check will be completed by Security on the status of badges. On projects longer than 180 days, the COR will submit a request to Pass and ID and request new badges to ensure contract personnel are vetted semi-annually.

9.6.4 The Prime Contractor shall be required to escort suppliers and vendors to the project site. The Contractor shall provide notification no less than 3 working days prior to arrival.

9.6.5 The Prime Contractor shall ensure that all access control requirements are adhered to per the DLA Defense Distribution Depot San Joaquin Physical Security Plan.

Any questions or concerns will be routed through the COR to the Security Services Branch for clarification.

9.6.6 Any additional requirements from Physical Security and Emergency Installation Management will be addressed during the pre-construction meeting conducted by the

COR.

10.0 AUTHORITIES

No person other than the USACE Contracting Officer has authority to make any changes to this contract. Any contractual change must be authorized by the USACE Contracting Officer and presented to the Contractor in an official, signed modification.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 240 dys. ANP 1 DDJC TRACY BLDG 19

FREDERICK MARTIN

25600 S CHRISMAN RD

TRACY CA 95304

916-649-0145

W91238

0002 240 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0003 240 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0004 240 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005 240 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0006 240 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0007 240 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0008 240 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calendar days after the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $ 2,138.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

Section G - Contract Administration Data

CLAUSES INCORPORATED BY REFERENCE

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

Section H - Special Contract Requirements

CHANGE AUTHROIZATIONS

Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO) or an Administrative Contracting Officer (ACO)), acting within their appointed limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, the Contractor shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting Officer shall be at the Contractor’s own risk.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)

APR 2014

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014

CLAUSE(S) 52.222-6 - DBA WAGE DETERMINATION

DAVIS BACON ACT, WAGE DETERMINATION

General Decision Number: CA170029 08/04/2017 CA29

Superseded General Decision Number: CA20160029

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 01/27/2017 3 02/17/2017 4 02/24/2017 5 03/03/2017 6 03/10/2017 7 03/31/2017 8 04/14/2017 9 04/21/2017 10 05/05/2017 11 05/12/2017 12 05/26/2017 13 06/02/2017 14 06/16/2017 15 06/30/2017 16 07/07/2017 17 07/14/2017 18 08/04/2017

ASBE0016-004 01/01/2017

AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,

MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &

TOULMNE COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA

CLARA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 28.20 8.95 Area 2......................$ 32.98 8.95

ASBE0016-008 01/01/2017

AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN

FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ

AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 62.36 22.98 Area 2......................$ 46.96 23.10

BOIL0549-001 10/01/2016

AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

AREA 2: REMAINING COUNTIES

BOILERMAKER

Area 1......................$ 43.28 37.91 Area 2......................$ 39.68 35.71

BRCA0003-001 02/01/2017

Rates Fringes

MARBLE FINISHER..................$ 31.17 14.99

BRCA0003-003 02/01/2017

Rates Fringes

MARBLE MASON.....................$ 41.77 26.76

BRCA0003-005 05/01/2017

Rates Fringes

BRICKLAYER

( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 38.45 21.22 ( 7) San Francisco, San Mateo.......................$ 42.34 25.83 ( 8) Alameda, Contra Costa, San Benito, Santa

Clara.......................$ 44.16 21.71 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 39.66 20.76

(16) Monterey, Santa Cruz...$ 39.51 23.49

BRCA0003-008 07/01/2016

Rates Fringes

TERRAZZO FINISHER................$ 34.43 16.58

TERRAZZO WORKER/SETTER...........$ 42.41 26.31

BRCA0003-011 04/21/2017

AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz

AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne

AREA 3: Fresno, Kings, Madera, Mariposa, Merced

TILE FINISHER

Area 1......................$ 27.48 15.45 Area 2......................$ 25.60 14.90 Area 3......................$ 24.42 14.53 Tile Layer Area 1......................$ 45.80 17.54 Area 2......................$ 42.67 17.46 Area 3......................$ 35.31 16.83

CARP0022-001 07/01/2017

San Francisco County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.55 28.71 Journeyman Carpenter........$ 46.40 28.71 Millwright..................$ 46.50 30.30

CARP0034-001 07/01/2017

Rates Fringes

Diver Assistant Tender, ROV

Tender/Technician...........$ 45.65 31.91 Diver standby...............$ 50.61 31.91 Diver Tender................$ 49.82 31.91 Diver wet...................$ 95.17 31.91 Manifold Operator (mixed gas)........................$ 54.82 31.91 Manifold Operator (Standby).$ 49.82 31.91

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2016

Rates Fringes

Piledriver.......................$ 44.65 31.40

CARP0035-007 07/01/2017

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties

Modular Furniture Installer Area 1

Installer I................$ 25.61 20.42 Installer II...............$ 22.18 20.42 Lead Installer.............$ 29.06 20.92 Master Installer...........$ 33.28 20.92 Area 2 Installer I................$ 22.96 20.42 Installer II...............$ 20.01 20.42 Lead Installer.............$ 25.93 20.92 Master Installer...........$ 29.56 20.92 Area 3 Installer I................$ 22.01 20.42 Installer II...............$ 19.24 20.42 Lead Installer.............$ 24.81 20.92 Master Installer...........$ 31.13 20.13

* CARP0035-008 08/01/2017

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: San Joaquin

AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties

Drywall Installers/Lathers:

Area 1......................$ 46.40 29.15 Area 2......................$ 40.52 29.15 Area 3......................$ 39.02 28.64 Area 4......................$ 39.67 29.15 Drywall Stocker/Scrapper Area 1......................$ 23.20 16.88 Area 2......................$ 20.26 16.88 Area 3......................$ 19.51 16.57 Area 4......................$ 19.84 16.88

CARP0152-001 07/01/2017

Contra Costa County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.55 28.71 Journeyman Carpenter........$ 46.40 28.71 Millwright..................$ 46.50 28.71

CARP0152-002 07/01/2017

San Joaquin County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.67 28.71 Journeyman Carpenter........$ 40.52 28.71 Millwright..................$ 43.02 30.30

CARP0152-004 07/01/2017

Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 39.32 28.71 Journeyman Carpenter........$ 39.17 28.71 Millwright..................$ 41.67 30.30

CARP0217-001 07/01/2017

San Mateo County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.55 28.71 Journeyman Carpenter........$ 46.40 28.71 Millwright..................$ 46.50 30.30

CARP0405-001 07/01/2017

Santa Clara County

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.55 28.71 Journeyman Carpenter........$ 46.40 28.71 Millwright..................$ 46.50 30.30

CARP0405-002 07/01/2017

San Benito County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.58 28.71 Journeyman Carpenter........$ 40.52 28.71 Millwright..................$ 43.02 30.30

CARP0505-001 07/01/2017

Santa Cruz County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.67 28.71 Journeyman Carpenter........$ 40.52 28.71 Millwright..................$ 43.02 30.30

CARP0605-001 07/01/2017

Monterey County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw

Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 40.67 28.71 Journeyman Carpenter........$ 40.52 28.71 Millwright..................$ 43.02 30.30

CARP0701-001 07/01/2017

Fresno and Madera Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 39.32 28.71 Journeyman Carpenter........$ 39.17 28.71 Millwright..................$ 41.67 30.30

CARP0713-001 07/01/2017

Alameda County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.55 28.71 Journeyman Carpenter........$ 46.40 28.71 Millwright..................$ 46.50 30.30

CARP1109-001 07/01/2017

Kings County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 46.40 28.71 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 39.32 28.71 Journeyman Carpenter........$ 39.17 28.71 Millwright..................$ 41.67 30.30

ELEC0006-004 12/01/2016

SAN FRANCISCO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 35.57 3%+18.05 Technician..................$ 40.50 3%+18.05

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0006-007 06/01/2017

SAN FRANCISCO COUNTY

Rates Fringes

ELECTRICIAN......................$ 66.00 3%+43.40

ELEC0100-002 03/01/2017

FRESNO, KINGS, AND MADERA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 36.50 21.65

ELEC0100-005 12/01/2016

FRESNO, KINGS, MADERA

Rates Fringes

Communications System Installer...................$ 30.64 3%+17.86

Technician..................$ 34.89 3%+17.86

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems

WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).

Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0234-001 12/25/2016

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES

Rates Fringes

ELECTRICIAN

Zone A......................$ 44.65 24.44 Zone B......................$ 49.12 24.57

Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line

Zone B: Any area outside of Zone A

ELEC0234-003 12/01/2016

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 35.07 18.60 Technician..................$ 37.94 16.30

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0302-001 02/27/2017

CONTRA COSTA COUNTY

CABLE SPLICER....................$ 54.92 26.75

ELECTRICIAN......................$ 48.51 26.56

ELEC0302-003 12/01/2016

CONTRA COSTA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 35.07 18.05 Technician..................$ 39.93 18.20

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0332-001 05/29/2017

SANTA CLARA COUNTY

Rates Fringes

CABLE SPLICER....................$ 69.60 34.318

ELECTRICIAN......................$ 60.52 34.046

FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, "Bosun's chairs," or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.

Work on structures of 60 ft. or over (as described above):

to be paid twice the straight-time rate of pay.

ELEC0332-003 12/01/2016

SANTA CLARA COUNTY

Sound & Communications Installer...................$ 35.07 18.602 Technician..................$ 39.93 18.748

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-001 06/01/2017

ALAMEDA COUNTY

Rates Fringes

CABLE SPLICER....................$ 59.91 3%+34.10

ELECTRICIAN......................$ 53.25 3%+34.10

ELEC0595-002 06/01/2017

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

CABLE SPLICER....................$ 41.40 3%+28.83

ELECTRICIAN

(1) Tunnel work.............$ 38.86 3%+28.83

(2) All other work.........$ 36.00 3%+28.83

ELEC0595-006 12/01/2016

ALAMEDA COUNTY

Sound & Communications Installer...................$ 35.07 3%+17.55 Technician..................$ 39.93 3%+17.55

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-008 12/01/2016

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

Communications System Installer...................$ 30.64 3%+17.55 Technician..................$ 34.89 3%+17.55

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0617-001 06/01/2017

SAN MATEO COUNTY

Rates Fringes

ELECTRICIAN......................$ 57.00 33.59

ELEC0617-003 12/01/2016

SAN MATEO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 35.07 18.86 Technician..

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .