Attachment 2 Wage Determination

View the file

Other files

File Type Posted
W9128-10-R-0008-0004.pdf PDF
W91238-10-R-0008 Amd 0004 Specifications_7pgs.pdf PDF
SF30 Amd 0003.pdf PDF
SF30 Amd 0002.pdf PDF
Atch 4 Spec Dwg.pdf PDF
W91238-10-R-0008-0001.pdf PDF
Amendment 0001 Specs - Drawings.pdf PDF
Pre-Proposal Sign-In Sheet.pdf PDF
10-R-0008 Pre-Proposal Sign-In Sheet.txt TXT text file
PreProposal Conference Script 2009Dec16.pdf PDF
VOL-1_FRONT END.pdf PDF
VOL-2_SPECS-DWGS_W91238-10-R-0008.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: UT080040 11/20/2009 UT40

State: Utah

Construction Type: Building

County: Tooele County in Utah.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 08/29/2008 1 09/19/2008 2 10/31/2008 3 02/27/2009 4 07/24/2009 5 11/20/2009

BRUT0001-002 01/01/2008

Rates Fringes

BRICKLAYER.......................$ 20.75 6.55

CARP0140-001 11/01/2007

Rates Fringes

CARPENTER (Form Work Only).......$ 20.19 6.74

ENGI9993-011 07/01/2008

Rates Fringes

POWER EQUIPMENT OPERATOR

(CRANES & ATTACHMENTS)

(1) Up to 35 tons...........$ 24.86 12.71

(2) Over 35 tons to 100 tons........................$ 26.15 12.71

(3) Over 100 tons...........$ 27.49 12.71

POWER EQUIPMENT OPERATOR

(1) Mechanic................$ 26.71 12.71 (2a) Grader/Blade...........$ 25.05 12.71

(3) Front End loader (over 5 cu. yds)...........$ 24.53 12.71

(4) Bulldozer, Front End Loader (2 to 5 cu. yds.)....$ 23.53 12.71

(5) Asphalt Roller, Front End Loader (Under 2 cu.

yds.), Oil Distributor......$ 22.53 12.71

(6) Screed..................$ 21.57 12.71

(7) Roller (Dirt and Grade Compaction).................$ 20.66 12.71

* IRON0027-014 07/01/2009

Rates Fringes

IRONWORKER: ORNAMENTAL,

REINFORCING, AND STRUCTURAL......$ 26.61 11.60

LABO0295-007 07/01/2008

Rates Fringes

Laborer: Mason Tender (Brick, Cement/Concrete)........$ 17.70 6.25

* PLAS0568-001 07/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 22.70 5.10

PLUM0140-010 08/01/2008

Rates Fringes

PIPEFITTER, Excluding HVAC Pipe Installation................$ 29.02 8.90

PLUM0140-011 08/01/2008

Rates Fringes

PLUMBER, Including HVAC Pipe and System Installation..........$ 29.02 8.90

SFUT0669-001 01/01/2009

Rates Fringes

SPRINKLER FITTER.................$ 28.35 14.80

SUUT2008-007 07/14/2008

Rates Fringes

CARPENTER, Including Acoustical Ceiling Installation, Drywall Hanging and Metal Stud Installation (Excludes Form Work).............$ 14.56 0.89

ELECTRICIAN......................$ 19.80 1.17

FLOOR LAYER: Vinyl Flooring (Soft Floor).....................$ 14.50 0.96

LABORER: Common or General......$ 10.25 0.00

LABORER: Landscape..............$ 10.52 0.00

LABORER: Plaster Tender.........$ 11.21 0.00

LABORER: Power Tool Operator (Hand Drill, Jackhammer and Power Saw Only)..................$ 11.70 0.00

OPERATOR: Backhoe/Excavator.....$ 15.56 3.53

PAINTER: Brush, Roller and Spray............................$ 13.86 0.00

PLASTERER........................$ 14.06 0.00

ROOFER...........................$ 13.70 1.17

SHEETMETAL WORKER................$ 14.43 0.00

TEAM0222-011 07/01/2008

Rates Fringes

TRUCK DRIVER (Articulated).......$ 20.73 8.43 TRUCK DRIVER (Flat Rack, Bulk Cement, Semi-trailers, Mud/Banding and Paint) Less than 10 tons...........$ 18.06 8.43 10 tons to less than 15 tons........................$ 18.21 8.43 15 tons and less than 20 tons........................$ 18.31 8.43 20 tons and over............$ 18.46 8.43 Pickup Truck................$ 17.99 8.43

TRUCK DRIVER (Oil Spreader)......$ 18.86 8.43 TRUCK DRIVER (Transit Mix) 0 cu. yds. to 8 cu. yds.....$ 18.39 8.43 Over 8 cu. yds. to 14 cu.

yds.........................$ 18.49 8.43 TRUCK DRIVER (Water, Fuel & Oil Tank) 0 to less than 1,200 gal....$ 18.04 8.43 1,200 gal. to less than 2,500 gal...................$ 18.16 8.43 2,500 gal. to less than 4,000 gal...................$ 18.31 8.43 4,000 gal. to less than 6,000 gal...................$ 18.61 8.43 6,000 gal. to less than 10,000 gal..................$ 18.86 8.43 10,000 gal. to less than 15,000 gal..................$ 19.11 8.43 15,000 gal. to less than 20,000 gal..................$ 18.36 8.43 20,000 gal. to less than 25,000 gal..................$ 19.71 8.43 Over 25,000 gal.............$ 19.86 8.43 TRUCK DRIVER: Dump Truck (Includes Bottom-end or side) Less than 8 cu. yds.........$ 18.16 8.43 8 cu. yds. and less than 14 cu. yds..................$ 18.31 8.43 14 cu. yds. and less than 35 cu. yds..................$ 18.46 8.43 35 cu. yds. and less than 55 cu. yds..................$ 18.66 8.43 55 cu. yds. and less than 75 cu. yds..................$ 18.86 8.43 75 cu. yds. and less than 95 cu. yds..................$ 19.06 8.43 95 cu. yds. and less than 105 cu. yds.................$ 19.26 8.43 105 cu. yds. and less than 130 cu. yds.................$ 19.38 8.43 TRUCK DRIVER: Lowboy Truck......$ 21.238 8.43

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, Project description, area practice material, etc.)

that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).

Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION