Atch 4 Spec Dwg.pdf
PDF 911 KB Posted
- Solicitation number
- W91238-10-R-0008
About this file
Amendment 0002 Attachment 4 Spec Dwgs
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DPG CLEAN POTABLE WATER SYSTEMS 1687
01010-46 91238-10-R-0008 AM-02
6.11 FACILITY ELECTRICAL SYSTEMS
6.11.1 Interior Lighting. Lighting shall comply with the recommendations of the Illumination Engineering Society of North Ameri ca (IESNA) an d as indi cated below. Lig hting sh all be efficient fluorescent or compact fluorescent type utilizing el ectronic ballasts for all area s except areas wh ere e nvironmental considerations prohibit the use of thi s t ype of lig hting.
Interior lig hting levels shall be mea sured at 2.5 feet above finish ed floo r, unless n oted otherwise.
6.11.2 Interior Powe r: Po wer shall b e p rovided fo r all rece ptacles, HVAC equipment, lightin g, electrical equipment, special power equipment, all ot her motorized equipment. Coordinate during design charrette if there is any Government Furnished Contractor Installed equipment and\or government furnished government installed equipment. 480 volt, 3 phase power is preferred for motor load s large r than 3\4 HP. For re ceptacles and oth er smaller loa ds 208\120 volt, 3 phase power shall be OK.
6.11.3 SCADA System: All 4 building s (Ditto, Carr and 2 a uxiliary buildings Well #3 and # 28) shall be equipped to handle SCADA communication. SCADA system shall be a complete package consisting of operator int erface, po wer su pply, bat tery back-up, radio tran sceiver, battery charger and antenna system. Batteries shall be gel-type with sealed construction. Power supply shall be ca pable of powe ring SCADA sy stem for mini mum 12 ho urs. Refe r to Electrical Improvem ents Location drawing E-001 for relative loca tions of variou s facilities.
This drawing is for rough reference only and is included at the end of Appendix “C”.
Input\output processing d evice (proce ssor) s hall be micro processor b ased, cap able of accepting digital and analog inputs, pulse inputs and counter inputs. Device shall be capable of producing digital and analog outputs, perform local control, monitor and data manipulation functions, tra nsmit mea sured an d\or calculated val ues a nd sen d status\al arm signal s to a master computer system. This processor shall be cap able of receiving and processing al l command signals and d ata config uration packet s per latest i ndustry stan dard p rotocol (publicly available).
All enclosures shall be rated for and sized to contain the equipment required to make the installation complete an d suitable for i ntended use. Enclosu res shall be m anufactured by Hoffman engineering or equal.
6.11.4 Interior Communications: D-B Contractor shall provide Data\Voice communication Jacks only in office space of each building. Communication systems shall comply with the United States Army Inform ation System s Engi neering Co mmand’s I3A Stand ard. T he n umber of pat ch panels shall be determined by the number of telephone outlet/jacks plus 10%.
Additional Data\voice outlets may be provided for any other functional requirements for new equipment lay-out by D-B Contractor’s design. Specific SCADA communication improvements shall be coordinated with Mr. Donovan Pomikala @ 435-831-3399 or Mr.
Michael Cassun @ 435-831-2461; and specific Fire Alarm Communication shall be coordinated with Mr. Kay Bankhead @ 435-831-2742.
Following buildings shall require following specific components and electronic equipment to successfully interact without compatibility issues.
Bldg 5330 (Administrative Office Building):
Fiber termination: Single-mode ST connectors CommScope SystiMax, 1000A panel ST/LC duplex single mode jumper 3M
Attachment 4 W91238-10-R-0008 Amendment 0002
Construct Clean Potable Water System 1687 Dugway PG, UT
Reports. Failure of the Contractor to document the AS and AF dates on the Daily Quality Control report for every in-progress or completed activity, and failure to ensure that the data contained on the Daily Quality Control reports is the sole basis for schedule updating shall result in the disapproval of the Contractor's updated schedule and the inability of the Contracting Officer to evaluate Contractor progress for payment purposes.
Updating of the percent complete and the remaining duration of any activity shall be independent functions. Disable program features which calculate one of these parameters from the other.
3.3.6 Out-of-Sequence Progress
Activities that have progressed before all preceding logic has been satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case basis subject to approval by the Contracting Officer. Propose logic corrections to eliminate all out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule. Correct out of sequence progress that continues for more than two update cycles by logic revision, as approved by the Contracting Officer.
3.3.7 Negative Lags and Start to Finish Relationships
Lag durations contained in the project schedule shall not have a negative value. Do not use Start to Finish (SF) relationships.
3.3.8 Calculation Mode
Schedule calculations shall retain the logic between predecessors and successors even when the successor activity starts and the predecessor activity has not finished. Software features that in effect sever the tie between predecessor and successor activities when the successor has started and the predecessor logic is not satisfied ("progress override") will not be allowed.
3.3.9 Milestones
The schedule must include milestone activities for each significant project event including but not limited to: milestone activities for each fast track design package released for construction; design complete;
foundation/substructure construction complete; superstructure construction complete; building dry-in or enclosure complete to allow the initiation of finish activities; permanent power complete; and building systems commissioning complete.
3.4 PROJECT SCHEDULE SUBMISSIONS
Provide the submissions as described below. The data CD, reports, and network diagrams required for each submission are contained in paragraph
SUBMISSION REQUIREMENTS.
3.4.1 Preliminary Project Schedule Submission
Submit the Preliminary Project Schedule, defining the Contractor's planned operations for the first 90 calendar days for approval within 2015 calendar days after the NTP is acknowledged. The approved Preliminary Project Schedule will be used for payment purposes not to exceed 90 calendar days after NTP. Completely cost load the Preliminary Project Schedule to balance the contract award CLINS shown on the Price Schedule. Detail it for the first 90 calendar days. It may be summary in nature for the remaining performance period. It must be early start and late finish constrained and logically tied as previously specified. The Preliminary
01 32 01.00 10 - 9 AM-02
Attachment 4
01 33 16-6 AM-02
7.2 CAUTION: A SUBMITTAL NOT READY FOR A GOV’T QUALITY
ASSURANCE REVIEW WILL WASTE GOV’T RESOURCES AND POSSIBLY DELAY
EXPECTATIONS OF THE CONTRACTOR AT THE CONTRACTOR’S EXPENSE. IT IS
EXTREMELY IMPORTANT EACH SUBMITTAL RECEIVE AN INTERNAL CONTRACTOR
QUALITY CONTROL REVIEW, INDEPENDENT TECHNICAL REVIEW, AND CORRECTIONS
BEFORE SUBMITTING TO THE GOV’T.
7.3 CAUTION: THE GOVT’S QUALITY ASSURANCE REVIEW IS
DESIGNED TO BE A SPOT CHECK --- IT WILL NOT BE A TECHNICAL REVIEW ---
ADEQUATE RESOURCES TO ACCOMPLISH ANYTHING MORE ARE NOT PROVIDED. THE
CONTRACTOR MUST PERFORM QUALITY CONTROL ON ALL SUBMITTALS. THE
CONTRACTOR IS CAUTIONED --- THE GOVERNMENT DOES NOT PLAN TO CONDUCT
TECHNICAL REVIEW OF DESIGN DELIVERABLES SUBMITTED FOR REVIEW. THE
GOVERNMENT REVIEW WILL NOT FOCUS ON THE CALCUALTIONS, CODE
COMPLIANCE, OR ANY OTHER TECHNICAL ASPECT RELATED TO CONTRACT
COMPLIANCE. NEVERTHELESS --- THE GOVERNMENT DOES RESERVE THE RIGHT
TO MAKE SUCH COMMENTS SHOULD THE SITUATION ARISE.
8 Design and Construction Schedule
8.1 The contractor shall have the freedom to establish the
design and construction schedule within contract period of service.
Both design schedule and construction schedule data shall be placed on a single overall schedule to facilitate an overall understanding of the presented logic.
8.1.1 The contractor shall include on the schedule a 15 WORKING day period for the government to conduct a quality assurance compliance review for each submittal.
8.1.2 The contractor shall include on the schedule a 2 1 calendar day period for a compliance review conference related to each submittal with the exception of the Charrette submittal. These conferences shall not be scheduled during a weekend or holiday or on a day of the week that is adjacent to a day of a weekend or holiday.
This typically will leave Tuesdays, Wednesdays, or Thursdays (except as holidays impact) for these conferences.
8.2 The Contractor shall submit one schedule; consisting of
both the design activities and the construction activities.
8.2.1 The design schedule shall be submitted within the first 20 calendar days after the date of Notice To Proceed. The design schedule shall include all activities associated with the design. On this schedule include as much clarity as can be provided of
Attachment 4 W91238-10-R-0008 Amendment 0002
L2EDMGH9
Cross-Out
AM-02
Fire Hydrant Schedule:
Avery: 8 hydrants, 0 replacements (all are functional) Carr: 10 hydrants, 10 replacements Baker: 10 hydrants, 6 replacements (B-3, 4, 5, 6, 7, 8) Ditto: 46 hydrants, 4 replacements (D-13, 14, 20, 33)
Attachment 4
C06
Clearance EL.
4475.5'
T0 OVERBOARD
DRAIN
PUMP
PS
M
TO MAIN
P
PUMP HOUSE&
WATER TOWER
WELL NO. 4
C04
6" A C
6" A C
A C
6" AC6" AC
6" AC
6" A C
C I
6" C I
6" AC
C03
C02 C01
C08
C07
8" CI
8" P
VC
C09
8" P
VC
8"
PVC
8" PVC
6" AC
C05
SIZE RES GPM
C01 C02
DRAW
10",6" 10",8"
170'
DATE OF MAIN DATE
TESTED
TYPE RATES STATUS/DESCRIPTION
NUMBERLOW HIGH LOW W. TESTED
ACTIVE-TEST WELL-POTABLE
6" A C
6" A C
T0 OVERBOARD
DRAIN
PUMP
PS
M
TO MAIN
P
WATER TOWER
Clearance EL.
PUMP HOUSE
WELL NO. 33
PV
C
6" P
VC
4480.87'
0 100 200 300 40050 Meters
0 400 800 1,200200 Feet
Map Extent
CARR WATER SYSTEM
Attachment 4
WATER TOWER
Clearance EL.
4475.5'
WELL NO. 31
PUMP HOUSE
WATER TREATMENT
PLANT
VALVE
PIT
4432.8'
TANKS
T0 OVERBOARD
DRAIN
PUMP
PS
M
TO MAIN
P
6" AC
10" AC
C I
6" CI
T0 OVERBOARD
DRAIN
TO MAIN
M
PS
PUMP
P
WELL NO. 28
PUMP HOUSE
T
O V E R B O A R D
D R A I N
M
PUMP
PS P
TO MAIN
ENGINE
PUMP HOUSE
WELL NO. 3
WATER TOWER
Clearance EL.
6"PVC6"PVC
2 MGD
A C
D01D02
D03
D04 D05
D06
D07
D08
D09D10
D17
D18
D19
D20
D21
D22
D23
D24 D25
D30
D31
D32
D33 D35 D36
D37
D38
D39
D40
D41 D42 D43 D44 D45 D46
D16
D26
D27
D28
D29
D34
A03
A06
A08
H43
H65
NUMBER
C06
C04
C03
C02
C08
C07
C09
C05
NUMBER STATUS/DESCRIPTION
PORT
STATRESDATE
C02 C03
C05
C07
C09
DEPTH TO
AQUIFER/DATE
DRAW
DOWN
DROP IN
AQUIFER (DATE) STATUS/DESCRIPTION
5 10",8"
170' 320'
INACTIVE-TEST WELL-ABANDONED,PLUGGED
DATE OF
MANUFACTURESIZE/RATE
MAIN
POWER
BACK-UPDATE
TESTED STATUS/DESCRIPTION
PUMP NO./
BLDG NO.
TYPE RATES CAL-DATEEQUIPMENT
NUMBER ALARMS STATUS/DESCRIPTIONDATE
ACTIVE-TEST WELL-POTABLE
LOCATED ON CARR FACILITY ZONE 3
6" CI
D15 D14
D13
D12
D11
A C
2"BI
B I
6"CI
C I
A C
C I
6"CI
C I
C I
6"CI
C I6 C I
C I
C I
C I
6"CI
A C
C I
6"CI
6"CI
C I
6"CI 6"CI6"CI
6"CI
C I
6"CI
"A C
6"AC
6"CI
6"AC6"AC
C I
C I
6"CI 10"AC
C I
C I 6 C I
C I
A C
C I
C I
A C
6"CI
6"CI
6"AC
6"CI
C I
6"AC
0 100 20050 Meters
0 200 400 600100 Feet
Map Extent
DITTO WATER SYSTEM
Attachment 4
| 01 10 10 - 46 |
| 01 32 01.00 10-9 |
| 01 33 16 - 6 |
| Fire Hydrant Schedule |
| Carr Water System |
| Ditto Water System |
File details come from the government source that posted it. Updated .