09-B-0001-0004 CLIN PRICING AGREEMENT.xls

XLS spreadsheet 46 KB Posted

Attached to
Maintenance Dredging along the Sacramento and San Joaquin Deep Water Ship Channels
Solicitation number
W91238-09-B-0001
Issued by

About this file

W91238-09-B-0001-0004 CLIN PRICING AGREEMENT EXCEL SPREADSHEET

View the file

Other files

File Type Posted
W91238-09-B-0001 Bid Results.doc DOC document
09-B-0001-0004 SSDWSC.pdf PDF
09-B-0001-0003 SF30.pdf PDF
09-B-0001-0003 CLIN ITEMS PRICING AGREEMENT.xls XLS spreadsheet
Pages from 09-B-0001-0002 AM-03_SF30.pdf PDF
09-B-0001-0002 AM-03_SF30_CLIN PRICING AGREEMENT.pdf PDF
W91238-09-B-0001_SF0030_AM01.pdf PDF
W91238-09-B-0001_AM01.pdf PDF
SOLICIATION_1.pdf PDF
CONTRACT_LINE_ITEMS_PRICING_AGREEMENT.xls XLS spreadsheet
ATTACHMENT_4_DRAWING_LIST.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR AND

SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (BASE YEAR)$0.00000
SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FOLLOWING FORMULA (OPTION YEAR 1)$0.00000
SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (OPTION YEAR 2)$0.00000
TOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (BASE YEAR PLUS OPTION YEARS 1 & 2)$0.00000
CONTRACT LINE ITEMS PRICING AGREEMENT
BASE YEAR – FROM DATE OF AWARD to 31 MAY 2010
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM NO.DESCRIPTIONQUANTITYUNIT OF MEASUREUNIT PRICE
0001Mobilization and Demobilization
000101Mobilization Maintenance Dredging per Task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment to the Initial Starting Location1LS
000102Incremental Mobilization Between Disposal Sites or Dredging Reaches1*0.1 Mile
000103Demobilization Maintenance Dredging per task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment from the Final Location1LS
0002Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut less than or equal to 2.0 ft
000201Pumping less than 5,000'Per Cubic Yard1*CY
000202Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
000203Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
000204Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
000205Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
000206Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
0003Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut greater than 2.0 ft
000301Pumping less than 5,000'Per Cubic Yard1*CY
0000302Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
000303Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
000304Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
000305Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
000306Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
0004Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material with a depth of cut less than or equal to 2.0 ft
000401Pumping less than 5,000'Per Cubic Yard1*CY
000402Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
000403Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
000404Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
000405Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
000406Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
0005Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material (sand) with a depth of cut greater than 2.0 ft
000501Pumping less than 5,000'Per Cubic Yard1*CY
000502Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
000503Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
000504Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
000505Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
000506Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
0006Disposal Sites
000601Prep of Class I Disposal Sites1*Ea
000602Prep of Class II Disposal Sites1*Ea
000603Disposal site return water pumping (for sites that require return water pumping) Per Hour1*hour
0007Fish Monitoring and Entrainment
000701Boat Captain per hour1*hour
000702Deck Hand per hour1*hour
000703Sr. Fisheries Biologist per hour1*hour
000704Jr. Fisheries Biologist per hour1*hour
000705GIS Technician per hour1*hour
000706Statistician per hour1*hour
000707Technical Writer per hour1*hour
000708Sample Site Construction per hour1*hour
000709Sampling Vessel per hour1*hour
SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (BASE YEAR)$0.00000
CONTRACT LINE ITEMS PRICING AGREEMENT
OPTION YEAR 1 – FROM DATE OF AWARD to 31 MAY 2011
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM NO.DESCRIPTIONQUANTITYUNIT OF MEASUREUNIT PRICE
1001Mobilization and Demobilization
100101Mobilization Maintenance Dredging per Task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment to the Initial Starting Location1LS
100102Incremental Mobilization Between Disposal Sites or Dredging Reaches1*0.1 Mile
100103Demobilization Maintenance Dredging per task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment from the Final Location1LS
1002Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut less than or equal to 2.0 ft
100201Pumping less than 5,000'Per Cubic Yard1*CY
100202Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
100203Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
100204Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
100205Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
100206Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
1003Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut greater than 2.0 ft
100301Pumping less than 5,000'Per Cubic Yard1*CY
1000302Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
100303Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
100304Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
100305Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
100306Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
1004Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material with a depth of cut less than or equal to 2.0 ft
100401Pumping less than 5,000'Per Cubic Yard1*CY
100402Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
100403Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
100404Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
100405Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
100406Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
1005Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material (sand) with a depth of cut greater than 2.0 ft
100501Pumping less than 5,000'Per Cubic Yard1*CY
100502Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
100503Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
100504Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
100505Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
100506Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
1006Disposal Sites
100601Prep of Class I Disposal Sites1*Ea
100602Prep of Class II Disposal Sites1*Ea
100603Disposal site return water pumping (for sites that require return water pumping) Per Hour1*hour
1007Fish Monitoring and Entrainment
100701Boat Captain per hour1*hour
100702Deck Hand per hour1*hour
100703Sr. Fisheries Biologist per hour1*hour
100704Jr. Fisheries Biologist per hour1*hour
100705GIS Technician per hour1*hour
100706Statistician per hour1*hour
100707Technical Writer per hour1*hour
100708Sample Site Construction per hour1*hour
100709Sampling Vessel per hour1*hour
SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FOLLOWING FORMULA (OPTION YEAR 1)$0.00000
CONTRACT LINE ITEMS PRICING AGREEMENT
OPTION YEAR 2 – FROM DATE OF AWARD to 31 MAY 2012
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM NO.DESCRIPTIONQUANTITYUNIT OF MEASUREUNIT PRICE
2001Mobilization and Demobilization
200101Mobilization Maintenance Dredging per Task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment to the Initial Starting Location1LS
200102Incremental Mobilization Between Disposal Sites or Dredging Reaches1*0.1 Mile
200103Demobilization Maintenance Dredging per task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment from the Final Location1LS
2002Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut less than or equal to 2.0 ft
200201Pumping less than 5,000'Per Cubic Yard1*CY
200202Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
200203Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
200204Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
200205Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
200206Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
2003Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut greater than 2.0 ft
200301Pumping less than 5,000'Per Cubic Yard1*CY
2000302Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
200303Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
200304Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
200305Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
200306Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
2004Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material with a depth of cut less than or equal to 2.0 ft
200401Pumping less than 5,000'Per Cubic Yard1*CY
200402Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
200403Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
200404Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
200405Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
200406Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
2005Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material (sand) with a depth of cut greater than 2.0 ft
200501Pumping less than 5,000'Per Cubic Yard1*CY
200502Pumping between 5,000'and less than 10,000'Per Cubic Yard1*CY
200503Pumping between 10,000'and less than 15,000'Per Cubic Yard1*CY
200504Pumping between 15,000'and less than 20,000'Per Cubic Yard1*CY
200505Pumping between 20,000'and less than 25,000'Per Cubic Yard1*CY
200506Pumping between 25,000'and less than 30,000'Per Cubic Yard1*CY
2006Disposal Sites
200601Prep of Class I Disposal Sites1*Ea
200602Prep of Class II Disposal Sites1*Ea
200603Disposal site return water pumping (for sites that require return water pumping) Per Hour1*hour
2007Fish Monitoring and Entrainment
200701Boat Captain per hour1*hour
200702Deck Hand per hour1*hour
200703Sr. Fisheries Biologist per hour1*hour
200704Jr. Fisheries Biologist per hour1*hour
200705GIS Technician per hour1*hour
200706Statistician per hour1*hour
200707Technical Writer per hour1*hour
200708Sample Site Construction per hour1*hour
200709Sampling Vessel per hour1*hour
SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (OPTION YEAR 2)$0.00000
TOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (BASE YEAR PLUS OPTION YEARS 1 & 2)$0.00000