09-B-0001-0003 CLIN ITEMS PRICING AGREEMENT.xls
XLS spreadsheet 47 KB Posted
- Solicitation number
- W91238-09-B-0001
About this file
W91238-09-B-0001-0003 CLIN PRICING AGREEMENT EXCEL SPREADSHEET
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91238-09-B-0001 Bid Results.doc | DOC document | |
| 09-B-0001-0004 CLIN PRICING AGREEMENT.xls | XLS spreadsheet | |
| 09-B-0001-0004 SSDWSC.pdf | ||
| 09-B-0001-0003 SF30.pdf | ||
| Pages from 09-B-0001-0002 AM-03_SF30.pdf | ||
| 09-B-0001-0002 AM-03_SF30_CLIN PRICING AGREEMENT.pdf | ||
| W91238-09-B-0001_SF0030_AM01.pdf | ||
| W91238-09-B-0001_AM01.pdf | ||
| SOLICIATION_1.pdf | ||
| CONTRACT_LINE_ITEMS_PRICING_AGREEMENT.xls | XLS spreadsheet | |
| ATTACHMENT_4_DRAWING_LIST.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YEAR AND
| CONTRACT LINE ITEMS PRICING AGREEMENT | ||||
| BASE YEAR – FROM DATE OF AWARD to 31 MAY 2010 | ||||
| CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. | ||||
| LINE ITEM NO. | DESCRIPTION | QUANTITY | UNIT OF MEASURE | UNIT PRICE |
| 0001 | Mobilization and Demobilization | |||
| 000101 | Mobilization Maintenance Dredging per Task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment to the Initial Starting Location | 1 | LS | |
| 000102 | Incremental Mobilization Between Disposal Sites or Dredging Reaches | 1* | 0.1 Mile | |
| 000103 | Demobilization Maintenance Dredging per task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment from the Final Location | 1 | LS | |
| 0002 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut less than or equal to 2.0 ft | |||
| 000201 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 000202 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 000203 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 000204 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 000205 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 000206 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 0003 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut greater than 2.0 ft | |||
| 000301 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 0000302 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 000303 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 000304 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 000305 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 000306 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 0004 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material with a depth of cut less than or equal to 2.0 ft | |||
| 000401 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 000402 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 000403 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 000404 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 000405 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 000406 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 0005 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material (sand) with a depth of cut greater than 2.0 ft | |||
| 000501 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 000502 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 000503 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 000504 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 000505 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 000506 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 0006 | Disposal Sites | |||
| 000601 | Prep of Class I Disposal Sites | 1* | CY | |
| 000602 | Prep of Class II Disposal Sites | 1* | CY | |
| 000603 | Disposal site return water pumping (for sites that require return water pumping) Per Hour | 1* | CY | |
| 0007 | Fish Monitoring and Entrainment | |||
| 000701 | Boat Captain per hour | 1* | hour | |
| 000702 | Deck Hand per hour | 1* | hour | |
| 000703 | Sr. Fisheries Biologist per hour | 1* | hour | |
| 000704 | Jr. Fisheries Biologist per hour | 1* | hour | |
| 000705 | GIS Technician per hour | 1* | hour | |
| 000706 | Statistician per hour | 1* | hour | |
| 000707 | Technical Writer per hour | 1* | hour | |
| 000708 | Sample Site Construction per hour | 1* | hour | |
| 000709 | Sampling Vessel per hour | 1* | hour | |
| SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (BASE YEAR) | $0.00 | |||
| CONTRACT LINE ITEMS PRICING AGREEMENT | ||||
| OPTION YEAR 1 – FROM DATE OF AWARD to 31 MAY 2011 | ||||
| CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. | ||||
| LINE ITEM NO. | DESCRIPTION | QUANTITY | UNIT OF MEASURE | UNIT PRICE |
| 1001 | Mobilization and Demobilization | |||
| 100101 | Mobilization Maintenance Dredging per Task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment to the Initial Starting Location | 1 | LS | |
| 100102 | Incremental Mobilization Between Disposal Sites or Dredging Reaches | 1* | 0.1 Mile | |
| 100103 | Demobilization Maintenance Dredging per task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment from the Final Location | 1 | LS | |
| 1002 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut less than or equal to 2.0 ft | |||
| 100201 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 100202 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 100203 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 100204 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 100205 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 100206 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 1003 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut greater than 2.0 ft | |||
| 100301 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 1000302 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 100303 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 100304 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 100305 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 100306 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 1004 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material with a depth of cut less than or equal to 2.0 ft | |||
| 100401 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 100402 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 100403 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 100404 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 100405 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 100406 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 1005 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material (sand) with a depth of cut greater than 2.0 ft | |||
| 100501 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 100502 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 100503 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 100504 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 100505 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 100506 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 1006 | Disposal Sites | |||
| 100601 | Prep of Class I Disposal Sites | 1* | CY | |
| 100602 | Prep of Class II Disposal Sites | 1* | CY | |
| 100603 | Disposal site return water pumping (for sites that require return water pumping) Per Hour | 1* | CY | |
| 1007 | Fish Monitoring and Entrainment | |||
| 100701 | Boat Captain per hour | 1* | hour | |
| 100702 | Deck Hand per hour | 1* | hour | |
| 100703 | Sr. Fisheries Biologist per hour | 1* | hour | |
| 100704 | Jr. Fisheries Biologist per hour | 1* | hour | |
| 100705 | GIS Technician per hour | 1* | hour | |
| 100706 | Statistician per hour | 1* | hour | |
| 100707 | Technical Writer per hour | 1* | hour | |
| 100708 | Sample Site Construction per hour | 1* | hour | |
| 100709 | Sampling Vessel per hour | 1* | hour | |
| SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FOLLOWING FORMULA (OPTION YEAR 1) | $0.00 | |||
| CONTRACT LINE ITEMS PRICING AGREEMENT | ||||
| OPTION YEAR 2 – FROM DATE OF AWARD to 31 MAY 2012 | ||||
| CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. | ||||
| LINE ITEM NO. | DESCRIPTION | QUANTITY | UNIT OF MEASURE | UNIT PRICE |
| 2001 | Mobilization and Demobilization | |||
| 200101 | Mobilization Maintenance Dredging per Task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment to the Initial Starting Location | 1 | LS | |
| 200102 | Incremental Mobilization Between Disposal Sites or Dredging Reaches | 1* | 0.1 Mile | |
| 200103 | Demobilization Maintenance Dredging per task Order that Requires to Move the Dredge, Pipes, and Necessary Material and Equipment from the Final Location | 1 | LS | |
| 2002 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut less than or equal to 2.0 ft | |||
| 200201 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 200202 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 200203 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 200204 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 200205 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 200206 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 2003 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Unclassified dredge material with a depth of cut greater than 2.0 ft | |||
| 200301 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 2000302 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 200303 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 200304 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 200305 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 200306 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 2004 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material with a depth of cut less than or equal to 2.0 ft | |||
| 200401 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 200402 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 200403 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 200404 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 200405 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 200406 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 2005 | Dredging, Disposal, and Water Quality Monitoring with a pumping/1-way transit distance and dredge material consisting of: Classified dredge material (sand) with a depth of cut greater than 2.0 ft | |||
| 200501 | Pumping less than 5,000'Per Cubic Yard | 1* | CY | |
| 200502 | Pumping between 5,000'and less than 10,000'Per Cubic Yard | 1* | CY | |
| 200503 | Pumping between 10,000'and less than 15,000'Per Cubic Yard | 1* | CY | |
| 200504 | Pumping between 15,000'and less than 20,000'Per Cubic Yard | 1* | CY | |
| 200505 | Pumping between 20,000'and less than 25,000'Per Cubic Yard | 1* | CY | |
| 200506 | Pumping between 25,000'and less than 30,000'Per Cubic Yard | 1* | CY | |
| 2006 | Disposal Sites | |||
| 200601 | Prep of Class I Disposal Sites | 1* | CY | |
| 200602 | Prep of Class II Disposal Sites | 1* | CY | |
| 200603 | Disposal site return water pumping (for sites that require return water pumping) Per Hour | 1* | CY | |
| 2007 | Fish Monitoring and Entrainment | |||
| 200701 | Boat Captain per hour | 1* | hour | |
| 200702 | Deck Hand per hour | 1* | hour | |
| 200703 | Sr. Fisheries Biologist per hour | 1* | hour | |
| 200704 | Jr. Fisheries Biologist per hour | 1* | hour | |
| 200705 | GIS Technician per hour | 1* | hour | |
| 200706 | Statistician per hour | 1* | hour | |
| 200707 | Technical Writer per hour | 1* | hour | |
| 200708 | Sample Site Construction per hour | 1* | hour | |
| 200709 | Sampling Vessel per hour | 1* | hour | |
| SUBTOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (OPTION YEAR 2) | $0.00 | |||
| TOTAL BID EVALUATION PRICE IN ACCORDANCE WITH THE FORMULA (BASE YEAR PLUS OPTION YEARS 1 & 2) | $0.00 |
File details come from the government source that posted it. Updated .