This document is a Questions and Answers record from the Sandbridge Beach Renourishment Industry Day held on 29 January 2026 from 0930 to 1130 hours. The file captures contractor inquiries and corresponding government responses regarding the upcoming beach renourishment project.

Kyle Howe from Manson Construction inquired about pipeline corridor requirements, noting that such corridors were not used in past projects and requesting consideration of eliminating them. The Norfolk District responded that it is ensuring pipeline corridors are not a permit requirement, leaving flexibility for contractor approaches. Hannah Madison from Weeks Marine requested that the government increase borrow area capacity if volumes are close to pay area capacity to ensure adequate material availability. The Norfolk District acknowledged this feedback and stated it is reviewing borrow area volumes to ensure sufficient material for beach construction. These responses indicate the government is actively considering contractor input on project design parameters and material availability prior to formal solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sandbridge Beach Renourishment Industry Day

29 January 2026

0930 – 1130

Interested Contractor Questions & Government Responses

Question/Comment 1: Kyle Howe from MANSON CONSTRUCTION:

Verify if the plan to have pipeline corridors, in the past there have not been. Can we consider not having them?

Government Response to Question 1:

The Norfolk District acknowledges the feedback. The District is ensuring the pipeline corridor is not a permit requirement.

Question/Comment 2: Hannah Madison from WEEKS MARINE:

Request that we increase borrow area capacity if it is close to the pay area capacity.

Government Response to Question 2:

The Norfolk District acknowledges the feedback. The District is reviewing the borrow area volume to ensure there is adequate material to construct the beach.