About this file

Bidder Inquiry Responses

View the file

Other files for this federal contract opportunity

Other files attached to Replace Ground Vehicle Fuel Faciltiy, newest first.
File Type Posted
Revised_IFB_Abstract_of_Offerors.pdf PDF
B.01.02_IFB_Abstract_of_Offerors_19B0008_Grd_Vehicle.pdf PDF
Bid_Inquiry_Contracting_Officers_Report.pdf PDF
Amendment_03_19B0008_Ground_Vehicle.pdf PDF
Amendment_0002_W9123619B0008_Grd_Vehicle.pdf PDF
19-B-0008_Amend_1.pdf PDF
DESC_1914_-_Drawings_-_RTA.pdf PDF
DESC_1914_-_Specifications_Volume_II_-_RTA.pdf PDF
DESC_1914_-_Specifications_Volume_I_-_RTA.pdf PDF
W91236-19-B-0008_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: DLA - Construct New TMP Gas Station at JBLE Review: W91236-19-B-0008 (00001) (sorted by CommentID ) Displaying 26 inquiries.

Id Discipline Sheet Detail Spec

8129122 Other Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Project Duration: The SF 1442 and Pages 17/18 state a project duration of 300 calendar days, while Page 3 states a project duration of 365 calendar days. Please advise if the project duration is to be 300 or 365 calendar days.

On: Aug 07 2019.

Government Response. . Posted Amendment 0002 on FBO address this question. On: Aug 14 2019

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8129133 Other Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Number/Type of Copies: The SF 1442 states (1) original and (1) copy, while Page 3 states (1) original and (1) CD copy. Please advise if the submission package should contain (1) original, (1) hard copy, and (1) CD copy, OR (1) original and (1) CD copy.

On: Aug 07 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8129162 Other Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Contractor Performance and Banking Information (Page 6): Please confirm if the following is ALL that we are to submit in order to be compliant for this section, or if we are to submit additional information/documentation (and what all that entails).

"YOUR FIRM'S NAME

a. BANK: Branch/Location Point-of-Contact Telephone Number/Fax Number/Email Address

Please contact the bank in advance so they will release the necessary information regarding average balances in your operating accounts, lines of credit and credit history."

On: Aug 07 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8129171 Other Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Period for Acceptance of Bids: Page 19 states this is to be 300 calendar days, while the SF 1442 states this is to be 90 calendar days. Please advise if the period for acceptance of bids is to be 300 or 90 calendar days.

On: Aug 07 2019.

Government Response. . Posted Amendment 0002 on FBO addressing this question On: Aug 14

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8129184 Other Solicitation

Page 1 of 5ProjNet: Logged In User

8/26/2019https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

IFB Submission Package: After reading through the solicitation, we are under the impression that a complete IFB package should consist of the following documents: 1. SF 1442; 2. Schedule of Prices; 3. Bid Bond; 4. Contractor Performance and Banking Information (highly recommended); 5. JV Agreement (if applicable); 6. Completed Reps & Certs (from the solicitation). Please confirm if this is correct. If this is not correct, please provide a list of IFB package documents for submission.

On: Aug 07 2019.

Government Response. . Posted Amendment 0002 on FBO addressing this question On: Aug 14

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8130110 Contracting Solicitation Document

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the definitive responsibility criteria section- submission requirements-Would submission of projects that are commercial fueling (Non-DOD)be accepted to satisfy this requirement?

On: Aug 07 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8131194 Other Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

CLINs 0008 & 0009 Unit Pricing (Pages 11/12): For both of these CLINs, the "0 to 100 (est.) cubic yards (CY)" unit pricing states "100 CY", while the "101 to 200 (est.) cubic yards (CY)" unit pricing does not. Please clarify if the unit price to be quoted on both of these lines is supposed to be for (1) CY, or for (100) CY.

On: Aug 08 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8131203 Other Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

CLIN 0010 Unit Pricing (Page 13): Both unit pricing lines state "Over ten (10) 5,000 gal frac tanks 11 to 25". As there is no difference between either of these descriptions, we believe this may be in error. If so, please provide us with the corrected descriptions for both unit pricing lines.

On: Aug 08 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8131213 Other Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

CLIN 0015 & TOTALS (Page 15): It appears that the CLIN "TOTALS" section has inadvertently been placed in the middle of CLIN 0015. It is our understanding that this section should follow after the "NET AMT" for CLIN 0015. If so, please provide a corrected form.

On: Aug 08 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8141226 Other n/a n/a n/a

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is there an expected period of performance? I understand the duration is 365 days, but when is this project expected to be mobilized?

On: Aug 15 2019.

Page 2 of 5ProjNet: Logged In User

Current Request Status: Request Working

Information for this report is procurement sensitive.

8142032 Other Spec Spec

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will the government be removing fuel oil from the existing tanks and cleaning the tanks prior to removal? If not, provide amounts of fuel to be disposed of.

On: Aug 15 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8142036 Other Spec Spec

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will the government be removing fuel from the existing generator and belly tank prior to removal? If not provide amounts of fuel to be disposed of.

On: Aug 15 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8142039 Other Spec Spec

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Have previous plans and specs from the original construction determined existing deadmen utilization or is there possibility of a concrete pad under the existing tanks?

On: Aug 15 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8147205 Electrical E-601 26 32 14.00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference Contract Drawing Sheet E-601. This sheet denotes a "60 kW" generator. However, Specification Section 26 32 14.00, Paragraph 1.2.1 states the service load as "100 kW". Please clarify the required kW rating of the generator.

On: Aug 19 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8147863 Structural S401 B4 03 30 00.00 10 CAST-IN-PLACE CONCRETE

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

May we saw cut the "1/2" x 2" deep formed joint filled with fuel resistant sealant" post concrete placement?

Or is it intended that this joint be truly formed, each side of the joint placed separately?

On: Aug 19 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8147903 Civil C501 A1 03 20 00.00 10

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The reinforcing described at the bollard detail is described as "#4 bars at 12" OC EW" . Is it correct to assume circular bent #4 bars will ( standard T3 bend) will be required at 12" oc vertically?

On: Aug 19 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

Page 3 of 5ProjNet: Logged In User

8147927 Structural S401 C4, D4, D5 03 30 00.00 10 CAST-IN-PLACE CONCRETE

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

May we form and pour the curb shown after pouring the slab below? Would a bonding agent be required similar to detail D4 on sheet S-501?

On: Aug 19 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8147942 Structural S404 C4 03 30 00.00 10 CAST-IN-PLACE CONCRETE

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can the 9" thick Floor of the trench be cast separately from the adjacent slab? thus allowing the trench walls to be formed and poured with the adjacent slab. If approved, would a bonding agent or water stop be required?

On: Aug 19 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8147984 Structural S501 B3 03 30 00.00 10 CAST-IN-PLACE CONCRETE

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can the floor (1'-6" thick ) of the sump be cast independently from the adjacent slab? Allowing the sump form itself to be attached thereto

On: Aug 19 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8148393 General 2.1.2.2 01 32 01.00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

RFI questions for solicitation W9123619B0008

(Attachment: Ocean_Construction_Ground_Vehicle_RFI's.pdf) On: Aug 19 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8150545 General 2.1.2.2. 2.1.2.2. 01 32 01.00 10

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

1. Section 01 32 01.00 10 Paragraph 2.1.2.2 states that if the Contractor uses any scheduling program other than P6 that the Contractor must provide the Government with 2 computers and provide training for the schedule program. Is this correct?

On: Aug 20 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8150554 General 3.7 3.7 01 32 01.00 10

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that Progress Meetings will be weekly in lieu of bi-weekly.

On: Aug 20 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8150556 General 1.5.1 1.5.1 01 35 29.13

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the site SSHO must be an Industrial Hygienist certified by the American Board of Industrial Hygiene.

Page 4 of 5ProjNet: Logged In User

On: Aug 20 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8150558 General 01 45 00.00 50

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

4. Section 01 45 00.00 50 states the QC Manager will have no other duties. Section 01 35 26.00 50 states the SSHO can't be the QC Manager. Can the Superintendent be the SSHO or will 3 people be required to fill the positions?

On: Aug 20 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8150561 General 01 45 00.15.10

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 01 45 00.15 10. Please confirm that this project will require using the RMS system.

On: Aug 20 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

8150564 General 3.1.2.B 01 45 35

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 01 45 35 Paragraph 3.1.2 b. Please confirm the Special Inspectors must attend all preparatory phase meetings related to the DFOW.

On: Aug 20 2019.

Current Request Status: Request Working

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

Page 5 of 5ProjNet: Logged In User

File details come from the government source that posted it.