Storm_Water_Repair_Final_Design(2).pdf
PDF 19 MB Posted
- Attached to
- Basewide Storm Sewer Repair Federal contract opportunity
- Solicitation number
- W91236-19-B-0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_04_DLA_Basewide_Storm_Sewer.pdf | ||
| Amend_03_DLA_Basewide_Storm_Sewer_Repair.pdf | ||
| DLA_Storm_Sewer_Site_Visit.pdf | ||
| Amend_02_W9123619B0007_DLA_Basewide_Storm_Sewer.pdf | ||
| Amend_01_19-B-0007.pdf | ||
| DSCR_STORM_SEWER_V-100_V-105.pdf | ||
| Storm_Water_Repair_Final_Design_(1).pdf | ||
| A.07.24_-_REVISED_FINAL_DESIGN_SPECIFICATIONS_as_of_20181115.pdf | ||
| Contractor_Pricing_for_Pipe_Lining_Speadsheet.xlsx | XLSX spreadsheet | |
| 19-B-0007_DLA_Storm_Drains.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1 C3
A2
B3
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-504
C
IV
IL
D
ET
AI
LS
swaffordj melissa
C1 C3
A2
A1A1 A3
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-505
C
IV
IL
D
ET
AI
LS
C1 C3
A1 A3
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-506
C
IV
IL
D
ET
AI
LS
A4 NTS
ADJUST EXSITING MONITORING WELL
2'
2'
C1
C4
A1 A3
W
Barrier Frame
Outfall Opening
1/8
Barrier Bar
Hinge Angle
Hinge Angle
2" 2"
1/4"
4"
3" or 4"
Barrier Frame
Shear Pin
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
2" Barrier Bars
(Typ)
8.16"
4" (Typ)
Barrier Frame Angle
Shear Pin Clip Angle
PIPE ACCESS BARRIER FRONT ELEVATION
9.
1"
Hinge Pin
10. All welding shall be in accordance with Std Spec 604-3.06.
SECTION A-A
SECTION B-B
2" Maximum
Standard Pipe
5/8" Diameter Steel Bolt Standard Thread
4" Minimum Embedment
During Construction of Concrete Walls
Top of Headwall
Barrier Hinge Detail 2
Anchor Bolt Detail 3
Anchor Bolt Detail 3
DETAIL 1
DETAIL 3
All shear pin angles shall fit snug and true to face. Cover with waterproof grease prior to installation of pin.
Shear pin holes in the angle shall be drilled for a tight fit of the pins.
Both ends of the shear pins shall be peened after installation.
Shear pin material shall be commercially pure aluminum wire alloy 1100, Temper 0, Federal Spec QQ-A411.
Galvanize all ferrous parts after fabrication.
Frame and hinge angles shall have the outstanding legs out.
All steel shall be in accordance with ASTM A36.
Barrier bars shall be equally spaced.
Hinge pin material shall be bolt stock and threaded on both ends so nut and lock washer are flush with the lower angle. Cover pin with waterproof grease prior to installation. Upset or damage exposed threads after installation.
AB B
(Typ) 1/8
(Typ)
(Typ)
1/8
1/8 (Typ)
(Typ)
See Detail D4
1/8 1/8
1/8
1/8 1/8
1/8 1/8
D1
D4
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-507
C
IV
IL
D
ET
AI
LS
D1
A1
B3
B2
B1
NOTE:
MANHOLE FRAME & COVER BE MARKED "STORM"
A2
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-508
C
IV
IL
D
ET
AI
LS
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-509
C
IV
IL
D
ET
AI
LS
TYPICAL OUTFALL DITCH REQUIRING
RE-GRADE AND STABILIZING
ADJUST (LOWER) STRUCTURE
TO MATCH GRADE (TYP.)
UNCOVER STRUCTURE AND REPLACE TOP WITH
CATCH BASIN FRAME AND COVER (TYP.)
REPLACE STRUCTURE TOP WITH CATCH BASIN
FRAME & COVER AND MATCH EXISTING GRADE (TYP.)
REPLACE STRUCTURE TOP WITH CATCH BASIN
FRAME & COVER AND MATCH EXISTING GRADE (TYP.)
REPLACE STRUCTURE TOP WITH CATCH BASIN
FRAME & COVER AND MATCH EXISTING GRADE (TYP.)
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-510
C
IV
IL
D
ET
AI
LS
OVERALL VIEW OF STRUCTURE 130-1
SHEET C-130, S-501
LEAKING AT LEFT SIDE OF BASIN *
STRUCTURE 130-1
SHEET C-130, S-501
UNDERSIDE OF WALKWAY, LEFT SIDE *
STRUCTURE 130-1
SHEET C-130, S-501
UNDERSIDE OF WALKWAY, RIGHT SIDE *
STRUCTURE 130-1
SHEET C-130, S-501
OVERALL VIEW OF STRUCTURE 130-1
SHEET C-130, S-501
OVERALL VIEW OF STRUCTURE 130-1
SHEET C-130, S-501
* DIRECTION IS LOOKING AT BACK OF SPILLWAY, TOWARD POND
+ DIRECTION IS LOOKING TOWARD BACK OF BASIN, AWAY FROM POND
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-511
C
IV
IL
D
ET
AI
LS
REPLACE ENDWALLS AND STEEL BARRIER
MANPROOFING OUTFALL 006A, SHEET C-118 PONDING ALONG G ROAD (TYP.)
CONSTRUCTION JOINT AT BACK OF BASIN,
NEAR TOP, LEFT +
STRUCTURE 130-1
SHEET C-130, S-501
CONSTRUCTION JOINT AT BACK OF BASIN WALL
NEAR TOP, RIGHT+
STRUCTURE 130-1
SHEET C-130, S-501
* DIRECTION IS LOOKING AT BACK OF SPILLWAY, TOWARD POND
+ DIRECTION IS LOOKING TOWARD BACK OF BASIN, AWAY FROM POND
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
CU-512
C
IV
IL
D
ET
AI
LS
D
EF
EN
SE
S
U
PP
LY
C
EN
TE
R , R
IC
H
M O
N D
ST
O
R M
S E
W
ER
R
EP
AI
R
A T
W
SP
U
SA
In c.
B en di x
R oa d S ui te
V irg in ia
B ea ch , V
A
(7
) 4
-1
S-501
ST
R
U C
TU
R
AL
D
ET
AI
L
SH
EE
T
PLAN-PARKER POND OUTFALL
NOT TO SCALE
± 22.7
± 3.2
± 0.6 ± 8.6 jason
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 61 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 62 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 63 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 64 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 65 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 66 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 67 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 68 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 69 |
| A.07.24 - 2018 0406 FINAL DESIGN - DSCR Storm Sewer (002) 70 |
File details come from the government source that posted it.