Contractor_Pricing_for_Pipe_Lining_Speadsheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Basewide Storm Sewer Repair Federal contract opportunity
Solicitation number
W91236-19-B-0007
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Contractor Pricing for Pipe Lining Spreadsheet

View the file

Other files for this federal contract opportunity

Other files attached to Basewide Storm Sewer Repair, newest first.
File Type Posted
Amend_04_DLA_Basewide_Storm_Sewer.pdf PDF
Amend_03_DLA_Basewide_Storm_Sewer_Repair.pdf PDF
Amend_02_W9123619B0007_DLA_Basewide_Storm_Sewer.pdf PDF
DLA_Storm_Sewer_Site_Visit.pdf PDF
Amend_01_19-B-0007.pdf PDF
DSCR_STORM_SEWER_V-100_V-105.pdf PDF
Storm_Water_Repair_Final_Design(2).pdf PDF
Storm_Water_Repair_Final_Design_(1).pdf PDF
A.07.24_-_REVISED_FINAL_DESIGN_SPECIFICATIONS_as_of_20181115.pdf PDF
19-B-0007_DLA_Storm_Drains.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Storm Sewer System Pipe LiningQUANTITYUNIT OF ISSUEUNIT PRICETOTAL PRICE
016 inch537LF$$
028 inch1,409LF$$
0310 inch1,233LF$$
0412 inch20,668LF$$
0515 inch15,295LF$$
0618 inch8,166LF$$
0721 inch3,533LF$$
0824 inch8,378LF$$
0930 inch12,383LF$$
1036 inch3,636LF$$
1148 inch2,431LF$$
1260 inch2,057LF$$
1372 inch72LF$$
Segmental Repair Storm Sewer Piping
1415 inch CMP20LF$$
1515 inch CPP20LF$$
1610 inch PVC16LF$$
1712 inch PVC336LF$$
1812 inch RCP254LF$$
1915 inch RCP39LF$$
2018 inch RCP8LF$$
2121 inch RCP36LF$$
Segmental Repair Storm Sewer Piping, with dewatering
2212 inch RCP40LF$$
2315 inch RCP134LF$$
2424 inch RCP241LF$$
2527 inch RCP32LF$$
Replace Storm Sewer Pipe
2612 inch RCP176LF$$
2715 inch RCP64LF$$
2818 inch RCP172LF$$
Replace Storm Sewer Pipe with dewater
2912 inch RCP285LF$$
3015 inch RCP233LF$$
3148 inch RCP269LF$$
Segmental Repair Storm Storm Sewer Piping Hazardous Material Excavation
3212 inch RCP32LF$$
3318 inch RCP191LF$$
Replace Storm Sewer Piping Hazardous Material Excavation,
3412 inch RCP18LF$$
3518 inch RCP55LF$$
Segmental Repair Storm Sewer Piping Hazardous Material Excavation,
3612 inch RCP28LF$$
Replace Storm Sewer Pipe Hazardous Material Excavation with Dewatering,
3712 inch RCP53LF$$
3818 inch RCP202LF$$
39Adjust Structure Top to Match Grade38EA$$
40Replace Structure Top with Catch Basin Frame and cover58EA$$
41Replace Manhole Frame and Cover43EA$$
42Replace Endwall27EA$$
43Replace Modified Structure In-Kind1EA$$
44Inlet Shaping3,000CF$$
45Trench Drain8LF$$
46Catch Basin5EA$$
47Double Catch Basin1EA$$
48Outlet Control Structure - Parker Pond1Job$$
49Storm Sewer Sluice Gate1Job$$
Pipe Internal Cleaning & Inspection
504- 12 inch diameter9,562LF$$
5113 - 24 inch diameter23,995LF$$
5225 - 30 inch diameter5,396LF$$
5331 - 36 inch diameter1,129LF$$
5437 - 48 inch diameter1,116LF$$
5549 - 60 inch diameter213LF$$
5661 - 72 inch diameter10LF$$
57Excessive Pipeline Cleaning - Pig Method290LF$$
58Excessive Debris Removal - Manhole8EA$$
59Excessive Debris Removal - Storm Drainage Intlet4EA$$
60Structural Repairs, Concrete Structures-Epoxy Repairs2,725LF$$
61Point Spot Repair - Brick Structure Repair2,725LF$$
62Rip Rap Stabilization575SY$$
Steel Barrier Manproofing
6310 inch3EA$$
6412 inch11EA$$
6515 inch1EA$$
6618 inch1EA$$
6724 inch1EA$$
6848 inch1EA$$
69Curb & Gutter200LF$$
70Rigid Concrete Placement400SY$$
71Ditch Grading2,630LF$$