A.07.24_-_REVISED_FINAL_DESIGN_SPECIFICATIONS_as_of_20181115.pdf
PDF 3 MB Posted
- Attached to
- Basewide Storm Sewer Repair Federal contract opportunity
- Solicitation number
- W91236-19-B-0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_04_DLA_Basewide_Storm_Sewer.pdf | ||
| Amend_03_DLA_Basewide_Storm_Sewer_Repair.pdf | ||
| Amend_02_W9123619B0007_DLA_Basewide_Storm_Sewer.pdf | ||
| DLA_Storm_Sewer_Site_Visit.pdf | ||
| Amend_01_19-B-0007.pdf | ||
| DSCR_STORM_SEWER_V-100_V-105.pdf | ||
| Storm_Water_Repair_Final_Design(2).pdf | ||
| Storm_Water_Repair_Final_Design_(1).pdf | ||
| Contractor_Pricing_for_Pipe_Lining_Speadsheet.xlsx | XLSX spreadsheet | |
| 19-B-0007_DLA_Storm_Drains.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final Corrected Submittal
Basewide Storm Sewer Rehabilitation Project
Defense Supply Center, Richmond
CONTRACT NO. W91236-14-D-0028
Specifications
Prepared by:
WSP
277 Bendix Road, Suite 300 Virginia Beach, VA 23452
April 6, 2018 Revised November 2018 swaffordj melissa
Storm Sewer Repair at DLA/DSCR Richmond W91236-14D-0028
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00.00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02.00 10 QUALITY CONTROL SYSTEM
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 02 CLOSEOUT SUBMITTALS
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION AND RECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 81 00 TRANSPORATION AND HANDLING OF HAZARDOUS MATERIAL
02 82 13.00 10 ASBESTOS ABATEMENT
DIVISION 03 – GENERAL REQUIREMENTS
03 01 32 CONCRETE REHABILITATION FOR CIVIL WORKS
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 01 19 SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 00 DRAINAGE LAYER
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 31 13 CHAIN LINK FENCE AND GATES
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 – EXTERIOR IMPROVEMENTS
33 01 30.16 TV INSPECTION OF SEWER PIPELINES
33 01 99 SLIP LINING OF EXISTING PIPING
Storm Sewer Repair at DLA/DSCR Richmond W91236-14D-0028
33 40 00 STORM DRAINAGE UTILITIES
VDOT 2016 ROAD AND BRIDGE SPECIFICATIONS
SECTION 201 MINERAL FILLER
SECTION 202 FINE AGGREGATE
SECTION 203 COARSE AGGREGATE
SECTION 205 CRUSHER RUN AGGREGATE
SECTION 208 SUBBASE AND AGGREGATE BASE MATERIAL
SECTION 210 ASPHALT MATERIAL
SECTION 211 ASPHALT CONCRETE
SECTION 234 GLASS BEADS FOR REFLECTORIZING TRAFFIC MARKINGS
SECTION 235 RETROREFLECTORS
SECTION 239 SODIUM CHLORIDE AND CALCIUM CHLORIDE
SECTION 246 PAVEMENT MARKINGS
SECTION 247 REFLECTIVE SHEETING
SECTION 308 SUBBASE COURSE
SECTION 309 AGGREGATE BASE COURSE
SECTION 310 TACK COAT
SECTION 311 PRIME COAT
SECTION 315 ASPHALT CONCRETE PLACEMENT
SECTION 605 ASPHALT CONCRETE MIX (PERMABLE PAVEMENT DESIGN)
SECTION 701 TRAFFIC SIGNS
SECTION 704 PAVEMENT MARKINGS AND MARKERS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NO. SHEET ID TITLE
1 of 76 G-001 COVER SHEET
2 of 76 G-002 INDEX OF SHEETS
3 of 76 G-003 LAYOUT SHEET
4 of 76 G-004 GENERAL NOTES
5 of 76 G-005 GENERAL NOTES
6 of 76 G-006 ENVIRONMENTAL GENERAL NOTES
7 of 76 G-007 ENVIRONMENTAL GENERAL NOTES
8 of 76 G-008 STORM SEWER REHAB SUMMARY
9 of 76 G-008A STORM SEWER REHAB SUMMARY
10 of 76 G-008B STORM SEWER REHAB SUMMARY
11 of 76 G-008C STORM SEWER REHAB SUMMARY
12 of 76 G-008D STORM SEWER REHAB SUMMARY
13 of 76 G-008E STORM SEWER REHAB SUMMARY
14 of 76 G-008F STORM SEWER REHAB SUMMARY
15 of 76 G-008G STORM SEWER REHAB SUMMARY
16 of 76 G-008H STORM SEWER REHAB SUMMARY
17 of 76 G-008J STORM SEWER REHAB SUMMARY
18 of 76 G-008K STORM SEWER REHAB SUMMARY
19 of 76 G-008L STORM SEWER REHAB SUMMARY
20 of 76 G-008M STORM SEWER REHAB SUMMARY
DRAWING NO. SHEET ID TITLE
21 of 76 G-008N STORM SEWER REHAB SUMMARY
22 of 76 G-008P STORM SEWER REHAB SUMMARY
23 of 76 G-008R STORM SEWER REHAB SUMMARY
24 of 76 G-008S STORM SEWER REHAB SUMMARY
25 of 76 V-100 EXISTING SITE PLAN KEY SHEET, LEGEND, SURVEY NOTES - OUTFALL
26 of 76 V-101 EXISTING SITE PLAN OUTFALL
27 of 76 V-102 EXISTING SITE PLAN OUTFALL
28 of 76 V-103 EXISTING SITE PLAN KEY SHEET, LEGEND, SURVEY NOTES - NATIONAL GUARD AREA
29 of 76 V-104 EXISTING SITE PLAN - NATIONAL GUARD
AREA
30 of 76 V-105 EXISTING SITE PLAN - NATIONAL GUARD
AREA
31 of 76 C-101 PLAN SHEET
32 of 76 C-102 PLAN SHEET
33 of 76 C-103 PLAN SHEET
34 of 76 C-104 PLAN SHEET
35 of 76 C-105 PLAN SHEET
36 of 76 C-106 PLAN SHEET
37 of 76 C-107 PLAN SHEET
38 of 76 C-108 PLAN SHEET
39 of 76 C-109 PLAN SHEET
40 of 76 C-110 PLAN SHEET
41 of 76 C-111 PLAN SHEET
42 of 76 C-112 PLAN SHEET
43 of 76 C-113 PLAN SHEET
44 of 76 C-114 PLAN SHEET
45 of 76 C-115 PLAN SHEET
46 of 76 C-116 PLAN SHEET
47 of 76 C-117 PLAN SHEET
48 of 76 C-118 PLAN SHEET
49 of 76 C-119 PLAN SHEET
DRAWING NO. SHEET ID TITLE
50 of 76 C-120 PLAN SHEET
51 of 76 C-121 PLAN SHEET
52 of 76 C-122 PLAN SHEET
53 of 76 C-123 PLAN SHEET
54 of 76 C-124 PLAN SHEET
55 of 76 C-125 PLAN SHEET
56 of 76 C-126 PLAN SHEET
57 of 76 C-127 PLAN SHEET
58 of 76 C-128 PLAN SHEET
59 of 76 C-129 PLAN SHEET
60 of 76 C-130 PLAN/PROFILE - POND OUTFALL
61 of 76 C-131 PLAN/PROFILE - POND OUTFALL
62 of 76 C-132 PLAN - NATIONAL GUARD AREA
63 of 76 C-133 PROFILE - NATIONAL GUARD AREA
64 of 76 CU-501 CIVIL DETAILS
65 of 76 CU-502 CIVIL DETAILS
66 of 76 CU-503 CIVIL DETAILS
67 of 76 CU-504 CIVIL DETAILS
68 of 76 CU-505 CIVIL DETAILS
69 of 76 CU-506 CIVIL DETAILS
70 of 76 CU-507 CIVIL DETAILS
71 of 76 CU-508 CIVIL DETAILS
72 of 76 CU-509 CIVIL DETAILS
73 of 76 CU-510 CIVIL DETAILS
74 of 76 CU-511 CIVIL DETAILS
75 of 76 CU-512 CIVIL DETAILS
76 of 76 S-501 STRUCTURAL PARKER POND DETAIL
-- End of Document --
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001-0072 - BASE PRICE. Price includes the following:
CLIN 0001-0072. Price for the entire work Storm Source Rehabilitation Project, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 1001-1004.
CLIN DESCRIPTION QUANTITY UNIT UNIT
PRICE
TOTAL
PRICE
0001 Base-Wide Storm Sewer Rehabilitation, Temporary Facilities, Site Preparations, Concrete Sidewalk Restoration, Borrow Placement, Landscaping, Plugging, Survey, and all work incidental of, complete, as shown in specification within this solicitation, exclusive of CLIN 0002 - CLIN 0072, and Option CLINs 1001 - 1004
1 JOB $ $
0002 Storm Sewer System Pipe Lining , 6-in diameter, complete, as shown in specification within this soilication, exclusive of CLIN 0001, CLIN 0003 - CLIN 0072, and Option CLINs 1001 - 1004
537 LF $ $
0003 Storm Sewer System Pipe Lining, 8-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0002, CLIN 0004 - CLIN 0072, and Option CLINs 1001 -
1409 LF $ $
0004 Storm Sewer System Pipe Lining, 10-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0003, CLIN 0005 - CLIN 0072, and Option CLINs 1001 -
1233 LF $ $
CLIN DESCRIPTION QUANTITY UNIT UNIT
PRICE
TOTAL
PRICE
0005 Storm Sewer System Pipe Lining, 12-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0004, CLIN 0006 - CLIN 0072, and Option CLINs 1001 -
20668 LF $ $
0006 Storm Sewer System Pipe Lining, 15-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0005, CLIN 0007 - CLIN 0072, and Option CLINs 1001 -
15295 LF $ $
0007 Storm Sewer System Pipe Lining, 18-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0006, CLIN 0008 - CLIN 0072, and Option CLINs 1001 -
8166 LF $ $
0008 Storm Sewer System Pipe Lining, 21-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0007, CLIN 0009 - CLIN 0072, and Option CLINs 1001 -
3533 LF $ $
0009 Storm Sewer System Pipe Lining, 24-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0008, CLIN 0010 - CLIN 0072, and Option CLINs 1001 -
8378 LF $ $
0010 Storm Sewer System Pipe Lining, 30-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0009, CLIN 0011 - CLIN 0072, and Option CLINs 1001 -
12383 LF $ $
0011 Storm Sewer System Pipe Lining, 36-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0010, CLIN 0012 - CLIN 0072, and Option CLINs 1001 -
3636 LF $ $
0012 Storm Sewer System Pipe Lining, 48-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0011, CLIN 0013 - CLIN 0072, and Option CLINs 1001 -
2431 LF $ $
TOTAL
PRICE
0013 Storm Sewer System Pipe Lining, 60-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0012, CLIN 0014 - CLIN 0072, and Option CLINs 1001 -
2057 LF $ $
0014 Storm Sewer System Pipe Lining, 72-in diameter, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0013, CLIN 0015 - CLIN 0072, and Option CLINs 1001 -
72 LF $ $
0015 Segmental Repair Storm Sewer Piping, 15-in CMP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0014 , CLIN 0016 - CLIN 0072, and Option CLINs 1001 - 1004
20 LF $ $
0016 Segmental Repair Storm Sewer Piping, 15-in CPP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0015, CLIN 0017 - CLIN 0072, and Option CLINs 1001 - 1004
20 LF $ $
0017 Segmental Repair Storm Sewer Piping, 10-in PVC, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0016, CLIN 0018 - CLIN 0072, and Option CLINs 1001 - 1004
16 LF $ $
0018 Segmental Repair Storm Sewer Piping, 12-in PVC, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0017, CLIN 0019 - CLIN 0072, and Option CLINs 1001 - 1004
336 LF $ $
0019 Segmental Repair Storm Sewer Piping, 12-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0018, CLIN 0020 - CLIN 0072, and Option CLINs 1001 - 1004
254 LF $ $
0020 Segmental Repair Storm Sewer Piping, 15-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0019, CLIN 0021 - CLIN 0072, and Option CLINs 1001 - 1004
39 LF $ $
0021 Segmental Repair Storm Sewer Piping, 18-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0020, CLIN 0022 - CLIN 0072, and Option CLINs 1001 - 1004
8 LF $ $
0022 Segmental Repair Storm Sewer Piping, 21-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0021, CLIN 0023 - CLIN 0072, and Option CLINs 1001 - 1004
36 LF $ $
TOTAL
PRICE
0023 Segmental Repair Storm Sewer Piping with Dewatering, 12-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0022, CLIN 0024 - CLIN 0072, and Option CLINs 1001 -
40 LF $ $
0024 Segmental Repair Storm Sewer Piping with Dewatering, 15-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0023, CLIN 0025 - CLIN 0072, and Option CLINs 1001 -
134 LF $ $
0025 Segmental Repair Storm Sewer Piping with Dewatering, 24-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0024, CLIN 0026 - CLIN 0072, and Option CLINs 1001 -
241 LF $ $
0026 Segmental Repair Storm Sewer Piping with Dewatering, 27-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0025, CLIN 0027 - CLIN 0072, and Option CLINs 1001 -
32 LF $ $
0027 Replace Storm Sewer Pipe, 12-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0026, CLIN 0028 - CLIN 0072, and Option CLINs 1001 - 1004
176 LF $ $
0028 Replace Storm Sewer Pipe, 15-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0027, CLIN 0029 - CLIN 0072, and Option CLINs 1001 - 1004
64 LF $ $
0029 Replace Storm Sewer Pipe, 18-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0028, CLIN 0030 - CLIN 0072, and Option CLINs 1001 - 1004
172 LF $ $
0030 Replace Storm Sewer Pipe with Dewatering, 12-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0029, CLIN 0031 - CLIN 0072, and Option CLINs 1001 - 1004
285 LF $ $
0031 Replace Storm Sewer Pipe with Dewatering, 15-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0030, CLIN 0032 - CLIN 0072, and Option CLINs 1001 - 1004
233 LF $ $
TOTAL
PRICE
0032 Replace Storm Sewer Pipe with Dewatering, 48-in RCP, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0031, CLIN 0033 - CLIN 0072, and Option CLINs 1001 - 1004
269 LF $ $
0033 Segmental Repair Storm Sewer Piping, 12-in RCP, Hazardous Material Excavation, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0032, CLIN 0034 - CLIN 0072, and Option CLINs 1001 - 1004
32 LF $ $
0034 Segmental Repair Storm Sewer Piping, 18-in RCP, Hazardous Material Excavation, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0033, CLIN 0035 - CLIN 0072, and Option CLINs 1001 - 1004
191 LF $ $
0035 Replace Storm Sewer Piping, 12-in RCP, Hazardous Material Excavation, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0034, CLIN 0036 - CLIN 0072, and Option CLINs 1001 -
18 LF $ $
0036 Replace Storm Sewer Piping, 18-in RCP, Hazardous Material Excavation, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0035, CLIN 0037 - CLIN 0072, and Option CLINs 1001 -
55 LF $ $
0037 Segmental Repair Storm Sewer Piping, 12-in RCP, Hazardous Material Excavation with Dewatering, as shown in specification within this solicitation, exclusive of CLIN
0001 - CLIN 0036, CLIN 0038 - CLIN 0072,
and Option CLINs 1001 - 1004
28 LF $ $
0038 Replace Storm Sewer Piping, 12-in RCP, Hazardous Material Excavation with Dewatering, as shown in specification within this solicitation, exclusive of CLIN
0001 - CLIN 0037, CLIN 0039 - CLIN 0072,
and Option CLINs 1001 - 1004
53 LF $ $
0039 Replace Storm Sewer Piping, 18-in RCP, Hazardous Material Excavation with Dewatering, as shown in specification within this solicitation, exclusive of CLIN
0001 - CLIN 0038, CLIN 0040 - CLIN 0072,
and Option CLINs 1001 - 1004
202 LF $ $
TOTAL
PRICE
0040 Adjust Structure Top to Match Grade, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0039, CLIN 0041 - CLIN 0072, and Option CLINs 1001 - 1004
38 EA $ $
0041 Replace Structure Top with Catch Basin Frame , CLIN Cover, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0040, CLIN 0042 - CLIN 0072, and Option CLINs 1001 -
58 EA $ $
0042 Replace Manhole Frame , CLIN Cover, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0041, CLIN 0043 - CLIN 0072, and Option CLINs 1001 - 1004
43 EA $ $
0043 Replace Endwall, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0042, CLIN 0044 - CLIN 0072, and Option CLINs 1001 -
27 EA $ $
0044 Replace Modified Structure In-Kind, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0043, CLIN 0045 - CLIN 0072, and Option CLINs 1001 - 1004
1 EA $ $
0045 Inlet Shaping, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0044, CLIN 0046 - CLIN 0072, and Option CLINs 1001 -
3000 CF $ $
0046 Trench Drain, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0045, CLIN 0047 - CLIN 0072, and Option CLINs 1001 -
8 LF $ $
0047 Catch Basin, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0046, CLIN 0048 - CLIN 0072, and Option CLINs 1001 -
5 EA $ $
0048 Double Catch Basin, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0047, CLIN 0049 - CLIN 0072, and Option CLINs 1001 -
1 EA $ $
0049 Outlet Control Structure - Parker Pond Outfall, complete as shown in specification within this solicitation, exclusive of CLIN
0001 - CLIN 0048, CLIN 0050 - CLIN 0072,
and Option CLINs 1001 - 1004
1 JOB $ $
TOTAL
PRICE
0050 Storm Sewer Sluice Gate, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0049, CLIN 0051 - CLIN 0072, and Option CLINs 1001 -
1 JOB $ $
0051 Pipe, Internal cleaning , CLIN inspection, 4-in to 12-in diameter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0050, CLIN 0052 - CLIN 0072, and Option CLINs 1001 -
9562 LF $ $
0052 Pipe, Internal cleaning , CLIN inspection, 13-in to 24-in diameter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0051, CLIN 0053 - CLIN 0072, and Option CLINs 1001 -
23995 LF $ $
0053 Pipe, Internal cleaning , CLIN inspection, 25-in to 30-in diameter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0052, CLIN 0054 - CLIN 0072, and Option CLINs 1001 -
5396 LF $ $
0054 Pipe, Internal cleaning , CLIN inspection, 31-in to 36-in diameter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0053, CLIN 0055 - CLIN 0072, and Option CLINs 1001 -
1129 LF $ $
0055 Pipe, Internal cleaning , CLIN inspection, 37-in to 48-in diameter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0054, CLIN 0056 - CLIN 0072, and Option CLINs 1001 -
1116 LF $ $
0056 Pipe, Internal cleaning , CLIN inspection, 49-in to 60-in diameter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0055, CLIN 0057 - CLIN 0072, and Option CLINs 1001 -
213 LF $ $
0057 Pipe, Internal cleaning , CLIN inspection, 61-in to 72-in diameter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0056, CLIN 0058 - CLIN 0072, and Option CLINs 1001 -
10 LF $ $
0058 Excessive Pipeline Cleaning - Pig Method, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0057, CLIN 0059 - CLIN 0072, and Option CLINs 1001 - 1004
290 LF $ $
TOTAL
PRICE
0059 Excessive Debris Removal - Manhole, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0058, CLIN 0060 - CLIN 0072, and Option CLINs 1001 - 1004
8 EA $ $
0060 Excessive Debris Removal - Storm Drainage Inlet, complete as shown in specification within this solicitation, exclusive of CLIN
0001 - CLIN 0059, CLIN 0061 - CLIN 0072,
and Option CLINs 1001 - 1004
4 EA $ $
0061 Structural Repairs, Concrete Structures - Epoxy Repairs, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0060, CLIN 0062 - CLIN 0072, and Option CLINs 1001 -
2725 VLF $ $
0062 Point Spot Repair - Brick Structure Repair, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0061, CLIN 0063 - CLIN 0072, and Option CLINs 1001 - 1004
2725 VLF $ $
0063 Rip Rap Stabilization, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0062, CLIN 0064 - CLIN 0072, and Option CLINs 1001 -
575 SY $ $
0064 Steel Barrier Manproofing, 10-in, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0063, CLIN 0065 - CLIN 0072, and Option CLINs 1001 - 1004
3 EA $ $
0065 Steel Barrier Manproofing, 12-in, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0064, CLIN 0066 - CLIN 0072, and Option CLINs 1001 - 1004
11 EA $ $
0066 Steel Barrier Manproofing, 15-in, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0065, CLIN 0067 - CLIN 0072, and Option CLINs 1001 - 1004
1 EA $ $
0067 Steel Barrier Manproofing, 18-in, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0066, CLIN 0068 - CLIN 0072, and Option CLINs 1001 - 1004
1 EA $ $
TOTAL
PRICE
0068 Steel Barrier Manproofing, 24-in, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0067, CLIN 0069 - CLIN 0072, and Option CLINs 1001 - 1004
1 EA $ $
0069 Steel Barrier Manproofing, 48-in, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0068, CLIN 0070 - CLIN 0072, and Option CLINs 1001 - 1004
1 EA $ $
0070 Curb & Gutter, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0069, CLIN 0071 - CLIN 0072, and Option CLINs 1001 -
200 LF $ $
0071 Rigid Concrete Placement, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0070, CLIN 0072, and Option CLINs 1001 - 1004
400 SY $ $
0072 Ditch Grading, complete as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0071 and Option CLINs 1001 - 1004
2630 LF $ $
CLIN 1001-1004 Option Item No. 1 - Price includes the following:
Price for providing all work in connection with Storm Sewer Rehabilitation Project, complete in accordance with the drawings and specifications.
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
PRICE
1001 Storm Sewer System Pipe Lining, 66-in X 66-in Box Culvert, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0072 and Option CLINs 1002 - 1004.
This option can be excercised anytime during the period of performance of the base contract
909 LF $ $
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
1002 Storm Sewer System Pipe Lining, 3.75-ft X 5.0-ft Box Culvert, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0072, and Option CLIN 1001 and Option CLINs 1003 - 1004. This option can be excercised anytime during the period of performance of the base contract
1638 LF $ $
1003 Pipe, Internal Cleaning and Inspection, 66-in X 66-in Box Culvert, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0072, and Option CLINs 1001 - 1002 and Option CLIN 1004. This option can be excercised anytime during the period of performance of the base contract
741 LF $ $
1004 Pipe, Internal Cleaning and Inspection, 3.75-ft X 5.0-ft Box Culvert, complete, as shown in specification within this solicitation, exclusive of CLIN 0001 - CLIN 0072, and Option CLINs 1001 - 1003. This option can be excercised anytime during the period of performance of the base contract
10 LF $ $
Include the price for supporting, permanent infrastructure under CLIN 0001- 0072 - BASE PRICE. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door hardware, mount-ing hardware, and power connections. Exterior supporting infrastructure in-cludes items such as exterior ductbanks, manholes, utility poles, utility connections, and power connections.
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Item(s) 0001-0072.
If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLIN 1001-1004 to the Contractor at the proposed price can be exercised anytime during the period of performance of the base contract. A firm fixed proposed price is required for CLIN 0001-0072. No provision is made for eco-nomic price adjustment.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001- 0072. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If CLIN 1001-1004 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
f. 1 Measurement Ton (MTON) = 40 cubic feet
g. History has shown that the average billable volume for a 40 ft.
container is 59.0 MTON. There is a weight restriction of 50,000 lbs.
per container, which includes tare weight of the container.
h. Bids will be accepted only from United States of America Contractors.
i. U.S. Contractor: To qualify as a U.S. Contractor, the firm (or if a joint venture, members of the joint venture) must be incorporated in the United States, and must comply with the following:
(1) The principal place of business and corporate headquarters must be in the United States.
(2) The firm must have paid corporate franchise and employment taxes in the United States for a minimum of 2 years. The firm must have filed state and federal income tax declarations for a minimum of 2 corporate years and paid any applicable taxes determined to be due as a result of such filing.
(3) The firm must employ U.S. citizens in key management positions.
j. Joint Ventures: Joint ventures will be permitted provided that members of the joint venture meet the specified requirements for either a U.S.
Contractor or a Portuguese Contractor.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Excavation Permits
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes repairs and improvements to the storm sewer system including pipelining, segmental repairs, storm sewer structure installation and repairs and incidental related work.
1.2.2 Location
The work is located at the Defense Supply Center Richmond, Virginia, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment.
1.4 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 7 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 3 days prior to starting excavation work.
1.6 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Construction Documents to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located on the installation.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
1.7 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled "Default: (Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
a. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
1.7.1 Schedule
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
DSCR 10 9 9 6 8 7 8 7 6 5 7 9
1.7.2 Records
Upon acknowledgement of the Notice to Proceed and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
1.7.3 Impacted Days
The number of actual adverse weather days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day in each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in the schedule of monthly anticipated adverse weather delays, above, the contracting officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract Clauses entitled "Default (Fixed Price Construction)".
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Government Guard Services; G Transportation of Personnel, Materials, and Equipment; G List of Contact Personnel; G
Personnel List; G
Vehicle List; G
Statement of Acknowledgement Form SF 1413; G
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The installation will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Identification Badges and Installation Access
Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer.
1.3.2 Working Hours
Regular working hours must consist of a period between 7 a.m. and 5 p.m., Monday through Friday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, unless directed otherwise.
1.3.4 Occupied Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays. Conform to procedures required paragraph WORK
OUTSIDE REGULAR HOURS.
b. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, are considered utility cutovers pursuant to the paragraph WORK OUTSIDE
REGULAR HOURS.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
1.4.1.1 Subcontractors and Personnel Contacts
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 Security Requirements Defense Supply Center Richmond (DSCR)
No employee or representative of the Contractor will be admitted to the work site unless he furnishes satisfactory proof that he is a citizen of the United States or has proper identification to work in the United States.
a. Personnel Information - All authorized non-military personnel utilizing the base are required to have in their possession at all times a Base Visitor Pass or Base Identification. This pass is issued by the DSCR Visitors Center located at the North Gate. Proof of identity is required to obtain a visitor pass or Base Identification.
The Visitors Center is open Monday through Friday except Federal holidays from 7:00 a.m. to 3:00 p.m. A minimum of 5 working days prior to start of work, the Contractor shall furnish to the Defense Supply Center Richmond (DSCR), Richmond, VA, Security Department, via the Contracting Officer, the following information for Contractor and subcontractor personnel required to enter the Station:
(1) Contract Number
(2) Beginning Date (Month, Day, Year)
(3) Ending Date (Month, Day, Year)
(4) Name of the company (The Prime Contractor and Sub Contractor)
(5) Full Name of the employee (First, Middle and Last)
(6) Address of Current (Employee's) Residence (Bldg#, Street, City, State, Zip or City and Country)
(7) Social Security Number (SS#)
(8) US Citizen (Yes / No)
(9) Gender (Male/Female)
(10) Race (American Indian or Alaska Native, Asian, Black or African American, Native Hawaiian or Other Pacific Islander, and White)
(11) Date of Birth (Month, Day, Year)
(12) Place of Birth (City, State, Country)
b. The DSCR Security Department will run a criminal history check on Contractor employees as a condition of employment. Official proof of identity or naturalization papers may be required, which will be returned once entered into the security computer system. Based on the results of the criminal history check, the Security Officer will or will not grant entry to the Station. If entry is denied, the Contractor will be immediately notified. DSCR Security may require updating or rechecking criminal history based on the duration of the contract. NOTE: DSCR Security has been denying entry to persons whose police record checks are positive.
c. Proof of Identity -Official identification can consist of copies of birth certificates, valid federal identification, valid state identification, or valid naturalization papers. Examples of official identification are valid state issued driver's license, military ID card, military dependent ID card, green card, etc. Expired identification is not valid.
d. Base Entry Passes - Contractor base entry passes will be valid for each entry aboard DSCR from 6:00 a.m. to 6:00 p.m., Monday through Friday except for Federal holidays, unless prior arrangements have been made with the Contracting Officer, and DSCR Security has been notified. The passes are the property of the base and are to be returned to Visitors Control at the North Gate upon completion of the contract or termination of employment. Replacement passes must be requested in writing and be accomplished by written authorization from the Contracting Officer. Compliance with this requirement is mandatory and certification thereof to the Contracting Officer is required prior to submitting final invoices. Failure to return badges will hold up Contractor's final payment.
e. Contractor Responsibility for Employees - The Contractor is responsible for employees under his employment. Ensure that employees are familiar with and obey station traffic, safety, and security regulations.
f. Unofficial photography, cameras, or photographs are prohibited on DSCR property. When official photographs are required, submit a written approval request containing specific justification and details to the Contracting Officer 5 days prior.
g. Firearms, Weapons, Alcoholic Beverages, Illegal Drugs, and Contraband are prohibited on DSCR property. Violators may be prosecuted. State issued/authorized concealed weapons permits are not valid on Federal (DSCR) property.
h. Motor Vehicle Operation - Ingress and egress of personnel will be subject to the DSCR security regulations.
(1) All personnel must be made aware of the base speed limits:
25 mph (unless otherwise posted)
Speed limits are enforced and violators will be ticketed. DSCR traffic violations are processed through the federal court system.
(2) Seat belts are MANDATORY.
(3) Parking is in designated areas only, between two white lines. No parking is permitted in fire lanes, on seeded areas, in reserved parking slots, or assigned handicapped parking. Any equipment or vehicle that does not fit within a standard parking space must contact the Contracting Officer to determine a designated area for parking such equipment or vehicle.
Contractor employees shall park vehicles (Commercial or Private) in areas designated by the Contracting Officer. This area may or may not necessarily be within reasonable walking distance of the construction site. The contractor shall provide transportation between the parking area and the construction site. Contractor employee parking shall not interfere with existing and established parking requirements of the Base.
(4) Traffic accidents should be reported immediately to the DSCR Emergency Dispatch by calling 911 or (804) 279-4888.
(5) All personnel entering the installation are subject to random vehicle inspections/searches at any time while on the base. The purpose of these inspections is to detect the theft of Government and private property, firearms, weapons, alcoholic beverages, illegal drugs, or contraband.
i. Commercially Owned Vehicles - All commercial Vehicles are to clearly display the authorized company name or logo on both sides of the vehicle.
ii. Privately Owned Vehicles - No Privately Owned Vehicles will be allowed within the Defense Distribution Depot, Richmond, VA (DDRV) area or any other secure/controlled industrial area located on DSCR.
iii. Rental Vehicles - The driver is to show all paper work from the rental company showing that the driver is authorized to operate the subject vehicle. Rental vehicles will not be allowed in secure/controlled industrial areas located on DSCR unless the rental vehicle clearly displays the authorized operating company name or logo on both sides of the vehicle.
i. Access to Restricted Areas - Base entry passes allow access to designated areas on the installation only. Entries into secure/controlled industrial areas are prohibited unless the contract requires it.
j. Current Information - Contractors will be responsible for keeping the vehicle and employee lists current, and for securing and returning identification cards belonging to terminated employees to the DSCR Security Department.
k. Providing Information to Subcontractors - Prime Contractors shall be responsible for ensuring that subcontractors receive security information. Failure to comply with the specified requirements will result in prime contractors and subcontractors being denied access to the construction site.
l. DSCR is not responsible for job site security. Removal of material from job-site and base are subject to security checks. Contractor is to notify DSCR security of any special measures (watchmen, alarm, etc), security concerns, security problems, or unusual activities within the job site.
1.4.1.3 Personnel Entry Approval
Failure to obtain entry approval will not affect the contract price or time of completion.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
15 CFR 772 Definition of Terms
15 CFR 773 Special Licensing Procedures
1.2 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 LIABILITY, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.
1.3 FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS
Accomplish all contract requirements of Section 02 82 13.00 10 ASBESTOS ABATEMENT, assigned to the Private Qualified Person, Designated Competent Person, directly with a first tier subcontractor.
1.4 SUPERVISION
1.4.1 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.
1.4.2 Superintendent Qualifications
The project superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
For routine projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00.00 10 QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.
1.4.3 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.5 PRECONSTRUCTION MEETING/CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule of prices or earned value report, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work must also attend.
1.6 ELECTRONIC MAIL (E-MAIL) ADDRESS
Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats.
Multiple email addresses are not allowed.
It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.
PART 2 PRODUCTS
PART 3 EXECUTION
Not Used
SECTION 01 32 01.00 10
PROJECT SCHEDULE
02/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AACE INTERNATIONAL (AACE)
AACE 29R-03 (2011) Forensic Schedule Analysis
AACE 52R-06 (2006) Time Impact Analysis - As Applied in Construction
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1-1-11 (1995) Administration -- Progress, Schedules, and Network Analysis Systems
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Project Scheduler Qualifications; G
Initial Project Schedule; G Periodic Schedule Update; G
1.3 PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 2-years experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. .
3.2 BASIS FOR PAYMENT AND COST LOADING
The schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment.
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.3.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
3.3.2 Mandatory Tasks
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.