West_Point_Facility_List.pdf
PDF 102 KB Posted
- Solicitation number
- W91236-17-R-0012
About this file
West Point Facility List
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J-1 (FACILITY LIST)
WEST POINT FACILITIES 1 2 3 4
FACILITY NAME: West Point ES (old) West Point ES (new) West Point MS West Point Gym INSTALLATION: West Point West Point West Point West Point LOCATION: 705B Barry Road, West Point ,NY 10996 705 Barrry Road, West Point, NY 10996
705 Barry Road, West Point, NY 10996
705C Barry Road, West Point, NY 10996
COUNTY: Orange County Orange County Orange County Orange County FACILITY USE: Pre-K - 4 Pre-K - 4 Grades 5 - 8 Pre-K - 4
GROSS SQUARE FOOTAGE: 59,663 95,552 73,062 14,797
KITCHEN/CAFETERIA? Heat & Serve Only Yes Yes No MULTIPURPOSE ROOM/AUDITORIUM? Yes Yes Yes Yes GYMNASIUM? No No Yes Yes
MAJOR MECHANICAL SYSTEMS: Hot water system. Heated by steam supplied by the post.
Air cooled chiller and natural gas boiiler
Hot water system. Heated by steam supplied by the post.
Roof Mounted AC.
Hot water system. Heated by steam supplied by the post.
Roof mounted AC.
PRIMARY TYPE OF CONSTRUCTION: Block and brick with flat built up roof
Block/Brick with pitched metal roof
Brick veneer with flat built up roof
Block w/ brick veneer and flat built up roof
YEAR OF CONSTRUCTION: 1962; Renovation 1985;
Addition 2005; Demo 2019
Under construction;
Completion Winter 2018
1934; Renovation/Addition 2013 2003
MAINTENANCE SECTIONS
Section C-3 (Mech) Yes Yes Yes Yes Section C-4 (DDC) Yes Yes Yes Yes Section C-5 (Plumbing) Yes Yes Yes Yes Section C-6 (Electrical) Yes Yes Yes Yes Section C-7 (Kitchen Equipment) Yes Yes Yes Yes Section C-8 (Roof Systems & Site) Yes Yes Yes Yes Section C-9 (Building Systems) Yes Yes Yes Yes Section C-10 (Fire Alarm & Suppression) Yes Yes Yes Yes Section C-11 (Playgrounds) Yes Yes Yes Yes
NOTE: The scope of the contract shall include all requisite preventative maintenance, demand maintenance, and repair services, as defined more fully in this Performance Work Statement (PWS) up to the limit of liability ($20,000) for the “Maintenance Sections” indicated above with a “yes.” In addition, the scope of the contract shall include the ability to order on demand maintenance or repair services for requirements above the limit of liability for any “Maintenance Section” indicated above with a “yes.” Also, the contract shall include the ability to order on demand maintenance or repair services for requirements for any amount for those “Maintenance Sections” indicated above by a “no” or to add Sections in their entirety, or portions thereof, for requisite preventive maintenance. Those on demand requirements or “Maintenance Sections” not included in the initial solicitation shall be added by way of bilateral task order or modification.
File details come from the government source that posted it. Updated .