ACPh1RTAPlansVol120171109_-_Part_12_of_17.pdf
PDF 10 MB Posted
- Attached to
- Aircraft Apron and Airfield Site Improvements
- Solicitation number
- W9123617R0001
About this file
AC_Ph1_RTA_Plans_Vol1_2017_11_09: Due to large files of Plans Volume 1, a total of 17 parts will be attached for Plans Volume 1: 12 of 17
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
J
L Y
P R
O J E
C T
N
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
M E
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG516
F C
D P
C
G
NOTES:
1. ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR AN EXTENDED PERIOD OF TIME SHALL BE SEEDED WITH FAST
GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING. SELECTION OF THE SEED MIXTURE WILL
DEPEND ON THE TIME OF YEAR IT IS APPLIED ACCORDING TO TABLE 3.31-C. SEEDING MADE IN FALL FOR WINTER COVER
AND DURING HOT AND DRY SUMMER MONTHS SHALL BE MULCHED ACCORDING TO STD. & SPEC. 3.35.
2. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING
FINISH GRADING. SEEDING SHALL BE DONE ACCORDING TO TABLE 3.32-D.
3. EROSION CONTROL BLANKETS WILL BE INSTALLED OVER FILL SLOPES WHICH HAVE BEEN BROUGHT TO FINAL GRADE AND
HAVE BEEN SEEDED TO PROTECT THE SLOPES FROM RILL AND GULLY EROSION AND TO ALLOW SEED TO GERMINATE
PROPERLY. MULCH WILL BE USED ON RELATIVELY FLAT AREAS.
4. IN ALL SEEDING OPERATIONS, SEED, FERTILIZER AND LIME WILL BE APPLIED PRIOR TO MULCHING. LIME REQUIREMENTS
FOR TEMPORARY SEEDING ACCORDING TO TABLE 3.31-A.
E R
O S
I O
N
A
D
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
NOT TO SCALE
VEGETATIVE CONTROL MEASURES
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG517
F C
D P
C
G
SAND FILTER (VDEQ DESIGN SPECIFICATION NO. 12)
INSPECTION AND MAINTENANCE OF PERMANENT STORMWATER MANAGEMENT BMPS
SECTION 9VAC25-870-112 OF THE REGULATIONS SPECIFIES THE CIRCUMSTANCES UNDER WHICH A MAINTENANCE
AGREEMENT MUST BE EXECUTED BETWEEN THE OWNER AND THE LOCAL PROGRAM. THIS SECTION SETS FORTH
INSPECTION REQUIREMENTS, COMPLIANCE PROCEDURES IF MAINTENANCE IS NEGLECTED, NOTIFICATION OF THE LOCAL
PROGRAM UPON TRANSFER OF OWNERSHIP, AND RIGHT-OF-ENTRY FOR LOCAL PROGRAM PERSONNEL.
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
PERSON RESPONSIBLE FOR MAINTENANCE INSPECTION AND MAINTENANCE OF BMPS:
MS. PANDORA HOWELL
CHIEF, PORTFOLIO OPTIMIZATION ELEMENT
pandora.m.howell.civ@mail.mil
(MILITARY INSTALLATION UNNAMED AT THE REQUEST OF THE PROJECT SPONSOR)
MAINTENANCE INSPECTIONS
REGULAR INSPECTIONS ARE CRITICAL TO SCHEDULE SEDIMENT REMOVAL OPERATIONS, REPLACE FILTER MEDIA, AND RELIEVE
ANY SURFACE CLOGGING. FREQUENT INSPECTIONS ARE ESPECIALLY NEEDED FOR UNDERGROUND AND PERIMETER FILTERS
SINCE AN ORGANIC MAT CAN QUICKLY CLOG THE FILTER SURFACE. DEPENDING ON THE LEVEL OF TRAFFIC OR THE
PARTICULAR LAND USE, A FILTER SYSTEM MAY BECOME CLOGGED WITHIN A FEW MONTHS OF NORMAL RAINFALL. FREQUENT
MAINTENANCE CAN QUICKLY ESTABLISH A ROUTINE FREQUENCY ACCLIMATED TO THE LAND USE. MAINTENANCE INSPECTIONS
SHOULD BE CONDUCTED WITHIN 24 HOURS FOLLOWING A STORM THAT EXCEEDS 1/2 INCH OF RAINFALL IN ORDER TO
EVALUATE THE CONDITION AND PERFORMANCE OF THE FILTERING PRACTICE, INCLUDING CHECKING FOR THE FOLLOWING:
· CHECK TO SEE IF SEDIMENT ACCUMULATION IN THE SEDIMENTATION CHAMBER HAS EXCEEDED 6 INCHES. IF SO, SCHEDULE
A CLEANOUT.
· CHECK TO SEE IF INLETS AND FLOW SPLITTERS ARE CLEAR OF DEBRIS AND ARE OPERATING PROPERLY.
· CHECK THE DRY SEDIMENT CHAMBER AND SAND FILTER BED FOR ANY EVIDENCE OF STANDING WATER OR PONDING MORE
THAN 48 HOURS AFTER A STORM, AND TAKE NECESSARY CORRECTIVE ACTION TO RESTORE PERMEABILITY.
· DIG A SMALL TEST PIT IN THE SAND FILTER BED TO DETERMINE WHETHER THE FIRST 3 INCHES OF SAND ARE VISIBLY
DISCOLORED AND NEED REPLACEMENT.
· INSPECT WHETHER THE CONTRIBUTING DRAINAGE AREA TO THE FILTER IS STABLE AND NOT A SOURCE OF SEDIMENT.
· CHECK WHETHER TURF ON THE FILTER BED AND BUFFER IS MORE THAN 12 INCHES HIGH, AND SCHEDULE NECESSARY
MOWING OPERATIONS.
· CHECK THE INTEGRITY OF OBSERVATION WELLS AND CLEANOUT PIPES.
· CHECK CONCRETE STRUCTURES AND OUTLETS FOR ANY EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION, ETC.
· ENSURE THAT THE FILTER BED IS LEVEL AND REMOVE TRASH AND DEBRIS FROM THE FILTER BED. SAND OR GRAVEL COVERS
SHOULD BE RAKED TO A DEPTH OF 3 INCHES. FILTERS WITH A TURF COVER SHOULD HAVE 95% VEGETATIVE COVER.
THE RESULTS OF THE INSPECTION WILL THEN DETERMINE THE LEVEL OF MAINTENANCE REQUIRED (ROUTINE OR MAJOR - SEE
TABLE 12.5) EXAMPLE MAINTENANCE INSPECTION CHECKLISTS FOR FILTERING PRACTICES CAN BE ACCESSED IN APPENDIX C
OF CHAPTER 9 OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK (2010)
ROUTINE MAINTENANCE TASKS
A CLEANUP SHOULD BE SCHEDULED AT LEAST ONCE A YEAR TO REMOVE TRASH AND FLOATABLES THAT ACCUMULATE IN THE
PRETREATMENT CELLS AND FILTER BED. SEDIMENT CLEANOUTS IN THE DRY AND WET SEDIMENTATION CHAMBERS SHOULD BE
PERFORMED AS NEEDED IN ORDER TO MAINTAIN THE FUNCTION AND PERFORMANCE OF THE FILTER. IF THE FILTER TREATS
RUNOFF FROM A STORMWATER HOTSPOT, CREWS MAY NEED TO TEST THE FILTER BED MEDIA BEFORE DISPOSING OF THE
MEDIA AND TRAPPED POLLUTANTS. TESTING IS NOT NEEDED IF THE FILTER DOES NOT RECEIVE RUNOFF FROM A DESIGNATED
STORMWATER HOTSPOT, IN WHICH CASE THE MEDIA CAN BE SAFELY DISPOSED BY EITHER LAND APPLICATION OR LAND
FILLING.
VEGETATED FILTER STRIP (VDEQ DESIGN SPECIFICATION NO. 2)
MAINTENANCE INSPECTIONS
ANNUAL INSPECTIONS ARE USED TO TRIGGER MAINTENANCE OPERATIONS SUCH AS SEDIMENT REMOVAL, SPOT
RE-VEGETATION AND LEVEL SPREADER REPAIR. IDEALLY, INSPECTIONS SHOULD BE CONDUCTED IN THE NON-GROWING
SEASON WHEN IT EASIER TO SEE THE FLOW PATH.
INSPECTIONS SHOULD CHECK TO ENSURE THAT:
· FLOWS THROUGH THE VEGETATED FILTER STRIP DO NOT SHORT-CIRCUIT THE OVERFLOW CONTROL SECTION;
· DEBRIS AND SEDIMENT DOES NOT BUILD UP AT THE TOP OF THE VEGETATED FILTER STRIP;
· FOOT OR VEHICULAR TRAFFIC DOES NOT COMPROMISE THE GRAVEL DIAPHRAGM;
· SCOUR AND EROSION DO NOT OCCUR WITHIN THE FILTER STRIP;
· SEDIMENTS ARE CLEANED OUT OF LEVEL SPREADER FOREBAYS AND FLOW SPLITTERS; AND
· VEGETATIVE DENSITY EXCEEDS A 90% COVER IN THE BOUNDARY ZONE OR GRASS FILTER.
EXAMPLE MAINTENANCE INSPECTION CHECKLISTS FOR SHEET FLOW TO A VEGETATED FILTER STRIP OR CONSERVED OPEN SPACE
AREAS CAN BE ACCESSED IN APPENDIX C OF CHAPTER 9 OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK (2010)
ONGOING MAINTENANCE
ONCE ESTABLISHED, VEGETATED FILTER STRIPS HAVE MINIMAL MAINTENANCE NEEDS OUTSIDE OF THE SPRING CLEANUP, PERIODIC MOWING, REPAIR OF CHECK DAMS AND OTHER MEASURES TO MAINTAIN THE HYDRAULIC EFFICIENCY OF THE STRIP
AND A DENSE, HEALTHY GRASS COVER. VEGETATED FILTER STRIPS THAT CONSIST OF GRASS/TURF COVER SHOULD BE MOWED
AT LEAST TWICE A YEAR TO PREVENT WOODY GROWTH.
DETENTION BASIN (VDEQ DESIGN SPECIFICATION NO. 15)
MAINTENANCE INSPECTIONS
MAINTENANCE OF ED PONDS IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE
POND, INCLUDING THE FOLLOWING:
· MEASURE SEDIMENT ACCUMULATION LEVELS IN FOREBAY.
· MONITOR THE GROWTH OF WETLANDS, TREES AND SHRUBS PLANTED. RECORD THE SPECIES AND THEIR APPROXIMATE
COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES.
· INSPECT THE CONDITION OF STORMWATER INLETS TO THE POND FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING.
· INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY.
· INSPECT POND OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP-RAP DISPLACEMENT, WOODY GROWTH, ETC.
· INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION, ETC.
· INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION, ETC.
· INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED.
· INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE POND FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING, AND MAKE NEEDED REPAIRS IMMEDIATELY.
BASED ON INSPECTION RESULTS, SPECIFIC MAINTENANCE TASKS WILL BE TRIGGERED. EXAMPLE MAINTENANCE INSPECTION
CHECKLISTS FOR ED PONDS CAN BE ACCESSED IN APPENDIX C OF CHAPTER 9 OF THE VIRGINIA STORMWATER MANAGEMENT
HANDBOOK (2010).
OIL/WATER SEPARATOR (PROPRIETARY BMP)
REFER TO THE MANUFACTURER'S USER'S MANUAL FOR PROPER INSPECTION AND MAINTENANCE.
NOT TO SCALE
INSPECTION AND MAINTENANCE OF PERMANENT STORMWATER MANAGEMENT BMPS
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG518
F C
D P
C
G
SILT FENCE WITH WIRE SUPPORT(STD. & SPEC. 3.05, VESCH)
INSPECTION AND MAINTENANCE OF TEMPORARY ESC CONTROL MEASURES
TEMPORARY DIVERSION DIKE (STD. & SPEC. 3.09, VESCH)
TEMPORARY SEDIMENT TRAP (STD. & SPEC. 3.13, VESCH)
THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD
ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE OR
THE WASHING AND REWORKING OF EXISTING STONE AS CONDITIONS DEMAND AND REPAIR AND/OR
CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY.
THE USE OF WATER TRUCKS TO REMOVE MATERIALS DROPPED, WASHED, OR TRACKED ONTO ROADWAYS
WILL NOT BE PERMITTED UNDER ANY CIRCUMSTANCES.
1. SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING
PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
2. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND
UNDERCUTTING.
3. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE
EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY.
4. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN
DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
5. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE
DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED.
STORM DRAIN INLET PROTECTION (STD. & SPEC. 3.07, VESCH)
1. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED.
2. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT
HAS ACCUMULATED TO ONE HALF THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED
IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE.
3. STRUCTURES SHALL BE REMOVED AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE AREA HAS
BEEN PROPERLY STABILIZED.
CULVERT INLET PROTECTION (STD. & SPEC. 3.08, VESCH)
1. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED.
2. AGGREGATE SHALL BE REPLACED OR CLEANED WHEN INSPECTION REVEALS THAT CLOGGED VOIDS ARE
CAUSING PONDING PROBLEMS WHICH INTERFERE WITH ON-SITE CONSTRUCTION.
3. SEDIMENT SHALL BE REMOVED AND THE IMPOUNDMENT RESTORED TO ITS ORIGINAL DIMENSIONS WHEN
SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH. REMOVED SEDIMENT SHALL BE DEPOSITED IN
A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE AND CAUSE SEDIMENTATION PROBLEMS.
4. TEMPORARY STRUCTURES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT
BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED.
THE MEASURE SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS MADE TO THE DIKE, FLOW CHANNEL, OUTLET OR SEDIMENT TRAPPING FACILITY, AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM
EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED.
DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END
OF EACH WORKING DAY.
OUTLET PROTECTION (STD. & SPEC. 3.18, VESCH)
1. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT
HAS ACCUMULATED TO ONE HALF THE DESIGN VOLUME OF THE WET STORAGE. SEDIMENT REMOVAL FROM
THE BASIN SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE
AND CAUSE SEDIMENTATION PROBLEMS.
2. FILTER STONE SHALL BE REGULARLY CHECKED TO ENSURE THAT FILTRATION PERFORMANCE IS MAINTAINED.
STONE CHOKED WITH SEDIMENT SHALL BE REMOVED AND CLEANED OR REPLACED.
3. THE STRUCTURE SHOULD BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUND AND HAS
NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. THE HEIGHT OF THE STONE OUTLET
SHOULD BE CHECKED TO ENSURE THAT ITS CENTER IS AT LEAST 1FOOT BELOW THE TOP OF THE
EMBANKMENT.
THE MEASURE SHALL BE INSPECTED AFTER EVERY RAINFALL AND REPAIRS MADE, IF REQUIRED. LEVEL
SPREADER LIP MUST REMAIN AT 0% SLOPE TO ALLOW PROPER FUNCTION OF MEASURE. THE CONTRACTOR
SHOULD AVOID THE PLACEMENT OF ANY MATERIAL ON AND PREVENT CONSTRUCTION TRAFFIC ACROSS THE
STRUCTURE. IF THE MEASURE IS DAMAGED BY CONSTRUCTION TRAFFIC, IT SHALL BE REPAIRED
IMMEDIATELY.
LEVEL SPREADER (STD. & SPEC. 3.21, VESCH)
ONCE A OUTLET PROTECTION INSTALLATION HAS BEEN COMPLETED, IT SHOULD REQUIRE VERY LITTLE
MAINTENANCE. IT SHOULD, HOWEVER, BE INSPECTED PERIODICALLY TO DETERMINE IF HIGH FLOWS HAVE
CAUSED SCOUR BENEATH THE RIPRAP OR FILTER FABRIC OR DISLODGED ANY OF THE STONE. CARE MUST BE
TAKEN TO PROPERLY CONTROL SEDIMENT-LADEN CONSTRUCTION RUNOFF WHICH MAY DRAIN TO THE POINT
OF THE NEW INSTALLATION. IF REPAIRS ARE NEEDED, THEY SHOULD BE ACCOMPLISHED IMMEDIATELY.
TEMPORARY STONE CONSTRUCTION ENTRANCE (STD. & SPEC. 3.02, VESCH)
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
PERSON RESPONSIBLE FOR MAINTENANCE INSPECTION AND MAINTENANCE OF BMPS:
MS. PANDORA HOWELL
CHIEF, PORTFOLIO OPTIMIZATION ELEMENT
pandora.m.howell.civ@mail.mil
(MILITARY INSTALLATION UNNAMED AT THE REQUEST OF THE PROJECT SPONSOR)
NOT TO SCALE
INSPECTION AND MAINTENANCE OF TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
SF
F
S
F
S
F
S
F
S
F
S
F
S F
S
F
L O
N
G
I T
U
D
I N
A
L
S
L O
P
E
S
US Army Corps of Engineers ®
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG519
F C
D P
C
G
TRANSVERSE SLOPES
TEMPORARY DIVERSION DIKE/SAND BAGS AS NEEDED
ON TRANSVERSE SLOPES
SILT FENCE WITH WIRE SUPPORT
DOWN SLOPE OF TRANSVERSE SLOPES
TEMPORARY DIVERSION DIKE/SAND BAGS
AT UPPER END OF TRENCH EXCAVATION
SILT FENCE WITH WIRE SUPPORT
AT LOWER END OF TRENCH EXCAVATION
NOTES:
1. THE PROJECT WILL BE PHASED SO THAT NO MORE THAN 500
FEET OF TRENCH IS OPEN AT ANY GIVEN TIME.
2. WORK WILL PROGRESS FROM HIGHER ELEVATIONS TO
LOWER ELEVATIONS WHERE EVER PRACTICAL.
3. EROSION CONTROL SYSTEMS WILL BE MOVING AND
ADAPTING IN SIZE AS THE PROJECT PROGRESSES.
4. SILT FENCE WITH WIRE SUPPORT AND TEMPORARY
DIVERSION DIKE WILL BE UTILIZED IN AREAS WHERE
GROUND COVER WILL BE DISTURBED.
5. CONSTRUCTION ZONE FENCING WITHIN 50' OF RUNWAYS OR
TAXIWAYS IS TO BE CONSTRUCTED OF LOW PROFILE
BARRIERS WITH AMBER LIGHTS AT NIGHT, BARRIERS TO BE
SPACED 20' ON CENTER.
TEMPORARY DIVERSION DIKE/ SAND BAGS
SILT FENCE WITH WIRE SUPPORT
TRENCH LINE
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
SF
NOT TO SCALE
TYPICAL BMP LAYOUT
130+00
111+00
126+00
125+00
124+00
104+00
106+00
129+00
128+00
127+00
101+00
102+00
103+00
122+00
123+00
120+00
121+00
119+00
117+00
118+00
116+00
115+00
114+00
113+00
112+00
110+00
109+00
108+00
107+00
105+00
X
X
X
X
X
X
X
794+00
795+00
796+00
797+00
798+00
799+00
800+00
801+00
802+00
803+00
804+00
805+00
806+00
807+00
809+00
810+00
811+00
812+00
18+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
25+00
X
X
X
X
X
X
X
X
X
XXX
794+00
795+00
796+00
797+00
798+00
799+00
800+00
801+00
802+00
803+00
804+00
805+00
806+00
807+00
808+00
809+00
810+00
811+00
812+00
813+00
814+00
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X X
A=11.75 ACRE
A=2.15 ACRE
A=5.05 ACRE
S
F
SF
SF SF SF
SF
SF
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S F
S F
S F
S
F
S F
S
F
S
F
S
F
S
F
S F
SF
SF
S
F
S
F
S
FS
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
SF
SF
S
F
S F
SF
SF
SF
SF
SF
S
F
7 9
S
F
S
F
S
F
S
F
S F
S
F
BEGINING OF
GABION WALL
BEGINING OF
GABION WALL
BEGINING OF
GABION WALL
END OF
GABION WALL
END OF
GABION WALL
END OF
GABION WALL
SILT FENCE
FOR PERIMETER CONTROL
SILT FENCE
4' OFFSET FROM
GABION WALL
TEMPORARY SEDIMENT TRAP TO TREAT RUNOFF
FROM 6 ACRE APRON AREA PENDING VDEQ APPROVAL.
IT WILL BE CONVERTED TO PERMANENT
DETENTION/ SAND FILTER FACILITY ONCE THE CONSTRUCTION
IS COMPLETED AND THE SITE IS STABILIZED
NOTES:
1. DRAINAGE AREA DELINEATION IS BASED ON EXISTING GROUND CONTOURS. THIS
MEASURE OF ESC WILL NOT BE LIMITED BY MAXIMUM CONTRIBUTING DRAINAGE AREA
2. SEE SHEET CG521 FOR GABION WALL SEDIMENT BASIN CONSTRUCTION
SEQUENCE NOTES
EARTH BERM TO CONTAIN
LARGER STORM EVENT
WITHIN THE PROPOSED
GABION WALL SEDIMENT BASIN (TYP.)
SILT FENCE
4' OFFSET FROM
GABION WALL
EARTH BERM TO CONTAIN
LARGER STORM EVENT
WITHIN THE PROPOSED
GABION WALL SEDIMENT BASIN (TYP.)
EARTH BERM TO CONTAIN
LARGER STORM EVENT
WITHIN THE PROPOSED
GABION WALL SEDIMENT
BASIN (TYP.)
NN
CG520
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
P
C
G
D
W G
N O
T E
S
A
T
A I L
S
SCALE: 1" = 100'
ALTERNATIVE EROSION AND SEDIMENT CONTROL CONCEPT PLAN WITH GABION WALL SEDIMENT BASIN
A
CG521
A
US Army Corps of Engineers ®
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
GABION WALL
FILTER FABRIC
GABION BLOCK WALL,
FOR DETAILS SEE SHEET SB512
PROPOSED
FINISHED
GRADE
M
I N
1' - 0"
11' - 0"
3' - 0" 3' - 0" 3' - 0"
WALL B AND BACK
FACE OF WALL
L
CONCRETE FOUNDATION
AND LEVELING PAD
4' - 0"
EXISTING
GROUND
LARGE EVENT
OVERFLOW
ADJACENT GROUND TO
BE LEVELED AS
NECESSARY FOR SHEET
FLOW, AND STABILIZED
WITH SEEDING, SOD, OR
TREATED WITH TRM.
OUTER PERIMETER OF
DISTURBED AREA TO BE
LINED WITH SILT FENCE
WITH WIRE SUPPORT
UNTIL DISTURBED
SURFACE IS STABILIZED.
NOT TO SCALE
SILT FENCE WITH WIRE SUPPORT
SILT FENCE
WITH WIRE
SUPPORT
PROPOSED
LINEAR SAND
FILTER
SEDIMENT
STORAGE
2 FEET WIDE AND 2.5 FEET DEEP
TRENCH FOR SEDIMENT STORAGE
WITH 2:1 SIDE SLOPE
GABION WALL
SILT FENCE
SILT FENCE
FINISHED GRADE
EXISTING GROUND
GABION WALL
SILT FENCE
SILT FENCE
SEDIMENT STORAGE
SEDIMENT STORAGE
US Army Corps of Engineers ®
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG521
P
C
G
D
W G
NOTES:
ALTERNATIVE EROSION AND SEDIMENT CONTROL CONCEPT PLAN OUTLINE (PENDING
ACCEPTANCE OF VARIANCE REQUEST THAT A GABION WALL SEDIMENT BASIN BE
ACCEPTED AS AN ESC CONTROL MEASURE)
- GABION WALL ALONG DOWNSTREAM PERIMETER OF DRAINAGE AREA WILL BE
INSTALLED PRIOR TO STARTING FILL PLACEMENT.
- STORMWATER MAY HAVE TO BE PUMPED TO A TEMPORARY SEDIMENT TRAP
DURING EXCAVATION OF FOUNDATION TRENCH FOR GABION WALL (LEVELING PAD).
- EXTERIOR AREAS IMMEDIATELY ADJACENT TO GABION WALLS MAY NEED TO BE
REGRADED TO ENHANCE SHEET FLOW CONDITIONS. REGRADED AREAS WILL HAVE
VEGETATION REESTABLISHED AS QUICKLY AS POSSIBLE, AND/OR WILL BE TREATED
WITH TRM. SILT FENCE WITH WIRE SUPPORT WILL BE UTILIZED AT THE OUTSIDE
PERIMETER OF THE GABION WALL DURING CONSTRUCTION.
- A TRENCH WITH 2 FEET WIDE BOTTOM, 2.5 DEEP AND 2:1 SIDE SLOPE WILL BE
EXCAVATED ALONG THE GABION WALL TO DETAIN RUNOFF AND ALLOW THE
SEDIMENT TO SETTLE OUT. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT
REACHES 1/2 THE TRENCH HEIGHT.
- SILT FENCE WITH WIRE SUPPORT WILL BE INSTALLED 4 FEET FROM THE BACK OF
THE GABION WALL TO FILTER FLOWS, REMOVE ADDITIONAL SEDIMENT AND KEEP
GABIONS FROM CLOGGING.
- GABION WALL WITH SILT FENCE WITH WIRE SUPPORT WILL MAXIMIZE THE SEDIMENT
HOLDING CAPACITY AND ALLOW RUNOFF TO PASS THROUGH THE WALL WITH
MINIMAL CHANCE OF FAILURE DURING LARGER STORM EVENTS. LARGER EVENTS
WILL FLOW OVER THE SILT FENCE WITH WIRE SUPPORT, THROUGH THE GABION
WALL AND BE RELEASED AS SHEET FLOW.
- PRIOR TO BACKFILLING ADJACENT TO GABION WALLS, SILT FENCE WITH WIRE
SUPPORT WILL BE REMOVED AND REPLACED WITH A PERMANENT GEOTEXTILE
FABRIC EXTENDING THE ENTIRE HEIGHT OF THE BACK OF WALL.
- EARTH BERMS (2.5 HIGH) AT BOTH ENDS OF THE GABION WALL WILL BE
CONSTRUCTED TO CONTAIN 25-YR FLOOD. STORMWATER WILL SEEP THROUGH
THE GABION WALL AND WILL BE RELEASED SLOWLY TO THE ADJACENT AREA AS
SHEET FLOW.
- THE EARTH BERM SHALL BE INSPECTED AFTER EVERY STORM EVENT AND
REPAIRED IMMEDIATELY IF DAMAGED. WORK SHALL BE STOPPED UNTIL THE BERMS
ARE RESTORED.
SECTION A-A
HORIZONTAL SCALE:1"= 50'
VERTICAL SCALE: 1"= 10'
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
AS NOTED
GABION WALL SEDIMENT BASIN
A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text -5
AutoCAD SHX Text -10
AutoCAD SHX Text -15
AutoCAD SHX Text -20
AutoCAD SHX Text -25
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text -5
AutoCAD SHX Text -10
AutoCAD SHX Text -15
AutoCAD SHX Text -20
AutoCAD SHX Text -25
AutoCAD SHX Text 0+00
AutoCAD SHX Text 1+00
AutoCAD SHX Text 2+00
AutoCAD SHX Text 3+00
AutoCAD SHX Text 4+00
AutoCAD SHX Text 5+00
AutoCAD SHX Text 6+00
AutoCAD SHX Text 7+00
AutoCAD SHX Text 8+00
AutoCAD SHX Text 9+00
AutoCAD SHX Text
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG601
D R
A I N
A G
E
S
T R
U C
T U
H
E D
U L
E
P
C
G
D
W G
DRAINAGE SCHEDULE
STRUCTURE
STRUCTURE
NO.
CB-3B
CB-1A
CB-1B
CB-3A
CB-4B
CB-5A
CB-5B
CB-7A
CB-7B
CB-6A
CB-6B
CB-8A
CB-8B
CB-4A
CB-2B
CB-2A
DS-01
MH-01
NORTHING
3576635.60
3576745.05
3576735.10
3576645.55
3576508.49
3576499.92
3576489.97
3576400.42
3576390.47
3576329.99
3576320.04
3576270.29
3576260.33
3576518.44
3576608.00
3576617.95
3576178.24
3576155.92
EASTING
12033365.45
12033448.67
12033441.11
12033373.02
12033532.62
12033771.07
12033763.50
12033695.41
12033687.85
12033911.95
12033904.39
12033866.56
12033858.99
12033540.18
12033608.28
12033615.84
12033987.60
12034016.77
STRUCTURE
LENGTH/DIA.
(FT)
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
7.34
4.00
STRUCTURE
WIDTH
(FT)
5.34
TOP
ELEVATION
(FT)
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
14.06
12.90
11.70
PIPE DIA
(IN)
INVERT
IN
(FT)
9.97
9.54
9.97
9.97
9.54
9.97
8.15
9.97
9.69
9.97
7.42
9.54
9.97
8.83
9.97
6.70
6.50
PIPE DIA
OUT
(IN)
INVERT
OUT
(FT)
10.00
10.00
9.87
9.44
10.00
10.00
9.87
8.05
10.00
10.00
9.87
7.32
10.00
8.73
9.87
10.00
6.40
OWS 3576182.24 12034013.53 47.25 17.50 13.30 15 6.95 24 6.45
ES-01 3576052.09 12034110.44 6.15 5.00 8.70 30 6.00
*CB-11 3576856.50 12033049.03 4.17 4.17 13.50
15 9.25
*CB-12 3576810.46 12033014.06 4.17 4.17 13.34 15 9.90
*CB-13 3576913.31 12033092.22 4.17 4.17 13.50
15 8.55
18 5.40
EP-01 3576996.42 12033082.53
CB-18 3576584.82 12033030.63 4.17 4.17 13.00 18 9.07
EP-02 3576511.93 12032975.19
CB-19 3576369.77 12033267.20 4.17 4.17 13.00 18 8.79
EP-03 3576296.59 12033211.57
CB-20 3576117.79 12033598.61 4.17 4.17 13.00 18 8.13
EP-04 3576044.60 12033542.98
RS-01 3575973.30 12034203.30 5.33 5.33 6.80 24 2.80
ES-02 3575975.39 12034243.75 6.08 4.00 4.60 24 2.60
30 6.60
15 7.00
24 6.40
MH-02 3576765.24 12033298.21
15 7.9015 8.10
14.86
4.00 -
CB-14 3576719.04 12033271.65 15 8.70
CB-15 3576672.97 12033236.60 4.17 4.17 14.50 15 9.30
4.17 4.17 14.50
15 8.60
15 5.50
15 9.35
STORMDRAIN PIPE
FROM STRUCTURE NO.
TYPE
LENGTH
(FT)
TO STRUCTURE NO.
DIA./SIZE
(IN)
PIPE ID.
P-06
P-01
P-02
P-05
P-08
P-09
P-10
P-13
P-14
P-11
P-12
P-15
P-16
P-07
P-04
P-03
P-17
P-18
P-21
P-22
P-23
P-24
P-25
P-26
P-41
P-42
P-43
CB-2B
CB-1A
CB-1B
CB-2A
CB-4A
CB-5A
CB-5B
CB-6A
CB-6B
CB-7B
CB-7A
CB-8B
CB-8A
CB-4B
CB-3A
CB-3B
DS-01
MH-01
CB-12
CB-11
CB-15
CB-14
MH-02
CB-13
CB-18
CB-19
CB-20
CB-4A
CB-1B
CB-3A
CB-2B
CB-7A
CB-5B
CB-7A
CB-6B
CB-8A
CB-7A
CB-8A
CB-8A
DS-01
CB-4A
CB-4A
CB-3A
MH-01
ES-01
CB-11
CB-13
CB-14
MH-02
CB-13
EP-01
EP-02
EP-03
EP-04
42 x 27
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
RCP, CLASS V
HERCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
RCP, CLASS IV
SLOPE
(FT/FT)
FULL FLOW
CAPACITY
(FT)
0.006 8.14
0.003 5.89
0.006 8.14
12.43
8.14
5.89
0.003
0.006
0.003
0.006 8.14
22.84
0.003
8.14 0.006
5.890.003
0.006 8.14
22.62
0.003
0.006 8.14
6.01
0.003
0.006 8.14
26.83
0.003
0.004
22.91
0.003
29.88
6.46
0.010
6.51
0.010
6.69
0.011
6.46
0.010
6.32
0.097
0.005 7.62
0.005 7.47
0.005 7.47
0.005 7.47
DETAIL
SHEETS
APRON INLET
DETAIL
SHEET CP501
SHEET CG402
SHEET CG504
SHEET CG403
SHEET CG501
SHEET CG404
SHEET CG501
SHEET CP514
END OF 18" RCP AT THE BACK OF GABION WALL AT ELEVATION 7.67
END OF 18" RCP AT THE BACK OF GABION WALL AT ELEVATION 8.33
END OF 18" RCP AT THE BACK OF GABION WALL AT ELEVATION 8.61
END OF 18" RCP AT THE BACK OF GABION WALL AT ELEVATION 5.00
SHEET CG503
SHEET CG503
SHEET CG503
SHEET CG503
*NOTE:
RIMS OF CATCH BASIN CB-11, CB-12 AND CB-13 WILL BE BELOW PROPOSED GRADE AND COVERED BY SOLID LID AT THE
END OF PHASE 1 TO PREVENT RUNOFF FROM ENTERING DURING PHASE 2 CONSTRUCTION. AREA AROUND THESE
CATCH BASINS WILL BE RE-GRADED TO OPEN UP CATCH BASIN TOPS BY OTHERS ONCE THE BUILDING IS BUILT.
| Sheets and Views |
| CG516 EROSION CONTROL NOTES AND DETAILS |
| CG517 EROSION CONTROL NOTES AND DETAILS |
| CG518 EROSION CONTROL NOTES AND DETAILS |
| CG519 EROSION CONTROL NOTES AND DETAILS |
| CG520 EROSION CONTROL NOTES AND DETAILS |
| CG521 EROSION CONTROL NOTES AND DETAILS |
| CG601 DRAINAGE STRUCTURE SCHEDULE |
File details come from the government source that posted it.