AC_Ph1_RTA_Plans_Vol1_2017_11_09: Due to large files of Plans Volume 1, a total of 17 parts will be attached for Plans Volume 1: 11 of 17
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L E
N
M
E
I S
S U
E
D
A T
E
F I
M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
J U
Y
P R
O J E
C T
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
M
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG509
P C
G D
W G
9VAC25-840-40. MINIMUM STANDARDS
(MS-19)
A VESCP MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS:
1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN
DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION
SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL
REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS
THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED
OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE
TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS
BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE
PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A
GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED
TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND
SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND
DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE
TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF
DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS
GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM
STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE
OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A
25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL
CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE
SEDIMENT BASIN IS UTILIZED.
7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE
EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT
STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS
CORRECTED.
8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN
ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE
PROVIDED.
10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED
SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING
FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.
11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE
OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL
LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE
ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST
EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES
IF ARMORED BY NONERODIBLE COVER MATERIALS.
13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN
ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE
MATERIAL SHALL BE PROVIDED.
14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING
LIVE WATERCOURSES SHALL BE MET.
15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS
IN ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY
AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS
SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED
SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD
SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM
THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.
STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS
PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING
ACTIVITIES.
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS
AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS
OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS
RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO
PREVENT FURTHER EROSION AND SEDIMENTATION.
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM
SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW
RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN
ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION
PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND
SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR
MAN-MADE CHANNELS:
A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY
INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR
THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY
ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.
B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS
WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE
PROJECT IN QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT
STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
(B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR
STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR
STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND
(C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY
THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.
C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR
PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS
AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED
WITHIN THE APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A
TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE
THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF
OUTFALLS INTO A MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES
WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION.
D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE
ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.
F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN
APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL
SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR
PERFORMING THE MAINTENANCE.
G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY
DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE
A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL.
H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT
PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A
DETENTION FACILITY.
J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A
RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE
DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A
SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT
CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS.
K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER
WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS
AND OTHER WATERS OF THE STATE.
L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT
ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE
CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR
MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO
RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL
RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE
RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO
THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED
THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL
TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE
RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW
RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY
REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT.
M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY
COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§
62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH
LAND-DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER
MANAGEMENT PROGRAM (VSMP) REGULATIONS.
N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE
VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE
REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION.
E R
O S
I O
N
A
D
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
J
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG510
F C
D P
C
G
VA ESC HANDBOOK PLATE 3.02
Table: Super Silt Fence Design Constraints
NOTE:
INSTALL MULTIPLE ROWS OF SILT FENCE ON LONG SLOPES MAXIMUM 300 FEET APART TO BREAK UP FLOW.
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
NOT TO SCALE
SILT FENCE WITH WIRE SUPPORT DETAIL
B
NOT TO SCALE
CONSTRUCTION ENTRANCE DETAIL
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG511
F C
D P
C
G
VA ESC HANDBOOK PLATE 3.07a VA ESC HANDBOOK PLATE 3.07c
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
NOT TO SCALE
DROP INLET SEDIMENT FILTER DETAIL
A
NOT TO SCALE
DROP INLET PROTECTION DETAIL
B
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG512
F C
D P
C
G
VA ESC HANDBOOK PLATE 3.08
VA ESC HANDBOOK PLATE 3.09
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
NOT TO SCALE
CULVERT INLET PROTECTION DETAIL
A
NOT TO SCALE
TEMPORARY DIVERSION DIKE DETAIL
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG513
F C
D P
C
G
VA ESC HANDBOOK PLATE 3.13
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
VA ESC HANDBOOK PLATE 3.04
NOT TO SCALE
TEMPORARY SEDIMENT TRAP DETAIL
A
NOT TO SCALE
STRAW BALE BARRIER DETAIL
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG514
F C
D P
C
G
VA ESC HANDBOOK PLATE 3.17
VA ESC HANDBOOK PLATE 3.18
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
NOT TO SCALE
TYPICAL WATERWAY CROSS-SECTION DETAILS
A
NOT TO SCALE
PIPE OUTLET CONDITION DETAILS
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG515
F C
D P
C
G
VA ESC HANDBOOK PLATE 3.20a
VA ESC HANDBOOK PLATE 3.20b
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
NOT TO SCALE
ROCK CHECK DAM DETAIL
A
NOT TO SCALE
CHECK DAM SPACING DETAIL
| Sheets and Views |
| CG509 EROSION CONTROL NOTES AND DETAILS |
| CG510 EROSION CONTROL NOTES AND DETAILS |
| CG511 EROSION CONTROL NOTES AND DETAILS |
| CG512 EROSION CONTROL NOTES AND DETAILS |
| CG513 EROSION CONTROL NOTES AND DETAILS |
| CG514 EROSION CONTROL NOTES AND DETAILS |
| CG515 EROSION CONTROL NOTES AND DETAILS |
File details come from the government source that posted it.