ACPh1RTAPlansVol120171109_-_Part_10_of_17.pdf
PDF 13 MB Posted
- Attached to
- Aircraft Apron and Airfield Site Improvements
- Solicitation number
- W9123617R0001
About this file
AC_Ph1_RTA_Plans_Vol1_2017_11_09: Due to large files of Plans Volume 1, a total of 17 parts will be attached for Plans Volume 1: 10 of 17
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
J
L Y
P R
O J E
C T
N
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
M E
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG501
D R
A I N
A G
E
S
T R
U C
T U
A
N D
A R
D
D
E T
A I L
S
P C
G D
W G
NOT TO SCALE
FLARED END-SECTION FOR CONCRETE PIPE CULVERTS
A
NOT TO SCALE
FLARED END SECTION FOR ELLIPTICAL PIPE
B
CG502
D R
A I N
A G
E
S
T R
U C
T U
A
N D
A R
D
D
E T
A I L
S
P C
G D
W G
NOTES:
1. SHAPING OF MANHOLE AND INLET INVERTS IN ACCORDANCE WITH THIS
DRAWING IS TO APPLY TO THOSE STRUCTURES SPECIFIED ON PLANS OR
WHERE INVERT OF PIPE IS ABOVE INVERT OF STRUCTURE.
2. MANHOLE OR DROP INLET IS TO BE FORMED AND CONSTRUCTED IN
ACCORDANCE WITH APPLICABLE STANDARD OR SPECIAL DRAWING.
CAST-IN-PLACE CONCRETE PER SECTION 03 30 00.00 10. THE
SURFACE SHALL BE LEFT SMOOTH BY MEANS OF HAND TROWELLING.
NONE OF THE COARSE AGGREGATE SHALL REMAIN EXPOSED.
3. DETAILS OF INVERT SHAPING AS SHOWN HEREON ARE FOR EXAMPLE
PURPOSES ONLY. EACH MANHOLE OR DROP INLET IS TO BE SHAPED
INDIVIDUALLY TO BEST FIT THE PARTICULAR INLET AND OUTLET
CONFIGURATION AND FLOW LINES.
US Army Corps of Engineers ®
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
NOT TO SCALE
METHOD OF SHAPING MANHOLE AND INLET INVERTS
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG503
D R
A I N
A G
E
S
T R
U C
T U
A
N D
A R
D
D
E T
A I L
S
P C
G D
W G
NOTES:
1. THE "H" DIMENSION SHOWN ON THE STANDARDS AND
SPECIFIED ON THE PLANS WILL BE MEASURED FROM THE
INVERT OF THE OUTFALL PIPE TO THE TOP OF THE
STRUCTURE. PLAN "H" DIMENSIONS ARE APPROXIMATE
ONLY FOR ESTIMATING PURPOSES AND THE ACTUAL
DIMENSIONS SHALL BE DETERMINED BY THE CONTRACTOR
FROM FIELD CONDITIONS.
2. WHEN SPECIFIED ON THE PLANS THE INVERT IS TO BE
SHAPED IN ACCORDANCE WITH STANDARD AS SHOWN
ON SHEET CG502.
3. IN THE EVENT THE INVERT OF THE OUTFALL PIPE IS HIGHER
THAN THE BOTTOM OF THE STRUCTURE, THE INVERT OF
THE STRUCTURE SHALL BE SHAPED WITH CEMENT MORTAR
TO PREVENT STANDING OR PONDING OF WATER IN THE
STRUCTURE.
4. STEPS ARE TO BE PROVIDED WHEN H IS 4'-0" OR GREATER.
FOR DETAILS SEE SHEET CG501.
5. THIS ITEM MAY BE PRECAST OR CAST-IN-PLACE.
6. CAST-IN-PLACE CONCRETE PER SECTION 03 30 00.00 10 IS
TO BE USED. PRECAST CONCRETE IS TO BE 4000 PSI.
7. ANY ALTERNATE METHODS OF ANCHORAGE MEETING
THE APPROVAL OF THE CONTRACTING OFFICER'S
REPRESENTATIVE MAY BE SUBSTITUTED
FOR THE CAST IRON LUGS AS SHOWN HEREON.
8. 3" DIAMETER WEEP HOLE WITH 12"x12" PLASTIC HARDWARE
CLOTH
" MESH OR GALVANIZED STEEL WIRE, MINIMUM WIRE
DIAMETER 0.03", NUMBER 4 MESH HARDWARE CLOTH
ANCHORED FIRMLY TO THE OUTSIDE OF THE STRUCTURE.
9. DUMP NO WASTE DRAINS TO WATERWAY LETTERING IS
REQUIRED ON ALL GRATES. LOCATION OF LETTERING
MAY VARY BY MANUFACTURER.
CENTER POINT OF STRUCTURE
SEE SHEET CG601 FOR
COORDINATES AND GRATE ELEVATION
NOT TO SCALE
DROP INLET
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
A
S
H A
I K
H
A
S
M I T
H
T
C
H A
O
H
W
E A
V E
R
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG504
D R
A I N
A G
E
S
T R
U C
T U
A
N D
A R
D
D
E T
A I L
S
P C
G D
W G
STORM
NOT TO SCALE
PRECAST CONCRETE MANHOLE DETAIL
A
NOT TO SCALE
MANHOLE FRAME AND COVER
B
MANHOLE FRAME
AND COVER
CLASS B CONCRETE
CAST IN PLACE
PRECAST
REINFORCED
CONCRETE BASE
COARSE AGGREGATE SIZE #57
8"
5"
2" (TYP.)
6"
6"
3" MINIMUM7"
REINFORCING STEEL AS
PER AASHTO M199
PRECAST REINFORCED CONCRETE MANHOLE
SECTIONS SHALL CONFORM TO AASHTO M199
3 FOOT
PRECAST REINF.
CONC.
MANHOLE
CONICAL TOP
PRECAST REINF. CONCRETE
MANHOLE RISERS - 1 FOOT,
2 FEET, 3 FEET, OR 4 FEET
LENGTHS AS REQUIRED
RISER HEIGHT
VARIES
P
I
W
L
L
M
H
W
L
L
N
S
H
R
I
N
K
G
R
O
U
T
"O" RING RUBBER
GASKET
EXTERIOR
WALL
3"
1"
1/4"
6"
PRECAST MANHOLE RISER JOINT
5"
2 3/4" (TYP.)
2 3/4" (TYP.)
3"
30"
30"
OPENING
6"
52 1/4"
52 3/4"
58"
PLAN
48" PRECAST REINFORCED
NOTE:
USE IN LIEU OF CONICAL SECTION WHEN
HEIGHT OF MANHOLE IS LESS THAN 4 FEET
GROOVE FOR "O" RING
RUBBER GASKET
4"
4"
CONCRETE MANHOLE FLAT TOP
A1
A2
1. STEPS WILL BE REQUIRED IN ALL STRUCTURES WITH A DEPTH OF
4'-0" OR GREATER UNLESS OTHERWISE NOTED ON THE PLANS.
2. ALL STEPS SHALL PROTRUDE 4
" FROM INSIDE FACE OF
STRUCTURE WALL.
3. IF THERE IS A NEED TO CHANGE STEP SPACING, MAXIMUM STEP
SPACING TO BE 16" C-C.
4. STEPS SHALL WITHSTAND A MINIMUM FORCE OF 300 POUNDS
WHEN EXTENDED 4
" FROM THE FACE OF THE SUPPORT.
5. STEPS ARE TO BE VERTICALLY ALIGNED AND UNIFORMLY SPACED
FOR THE ENTIRE DEPTH OF ANY STRUCTURE.
6. STEPS MAY BE CAST IN PLACE, MORTARED INTO HOLES
PROVIDED BY THE FABRICATOR, OR DRIVEN.
7. ALL STEPS INSTALLED SHALL BE PROVIDED WITH SLIP-RESISTANT
SURFACES SUCH AS BUT NOT LIMITED TO, CORRUGATED
KNURLED, OR DIMPLED SURFACES.
NOT TO SCALE
SECTION
A1
NOT TO SCALE
SECTION
A2
FOUNDATION OF PIPE SHALL BE FREE OF PROTRUDING ROCK. IF
ROCK IS ENCOUNTERED, THE TRENCH SHALL BE OVER-EXCAVATED A
MINIMUM OF 6" AND BACKFILLED WITH COMPACTED, SUITABLE
MATERIAL.
O
D
0.10 x O.D.
OF PIPE
M
I N
SIDE OF TRENCH
SUITABLE BACKFILL
MATERIAL (SEE SPECS. FOR
COMPACTION REQUIREMENTS)
MAXIMUM
SLOPE PER
OSHA STANDARDS
PIPE O.D. + (3'-0")
NOT TO SCALE
TRENCH DETAIL
C
NOTE:
B
NOTES:
STEPS
SEE NOTES BELOW
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 24"
AutoCAD SHX Text 5"
AutoCAD SHX Text 6"
AutoCAD SHX Text
12" (TYP.)
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1/4"
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W
R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG505
P C
G D
W G
NARRATIVE
THE PURPOSE OF THE PROJECT IS TO CONSTRUCT AN AVIATION COMPLEX WITH ASSOCIATED ACCESS ROAD, ELEVATED TAXIWAY, PARKING AREA, AIRCRAFT PARKING APRON, MAINTENANCE HANGAR AND UTILITY
STRUCTURES. THE PROJECT SITE AREA IS SURROUNDED BY RIPARIAN AND TIDAL WETLANDS AND LOCATED
SOUTH OF THE EXISTING RUNWAY IN FELKER ARMY FIELD, NEWPORT NEWS CITY, VIRGINIA. TOTAL 46 ACRES
(APPROXIMATELY) LAND WILL BE DISTURBED DURING CONSTRUCTION PERIOD AND SUBJECT TO EROSION AND
SEDIMENT CONTROL REGULATIONS. THE LAND DISTURBED TEMPORARILY WILL BE RESTORED TO ITS ORIGINAL
CONDITION OR BETTER AT THE END OF THE PROJECT. PRIMARY DEVELOPMENT SITE, APPROXIMATELY 27 ACRE
AREA WILL BE DISTURBED PERMANENTLY. PERMANENT BMPS ARE PROPOSED TO ADDRESS WATER QUALITY AND
QUANTITY REQUIREMENTS FOR THE PRIMARY DEVELOPMENT SITE ONLY.
LAND USE IN THE VICINITY IS A TRAINING AREA WHICH INVOLVES HEAVY VEHICLE AND AS A RESULT , THE AREA IS
HEAVILY COMPACTED, DESCRIBED BY NRCS AS MOSTLY URBAN LAND. THE UPPER SOIL IN THE PROJECT AREA IS
MAPPED AS SANDY CLAY (CL) WITH VARYING AMOUNT OF SILT AND TRACE OF ORGANICS. THE UPPER SOILS ARE
CONSIDERED MODERATELY LOW TO SOMEWHAT POORLY DRAINED WITH PERMEABILITY RATES RANGES
BETWEEN 0.008 INCHES/HOUR TO 0.083 INCHES/HOUR.
EROSION AND SEDIMENT CONTROL PLAN WILL BE IMPLEMENTED IN MULTIPLE STAGES FOLLOWING
CONSTRUCTION SEQUENCES. AT THE BEGINNING OF THE PROJECT THE PERIMETER CONTROLS I.E.
CONSTRUCTION ENTRANCE (#3.02)*, SILT FENCE WITH WIRE SUPPORT (#3.05)*, AND DIVERSIONS (#3.12)* WILL BE
INSTALLED. DURING CONSTRUCTION, IN ADDITION TO PERIMETER CONTROL OTHER ESC ITEMS I.E. STORMDRAIN
INLET PROTECTION (#3.07)*, ROCK CHECK DAMS(#3.20)*, GRADING STABILIZATION BY VEGETATION (#3.31, #3.32, #3.33, #3.34) * AND MULCH (#3.35) * WILL BE INSTALLED AS SOON AS THE FINISHED GRADE IS REACHED. ROCK
CHECK DAMS (#3.20)*, TEMPORARY DIVERSION DIKE (#3.09)* AND TEMPORARY SEDIMENT TRAP(#3.13)* WILL BE
USED LOCALLY AS REQUIRED BY THE ACTUAL SITE CONDITIONS DURING CONSTRUCTION.
THE SITE IS RELATIVELY FLAT AND CURRENTLY AT A LOWER ELEVATION ON AVERAGE THAN THE BASE FLOOD
ELEVATION. AS A RESULT, A CONSIDERABLE AMOUNT OF FILL WILL NEED TO BE BROUGHT INTO THE SITE TO
BRING THE ELEVATION UP FOR PROPER DRAINAGE. FILL WILL BE PLACED IN LAYERS NOT TO EXCEED 9 INCHES IN
DEPTH AND COMPACTED. TEMPORARY DIVERSIONS WILL BE MAINTAINED AT THE TOP OF THE FILL NOT TO
DESTABILIZE THE SLOPE .
MULTIPLE STAGES OF CONSTRUCTION ARE RECOMMENDED TO MINIMIZE LAND DISTURBANCE AT ONCE AND
DURATION WITHOUT GROUND COVER. MULTIPLE TEMPORARY SEDIMENT TRAPS AND SILT FENCE WITH WIRE
SUPPORT ARE THE PRIMARY SEDIMENT AND EROSION CONTROL MEASURE USED IN THIS PROJECT SINCE
CENTRALIZED SEDIMENT BASINS ARE NOT FEASIBLE DUE TO SITE CONSTRAINTS (LARGE FLAT SITE AREA, DIFFICULT TO CONVEY SEDIMENT LADEN RUNOFF TO THE BASINS DUE LACK OF AVAILABLE HEAD DURING FILLING
ETC.) PERMANENT BMP SAND FILTER/DETENTION BASIN WITHOUT FOREBAY AND RISER STRUCTURE MAY BE USED
AS A TEMPORARY SEDIMENT TRAP FOR THE APRON AREA ONCE THE STORMDRAIN SYSTEM IS IN PLACE. A
STONE SECTION OF THE EMBANKMENT WILL BE USED AS OUTLET FOR THE SEDIMENT TRAP. THE CREST OF THE
STONE OUTLET MUST BE AT LEAST 1.0 FOOT BELOW THE TOP OF THE EARTH EMBANKMENT. THIS PROPOSED
BMP CAN BE USED SUBJECT TO VDEQ APPROVAL SINCE CONTRIBUTING DRAINAGE AREA EXCEEDS THE 3-ACRE
LIMIT. SILT FENCE WITH WIRE SUPPORT WILL BE INSTALLED DOWN GRADIENT OF GRADING AND CLEARING
ACTIVITIES FOR THE ENTIRE SITE ALONG THE SITE PERIMETER AND REMAIN IN PLACE THROUGHOUT THE
CONSTRUCTION.
ADDITIONAL ROWS OF SILT FENCE WILL BE NECESSARY ALONG THE GABION WALL AND/OR VEGETATIVE FILTER
STRIPS AS THE FILL GETS PROGRESSED. THESE ADDITIONAL SILT FENCES WILL BE MOVED/REMOVED AND RESET
AS THE EMBANKMENT IS PLACED. THE RECOMMENDED SEQUENCE IS SHOWN ON THE SKETCH.
INSTALL MULTIPLE ROWS OF SILT FENCE ON LONG SLOPES 150 TO 325 FEET APART TO BREAK UP FLOW.
CONTRACTOR MAY NEED TO MAINTAIN MULTIPLE TEMPORARY SEDIMENT TRAPS IF HEAVY CONCENTRATED FLOW
IS UNAVOIDABLE, ONE AT EACH PHASE OF SITE GRADING. TEMPORARY COLLECTOR CHANNELS SHOULD BE
PROVIDED TO DIRECT THE MUDDY RUNOFF TO ENTER A TRAP. MAXIMUM ALLOWABLE CONTRIBUTING DRAINAGE
AREA TO EACH TRAP SHALL BE LESS THAN 3 ACRES.
1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
RUNOFF-PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE
EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO
MAINTAIN ALL PRACTICES AS DESIGNED AND INSTALLED FOR THEIR
APPROPRIATE PHASE OF THE PROJECT.
2. TEMPORARY SEDIMENT TRAP , IF USED, WILL BE CLEANED OUT WHEN
THE LEVEL OF SEDIMENT ACCUMULATES TO ONE HALF OF THE WET
VOLUME. FILTER STONE CHOKED WITH SEDIMENT SHALL BE
REMOVED AND CLEANED OR REPLACED.
3. SEDIMENT WILL BE REMOVED FROM INLET PROTECTION DEVICE
WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED.
GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL
NO LONGER DRAINS PROPERLY.
4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SUPER SILT FENCE
WHEN IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE
SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A
BARRIER.
5. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY,
AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE
PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER.
CONSTRUCTION SCHEDULE
MAINTENANCE PLAN
1. STAKE OUT LIMITS OF DISTURBANCE AND NOTIFY VIRGINIA DEQ AND USACE STAFF AT LEAST 7 DAYS PRIOR
TO COMMENCING ANY LAND DISTURBING ACTIVITY.
2. INSTALL SILT FENCE (WITH WIRE SUPPORT) ALONG THE PERIMETER AS SHOWN ON THE PLAN. INSTALL ALL
TEMPORARY SEDIMENT TRAPS AS SHOWN ON THE PLAN. THE LARGEST SEDIMENT TRAP CAN ONLY BE USED
IF VDEQ APPROVE THE WAIVER REQUEST OF MAXIMUM DRAINAGE AREA LIMIT (< 3.0 ACRE). INSTALL BOTH
STABILIZED CONSTRUCTION ENTRANCES AS SHOWN ON THE PLAN. IT WILL REDUCE THE AMOUNT OF MUD
TRANSPORTED BY THE CONSTRUCTION VEHICLES.
3. COMPLETE SITE CLEARING AND GRUBBING AND DEMOLITION AS NEEDED WITHIN CONSTRUCTION AREA.
4. INSTALL SILT FENCE (WITH WIRE SUPPORT) ALONG THE TOE OF THE TEMPORARY CAUSEWAYS AND PROVIDE
CULVERTS TO MAINTAIN CROSS DRAINAGE. PROVIDE CULVERT INLET PROTECTION.
5. SUGGESTED CONSTRUCTION STAGING AND STORAGE AREA ON THE NORTHWEST CORNER OF THE SITE.
6. FINISH THE SLOPES (VEGETATIVE FILTER STRIP) AROUND THE SITE AND VEGETATE AND MULCH IMMEDIATELY.
INSTALL THE GABION WALL AS SHOWN ON THE PLAN. (GABION WALL WITH SILT FENCE WITH WIRE SUPPORT
INSTALLED ALONG INSIDE FACE OF THE WALL MAY BE USED AS SEDIMENT BASIN. FLOWS EXCEEDING THE
SEDIMENT STORAGE EVENT WILL OVERTOP THE SILT FENCE AND EXIT THE SITE THROUGH THE GABION WALL.
THIS METHOD IS APPLICABLE SUBJECT TO VDEQ APPROVAL). INSTALL SAND FILTER ADJACENT TO GABION
WALL AS SHOWN ON THE PLAN (BACK OF THE HANGAR BUILDING AND NORTH OF POV PARKING LOT). FILL UP
THE EASTERN HALF OF THE SITE (APRON, HANGAR, GOV PARKING LOT AND ACCESS ALLEY) ACCORDING TO
STANDARDS AND SPECIFICATIONS. MAINTAIN DIVERSIONS ALONG TOP OF FILL SLOPE DAILY.
7. CONSTRUCT STORM SEWER SYSTEM AND CONSTRUCT ALL UTILITIES. BEGIN THE INSTALLATION AT THE
DOWNSTREAM END AND WORK UPSTREAM. UPON INSTALLING STORM INLET PROVIDE INLET PROTECTION
DEVICES. BEGIN THE INSTALLATION AT THE DOWNSTREAM END AND WORK UPSTREAM.
8. COMPLETE FINAL GRADING FOR APRON PAVEMENT, HANGAR BUILDING, ACCESS ALLEY, GOV PARKING AREA.
ORGANIC MATERIALS ARE NOT DESIRED UNDER PAVED AREA. THEREFORE, ANY DEGRADABLE MULCH USED
FOR TEMPORARY SITE STABILIZATION MUST BE REMOVED BEFORE PAVING THE AREAS.
9. FOOT PRINT OF THE HANGAR AND ADMINISTRATION BUILDING WILL BE GRADED TEMPORARILY AND
VEGETATED TILL THE STARTING OF THE BUILDING CONSTRUCTION. A TEMPORARY STORM DRAIN SYSTEM
TEMPORARILY DISCHARGES TO THE PROPOSED GABION WALL VIA STORMDRAIN PIPES.
10. PROVIDE INLET PROTECTION AT THE PROPOSED INLETS THAT COLLECT ELEVATED TAXIWAY RUNOFF. ALSO
PROVIDE OUTLET PROTECTION AT THE OUTFALLS OF THE TWO STORMDRAIN PIPES.
11. FILL UP THE WESTERN HALF OF THE SITE (ENTRY POINT, POV PARKING LOT ADMINISTRATION BUILDING)
ACCORDING TO STANDARDS AND SPECIFICATIONS. MAINTAIN DIVERSIONS ALONG TOP OF FILL SLOPE DAILY.
12. CONSTRUCT STORMDRAIN SYSTEM AND INSTALL INLET PROTECTION AT THE DOCKING AREA ONCE
APPROACHING THE FINAL GRADING .
13. ANY PERMANENT SAND FILTERS RECEIVING RUNOFF PRIOR TO THE COMPLETION OF CONSTRUCTION SHALL
BE RESTORED TO ORIGINAL CONDITION.
14. REMOVE ALL SEDIMENT CONTROL MEASURES WITH THE APPROVAL OF VDEQ SITE INSPECTOR.
15. STABILIZE AREAS DISTURBED BY THE REMOVAL OF THE SEDIMENT CONTROL DEVICES.
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL
PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
ADMINISTRATIVE CODE: VAC25-840-40 SOIL EROSION AND SEDIMENT CONTROL.
2. LOCAL DEQ OFFICE MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION MEETING, ONE WEEK
PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL
INSPECTION.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN
CLEARING AND GRUBBING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT
ALL TIMES
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS
(INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A
SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY VDEQ
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES
NECESSARY TO PREVENT EROSION SEDIMENTATION AS DETERMINED BY VDEQ
7. FILLING SHALL BE DONE IN SUCH A WAY SO THAT SITE RUNOFF IS DIRECTED AS SHEET FLOW TOWARDS THE
SILT FENCE .
8. IF SEDIMENT LADEN WATER ACCUMULATES AT SOME LOW POINTS, SUCH WATER SHALL BE PUMPED INTO A
PORTABLE SEDIMENT TANK/ FILTER BOX PRIOR TO RELEASE IT TO WETLAND AREA.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH
RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE
EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
GENERAL EROSION AND SEDIMENT CONTROL NOTES
STEP 1:
INSTALL SILT FENCE WITH WIRE SUPPORT ALONG
THE FACE OF THE GABION WALL. FILL AND
COMPACT THE AREA UP TO THE HEIGHT OF THE SILT
FENCE.
STEP 2:
REMOVE SILT FENCE AND PLACE FILTER FABRIC ALONG
THE FACE OF GABION WALL. FILL AND COMPACT THE
GAP AS SOON AS THE SILT FENCE IS REMOVED.
STEP 3:
INSTALL SILT FENCE ALONG THE FACE OF THE GABION
WALL AT THE COMPACTED EARTH. FILL AND COMPACT
UP TO THE NEW HEIGHT OF THE SILT FENCE.
REPEAT STEP 1 TO STEP 3 UNTIL FILL REACHES TO THE
ELEVATION OF THE BOTTOM OF PROPOSED LINEAR SAND
FILTER. BUILD THE SAND FILTER AS PER SPECIFICATIONS
AND FILL THE CORNERS TO THE FINISHED GRADE.
COMPACTED
EARTH FILL
SILT FENCE
FACE OF
GABION WALL
FILTER FABRIC
NEW LOCATION
OF SILT FENCE
A TEMPORARY STONE CONSTRUCTION ENTRANCE WILL BE INSTALLED NEAR THE INTERSECTION OF THE GRAVEL
TRAILS AT THE SOUTHWEST CORNER OF THE CONSTRUCTION SITE.
CRITICAL AREAS HAVE BEEN IDENTIFIED IN THE PLAN. THE AREA SURROUNDING THE SITE AND THE TIDAL
WETLAND HAS BEEN DESIGNATED AS CRITICAL. THIS AREA HAS VEGETATION WHICH WOULD EXPERIENCE
SERIOUS DEGRADATION IF SEDIMENT WERE TO LEAVE THE SITE. THEREFORE, CARE SHALL BE TAKEN TO AVOID
LAND DISTURBANCE IN THIS AREA, AND SEDIMENT MUST BE TRAPPED BEFORE IT LEAVES THE SITE.
ANY SAND FILTERS RECEIVING RUNOFF PRIOR TO THE COMPLETION OF CONSTRUCTION SHALL BE RESTORED TO
ORIGINAL CONDITIONS.
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
S
* VIRGINIA STATE MINIMUM STANDARDS AND SPECIFICATION NUMBER
NOT TO SCALE
FILL PLACEMENT NEXT TO GABION WALL
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I
M
E
I S
S U
E
D
A T
E
F I
M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
J U
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG506
P C
G D
W G
SECTION I GENERAL INFORMATION
SECTION II EROSION AND SEDIMENT CONTROL
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
GENERAL INFORMATION SHEET
THE SWPPP GENERAL INFORMATION SHEETS ARE TO BE COMPLETED AND INCLUDED IN THE
CONSTRUCTION PLAN SET (OR OTHER SUCH DOCUMENTS) FOR LAND DISTURBANCE (CONSTRUCTION)
ACTIVITIES THAT DISTURB AN AREA EQUAL TO OR GREATER THAN 10,000 SQUARE FEET, OR EQUAL TO
OR GREATER THAN 2,500 SQUARE FEET IN THE AREA DEFINED AS TIDEWATER, VIRGINIA IN THE
VIRGINIA CHESAPEAKE BAY PRESERVATION ACT.
THE CONTRACTOR WILL ENSURE THAT THE INFORMATION SHOWN ON THE SWPPP GENERAL INFORMATION
SHEETS IS UPDATED/REVISED AS NECESSARY IN ORDER TO REFLECT CHANGES THAT MAY OCCUR DURING THE
CONSTRUCTION PHASE OF THE LAND DISTURBING (CONSTRUCTION) ACTIVITY. THE UPDATED/REVISED SHEETS
SHALL BE MAINTAINED WITH THE DESIGNATED RECORD SET OF PLANS (OR OTHER SUCH DOCUMENTS)FOR THE
LAND DISTURBANCE (CONSTRUCTION) ACTIVITY.
DENOTES INFORMATION THAT IS TO BE PROVIDED/COMPLETED BY THE RLD.
DENOTES INFORMATION THAT IS TO BE PROVIDED/COMPLETED BY THE CONTRACTOR.
3. THIS PROPOSED ACTIVITY DISTURBS ONE ACRE OR GREATER AND REQUIRES COVERAGE UNDER THE
VPDES GENERAL PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES
(THE VPDES CONSTRUCTION PERMIT) AS ISSUED BY THE DEQ. A COPY OF THE VPDES CONSTRUCTION
PERMIT (VAR10), THE REGISTRATION INFORMATION AND THE PERMIT COVERAGE LETTER RECEIVED FROM
DEQ SHALL BE MAINTAINED WITH OTHER SWPPP DOCUMENTS FOR THIS LAND DISTURBING
(CONSTRUCTION) ACTIVITY.
2. THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY SITE IS LOCATED IN NEWPORT NEWS, VIRGINIA AND
APPROXIMATELY 46.5 ACRES WILL BE DISTURBED BY EXCAVATION, GRADING OR OTHER CONSTRUCTION
ACTIVITIES.
4. THE ESC AND SWM PLANS (WHERE APPLICABLE) FOR THIS LAND DISTURBANCE (CONSTRUCTION)
ACTIVITY HAVE BEEN DEVELOPED IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL AND
STORMWATER MANAGEMENT STANDARDS AND SPECIFICATIONS AS APPROVED BY VIRGINIA DEQ.
5. THE CONTRACTOR IS DESIGNATED AS THE RLD FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY.
6. THE LOCATION OF ON-SITE SUPPORT FACILITIES THAT WILL BE COVERED UNDER THE VPDES CONSTRUCTION
PERMIT COVERAGE FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY SHALL BE PROVIDED BY THE
CONTRACTOR AND IDENTIFIED ON THE RECORD SET OF PLANS OR IN OTHER APPROPRIATE CONTRACT
DOCUMENTS. SUPPORT FACILITIES SHALL INCLUDE, BUT NOT BE LIMITED TO, BORROW AND DISPOSAL AREAS, CONSTRUCTION AND WASTE MATERIAL STORAGE AREAS, EQUIPMENT AND VEHICLE WASHING, MAINTENANCE, STORAGE AND FUELING AREAS, STORAGE AREAS FOR FERTILIZERS, FUELS OR CHEMICALS, CONCRETE WASH OUT
AREAS, SANITARY WASTE FACILITIES AND ANY OTHER AREAS THAT MAY GENERATE A STORMWATER OR
NON-STORMWATER DISCHARGE DIRECTLY RELATED TO THE CONSTRUCTION SITE.
1. THE INTENDED SEQUENCE AND TIMING OF ACTIVITIES THAT DISTURB SOILS AT THE SITE
(E.G., GRUBBING, EXCAVATION, GRADING, UTILITIES AND INFRASTRUCTURE INSTALLATION, ETC.)
SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE INCLUDED WITH THE OTHER SWPPP
DOCUMENTS FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY.
2. DIRECTIONS OF STORMWATER FLOW AND APPROXIMATE SLOPES ANTICIPATED AFTER MAJOR
GRADING ACTIVITIES ARE IDENTIFIED IN THE CONSTRUCTION PLAN SET (OR OTHER SUCH
DOCUMENTS) FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY.
3. AREAS OF SOIL DISTURBANCE AND AREAS OF THE SITE WHICH WILL NOT BE DISTURBED ARE
IDENTIFIED IN THE CONSTRUCTION PLAN SET (OR OTHER SUCH DOCUMENTS) FOR THIS LAND
DISTURBANCE (CONSTRUCTION) ACTIVITY.
4. LOCATIONS OF MAJOR STRUCTURAL AND NONSTRUCTURAL ESC MEASURES INTENDED TO
FILTER, SETTLE OR SIMILARLY REMOVE SEDIMENT ARE IDENTIFIED IN THE CONSTRUCTION PLAN
SET (OR OTHER SUCH DOCUMENTS) FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY.
5. LOCATIONS WHERE VEGETATIVE STABILIZATION PRACTICES ARE EXPECTED TO OCCUR ARE
IDENTIFIED IN THE CONSTRUCTION PLAN SET (OR OTHER SUCH DOCUMENTS) FOR THIS LAND
DISTURBANCE (CONSTRUCTION) ACTIVITY.
6. A DESCRIPTION OF INTERIM AND PERMANENT STABILIZATION PRACTICES FOR THE SITE ARE
IDENTIFIED IN THE APPLICABLE SECTIONS OF THE DOCUMENTS IDENTIFIED IN THE NOTE 1 OF
SECTION III.
7. A RECORD OF THE DATES WHEN MAJOR GRADING ACTIVITIES OCCUR, WHEN CONSTRUCTION
ACTIVITIES TEMPORARILY OR PERMANENTLY CEASE ON A PORTION OF THE SITE, AND WHEN
STABILIZATION MEASURES ARE INITIATED WILL BE PROVIDED BY THE CONTRACTOR AND
MAINTAINED WITH THE RECORD SET OF PLANS OR OTHER SWPPP DOCUMENTS FOR THIS LAND
DISTURBANCE (CONSTRUCTION) ACTIVITY.
8. A DESCRIPTION AND SCHEDULE OF PROCEDURES TO MAINTAIN VEGETATION, EROSION AND
SEDIMENT CONTROL MEASURES AND OTHER PROTECTIVE MEASURES IN GOOD AND EFFECTIVE
OPERATING CONDITIONS ARE IDENTIFIED IN THE DEQ'S EROSION AND SEDIMENT CONTROL
HANDBOOK
9. NUTRIENTS SHALL NOT BE APPLIED DURING RAINFALL EVENTS.
11. THE TEMPORARY EROSION AND SILTATION CONTROL ITEMS SHOWN ON THE ESC PLAN FOR
THIS LAND DISTURBING (CONSTRUCTION) ACTIVITY ARE INTENDED TO PROVIDE A GENERAL PLAN
FOR CONTROLLING EROSION AND SEDIMENT WITHIN THE PROJECT LIMITS. THE ESC PLAN IS BASED
ON FIELD CONDITIONS AT THE TIME OF PLAN DEVELOPMENT AND AN ASSUMED SEQUENCE OF
CONSTRUCTION FOR THE PROJECT. THE CONTRACTOR, IN CONJUNCTION WITH USACE AND/OR THE ESC
INSPECTOR, SHALL ADJUST THE LOCATION, QUANTITY AND TYPE OF EROSION AND SEDIMENT CONTROL
ITEMS REQUIRED BASED ON THE ACTUAL FIELD CONDITIONS ENCOUNTERED AT THE TIME OF CONSTRUCTION
AND THE ACTUAL SCHEDULING AND SEQUENCING OF THE CONSTRUCTION ACTIVITIES. SIGNIFICANT CHANGES
TO THE PROPOSED ESC PLAN (E.G., THOSE THAT REQUIRE AN ENGINEERING ANALYSIS) SHALL BE SUBMITTED
TO USACE FOR REVIEW AND APPROVAL. ANY CHANGES TO THE PROPOSED ESC PLAN MUST BE NOTED ON THE
DESIGNATED RECORD SET OF PLANS WHICH SHALL BE RETAINED ON THE PROJECT SITE AND MADE AVAILABLE
UPON REQUEST DURING NORMAL BUSINESS HOURS.
12. THE AREAS BEYOND THE PROJECT'S CONSTRUCTION AREA ARE TO BE PROTECTED FROM SILTATION.
PERIMETER CONTROLS SUCH AS SILT FENCE, DIVERSION DIKES, TURBIDITY CURTAINS, ETC. SHALL BE
INSTALLED PRIOR TO ANY GRUBBING OPERATIONS OR OTHER EARTH MOVING ACTIVITIES.
13. TEMPORARY EARTHEN STRUCTURES SUCH AS DIKES AND BERMS ARE TO BE STABILIZED IMMEDIATELY
UPON INSTALLATION. STABILIZATION MAY INCLUDE TEMPORARY OR PERMANENT SEEDING, RIPRAP, AGGREGATE, SOD, MULCHING, AND/OR SOIL STABILIZATION BLANKETS AND MATTING IN CONJUNCTION WITH SEEDING.
14. THE CONTRACTOR SHALL PLAN AND IMPLEMENT HIS LAND DISTURBANCE OPERATIONS IN ORDER TO:
A. CONTROL THE VOLUME AND VELOCITY OF STORMWATER RUNOFF WITHIN THE SITE TO MINIMIZE EROSION.
B. CONTROL THE PEAK FLOW RATES, VOLUME AND VELOCITY OF STORMWATER DISCHARGES
TO MINIMIZE EROSION AT OUTLETS AND IN DOWNSTREAM CHANNELS.
C. MINIMIZE THE AMOUNT OF SOIL EXPOSED.
D. MINIMIZE THE DISTURBANCE OF STEEP SLOPES.
E. MINIMIZE SEDIMENT DISCHARGE FROM THE SITE.
F. PROVIDE AND MAINTAIN NATURAL BUFFERS AROUND SURFACE WATERS, DIRECT STORMWATER RUNOFF TO
VEGETATED AREAS AND MAXIMIZE STORMWATER INFILTRATION, UNLESS INFEASIBLE.
G. MINIMIZE SOIL COMPACTION (EXCEPT IN THOSE AREAS WHERE COMPACTION IS REQUIRED BY THE CONTRACT
DOCUMENTS) AND PRESERVE TOPSOIL WHERE FEASIBLE.
15. THE NAME OF THE INDIVIDUAL(S) OR CONTRACTOR(S) RESPONSIBLE FOR THE INSTALLATION AND
MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE SUPPLIED BY THE
CONTRACTOR AND MAINTAINED WITH THE OTHER SWPPP DOCUMENTS FOR THIS LAND DISTURBANCE
(CONSTRUCTION) ACTIVITY.
16. SOIL STOCKPILES TEMPORARILY PLACED WITHIN THE PROJECT AREA OR ON RIGHT OF WAY
OR EASEMENT SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES.
7. THE LOCATION OF THE ON-SITE RAIN GAGE THAT WILL BE USED TO DETERMINE THE OCCURRENCE OF A MEASURABLE
STORM EVENT FOR
THE PURPOSES OF ESC AND POLLUTION PREVENTION INSPECTIONS WILL BE PROVIDED BY THE CONTRACTOR AND
IDENTIFIED ON THE RECORD
SET OF PLANS OR IN OTHER APPROPRIATE SWPPP DOCUMENTS FOR THIS LAND DISTURBANCE (CONSTRUCTION)
ACTIVITY.
THE RAIN GAGE SHALL BE OBSERVED DAILY AT (INSERT TIME) TO DETERMINE THE OCCURRENCE OF A MEASURABLE
STORM EVENT (I.E., 0.25 INCHES OF RAINFALL OR GREATER IN A 24 HOUR PERIOD). A LOGBOOK SHALL BE MAINTAINED
TO RECORD OBSERVATION INFORMATION WHICH SHALL INCLUDE:
(1) THE DATE, (2) THE TIME, (3) WHETHER OR NOT RAINFALL IS OCCURRING AT THE TIME OF THE OBSERVATION,
(4) THE AMOUNT OF ACCUMULATED RAINFALL IN THE GAGE, IF ANY, AND (5) WHETHER OR NOT AN INSPECTION IS
REQUIRED BASED ON THE AMOUNT OF ACCUMULATED RAINFALL IN THE GAGE.
IF THERE IS NO RAINFALL OCCURRING AT THE TIME OF THE OBSERVATION, THE OBSERVATION INFORMATION SHALL BE
NOTED IN THE LOG BOOK AND THE RAIN GAGE EMPTIED AND REPLACED. AN INSPECTION IS REQUIRED IF THERE IS 0.25
INCHES OR MORE ACCUMULATION NOTED IN THE RAIN GAGE.
IF THERE IS RAINFALL OCCURRING AT THE TIME OF THE OBSERVATION, THE OBSERVATION INFORMATION IS TO BE
NOTED IN THE LOG BOOK. THE RAIN GAGE IS NOT TO BE EMPTIED BUT LEFT TO ACCUMULATE ADDITIONAL RAINFALL
UNTIL THE CONCLUSION OF THE RAINFALL EVENT. AT THE CONCLUSION OF THE RAINFALL EVENT, AN OBSERVATION OF
THE RAIN GAGE SHALL BE MADE AND THE OBSERVATION INFORMATION SHALL BE NOTED IN THE LOG BOOK AND THE
RAIN GAGE EMPTIED AND REPLACED. AN INSPECTION IS REQUIRED IF THERE IS 0.25 INCHES OR MORE ACCUMULATION
NOTED IN THE RAIN GAGE.
10. ALL ENGINEERING CALCULATIONS SUPPORTING THE DESIGN OF EROSION AND SEDIMENT
CONTROL MEASURES PROPOSED FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY ARE
CONTAINED IN THE PROJECT DRAINAGE FILE LOCATED IN THE OFFICE AND WILL BE MADE AVAILABLE
FOR REVIEW UPON REQUEST DURING NORMAL BUSINESS HOURS.
THE INFORMATION CONTAINED IN THE SWPPP GENERAL INFORMATION SHEETS IS INTENDED TO
COMPLY WITH THE REQUIREMENTS OF THE VPDES GENERAL PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES (THE VPDES CONSTRUCTION PERMIT) ISSUED
JULY 1, 2014.
17. A CONSTRUCTION ENTRANCE OR OTHER APPROVED MEASURE SHALL BE INSTALLED AT ALL
LOCATIONS WHERECONSTRUCTION VEHICULAR TRAFFIC ACCESS ROUTES INTERSECT A PAVED
OR A PUBLIC ROAD IN ORDER TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING
ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR A PUBLIC ROAD
SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH WORK DAY BY SHOVELING
OR SWEEPING. REMOVED SEDIMENT SHALL BE DISPOSED OF IN ACCORDANCE WITH DEQ'S STORMWATER
POLLUTION PREVENTION PLAN REQUIREMENTS.
8. THE NAME OF THE CONTRACTOR INDIVIDUAL(S) RESPONSIBLE FOR THE INSPECTION OF THE EROSION AND SEDIMENT
CONTROL AND POLLUTION PREVENTION MEASURES ON THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY IS
IDENTIFIED AND MAINTAINED WITH THE OTHER SWPPP DOCUMENTS FOR THIS LAND DISTURBANCE (CONSTRUCTION)
ACTIVITY (NOTE: INDIVIDUAL(S) SHALL BE CERTIFIED THROUGH THE DEQ ESC INSPECTOR CERTIFICATION PROGRAM AND
SHALL BE KNOWLEDGEABLE IN THE AREA OF POLLUTION PREVENTION AT CONSTRUCTION SITES).
1. ACTIVITY DESCRIPTION - THIS PROJECT CONSISTS OF BUILDING A NEW AVIATION COMPLEX WHICH
INCLUDES CONSTRUCTION OF APRON AREA, HANGAR , ADMINISTRATIVE BUILDING, PARKING LOTS, ACCESS
ALLEY AND ELEVATED TAXIWAY.
Sheet 1 of 3
Revised 10/21/15
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I
M
E
I S
S U
E
D
A T
E
F I
M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
J U
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG507
P C
G D
W G
SECTION III SWPPP
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
GENERAL INFORMATION SHEET
THE SWPPP GENERAL INFORMATION SHEETS ARE TO BE COMPLETED AND INCLUDED IN THE
CONSTRUCTION PLAN SET (OR OTHER SUCH DOCUMENTS) FOR LAND DISTURBANCE (CONSTRUCTION)
ACTIVITIES THAT DISTURB AN AREA EQUAL TO OR GREATER THAN 10,000 SQUARE FEET, OR EQUAL TO
OR GREATER THAN 2,500 SQUARE FEET IN THE AREA DEFINED AS TIDEWATER, VIRGINIA IN THE
VIRGINIA CHESAPEAKE BAY PRESERVATION ACT.
THE CONTRACTOR ENSURE THAT THE INFORMATION SHOWN ON THE SWPPP GENERAL INFORMATION
SHEETS IS UPDATED/REVISED AS NECESSARY IN ORDER TO REFLECT CHANGES THAT MAY OCCUR DURING THE
CONSTRUCTION PHASE OF THE LAND DISTURBING (CONSTRUCTION) ACTIVITY. THE UPDATED/REVISED SHEETS
SHALL BE MAINTAINED WITH THE DESIGNATED RECORD SET OF PLANS (OR OTHER SUCH DOCUMENTS)FOR THE
LAND DISTURBANCE (CONSTRUCTION) ACTIVITY.
DENOTES INFORMATION THAT IS TO BE PROVIDED/COMPLETED BY THE RLD (CONTRACTOR).
DENOTES INFORMATION THAT IS TO BE PROVIDED/COMPLETED BY THE CONTRACTOR.
1. ALL DOCUMENTS RELATED TO THE SWPPP FOR THIS LAND DISTURBANCE (CONSTRUCTION)
ACTIVITY SHALL BE MAINTAINED AT THE ACTIVITY SITE AND SHALL BE READILY AVAILABLE FOR
REVIEW UPON REQUEST DURING NORMAL BUSINESS HOURS. SUCH DOCUMENTS INCLUDE, BUT
ARE NOT LIMITED TO, THE CONSTRUCTION PLANS (OR OTHER SUCH DOCUMENTS), THE ESC PLAN, THE POLLUTION PREVENTION PLAN, THE POST CONSTRUCTION SWM PLAN (IF APPLICABLE), THE
STANDARDS AND SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS, SPECIAL
PROVISIONS AND SPECIAL PROVISION COPIED NOTES. DOCUMENTS RELATED TO STORMWATER
POLLUTION PREVENTION WHICH ARE NOT A PART OF THOSE DOCUMENTS REFERENCED ABOVE,
SUCH AS A COPIES OF THE VPDES CONSTRUCTION PERMIT COVERAGE LETTER (WHEN
APPLICABLE) AND THE VPDES GENERAL PERMIT FOR DISCHARGES OF STORMWATER FROM
CONSTRUCTION ACTIVITIES (WHEN APPLICABLE) AND THOSE REQUIRED TO BE DEVELOPED BY
THE CONTRACTOR FOR POLLUTION PREVENTION ASSOCIATED WITH ANY ON-SITE SUPPORT
FACILITIES BEING INCLUDED IN THE VPDES CONSTRUCTION PERMIT COVERAGE FOR THIS LAND
DISTURBANCE (CONSTRUCTION) ACTIVITY ARE TO BE MAINTAINED AT THE ACTIVITY SITE WITH THE
OTHER SWPPP DOCUMENTS FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY. WHERE
NO FACILITIES ARE AVAILABLE AT THE ACTIVITY SITE TO MAINTAIN THE SWPPP DOCUMENTS, THEY ARE TO BE KEPT BY OR WITH THE DESIGNATED RLD AT A LOCATION CONVENIENT TO THE
ACTIVITY SITE WHERE THEY WOULD BE MADE AVAILABLE FOR REVIEW UPON REQUEST DURING
NORMAL BUSINESS HOURS.
2. THE SWPPP AND ANY SUBSEQUENT AMENDMENTS, MODIFICATIONS AND UPDATES SHALL BE
IMPLEMENTED FROM COMMENCEMENT OF LAND DISTURBANCE UNTIL TERMINATION OF VPDES
CONSTRUCTION PERMIT COVERAGE OR COMPLETION OF LAND DISTURBANCE (CONSTRUCTION)
ACTIVITIES WHERE NO VPDES CONSTRUCTION PERMIT COVERAGE IS REQUIRED.
7. THE SWPPP SHALL BE MADE AVAILABLE FOR REVIEW BY THE PUBLIC UPON REQUEST. SUCH
REVIEWS SHALL BE AT A TIME AND PUBLICLY ACCESSIBLE LOCATION AND SHALL BE SCHEDULED
DURING NORMAL BUSINESS HOURS AND NO LESS THAN ONCE PER MONTH.
1. THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY UTILIZES THE PART IIB TECHNICAL CRITERIA (I.E., RUNOFF
REDUCTION METHOD, ENERGY BALANCE EQUATION, ETC.) IN SECTION 9VAC25-870-62 ET SEQ. OF THE VSMP
REGULATIONS.
3. A DESCRIPTION OF ALL POST-CONSTRUCTION STORMWATER MANAGEMENT MEASURES THAT WILL
BE INSTALLED DURING THE CONSTRUCTION PROCESS TO CONTROL POLLUTANTS IN STORMWATER
DISCHARGES AFTER CONSTRUCTION OPERATIONS HAVE BEEN COMPLETED IS INCLUDED IN THE
CONSTRUCTION PLAN SET (OR OTHER SUCH DOCUMENTS) FOR THIS LAND DISTURBANCE
(CONSTRUCTION) ACTIVITY.
5. ALL ENGINEERING CALCULATIONS SUPPORTING THE DESIGN OF THE POST-CONSTRUCTION
STORMWATER MANAGEMENT MEASURES FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY, INCLUDING AN EXPLANATION OF THE TECHNICAL BASIS USED TO SELECT THE PRACTICES, ARE
CONTAINED IN THE PROJECT DRAINAGE FILE LOCATED IN THE FIELD OFFICE AND WILL BE MADE
AVAILABLE FOR REVIEW UPON REQUEST DURING NORMAL WORKING BUSINESS HOURS.
THE INFORMATION CONTAINED IN THE SWPPP GENERAL INFORMATION SHEETS IS INTENDED TO
COMPLY WITH THE REQUIREMENTS OF THE VPDES GENERAL PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES (THE VPDES CONSTRUCTION PERMIT) ISSUED
JULY 1, 2014.
SECTION V - POLLUTION PREVENTION PLAN
1. THE FOLLOWING NON-STORMWATER DISCHARGES FROM THIS LAND DISTURBING (CONSTRUCTION)
ACTIVITYAND ANY ON-SITE SUPPORT FACILITIES ARE PROHIBITED:
A. WASTEWATER FROM CONCRETE WASHOUTS.
B. WASTEWATER FROM THE WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE
OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS.
C. FUELS, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND
MAINTENANCE.
D. OILS, TOXIC SUBSTANCES OR HAZARDOUS SUBSTANCES FROM SPILLS OR OTHER RELEASES.
E. SOAPS, SOLVENTS OR DETERGENTS USED IN EQUIPMENT AND VEHICLE WASHING.
F. THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN
TRACE AMOUNTS
SECTION IV POST CONSTRUCTION STORMWATER MANAGEMENT
2. THE FOLLOWING NON-STORMWATER DISCHARGES FROM THIS LAND DISTURBING (CONSTRUCTION)
ACTIVITY AND ANY ON-SITE SUPPORT FACILITIES ARE ALLOWED WHEN DISCHARGED IN
COMPLIANCE WITH THE VPDES CONSTRUCTION PERMIT:
A. DISCHARGES FROM FIRE FIGHTING ACTIVITIES.
B. FIRE HYDRANT FLUSHINGS.
C. WATERS USED TO WASH VEHICLES OR EQUIPMENT WHERE SOAPS, SOLVENTS OR
DETERGENTS HAVE NOT BEEN USED AND THE WASH WATER HAS BEEN FILTERED, SETTLED
OR SIMILARLY TREATED PRIOR TO DISCHARGE.
D. WATER USED TO CONTROL DUST THAT HAS BEEN FILTERED, SETTLED OR SIMILARLY
TREATED PRIOR TO DISCHARGE.
E. POTABLE WATER SOURCES INCLUDING UNCONTAMINATED WATERLINE FLUSHINGS.
F. ROUTINE EXTERNAL BUILDING WASH DOWN WHERE SOAPS, SOLVENTS OR DETERGENTS
HAVE NOT BEEN USED AND THE WASH WATER HAS BEEN FILTERED, SETTLED OR
SIMILARLY TREATED PRIOR TO DISCHARGE.
G. PAVEMENT WASH WATERS WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS
MATERIALS HAVE NOT OCCURRED (OR WHERE ALL SPILLED OR LEAKED MATERIAL HAS
BEEN REMOVED PRIOR TO WASHING), WHERE SOAPS, SOLVENTS OR DETERGENTS HAVE
NOT BEEN USED AND WHERE THE WASH WATER HAS BEEN FILTERED, SETTLED OR
SIMILARLY TREATED PRIOR TO DISCHARGE.
H. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE.
I. UNCONTAMINATED GROUND WATER OR SPRING WATER.
J. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH
PROCESS MATERIALS SUCH AS SOLVENTS.
K. UNCONTAMINATED EXCAVATION DEWATERING, INCLUDING DEWATERING TRENCHES AND
EXCAVATIONS THAT HAVE BEEN FILTERED, SETTLED OR SIMILARLY TREATED PRIOR TO DISCHARGE.
L. LANDSCAPE IRRIGATION.
2. THE PERMANENT ONSITE SWM FACILITIES OR OFFSITE STRATEGIES PROPOSED TO MEET THE
WATER QUALITY/QUANTITY REQUIREMENTS FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY
ARE LISTED IN SECTION VI.
ACRONYMS
BMP - BEST MANAGEMENT PRACTICE
DEQ - DEPARTMENT OF ENVIRONMENTAL QUALITY
EPA - U.S. ENVIRONMENTAL PROTECTION AGENCY
ESC - EROSION AND SEDIMENT CONTROL
RLD - RESPONSIBLE LAND DISTURBER
SWM - STORMWATER MANAGEMENT
SWPPP - STORMWATER POLLUTION PREVENTION PLAN
TMDL - TOTAL MAXIMUM DAILY LOAD
VPDES - VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM
VSMP - VIRGINIA STORMWATER MANAGEMENT PROGRAM
VESCP - VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM
3. FOR ALL ON-SITE SUPPORT FACILITIES THAT WILL BE INCLUDED IN THE VPDES CONSTRUCTION
PERMIT COVERAGE FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY, THE CONTRACTOR
SHALL DEVELOP A SWPPP IN ACCORDANCE WITH DEQ'S STORMWATER POLLUTION PREVENTION PLAN.
THE SWPPP FOR THE ON-SITE SUPPORT FACILITIES SHALL BE MAINTAINED WITH AND BECOME A
COMPONENT OF THE SWPPP FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY. SUPPORT
FACILITIES SHALL INCLUDE, BUT NOT BE LIMITED TO, BORROW AND DISPOSAL AREAS, CONSTRUCTION AND
WASTE MATERIAL STORAGE AREAS, EQUIPMENT AND VEHICLE WASHING, MAINTENANCE,
STORAGE AND FUELING AREAS, STORAGEAREAS FOR FERTILIZERS, FUELS OR CHEMICALS, CONCRETE
WASH OUT AREAS, SANITARY WASTE FACILITIES AND ANY OTHER AREAS THAT MAY GENERATE A
STORMWATER OR NON-STORMWATER DISCHARGE DIRECTLY RELATED TO THE CONSTRUCTION SITE.
3. THE CONTRACTOR SHALL DEVELOP A POLLUTION PREVENTION PLAN TO ADDRESS ANY OF HIS ON-
SITE OPERATIONS THAT HAVE A POTENTIAL TO GENERATE A POLLUTANT THAT MAY REASONABLY BE
EXPECTED TO AFFECT THE QUALITY OF STORMWATER DISCHARGES FROM THIS LAND DISTURBANCE
(CONSTRUCTION) ACTIVITY. THE POLLUTION PREVENTION PLAN SHALL BE DEVELOPED IN
ACCORDANCE WITH, BUT NOT LIMITED TO, SECTIONS 106.08, 107.02 AND 107.16 OF THE VDOT
ROAD AND BRIDGE SPECIFICATIONS AND SHALL INCLUDE A NARRATIVE WITH APPROPRIATE PLAN
DETAIL AND SHALL BE PROVIDED ON STANDARD 8.5 X 11 INCH PAPER OR LARGER AND SHALL:
A. IDENTIFY THE POTENTIAL POLLUTANT-GENERATING ACTIVITIES AND THE POLLUTANT THAT
IS EXPECTED TO BE EXPOSED TO STORMWATER.
B. DESCRIBE THE LOCATION WHERE THE POTENTIAL POLLUTANT-GENERATING ACTIVITIES
WILL OCCUR, OR IF IDENTIFIED ON THE RECORD SET OF PLANS, REFERENCE THE RECORD
SET OF PLANS.
C. IDENTIFY ALL NON-STORMWATER DISCHARGES, AS DESCRIBED IN NOTE TWO OF THIS
SECTION, THAT ARE OR WILL BE COMMINGLED WITH STORMWATER DISCHARGES FROM
THE CONSTRUCTION ACTIVITY, INCLUDING ANY ON-SITE SUPPORT ACTIVITIES.
D. IDENTIFY THE PERSON(S) OR CONTRACTOR(S) RESPONSIBLE FOR IMPLEMENTING AND
MAINTAINING THE POLLUTION PREVENTION PRACTICE OR PRACTICES FOR EACH
POLLUTANT-GENERATING ACTIVITY.
E. DESCRIBE THE POLLUTION PREVENTION PRACTICES AND PROCEDURES THAT WILL BE IMPLEMENTED TO:
1) PREVENT AND RESPOND TO LEAKS, SPILLS, AND OTHER RELEASES, INCLUDING
PROCEDURES FOR EXPEDITIOUSLY STOPPING, CONTAINING, AND CLEANING UP
SPILLS, LEAKS, AND OTHER RELEASES, AND PROCEDURES FOR REPORTING LEAKS,
SPILLS, AND OTHER RELEASES IN ACCORDANCE WITH SECTION 107.16 OF THE
VDOT ROAD AND BRIDGE SPECIFICATIONS AND THE REQUIREMENTS WITHIN
THE VPDES CONSTRUCTION PERMIT.
2) PREVENT THE DISCHARGE OF SPILLED AND LEAKED FUELS AND CHEMICALS FROM
VEHICLE FUELING AND MAINTENANCE ACTIVITIES.
3) PREVENT THE DISCHARGE OF SOAPS, SOLVENTS, DETERGENTS, AND WASH WATER
FROM CONSTRUCTION MATERIALS, INCLUDING PROCEDURES FOR THE CLEAN-UP OF
STUCCO, PAINT, FORM RELEASE OILS, AND CURING COMPOUNDS.
4) MINIMIZE THE DISCHARGE OF POLLUTANTS FROM VEHICLE AND EQUIPMENT
WASHING, WHEEL WASH WATER, AND OTHER TYPES OF WASHING.
5) DIRECT CONCRETE WASH WATER INTO A LEAK-PROOF CONTAINER OR LEAK-PROOF
SETTLING BASIN. THE CONTAINER OR BASIN SHALL BE DESIGNED SO THAT NO
OVERFLOWS CAN OCCUR DUE TO INADEQUATE SIZING OR PRECIPITATION.
HARDENED CONCRETE WASTES SHALL BE REMOVED AND DISPOSED OF IN A
MANNER CONSISTENT WITH THE HANDLING OF OTHER CONSTRUCTION WASTES.
LIQUID CONCRETE WASTES SHALL BE REMOVED AND DISPOSED OF IN A MANNER
CONSISTENT WITH THE HANDLING OF OTHER CONSTRUCTION WASH WATERS AND
SHALL NOT BE DISCHARGED TO SURFACE WATERS.
6) MINIMIZE THE DISCHARGE OF POLLUTANTS FROM STORAGE, HANDLING, AND
DISPOSAL OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTES INCLUDING
BUILDING PRODUCTS (SUCH AS ASPHALT SEALANTS, COPPER FLASHING, ROOFING
MATERIALS, ADHESIVES, AND CONCRETE ADMIXTURES), PESTICIDES, HERBICIDES,
INSECTICIDES, FERTILIZERS, LANDSCAPE MATERIALS, CONSTRUCTION AND DOMESTIC
WASTES (SUCH AS PACKAGING MATERIALS), SCRAP CONSTRUCTION MATERIALS,
MASONRY PRODUCTS, TIMBER, PIPE AND ELECTRICAL CUTTINGS, PLASTICS,
STYROFOAM, CONCRETE, AND OTHER TRASH OR BUILDING MATERIALS.
7) PREVENT THE DISCHARGE OF FUELS, OILS, AND OTHER PETROLEUM PRODUCTS,
HAZARDOUS OR TOXIC WASTES, AND SANITARY WASTES.
8) ADDRESS ANY OTHER DISCHARGE FROM ANY POTENTIAL POLLUTANT-GENERATING
ACTIVITY NOT LISTED HEREIN.
9) DESCRIBE AND IMPLEMENT PROCEDURES FOR PROVIDING POLLUTION PREVENTION
AWARENESS (INCLUDING BUT NOT LIMITED TO PREVENTION PRACTICES, DISPOSAL
PRACTICES AND APPROPRIATE DISPOSAL LOCATIONS) FOR ALL APPLICABLE WASTES
(INCLUDING ANY WASH WATER), TO APPROPRIATE PERSONNEL.
4. BY COMPLETING AND SUBMITTING THE SWPPP CERTIFICATION FORM, THE CONTRACTOR,
OR HIS AUTHORIZED REPRESENTATIVE, CERTIFIES THAT ALL DOCUMENTS IDENTIFIED HEREIN TO BE
SUPPLIED BY THE CONTRACTOR WILL BE REVIEWED, APPROVED AND INCLUDED WITH THE OTHER
SWPPP DOCUMENTS FOR THIS LAND DISTURBANCE (CONSTRUCTION) ACTIVITY PRIOR TO START
OF WORK IN THOSE AREAS IDENTIFIED BY SUCH INFORMATION.
5. FOR THOSE LAND DISTURBING (CONSTRUCTION) ACTIVITIES REQUIRING COVERAGE UNDER THE
VPDES CONSTRUCTION PERMIT, THE SWPPP SHALL BE MADE AVAILABLE FOR REVIEW UPON
THE REQUEST OF THE DEQ, THE EPA, THE VSMP AUTHORITY, THE VESCP AUTHORITY,
LOCAL GOVERNMENT OFFICIALS OR THE OPERATOR OF A MUNICIPAL SEPARATE STORM SEWER
SYSTEM (MS4) RECEIVING DISCHARGE FROM THE CONSTRUCTION SITE.
6. FOR THOSE LAND DISTURBING (CONSTRUCTION) ACTIVITIES REQUIRING COVERAGE UNDER THE
VPDES CONSTRUCTION PERMIT, THE CONTRACTOR SHALL POST, OR HAVE POSTED, A COPY
OF THE GENERAL PERMIT COVERAGE LETTER, NOTING THE NAME AND CONTACT INFORMATION
FOR THE ANC PERSON RESPONSIBLE FOR THE LAND DISTURBING (CONSTRUCTION) ACTIVITY AND
ITS SWPPP, OUTSIDE THE PROJECT'S CONSTRUCTION OFFICE ALONG WITH OTHER FEDERAL AND
STATE MANDATED INFORMATION. WHERE THERE IS NO CONSTRUCTION OFFICE (E.G., A
MAINTENANCE ACTIVITY), THE PERMIT COVERAGE LETTER IS TO BE MAINTAINED WITH THE OTHER
SWPPP DOCUMENTS FOR THE LAND DISTURBING (CONSTRUCTION) ACTIVITY.
Sheet 2 of 3
Revised 10/21/15
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
SHEET OF
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I
M
E
I S
S U
E
D
A T
E
F I
M
B E
R
1 2 3 4 5
D
C
B
A
R T
A
S
U B
M I T
T A
L
J U
P R
O J E
C O
N T
R A
M A
R K
D E
S C
R I P
T I O
N D
A T
E
PHASE 1
W R
S
Z
A M
A N
S
Z
A M
A N
T
C
H A
O
H
W
E A
V E
R
A V
I A
T I O
N
C
O M
P L
E X
V O
L U
S
I T
E
C
O N
S T
R U
C T
I O
N
N O
R F
O L
K
D
I S
T R
I C
T
N O
R F
O L
K
V
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
CG508
P C
G D
W G
Sheet 3 of 3
State
Hydrologic
Unit Code
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
GENERAL INFORMATION SHEET
INSTALLED BMP INFORMATION
Table A
County or
City
(7)
Latitude/Longitude
(1)
LAT LONG
ALTERNATIVE BMP INFORMATION
Table B
Receiving Stream Name
(2)
BMP Type Acres Treated Per BMP
(3)
Impervious Pervious
State
Hydrologic
Unit Code
LAT
LONG
BMP Type
Impervious Pervious
(See Table 2 )
County or
City
(5)
(5) (7)
Latitude/Longitude
(1) (5)
Project Acres Treated
Per BMP (3)
Name of
Nutrient
Bank or
Broker
(6)
Nutrient Credits
(lbs./acre/year)
Acquired
(3) (6)
THE SWPPP GENERAL INFORMATION SHEETS ARE TO BE COMPLETED AND INCLUDED IN THE
CONSTRUCTION PLAN SET (OR OTHER SUCH DOCUMENTS) FOR LAND DISTURBANCE (CONSTRUCTION)
ACTIVITIES THAT DISTURB AN AREA EQUAL TO OR GREATER THAN 10,000 SQUARE FEET, OR EQUAL TO
OR GREATER THAN 2,500 SQUARE FEET IN THE AREA DEFINED AS TIDEWATER, VIRGINIA IN THE
VIRGINIA CHESAPEAKE BAY PRESERVATION ACT.
THE CONTRACTOR WILL ENSURE THAT THE INFORMATION SHOWN ON THE SWPPP GENERAL INFORMATION
SHEETS IS UPDATED/REVISED AS NECESSARY IN ORDER TO REFLECT CHANGES THAT MAY OCCUR DURING THE
CONSTRUCTION PHASE OF THE LAND DISTURBING (CONSTRUCTION) ACTIVITY. THE UPDATED/REVISED SHEETS
SHALL BE MAINTAINED WITH THE DESIGNATED RECORD SET OF PLANS (OR OTHER SUCH DOCUMENTS)FOR THE
LAND DISTURBANCE (CONSTRUCTION) ACTIVITY.
DENOTES INFORMATION THAT IS TO BE PROVIDED/COMPLETED BY THE RLD.
DENOTES INFORMATION THAT IS TO BE PROVIDED/COMPLETED BY THE CONTRACTOR.
THE INFORMATION CONTAINED IN THE SWPPP GENERAL INFORMATION SHEETS IS INTENDED TO
COMPLY WITH THE REQUIREMENTS OF THE VPDES GENERAL PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES (THE VPDES CONSTRUCTION PERMIT) ISSUED
JULY 1, 2014.
Denotes information that is to be completed by the RLD.
( ) See note referenced by number in parentheses.
(See Table 1 and 3 )
TOTAL
TOTAL
( ) See note referenced by number in parentheses.
TABLE 1: PERMANENT BMP TYPES (BASED ON 2013 VA. SWM HANDBOOK)
BIO-RETENTION BASIN
BIO-RETENTION FILTER
CONSTRUCTED STORMWATER WETLANDS
EXTENDED DETENTION BASIN
EXTENDED DETENTION BASIN ENHANCED
GRASSED SWALE
INFILTRATION BASIN
INFILTRATION TRENCH
MANUFACTURED TREATMENT DEVICE
(MTD) (8)
RETENTION BASIN I
RETENTION BASIN II
RETENTION BASIN III
SAND FILTER
VEGETATED FILTER STRIP
OTHER APPROVED TYPES (LIST TYPE)
TABLE 2: ALTERNATIVE BMP TYPES
COMPREHENSIVE SWM PLAN (REGIONAL) FACILITY
POLLUTANT LOADING PRO RATA SHARE PROGRAM
PURCHASE OF NUTRIENTS CREDITS
OTHER APPROVED OPTIONS (LIST TYPE) (4)
TABLE 3: PERMANENT BMP TYPES (BASED ON BMP CLEARING HOUSE)
SHEET FLOW TO VEGETATED FILTER STRIP
GRASS CHANNEL
SOIL COMPOST AMENDMENT
PERMEABLE PAVEMENT
INFILTRATION PRACTICE
BIORETENTION
DRY SWALE
WET SWALE
FILTERING PRACTICE
CONSTRUCTED WETLANDS
BIORENTION CONSERVATION
EXTENDED DETENTION POND
WET POND
MANUFACTURED TREATMENT DEVICE (MTD)(8)
OTHER APPROVED TYPES (LIST TYPE) (4)
SECTION VI - PERMANENT BMP INFORMATION
ACRONYMS
BMP - BEST MANAGEMENT PRACTICE
DEQ - DEPARTMENT OF ENVIRONMENTAL QUALITY
EPA - U.S. ENVIRONMENTAL PROTECTION AGENCY
ESC - EROSION AND SEDIMENT CONTROL
RLD - RESPONSIBLE LAND DISTURBER
SWM - STORMWATER MANAGEMENT
SWPPP - STORMWATER POLLUTION PREVENTION PLAN
TMDL - TOTAL MAXIMUM DAILY LOAD
VPDES - VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM
VSMP - VIRGINIA STORMWATER MANAGEMENT PROGRAM
VESCP - VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM
ANY CHANGES TO THE PROPOSED SWM PLAN OR BMPS NECESSITATED DURING THE CONSTRUCTION PHASE
OF THE PROJECT THAT AFFECTS THE PROPOSED CONSTRUCTION DETAILS OR POTENTIALLY AFFECTS THE
INFORMATION SHOWN IN THE BMP TABLES A AND/OR B SHALL BE COORDINATED BY THE RLD (CONTRACTOR) WITH
USACE. THE CONSTRUCTION PLANS AND THE BMP TABLES A AND/OR B ARE TO BE FORMALLY REVISED TO REFLECT
ANY AUTHORIZED/APPROVED CHANGES TO THE PROPOSED SWM PLAN AND/OR THE PROPOSED BMP CONSTRUCTION
DETAILS. PRIOR TO SUBMITTING FOR TERMINATION OF COVERAGE UNDER THE VPDES GENERAL PERMIT FOR THE
DISCHARGE OF STORMWATER FROM CONSTRUCTION ACTIVITIES, THE RLD SHALL HAVE THE DISTRICT MAINTENANCE
INFRASTRUCTURE MANAGER REVIEW THE BMPS INSTALLED WITH THE PROJECT (BMP TABLE A) FOR ACCEPTANCE OF
MAINTENANCE RESPONSIBILITY AND TO OBTAIN A MAINTENANCE ID NUMBER FOR EACH BMP LISTED IN BMP TABLE A.
THE RLD SHALL USE THE INFORMATION IN BMP TABLES A AND B ALONG WITH THE ASSIGNED MAINTENANCE ID NUMBER
AND THE DATE THAT THE BMP BECAME FUNCTIONAL AS A PERMANENT CONTROL MEASURE (FOR BMPS IN TABLE A
ONLY) WHEN CERTIFYING THE CONSTRUCTION OF THE BMPS AND SUBMITTING FOR TERMINATION OF COVERAGE
UNDER THE VPDES GENERAL PERMIT FOR THE DISCHARGE OF STORMWATER FROM CONSTRUCTION ACTIVITIES.
Name of Impaired
Water (9)
Revised 10/21/15
NOTES:
(1) IN DECIMAL DEGREES TO THE NEAREST ONE TEN-THOUSANDTH OF A DEGREE.
(2) FOR STREAMS WITH NO NAMES, LIST "(UNNAMED TRIBUTARY TO (CLOSEST STREAM NAME)".
(3) SHOW ACRES TREATED TO THE NEAREST ONE TENTH OR POUNDS PURCHASED TO THE NEAREST ONE
HUNDREDTH.
(4) INCLUDE AGREEMENTS WITH OFF-SITE BMP OWNERS.
(5) INFORMATION PERTAINS TO THE ALTERNATIVE BMP OPTION LOCATION, WHERE APPLICABLE.
EXCEPTION - NOT REQUIRED FOR NUTRIENT CREDIT PURCHASE OPTION.
(6) APPLIES TO THE PURCHASE OF NUTRIENT CREDITS ONLY.
(7) VIRGINIA 6TH ORDER HUC (VAHU6) EXAMPLE - YO30.
(8) FINAL APPROVED SHOP DRAWINGS OF MANUFACTURED TREATMENT DEVICES (MTDS) ARE TO BE INCLUDED
WITH THE BMP INFORMATION .
SAND FILTER\DETENTION BASIN
LINEAR SAND FILTER
VEGETATED FILTER STRIP
SAND FILTER\DETENTION BASIN NEWPORT NEWS
NEWPORT NEWS
NEWPORT NEWS
JAMES RIVER-MORRISONS CREEK
JL37
JL37
JL37
JAMES RIVER-MORRISONS CREEK
JAMES RIVER-MORRISONS CREEK
5.80 0.00 5.80
8.81 0.85 9.66
3.43 0.12 3.55
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N O
T E
S
A
T
A I L
| Sheets and Views |
| CG501 DRAINAGE STRUCTURE STANDARD DETAILS |
| CG502 DRAINAGE STRUCTURE STANDARD DETAILS |
| CG503 DRAINAGE STRUCTURE STANDARD DETAILS |
| CG504 DRAINAGE STRUCTURE STANDARD DETAILS |
| CG505 EROSION CONTROL NOTES AND DETAILS |
| CG506 EROSION CONTROL NOTES AND DETAILS |
| CG507 EROSION CONTROL NOTES AND DETAILS |
| CG508 EROSION CONTROL NOTES AND DETAILS |