IFB NUMBER: ________________________________

OFFEROR'S NAME: ____________________________

CONTRACT LINE ITEM SCHEDULE

Item Line Item No. Description Quantity Unit Price Amount

SCHEDULE I - BASE BID

Bid Items 0001 thru 0006 and 0009 refer to construction of the Fuel Pier, the Ground Vehicle Fueling Facility (GVFF) and other land based features.

0001 Construct New Fuel Pier complete, including fuel piping/pumps in pier area, fire protection, all lighting and communication in the pier area, all primary and secondary electrical distribution in the pier area, pier operator’s enclosure, and all associated work as shown on the drawings and specified, excluding items 0002 thru 0009. 1 Job XXX $____________

0002 Construct Ground Vehicle Fueling Facility complete, including fuel tanks, pumps, piping, canopy, containment drains, lighting, communication, control and alarm systems, all primary and secondary electrical distribution for the GVFF, spill control pit, and all associated work as shown on the drawings and specified, excluding items 0001, and 0003 thru 0009. 1 Job XXX $____________

0003 All demolition and construction of support facilities complete, including earthwork, paving, water lines, fencing, pier utility enclosure, oily water storage vault, sanitary sewer, storm drainage, and all associated work as shown on the drawings and specified, excluding items 0001, 0002, and 0004 thru 0009. 1 Job XXX $____________

0004 Prestressed precast concrete piles-20” square, complete including all associated work as shown on the drawings and specified, excluding items 0001 thru 0003 and 0005 thru 0009. 10,840 VLF $________ $____________

0005 Prestressed precast concrete piles-18” square, complete including all associated work as shown on the drawings and specified, excluding items 0001 thru 0004 and 0006 thru 0009. 2,478 VLF $________ $____________

0006 All work complete for removal and disposal of fuel contaminated soil exceeding 100 ppm within the

Revetment Area. Any soil encountered with visual staining, and/or olfactory evidence of petroleum contamination shall be stockpiled and tested for contamination using real-time field screening data to monitor contamination levels. Contractor shall be responsible for segregation of materials; as appropriate sampling media for laboratory analyses, proper disposal and notification to regulatory agencies. Stockpiling, protection from weather and testing is part of Basic CLIN Item 0003. 100 BCY $________ $____________

Bid Items 0007 and 0008 refer only to dredging work.

0007 Mobilization and Demobilization of Dredge Equipment, excluding items 0001 thru 0006 0008, and 0009. 1 Job XXX $____________

0008 Dredging of Fuel Pier area to a depth of -12 feet with 2-foot of allowable overdepth. Place the dredged material at NODS (Norfolk Ocean Disposal Site) complete, including all associated work as shown on the drawings and specified, excluding items 0001 thru 0007. 50,000 CY $________ $____________

TOTAL ESTIMATED AMOUNT BASE BID $______________

OPTIONAL BID ITEMS

0009 Additional amount to provide Automatic Tank Gauging (ATG) System Equipment and associated wiring, excluding tank stilling wells and empty conduit included with CLIN Item 0002. 1 Job XXX $____________

TOTAL ESTIMATED AMOUNT BASE BID PLUS OPTION ITEMS $______________