Pricing_Sheet_Grounds_Maintenance_Ver1.pdf

PDF 7 KB Posted

Attached to
Grounds Maintenance
Solicitation number
W911YU-17-R-0002
Issued by

About this file

Pricing Sheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: GUARNG Grounds Maintenance Services

SOLICITATION: W911YU-17-R-0002

NO. NAME

TOTAL

ANNUAL

COST

(BASE)

TOTAL

ANNUAL

COST

(OPT YR1)

TOTAL

ANNUAL

COST

(OPT YR2)

TOTAL

ANNUAL

COST

(OPT YR3)

1 Pest Control 12 Mths 2 Improved Grounds 5.9 Acres

Semi-improved Grounds (Incl Unimproved Grounds)

0 Acres

4 Vegetation Control 0 Acres 5 Edging 6,700 L.F.

6 Trimming 200 L.F.

7 Roads 7,970 S.Y.

8 Parking lots 13,634 S.Y.

9 Sidewalks 388 S.Y.

10 Police grounds 5.9 Acres

NO. NAME

TOTAL

ANNUAL

COST

(BASE)

TOTAL

ANNUAL

COST

(OPT YR1)

TOTAL

ANNUAL

COST

(OPT YR2)

TOTAL

ANNUAL

COST

(OPT YR3)

1 Pest Control Program 12 Mths 2 Improved Grounds 37.28 Acres

Semi-improved Grounds

5.36 Acres

4 Vegetation Control 4 Acres 5 Edging 35,900 L.F.

6 Trimming 2,700 Lineal feet 7 Roads 11,844 S.Y.

8 Parking lots 47,958 S.Y.

9 Sidewalks 3,195 S.Y.

10 Police grounds 44.75 Acres 11 Herbicide 2700 L.F.

Fort Juan Muna, Harmon Industrial Park

FINAL COST:

NOTE: Minimum of 2 cuts per month. Additional services may be required in order to comply with PWS. At least, one cut prior to drill. Government to provide drill schedule.

NOTE: Minimum of 2 cuts per month. Additional services may be required in order to comply with PWS. At least, one cut prior to drill. Government to provide drill schedule.

TOTAL 2:

TOTAL 1:

QTY / UNIT

QTY / UNIT

Barrigada Readiness Center, Barrigada

File details come from the government source that posted it. Updated .