This file contains Questions and Answers (Q&A) for a catered meals Blanket Purchase Agreement (BPA) solicitation W911YP27QA001 issued by the Department of Defense for the Utah National Guard. The solicitation is a small business set-aside with a quote deadline of December 9, 2026, and covers catered meal services across 25 identified Utah locations, primarily at National Guard Armories and Readiness Centers throughout the state. The BPA establishes a five-year base period from December 27, 2026 through December 26, 2031, with anticipated annual meal volumes of 2,535 breakfasts, 16,500 lunches, and 6,550 dinners. The Government intends to award BPAs to multiple qualified small business vendors based on best value and individual call orders will be issued to the contractor providing the most advantageous quote with verified capability to service the specific location and delivery timeframe.

Offerors may propose coverage for selected Utah locations rather than statewide service and must submit separate annual rate schedules for the base year and each subsequent ordering period, with pricing expected to remain firm for each annual ordering period, though contractors may request price adjustments at least 30 days prior to the start of the next ordering period subject to Contracting Officer approval. Offerors must provide specific per-meal pricing for breakfast, lunch, dinner, and holidays, with authorization to price weekday and weekend services differently and to establish different unit rates for individual facilities or geographic regions. Small business primes may utilize qualified local catering subcontractors for meal preparation and delivery but must perform at least 50 percent of contract performance and remain solely responsible for overall contract performance, quality control, and compliance with FAR 52.219-14 (Limitations on Subcontracting); however, the Contract Manager and Alternate Contract Manager must be direct W-2 employees of the prime contractor. The Government will verify nutritional compliance through nutrient analysis per menu item and maintain a 95 percent compliance rate on nutritional testing samples with strict 100 percent adherence to an 850 kilocalorie minimum caloric floor. Individual BPA calls are generally subject to payment within 30 days following proper WAWF invoice submission and acceptance, and the prime contractor must maintain standard Commercial General Liability insurance including product/food-borne illness liability coverage throughout the BPA term. Service Contract Labor Standards do not apply to this requirement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS (Q&A) FOR CATERED MEALS BPA (09NOV2026)

1. SAM lists December 9 as the quote deadline, while Section M lists December 7. Which date controls?

We amended W911YP27QA001 in SAM.gov solicitation on Section M to read 9 Dec 2026 for deadline on all quotes.

2. Is the intent to award BPAs to multiple qualified vendors based on best value, as described in Section M?

Yes

3. Can vendors propose coverage for selected Utah locations rather than statewide service?

Yes. Offerors may propose coverage for specific, selected Utah locations or regions rather than providing statewide coverage. Offerors must clearly identify in their technical quote the specific geographic locations and facilities they are capable of servicing in accordance with PWS.

As stated in the evaluation criteria, BPAs may be established with multiple qualified small business offerors. Following BPA establishment, individual BPA call orders will be completed and issued based on established rates to the contractor that provides the most advantageous quote, possesses verified capability to service the specific requirement location, and can meet the delivery timeframe.

4. Can a small-business prime use qualified local catering subcontractors to fulfill the meal services?

Yes. A small-business prime contractor may utilize qualified local catering subcontractors to support contract execution. However, the prime contractor is solely responsible for overall contract performance, quality control, and coordination.

Additionally, because this requirement is set-aside for small business, the prime contractor must comply with FAR 52.219-14 (Limitations on Subcontracting). Under FAR 52.219- 14(e)(2) for supplies and services, the Prime Contractor must perform at least 50 percent of contract performance and/or perform at least 50 percent of the cost of manufacturing the supplies, excluding the cost of materials.

QUESTIONS & ANSWERS (Q&A) FOR CATERED MEALS BPA (10NOV2026)

5. The November 9 Q&A refers to 50% of personnel costs, while the amended SF1449's FAR 52.219-14(e)(1) refers to the amount paid by the Government to subcontractors that are not similarly situated. Which calculation governs? For paragraph (f)(1), should compliance be measured for each call order or across the base/option period? The two selection boxes appear blank.

Compliance will be measured with each “Call Order”

6. The PWS describes a five-year base period from December 27, 2026 through December 26, 2031. May offerors submit separate annual rate schedules, and are price updates permitted during the BPA? If so, what approval process or adjustment basis applies?

Offerors must submit separate annual rate schedules for the base year and each subsequent ordering period (Years 2 through 5) as part of their initial proposal. Pricing established under the BPA is expected to remain firm for each respective annual ordering period. However, in accordance with RFO FAR 12.201-1(e)(3), the Government will review the BPA pricing at least annually. Price updates/adjustments during the life of the BPA may be submitted by the contractor for consideration [at least 30 days prior to the start of the next ordering period]. All price updates must be submitted in writing by the contractor and are subject to the review, negotiation, and written approval of the Contracting Officer.

7. May the Contract Manager and Alternate required by PWS 1.10 be qualified personnel supplied by the first-tier catering subcontractor, with full authority to coordinate daily performance for the prime?

No, The Program/Contract Manager and Alternate Program/Contract Manager must be employees of the Prime Contractor. This is required to ensure direct accountability, management oversight, and full contractual authority to act on behalf of the Contractor in accordance with PWS Section 1.10.

QUESTIONS & ANSWERS (Q&A) FOR CATERED MEALS BPA (12NOV2026)

8. Should quotes give a price per meal for breakfast, lunch and dinner, or is there a pricing sheet to complete?

Yes. Offerors must provide a specific price per meal for breakfast, lunch, dinner, and holidays in their quotes. There is no separate pricing sheet or template to complete;

offerors should present this pricing clearly within their submitted quote.

9. The solicitation lists FAR 52.222-53 (exemption from the Service Contract Labor Standards), but no wage determination is attached. Please confirm the Service Contract Labor Standards (52.222-41) do not apply to this BPA.

The Service Contract Labor Standards (SCLS) do not apply to this requirement, therefore, the Department of Labor’s Wage Determination labor rates do not apply.

10. May offerors price weekend (drill) and weekday service differently? Should holiday meals be a separate line item?

Yes. Offerors are permitted to submit different unit meal pricing for weekday and weekend (drill) services.

Additionally, holiday meals must be identified and priced as a separate line item within the quote.

11. How will compliance with the nutritional standards in PWS 5.3.1 be verified? Is a nutrient analysis per menu item sufficient documentation?

Yes. A comprehensive nutrient analysis per menu item is sufficient initial documentation to demonstrate compliance with the nutritional standards in PWS 5.3.1.

Verification Process:

Compliance will be verified through the following methods:

1. Initial Review: The Government will review the contractor's submitted nutrient analysis (or recipe cards) to confirm that each portioned meal is planned to meet the baseline standards, including the 850 kcal minimum caloric floor, carbohydrate, protein, fat, and iron parameters.

2. Operational Surveillance: During contract performance, the Government reserves the right to conduct random quality assurance evaluations of served meals.

3. Acceptable Quality Level (AQL): Compliance is measured against a 95% compliance rate on nutritional testing samples and a strict 100% adherence to the minimum caloric floor of 850 kcal per meal, as specified in PWS 5.3.1.1(b).

12. Is there a required price schedule template or format for the five annual rates? Are there page limits for the technical quote?

There is no specific Government-furnished pricing template or spreadsheet required for submission. However, offerors must present their five annual rate schedules clearly within their quote, specifying the unit price per meal for breakfast, lunch, dinner, and holidays for each performance period.

No. There is no page limit established for the technical quote. However, offerors are encouraged to keep submissions concise, clear, and directly relevant to the requirements of the PWS.

13. Is the historical workload in Technical Exhibit C (2,535 breakfasts, 16,500 lunches, 6,550 dinners) available by location or by weekend vs. weekday? This would help offerors set accurate minimum/maximum capacities in the PWS 5.4.3 coverage table.

It does not differentiate…that is the total amount of meals for the year. The majority of IDT and AT catered meal services occur at National Guard Armories and Readiness Centers throughout the state as well as other training locations throughout the state.

14. Prime contractor qualifications: May a small-business prime contractor provide contract management, scheduling, quality assurance, invoicing, and subcontractor oversight while qualified local catering subcontractors perform meal preparation and delivery?

Yes. A small-business prime contractor may perform contract management, scheduling, quality assurance, invoicing, and subcontractor oversight. The actual meal preparation and delivery may be performed by qualified local catering subcontractors. However, the Prime Contractor remains solely responsible for overall contract performance, compliance with all PWS requirements, and must ensure adherence to the Limitations on Subcontracting (FAR 52.219-14) clause incorporated in the solicitation.

15. Limitations on subcontracting: How should offerors calculate and demonstrate compliance with FAR 52.219-14 for this particular BPA, especially when using small-business catering subcontractors?

Under FAR 52.219-14(e)(2) for supplies and services, the Prime Contractor must perform at least 50 percent of contract performance and/or perform at least 50 percent of the cost of manufacturing the supplies, excluding the cost of materials. Work performed by first-tier small-business subcontractors who are "similarly situated entities" (sharing the same small-business status as the prime) counts toward the prime’s 50 percent requirement.

Offerors should include a brief narrative in their quote showing that payments to non-similarly situated subcontractors will not exceed 50 percent of the contract value (minus material costs).

16. Experience requirements: Does the five-year management experience requirement apply specifically to the prime contractor, or may relevant subcontractor experience be considered?

The five-year management experience requirement outlined in PWS 1.10.a applies specifically to the individual proposed as the Contract Manager and Alternate Contract Manager.

The individual's submitted CV must demonstrate a minimum of five (5) years of experience within the past ten (10) years in commercial or institutional food service management, regardless of whether that individual is directly employed by the Prime Contractor or the first-tier subcontractor.

17. Geographic coverage: May an offeror submit pricing for selected Utah locations or regions without proposing statewide service?

Offerors may submit pricing for selected Utah locations or regions without proposing statewide service. The Government reserves the right to make multiple awards (BPAs) by location or region to ensure full geographic coverage. Offerors must clearly identify the specific geographic areas/locations they are proposing to service in Section 5.4.3.1 of their quote.

18. Pricing structure: Are quoted prices fixed for the full five-year period, or will annual adjustments or BPA call-specific pricing be permitted?

Initial quoted meal prices are fixed and should be projected for years 1-5. Price updates/adjustments during the life of the BPA may be submitted by the contractor for consideration [at least 30 days prior to the start of the next ordering period]. All price updates must be submitted in writing by the contractor and are subject to the review, negotiation, and written approval of the Contracting Officer.

19. Payment terms: Are individual BPA calls generally subject to payment within 30 days following proper invoice acceptance, and will payment be processed through WAWF or the Government Purchase Card?

Please see page 35 of SF1449. Individual BPA calls will generally be paid out within 30 days following proper WAWF invoice submission and WAWF acceptance. If an Ordering Officer Government Purchase Card is used as a method of payment, payment will occur after the IDT or AT period of performance.

20. Licensing and insurance: Must the prime contractor independently hold Utah food-service permits, or may the licensed catering subcontractor satisfy the applicable food-preparation requirements? Are there specific insurance requirements for the prime contractor?

Licensing/Permits: The prime contractor does not need to independently hold Utah food-service permits, provided that the subcontractor performing the actual meal preparation and delivery holds all required state, local, and Utah health department permits in accordance with the PWS.

Insurance Requirements: Yes. The Prime Contractor must maintain standard Commercial General Liability insurance, including product/food-borne illness liability coverage, throughout the life of the BPA.

21. Quotation documentation: Please confirm which forms, certifications, pricing schedules, and supporting documents must accompany the initial quotation.

The instructions for submitting a bid are located on page 36 of the attached file, “SF1449_Solicitation Amendment-W911YP27QA0010001”, under the section titled “Submission of Quotes.” Please review this section carefully to ensure your quote complies with all submission requirements. A filled out SF1449, to include geographic locations will service and price per individual meals, as well as any certifications and past performance information will be sufficient.

22. PWS Section 5.4.3.1 identifies 25 Utah service locations but does not provide complete facility addresses. Could the Government provide the physical street address, city, state, and ZIP code for each location, including the applicable readiness center, armory, installation, or training facility?

Services at each of the 25 identified Utah locations will primarily take place at the respective local National Guard Armory or Readiness Center within each city. Complete physical street addresses and facility points of contact will be provided to the awardee upon BPA call contract award.

23. Technical Exhibit C provides historical annual estimates of 2,535 breakfasts, 16,500 lunches, and 6,550 dinners. However, the location-specific weekday and weekend minimum and maximum quantity fields in PWS Section 5.4.3.1 appear unpopulated. Could the Government provide a facility-level breakdown of estimated meal quantities, including anticipated weekday and weekend minimum and maximum quantities, if available?

Please refer to Solicitation posted on SAM.gov under Solicitation No. W911YP27QA001 on Section 5.4.3.1 (Geographic Table Coverage) of the Performance Work Statement (PWS) \, which has been updated to include instructions and the populated location-specific meal quantity estimates.

24. Section M requires pricing quotations, and the PWS establishes three service levels with reduced rates for Level 2 and Level 3 services.

25.

a. We did not identify a separate mandatory pricing workbook in the amended solicitation package. May offerors submit a contractor-developed pricing schedule identifying meal categories, service levels, unit rates, and proposed geographic coverage?

Yes

b. May offerors establish different unit rates for individual facilities or geographic regions, or must the same rates apply throughout their proposed service area?

26. Contract Manager, Alternate Contract Manager, and Subcontractor Structure

PWS Section 1.10 establishes specific experience, certification, availability, and post-award CV submission requirements.

a. May qualified employees of the prime contractor's catering subcontractors serve as the designated Contract Manager and Alternate Contract Manager, provided they meet the PWS qualifications and the prime contractor retains overall contractual responsibility?

No. The Contract Manager (CM) and Alternate Contract Manager (ACM) must be direct, W-2 employees of the prime contractor.

While the prime contractor retains overall contractual responsibility, the CM and ACM are designated as Key Personnel who serve as the primary points of contact for the Government. These individuals must possess the direct authority to legally bind the prime contractor and make immediate operational decisions.

To maintain clear privity of contract and ensure direct accountability, subcontractor employees are not permitted to serve in these critical oversight roles.

b. May a prime contractor holding one BPA utilize multiple qualified catering subcontractors to fulfill individual calls at different approved locations, provided the prime remains responsible for quality control, contract management, and compliance with FAR 52.219-14?

27. The November 9 Q&A confirms that qualified local catering subcontractors are permitted.

a. Must the initial technical quotation identify proposed subcontractors and include subcontractor commitment letters, business-size representations, or qualification documentation?

No, However, offerors must describe their subcontractor management approach, including how they will vet, onboard, oversee, and ensure all local catering subcontractors meet the food safety, quality, and delivery requirements of the PWS.

Specific subcontractor documentation (e.g., health permits, facility certifications, CVs) will be verified post-award prior to performance on individual calls.

b. Beyond demonstrating compliance with PWS, are specific staffing plans, sample menus, or past-performance references mandatory for initial technical acceptability?

Offerors are evaluated solely against the evaluation criteria.

28. Insurance Requirements: Are there any minimum insurance coverage limits or additional insured requirements specific to this acquisition beyond the applicable incorporated contract clauses and standard legal requirements?

No

29. Minimum Order Charges: Although PWS Section 1.2 establishes that the BPA does not guarantee a minimum purchase, may offerors propose minimum meal quantities or minimum service charges for individual orders, particularly at remote locations where transportation and staffing costs are significant?

Yes, Offerors must identify their minimum and maximum meal quantities per location (if identifying “Yes” they can service that location). They is no minimum order values, only minimum meal quantity per person per location.

All costs associated with labor, preparation, delivery, travel, and site-specific support must be fully incorporated into the proposed all-inclusive per-meal unit rates. As previously clarified, offerors are authorized to establish different unit rates for individual facilities or geographic regions; vendors should reflect higher transportation or logistical expenses associated with remote locations within their facility- or region-specific unit prices.

30. Late Government Cancellations and Quantity Reductions: PWS Section 5.4.2.1 establishes a 48-hour notice period for cancellations and quantity reductions, while Section

5.5.4 limits invoicing to accepted meal quantities. If the Government cancels or reduces an authorized BPA call with less than 48 hours' notice, after the contractor has incurred food preparation, labor, or transportation expenses, what contractual procedure applies to seeking compensation for those costs?

If the government cancels a BPA call (or Ordering Officer GPC purchase) with less than 48 hours' notice, the government would be in violation of PWS section 5.4.2.1, triggering a Constructive Change or Termination for Convenience. Because PWS 5.5.4 blocks standard invoicing for unaccepted meals, you must submit a Request for Equitable Adjustment (REA) or Settlement Proposal to the KO to obtain a contract modification for payment.