W911YP-12-B-0001-0002 Site Visit Information.doc
DOC document 39 KB Posted
- Solicitation number
- W911YP-12-B-0001
About this file
Amendment 0002 Site Visit information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911YP-12-B-0001-_Amendment_004.doc | DOC document | |
| W911YP-12-B-0001_Conformed_Solicitation_Amendment_004.doc | DOC document | |
| Photo_3.JPG | JPG image | |
| SF24_Bid_Bond_Form.pdf | ||
| Photo_2.JPG | JPG image | |
| Photo_1_(1).JPG | JPG image | |
| Davis_Bacon_UT30_Heavy.pdf | ||
| Machine_Gun_Range_131250-Bleacher.pdf | ||
| Machine_Gun_Range_Bid_Opening_Location_Camp_Williams_Map.pdf | ||
| Davis_Bacon_UT09_Building.pdf | ||
| Master_Response_Pre_bid_Questions_Bid_No_W911YP-12-B-0001.docx | DOCX document | |
| W911YP-12-B-0001-0003_Machine_Gun_Range.doc | DOC document | |
| W911YP-12-B-0001-0002 Site Visit Attendees.pdf | ||
| W911YP-12-B-0001-0001 Amended Solicitation Machine Gun Range.doc | DOC document | |
| W911YP-12-B-0001-0001 SF30 Multi Purpose Machine Gun Range.doc | DOC document | |
| W911YP-12-B-0001 Multi Purpose Machine Gun Range.doc | DOC document | |
| UTARNG MPMG Drawings 12-July-12.pdf | ||
| UTARNG MPMG Specifications 12-July-12.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 002
4. CAD drawings were requested for the earthwork section of the project. They have been distributed at the Site visit. If additional copies are needed, contact the Contracting Officer.
5. Bid opening is rescheduled for 25 September 2012 at 2:00 p.m. MST. Location remains at Camp Williams Training Site, 17800 South Camp Williams Road (Redwood Road), Building 8000, Camp Williams, Utah.
6. Questions and answers are a separate attachment.
7. No other changes at this time.
QUESTIONS AND ANSWERS 002
Answers to Some of the Questions submitted are as follows:
1. Will background checks be required for workers?
Answer: Since this is a Federal Facility, please ensure you have workers who are not illegial workers. The Department of Immigration does visit the site periodically.
2. Please clarify if this project is going to be a LEED project or not.
Answer: This project is not a LEED project. Ignore all LEED requirements.
3. Under section 012900 paragraph L sentence 12, it states that on the initial pay application we need to submit “copies of building permits”. Please advise whether we need to submit and file for a building permit on this project.
Answer: Since this project is located on Federal property, no building permit is required.
4. It looks like the actual targets and target apparatuses are not going to be part of the contract and will be provided by the Government at a later date. Are we just to provide means for them to tie into later. Please confirm this.
Answer: The actual targets and target apparatuses will be provided by the Government. More information will follow.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 24-Sep-2012 02:00 PM to 25-Sep-2012 02:00 PM.
(End of Summary of Changes)