Q&A.pdf

PDF 51 KB Posted

Attached to
Replace HVAC System Dormitory Wing A Federal contract opportunity
Solicitation number
W911YN-18-Q-5003
Issued by
Department of the Army Florida Army National Guard

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC System Dormitory Wing A, newest first.
File Type Posted
Amendment_00002_(second_site_visit).pdf PDF
SOW-Dorm_HVAC-_Revision_1.pdf PDF
Solicitation_Amendment_0001.pdf PDF
W911YN-18-Q-5003-0001.pdf PDF
Minutes_to_Site_Visit.pdf PDF
Site_Visit_Brief.pdf PDF
Sign_In_Sheet.pdf PDF
W911YN-18-Q-5003.pdf PDF
SOW-DORM_HVAC-VERSION_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A W911YN-18-Q-5003

Q1: In the bid, it states the system must be integrated to the existing Johnson Controls system. Is the existing system BACnet or N2 communication protocol?

A1: The Johnson Controls System is a Metasys FEC2621 BACnet device.

Q2. Should the new electrical be run inside the exterior soffit?

A2. This is optional; the Contractor can run the electrical along the inside of the exterior soffit or above the ceiling interior of building. The electrical must not be visible.

Q3. Should the new refrigeration lines be run inside the exterior soffit?

A3. This is optional; the Contractor can run the refrigeration lines along the inside of the exterior soffit or above the ceiling interior of building. The refrigerant lines must not be visible.

Q4. For the demolition of the existing exterior unit - please confirm this is demolition and removal with capping of lines only. Not including removal of slab or replacement of vegetation surrounding unit.

A4. Yes, drain old unit, demo it and cap off lines right above the ground. No, the Contractor does not have to demo concrete slab or remove any vegetation surrounding the old unit.

Q5. For new slab to support new exterior unit - please confirm this is to be designed and installed per unit requirements for weight on existing grassy area to the exterior of the building.

A5. The design of new slab must be requirement for load of new unit per manufacturer recommendation for the new unit.

Q6. For the new interior unit, please confirm there is not a specific unit design for size or dimensions, the only requirement is the new unit meets the specifications published and fits in the existing interior motor room.

A6. This is the AHU (interior unit), no specific unit design. New unit must fit on existing unit pad and fit inside Mechanical room, meeting all requirements per manufacturer recommendations.