W911XK20R0011-0001.pdf

PDF 3 MB Posted

Attached to
UNION STREET DAM FISH PASS
Solicitation number
W911XK20R0011
Issued by

About this file

This document is an amendment to a federal solicitation for the construction of the Union Street Dam Fish Pass project. The amendment extends the proposal due date from July 17, 2020 to July 31, 2020 and adds questions and answers received from interested offerors. It also modifies the contracting officer's contact information. The project involves constructing a fish passage, research channel, headworks, and related structures and features at the Union Street Dam in Traverse City, Michigan. Electronic submissions through the DOD SAFE system are required by the amended due date. The U.S. Army Corps of Engineers District Detroit is the contracting agency overseeing this project.

View the file

Other files

File Type Posted
W911XK20R0011 0004.pdf PDF
W911XK20R0011- 0003.pdf PDF
W911XK20R0011-0003.pdf PDF
W911XK20R0011-0002.pdf PDF
W911XK20R0011-0002.pdf PDF
W911XK20R0011.pdf PDF
State of Mich WRP019834 v1 Permit Final Signed.pdf PDF
RTA FOR BIDDING_06152020 Part 1.pdf PDF
W911XK20R0011.pdf PDF
AllSpecs_FinalAsBid_06.15.2020.pdf PDF
SOM Placard.pdf PDF
RTA FOR BIDDING_06152020 Part 2.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES90655862

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Add questions and answ ers received during the question period.

b. Add FAR Provision 52.228-1, Bid Gaurantee.

c. Change the Contracting Officer from Stephen Schw artz to Justin Bennett in the Notes to Offers, Submission of Proposals, and FAR

Provision 52.233-2.

d. Extend the due date for proposals from 17 July 2020 at 1000 ET to 31 July 2020 at 1000 ET.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK20R0011

X 9B. DATED (SEE ITEM 11)

19-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2020

CODE

U.S.ARMY ENGINEER DISTRICT, DETROIT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK20R0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 17-Jul-2020 10:00 AM to 31-Jul-2020 10:00 AM.

The following have been modified:

NOTES TO OFFERORS

REQUESTS FOR INFORMATION

Questions/Inquiries. All questions pertaining to this requirement shall be submitted in writing no later than, fifteen

(15) business days proir to proposal due date. The offeror shall put the solicitation number located in Block 1 of the

SF 1449 followed by QUESTIONS in the subject line of the email. All questions received after the above date and time WILL NOT BE ANSWERED.

Questions shall be submitted to Brien Neal Burner, Contract Specialist at brien.n.burner@usace.army.mil and Justin

Bennett, Contracting Officer at Justin.K.Bennett@usace.army.mil.

Once all inquiries are compiled and addressed, the questions and answers will be generated as an amendment and posted to the beta.sam.gov website for all interested parties to view/acknowledge to be sent in with their submission prior to the closing date. If additional time is needed for submission, this extension will be executed on the same amendment as the questions and answers amendment.

AMENDMENTS

Acknowledgement of each amendment must be made in the space provided on the SF 1449, or by returning a signed copy of the amendment by the time set for receipt of offers to the personnel identified in 1 and 2 above.

Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. For security reasons; all potential Offerors, plan rooms and printing companies are required to register in SAM at www.sam.gov

SUBMISSION OF PROPOSALS

1. SUBMISSION OF PROPOSALS

A. All offerors are reminded to complete and submit with your proposal all FAR and DFARS Provisions related to Representations and Certifications.

B. Offerors shall complete and submit any additional full text certifications that are included in the solicitation. An offeror may also complete the certifications at https://www.sam.gov in lieu of completing the representations and certifications in this solicitation provided that all the FAR and DFARS certifications contained in the solicitation have been completed on line.

C. All offerors shall be registered at https://www.sam.gov with the NAICS code that is shown on the front page of the solicitation.

D. Remember to fill in and sign the Standard Form 1442, from the front of the Solicitation, before submission.

E. ALL RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONCIALLY.

Please see Paragraph 2 for DoD Safe procedures for electronic submission procedures.

2. ELECTRONIC PROPOSALS ACCEPTED BY DOD SAFE ONLY

https://www.sam.gov/

ALL RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY. Hand carried delivery or USPS/UPS/FEDEX delivery of hard copies and or CD-ROMs are not authorized. Facsimile submission is not authorized. Electronic Proposal Submission is required through the DOD’s Electronic File

Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE.

Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system

(https://safe.apps.mil/about.php). Instructions for uploading are as follows:

1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed fifteen (15) business days prior to proposal due date.

a. Brien Neal Burner, Contract Specialist at brien.n.burner@usace.army.mil

b. Justin Bennett, Contracting Officer at Justin.K.Bennett@usace.army.mil

2. You will receive an email with the link to submit your drop-off.

3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter

W911XK20R0011 – Firm Name.

4. Click Upload button to send documents.

5. Guest users will need to check their email to verify their email address before the recipients will be notified. No additional action is required by CAC users.

File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD

SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. If multiple drop offs are anticipated, the Offeror will need to request a new link for each additional drop off. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912QR20R0011-FIRMNAME-DOCUMENT TITLE

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously.

Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

mailto:brien.n.burner@usace.army.mil

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft

Office or Adobe Acrobat applications. Data submitted in a spreadsheet format shall be readable by MS Excel

(all cells and formulas should be unlocked).

3. OTHER ELECTRONIC PROPOSAL/FACSIMILE PROPOSALS/OFFERS NOT ACCEPTED

Facsimile proposals/offers, modifications thereto, or cancellations of proposals/offers will not be accepted.

Submittal of proposal information by electronic mail, other website, text message, or similar means will not be accepted. Hand carried delivery or USPS/UPS/FEDEX delivery of hard copies and or CD-ROMs are not authorized. Facsimile submission is not authorized.

4. AMENDMENTS

Acknowledgement of each amendment by the Offeror must be made in the space provided on the SF 1442, or by returning a signed copy of the amendment by the time set for receipt of proposals via DoD Safe only.

Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding.

Questions (on a non-attribution basis) and answers shall be furnished to all prospective Offerors via the web site. For security reasons all potential Offerors, plan rooms and printing companies are required to register in

SAM at www.sam.gov.

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

QUESTIONS AND ANSWERS

Question: There are a number of Government Furnished Material and Equipment. Can you provide a cost for these items as Michigan State Use Tax will be applicable to them?

Answer: Government Furnished Material is estimated to be $215,000

Question: Is there a required contract completion date or days? I have not been able to find this in the specifications or the solicitation. It states “See 52.211-10ALT1” in box 11, but I do not find that section in the solicitation or the specifications.

Answer: This is a clause in Section 00 70 00 of the solicitation

Question: The wage determination information references the State of Illinois. Given this project is in Traverse

City, should the determination reflect the State of Michigan?

Answer: Both Wage Determinations are in the solicitation

Question: FAR 52.236-27 states to contact Mr. Chris Schropp to arrange for a site visit. Are contractors allowed to visit the site on their own without contacting Mr. Schropp?

Answer: The site is open to the public and contractors are allowed to visit the site on their own without contacting

Mr. Schropp

Question: I need clarification on the thickness of calcium silicate on generator exhaust piping and muffler table 7 is unclear to me

Answer: 4" of calcium silicate is required on the generator exhaust piping http://www.sam.gov/

Question: Can you provide guidance on what work the specification Section 02 32 00 (Subsurface Drilling, Sampling, And Testing) applies to? It states “Geotechnical borings have been completed to inform the design of this project. Geotechnical borings and geotechnical report are provided as an attachment to this section. Provide the data to determine the type, nature, and characteristics of subsurface materials and the extent and conditions of the various materials as they exist to the depths and at the locations specified. This is to be accomplished by means of auger borings, drive sample borings, undisturbed sample borings, or test pits as necessary for construction of the project.”

I do not see any locations specified within the plan set.

Answer: This specification is provided in the event that further subsurface exploration is required or authorized by the project. At this time, no further geotechnical borings are anticipated to be required, unless desired by the contractor to further identify conditions the help with installation or equipment selection.

Question: FAR 52.211-10 references a date of 1 December 2022 for “Construction Substantially Complete, Pending

Final Establishment”. Can you please identify what scopes of the work fall under the definition of “Construction

Substantially Complete”?

Answer: Substantial Completion shall include: Labyrinth and Low Flow Weir installed, Temporary sheet piling removed, Naturalized channel with riprap bank protections, riffles, large wood and control weir in place, Headworks and research channel completed, Gates installed, tested and any manufacturer startup complete, safety devices and lockouts complete and in place, Stoplogs for divider and channel/structure closure provided and test installation of all stoplog components completed and accepted, Research building fully constructed and certificate of occupancy granted, Park open to the public and connectivity of sidewalks/boardwalks and pedestrian bridge complete, Watermain and utilties complete and accepted by CoTC, Asphalt paving complete, Open to river traffic (portage complete).

Question: Page 14 refers to drawing S-111 for the control weir. Drawing S-111 calls out detail 2/S-111 for the detail. On Detail 2/S-111 it show that the bottom elevation is 576.00. If 576 is the correct elevation the end of the footing closest to the fish passage will be on 4 feet of fill. Is it the USACE’s intention to install this on fill?

Answer: This area will require some fill to achieve final design grades. Generally excavation and backfill are covered by Specification 31 23 00.00, with specific references to 3.10.2 for 'Structures, Spread Footings and

Concrete Slabs'. This area also subject to temporary and final channel construction details (see Sheet C101 and

C104)

Question: Will the City of Traverse City waive watermain and city permit fees?

Answer: Yes, per Frank Dituri, watermain tap fees will be waived. Per John McWethy, City will also waive permit fees.

Question: Sheet C100: How are we to protect trees when sheet piling and storm sewer construction are interfering with these areas? Saving the trees is also cutting off critical access in an already constrained site. How will these areas be dealt with and will consideration be given to clearing these areas?

Answer: The owner acknowledges the site is tight for space. The owner and engineer will provide an update on the clearing limits and the apparent conflict with the storm sewer, but we do not anticipate large scale revisions of the clearing limits at this location or any others at this time. If further information is required it will be provided in a future amendment.

Question: Sheet S120: Can you provide more detail on what these are or provide guidance on where to find the detail.

Answer: This is a utility trench for the post-project installation (by others) of the PIT antenna system. It is further described on sheet E102 with additional detail on E501 (detail 4). Locations and details for the PIT channel are also located on sheets S110 and S111. This is intended to be a plastic utility trench for the owner's use to install an antenna monitoring system after the project is completed.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

The following have been modified:

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, Contracting Branch

Attn: Contracting Officer: Justin Bennett

477 Michigan Avenue, 7th floor

Detroit, Michigan, 48226-4523

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

(End of Summary of Changes)

GRAND TRAVERSE BAY

(WEST ARM )

BOARDM AN

LAKE

BOARDM AN RIVER

4" CONCRETE WALK

OUTDOOR EDUCATION

AREA & OVERLOOK

CONCRETE CURB

W/OUT GUTTER,

MDOT CURB TYPE E

ADA RAMP

UPSTREAM BOARDWALK

DECKING REPLACEMENT

UPSTREAM BOARDWALK &

ADA KAYAK LAUNCH

KAYAK BEACH LAUNCH

UPSTREAM

GRAVEL PAVING

KAYAK PORTAGE RAIL

& GRAVEL PAVING

KAYAK BEACH LAUNCH

DOWNSTREAMGRAVITY RETAINING

WALL 8

6 FT. SECURITY FENCE

GRAVITY RETAINING

WALL 6

GRAVITY RETAINING

WALL 1

4" CONCRETE WALK

CONNECT CONCRETE WALK TO

FUTURE BOARDWALK BY OTHERS

6" CONCRETE

ACCESS ROAD

PERVIOUS PAVERS

RESEARCH

BUILDING

(2) ADA PARKING SPACES

4" CONCRETE WALK

4" CONCRETE WALK

RAIN

GARDEN

6" CONCRETE

ACCESS ROAD

TREE PROTECTION

FENCING, TYP.

CONCRETE STAIRS - SOUTH

HILLSIDE (RECONSTRUCTED)

TREE PROTECTION

FENCING, TYP

TREE PROTECTION

FENCING, TYP.

(1) TRASH RECEPTACLE

TRACK FOR

GANTRY CRANE

(3) BENCH ON CONCRETE

RECONSTRUCTED EXISTING

WOOD STAIRS & BOARDWALK

BY OTHERS

(3) BIKE RACKS, TYP

GRAVITY RETAINING

WALL 9 & 10

FLOW DEFLECTOR

JAM

CONCRETE STAIRS

NORTH FISHPASS ACCESS

TREE PROTECTION

FENCING, TYP.

TURFSTONE

PAVERS

8 FT. SECURITY GATE

PERVIOUS PAVERS

(3) BIKE RACKS, TYP

GRAVITY RETAINING

WALL 7

ADA RAMP

FISHING ACCESS STONE

AMPHITHEATER

BITUMINOUS PAVING

STANDARD DUTY

(1) TRASH

RECEPTACLE

STORAGE AREA

DOUBLE SWING GATE

STORAGE AREA

SCREENING FENCE

DOWNSTREAM BOARDWALK

& ADA KAYAK LAUNCH

DOWNSTREAM (PAST UNION

ST. BRIDGE)BOARDWALK

BOARDWALK STAIRS RAIN

GARDEN

(3) BENCH ON

BOARDWALK

SECURITY FENCE BELOW

PEDESTRIAN BRIDGE

GRAVITY RETAINING WALL

4 & 5

GRAVITY RETAINING

WALL 2

GRAVITY RETAINING

WALL 3

6 FT. SECURITY FENCE

6 FT. SECURITY FENCE

6 FT. SECURITY GATE

R15'-11 2"

R98'-113 8"

R50' R250'

R108'

R26'

22'-43 8"

R20' R10'

1'-9"R25'

R50' R204'

R200' 4'-75 8"

5'-43 8"

R5'

R5'

RAIN GARDEN

30' MOTORIZED SECURITY

SLIDING GATE(1) TRASH RECEPTACLE

ON BOARDWALK

12'

8'-15 8"

8'

19'-83 8"8'

6'

R3'

66'-6"

R148'

R142'

R 15'

R5'

R25'

R5'

R10'

R15'

R10'

R2' R48'-7"

R45'-4"

R167'-81 8"

R5' R5'

R25'

R24'

R288'-8"

R99'-4"

R78'

27'-51 2"

PEDESTRIAN GUARDRAIL,

SEE L210, L211, L212.

GRAVEL PAVING

GRAVEL PAVING

GRAVEL PAVING

ALONG FENCE

PEDESTRIAN GUARDRAIL,

SEE L210, L211, L212.

PEDESTRIAN GUARDRAIL,

SEE L210, L211, L212.

PEDESTRIAN GUARDRAIL,

SEE L210, L211, L212.

PEDESTRIAN GUARDRAIL,

SEE L210, L211, L212.

4 FT. SECURITY

FENCE ON WALL

C204

MDOT C-4 CURBC204

CONCRETE CURB W/OUT

GUTTER, MDOT CURB TYPE E

C204

C204

C204

6" CONCRETE

ACCESS ROAD

4" CONCRETE WALKC204

C204 EXPOSED CURB ALONG

SLOPED WALK

BUOY BARRIER

ANCHOR, TYP.

RIFFLE & HABITAT

BOULDERS, TYP.

LEGEND

GRAVEL PAVING

SEE DETAIL 2/L213

RyanODonnell Highlight

RyanODonnell Highlight

RyanODonnell Highlight

RyanODonnell Highlight

RyanODonnell Callout How are we to protect trees when sheet piling and storm sewer construction are interfering with these areas? Saving the trees is also cutting off critical access in an already constrained site. How will these areas be dealt with and will consideration be given to clearing these areas?

RyanODonnell Line

RyanODonnell Line

RyanODonnell Line

Callout Can you provide more detail on what these are or provide guidance on where to find the detail.

Line

W911XK20R0011-0001
Sheet C100
Sheet S120

File details come from the government source that posted it. Updated .