Text version
W56MES73324906
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Low er Rouge River Old Channel Remedial Dredging, Detroit, Michigan
1. The solicitation response period is hereby extended to Wednesday, August 29, 2019, at 2:00 p.m. Eastern Time.
2. The time at w hich the Bidder Inquiry System w ill stop receiving new inquiries is hereby changed to Tuesday, August 21, 2018, at 4:00 p.m. Eastern Time.
3. Specification Section 35 80 00 QUALITY CONTROL SYSTEM AND PERSONNEL and Specif ication Section 01 20 00 PRICE AND PAYMENT PROCEDURES are amended as indicated on the follow ing pages.
4. FAR 52.252-3, Alterations in Solicitation, is updated as indicated.
5. All other provisions, clauses, terms, conditions, and requirements remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911XK18B0002
X 9B. DATED (SEE ITEM 11)
18-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2018
CODE
CONTRACTING BRANCH
USACE DETROIT DISTRICT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
H7P01A0 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK18B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT NO. 0002
The following changes are hereby incorporated into the Solicitation and resulting contract.
CHANGES TO THE SOLICITATION DOCUMENT
Section 00 21 13 – Instructions to Bidders
REPLACE:
Existing text of Paragraph 4.A.
WITH:
I. The Bidder Inquiry System will be stop receiving new inquiries on August 21, 2018, at 4:00 p.m.
Eastern Time in order to ensure that adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
CHANGES TO THE SPECIFICATION
Specification Section 35 80 00 – Quality Control System and Personnel
Existing text of Part 3.5, Paragraph A.
A. The Contractor shall install the mobile resuspension control system for use during dredging, capping, and residual cover operations in the areas as shown on the Engineering Drawings. The mobile resuspension system uses modular barges and the non-float permeable and impermeable turbidity curtains as shown on the Engineering Drawings. The Contractor shall size and install marine resuspension control systems to enclose marine Work areas as shown on the Engineering Drawings. The Contractor may not provide alternate layouts or system designs as a part of the Bid.
Specification Section 35 80 00 – Quality Control System and Personnel
Existing text of Part 3.6, Paragraph B
B. For developing the intake protection barrier design, the Contractor shall employ a third-party Professional Engineer, licensed in any State, experienced in bottom-sealed filter barrier systems used for dredging operations.
Specification Section 01 20 00 – Price and Payment Procedures
ADD the following text to Part 1.8, Paragraph E:
8. When determining quantities for payment, the Government reserves the right to either utilize the Government or Contractor survey(s). The Contractor’s survey(s) shall be performed with sufficient detail to allow quantity calculations.
Specification Section 01 20 00 – Price and Payment Procedures
ADD the following sentence at the end of Part 1.9, Paragraph I.2.a:
“The Government will always be available to either collect or process a Government Survey, or review a Contractor provided survey for sufficiency. The turnaround time for the Government's effort in either scenario will not exceed 8 hours, upon receipt of adequate survey data.”
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 22-Aug-2018 02:00 PM to 29-Aug-2018 02:00 PM.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0002
1. The solicitation response period is extended and the bid due date is CHANGED to Wednesday, August 29, 2018, at 2:00 p.m. Eastern Time.
2. The time at which the Bidder Inquiry System will stop receiving new inquiries for this solicitation is changed to Tuesday, August 21, 2018, at 4:00 p.m. Eastern Time.
3. Specification Section 35 80 00 QUALITY CONTROL SYSTEM AND PERSONNEL is amended as indicated in the Summary of Changes.
4. Specification Section 01 20 00 PRICE AND PAYMENT PROCEDURES is amended as indicated in the Summary of Changes.
Amendment 0001:
Lower Rouge River Old Channel Remedial Dredging, Detroit, Michigan
1. The applicable Construction Wage Determination for land-based work, MI180075 (MI75), is updated to the current version, Modification Number 3, Publication Date 08/03/2018.
2. Specification Section 01 45 00.00 10 QUALITY CONTROL SYSTEM AND PERSONNEL is amended as indicated in the Summary of Changes.
3. The bid due date is UNCHANGED.
(End of Summary of Changes)