Basis_of_Design_Report_Attachment_10.pdf
PDF 17 MB Posted
- Attached to
- Lower Rouge River Old Canal Remedial Dredging
- Solicitation number
- W911XK18B0002
About this file
Basis of Design Report Attachment 10
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9 Water Street, First Floor Amesbury, Massachusetts 01913
Phone 978.792.5737
A:\Projects\Honeywell\Detroit_Tar_(Rouge_River)\Design\Water Quality Monitoring\LRROC- Water Quality Memo (11-23-16).docx
M E M O R A N D U M To: Rose Ellison (USEPA – Great Lakes National
Program Office) Date: November 23, 2016
From: Chad Robinson, P.E., Jaime Harrison Rice, Paul LaRosa, P.E., Anchor QEA, LLC
Project: 130287-03.02
Cc: Chuck Geadelmann (Honeywell), Mike Ciarlo
(EA)
Re: Lower Rouge River – Old Channel: Water Quality Monitoring Approach
This memorandum presents an overview of the anticipated water quality control measures and monitoring protocols to be implemented as part of the sediment remediation of the Lower Rouge River – Old Channel (LRROC). Remedial activities include the installation of a permanent sheet pile wall along the shoreline of the northern bank of the LRROC, dredging and capping of contaminated sediments, and other temporary shoring installations and backfill to support sediment removal along submerged slopes.
Construction methodology and approach will be the first means of minimizing water quality impacts during remediation. By implementing best management practices (BMPs) as outlined within the Basis of Design Report (e.g., use of a sealed bucket, spill plate, watertight barges, etc.), combined with careful equipment operation, and contractor vigilance, the resuspension of fine particles can be minimized. Control measures, such as floating booms and turbidity curtains will also be used to control turbidity during construction.
To evaluate the performance of construction practices and control measures and to determine compliance with State and Federal laws and permits, water quality will be monitored during active construction. Turbidity will be the principal metric for water quality monitoring. Turbidity measurements will serve as a surrogate for total suspended solids (TSS). As opposed to TSS, turbidity can be measured in real-time and can provide an immediate indication of water quality conditions. Turbidity will be measured in nephelometric turbidity units (NTU) at points downstream of the construction operations.
Turbidity measurements will be compared to ambient water quality conditions measured at a designated background monitoring point (the background monitoring location may be
Water Quality November 23, 2016 adjusted during construction based on site conditions). The background monitoring point will be located beyond the direct influence (typically upstream) of construction related activities. A control limit of 50 NTU or 1.5 times background measurements, whichever is greater is anticipated based on feedback from the Michigan Department of Environmental Quality (MDEQ).
CONSTRUCTION EVENTS
Given the complex nature and duration of this remediation project, protective measures and water quality monitoring will be tailored to each specific construction activity. It is anticipated that the permanent sheet pile wall installation and associated activities will occur in 2017. Dredging, capping, and backfill operations are anticipated to start in 2018. The following sections present specific control and monitoring methods to be utilized based upon the specific construction activity or event. Generally, due to the nature of the activities anticipated in 2017 (i.e., planned activities are not expected to generate significant turbidity), a manual water quality monitoring approach is proposed. An automated continuous monitoring system is proposed during full scale dredging, capping, and backfill activities planned for 2018 due to the greater potential for these activities to generate ongoing turbidity.
Permanent Sheet Pile Wall Installation (2017) Prior to dredging, a permanent sheet pile wall will be installed along the northern bank of the LRROC. The proposed wall alignment runs parallel to the shoreline approximately from STA 8+90 to STA 33+60 as shown in the design drawings (note: final sheet pile wall alignment may be refined based on ongoing design analyses). Oversized debris that would obstruct the sheeting installation will need to be removed prior to construction. It is anticipated that debris will be removed in a narrow band along the shoreline within the “template” for sheet pile wall. This debris removal and installation is anticipated to be completed during the 2017 construction season. The following protective measures and water quality measures are proposed during debris removal and installation of the permanent sheet pile wall:
• A turbidity curtain will be installed parallel to shore outboard of the debris removal area along the length of the wall alignment that is subject to active construction. The curtain will be connected to shore at the upstream and downstream ends. The attached drawings (Drawings C-109, C-110, and C-111) illustrate the anticipated alignment of the turbidity curtain; it should be noted that the actual alignment will be selected by the contractor and may be divided into small discrete sections enclosing the area of active work as opposed to the entire shoreline.
• Floating oil booms will be deployed, if necessary, adjacent to the turbidity curtain to help absorb surface oils and films, if visually observed during construction.
• Manual (handheld) turbidity monitoring will be performed 3 times per day or when an obvious (large) turbidity event is visually apparent outside of the turbidity curtain during debris removal and sheet pile wall installation. If necessary, additional handheld turbidity readings will be taken if significant turbidity generating activities are performed that don’t align with the planned readings 3 times per day
− Turbidity measurements will be collected at mid depth of the water column.
− Turbidity measurements will be collected at three locations:
1. “Background” monitoring location, located upstream of work area,
2. “Near-field” early warning location approximately 300 feet downstream of the construction
3. “Far-field” compliance monitoring location approximately 600 feet downstream of the construction.
− A control limit of 50 NTUs or 1.5 times background measurements, whichever is greater, will be utilized for assessing compliance at each of the three monitoring locations, three times per day.
− If monitoring data indicate no exceedance and minimal impact to water quality during sheet pile wall installation over an extended period of monitoring (e.g., 10 consecutive days), the Engineer will propose to reduce or suspend daily monitoring unless operations change or a visual turbidity plume is observed.
− If handheld turbidity monitoring is deemed insufficient due to the frequency/duration of turbidity generating activities, real-time automated turbidity monitoring will be performed as described in the next section.
Dredging, Capping, and Backfilling (2018) Contaminated sediments are targeted for removal from the LRROC, as shown on the design drawings. Only material from within the remedial boundary as indicated on the design drawings will be removed. Dredged sediment and incidental debris will be collected and transferred to an offsite location for final disposal. No in-water disposal or side casting of dredged material will be allowed. The following protective measures and water quality monitoring are proposed during dredging, capping, and backfilling operations.
• Dredging and small debris (i.e. not requiring special equipment) removal will be conducted within a fully-enclosing turbidity curtain (moon-pool configuration). Spill aprons or other control devices will be utilized when loading and unloading debris and dredged material into transport scows/barges.
• Floating oil booms will be deployed, if necessary, within the work area (moon pool) to help absorb surface oils and films, if visually observed during construction.
• The Contractor will be required to have a work vessel and crew dedicated to addressing sheens, if any, observed outside of the moon-pool configuration. The crew will use oil booms and pads to address sheens to the extent practical.
• During dredging, turbidity measurements will be collected in real-time at three stations using automated monitoring buoys.
1. The background station will be located upstream of the work area, beyond the influence of construction related activities.
2. The near-field (i.e., early warning) station will be located approximately 300 feet downstream of the work area.
3. The far-field (i.e., compliance) station will be located 600 feet downstream of the work area.
• Turbidity measurements will be collected at mid depth of the water column at 10 minute intervals at each station. A rolling average of six consecutive readings (1 hour) for each location will be used as the basis of comparison against the control limits.
• A control limit of 50 NTUs or 1.5 times background measurements, whichever is greater will be utilized at the far-field compliance station.
• Sustained turbidity above the control limit for 1 hour, or the calculated 1-hour average above the control limit, at the compliance station, will constitute an exceedance of the control limit and trigger response actions including enhanced
BMPs (e.g., reduced dredging rate), additional turbidity controls, and even stop work if the additional measures are not successful in reducing turbidity to within acceptable limits.
• If an obvious outlier (determined through statistical analysis of monitoring data) appears in the monitoring data, it will be eliminated from the rolling average.
• The near field station will serve only as an early warning to the contractor and engineer of potential turbidity issues to which they can respond accordingly. For example, if the near-field station indicates turbidity readings above 50 NTU or 1.5 times background, it will trigger enhanced BMPs as noted above, but will not require a stop work.
Structure Removal (2017 and 2018)
A select number of existing in water and nearshore structures will be removed as part of the remediation. Structures to be removed primarily include pile supported docks, fender piles, and dolphins along the former Detroit Tar and former Detroit Coke property. In some cases, these structures will be replaced following dredging activities. Pilings will likely be removed and replaced, where required, by vibration which is anticipated to generate limited turbidity, if any, therefore the use of turbidity curtains is not recommended for this activity. It is anticipated that structure removal will occur during 2017 in conjunction with sheet pile wall installation (within a narrow corridor along the alignment of the wall) and during the 2018 construction season in conjunction with dredging operations, depending on the nature and location of the structure. Water quality during structure removal will be monitored either manually or by automated measurements.
• Manual (handheld) turbidity monitoring will be performed 3 times per day or when an obvious (large) turbidity event is visually apparent during active structure removal in 2017 associated with the sheet pile wall alignment.
− Turbidity measurements will be collected at mid depth of the water column.
− Turbidity measurements will be collected at three locations;
1. Background monitoring location located upstream of work area.
2. “Near-field” early warning location approximately 300 feet downstream of the construction.
3. Far-field compliance monitoring location, downstream (600 feet) of work the area.
− A control limit of 50 NTUs or 1.5 times background measurements for assessing compliance at each of the three monitoring times per day, whichever is greater, will be utilized.
• During structure removal and replacement in 2018, turbidity measurements will be collected in real-time utilizing the three automated monitoring buoys stations, as described above for dredging, capping, and backfilling operations.
o Approach and control limits will be consistent with that described above for dredging, capping, and backfilling operations.
Over-sized Debris Removal (2017 or 2018)
Oversized debris such as trees, sunken piles, cars, boats, etc. have been tentatively identified within the dredge area as part of the remedial investigations and pre-design studies.
Removal of over-sized debris will occur prior to dredging in localized areas likely using a grapple or other mechanical devices. The Contractor may elect to remove over-sized debris in parallel with sheet pile wall activities or directly preceding dredging activities depending on equipment availability and construction sequencing. The following conditions will apply during removal of oversized debris.
• A modified mobile resuspension system (i.e. working off the back of the dredge barge with stand-alone turbidity curtains attached to the shoreline as on the Drawings) will be used for oversized debris that can be reached and removed with this method. If turbidity curtains and floating booms are not practical, given the variable size of debris and associated safety concerns, turbidity controls will not be used.
• If the Contractor elects to remove oversized debris in 2017 in parallel with the permanent sheet pile wall activities and prior to the commencement of dredging, capping, and backfill activities in 2018, manual (handheld) turbidity monitoring will be conducted in accordance with the plan outlined above for structure removal and briefly summarized below:
− Turbidity measurements will be collected at mid depth of the water column.
− Turbidity measurements will be collected at three locations;
1. Background monitoring location located upstream of work area.
2. “Near-field” early warning location approximately 300 feet downstream of the construction.
3. Far-field compliance monitoring location, downstream (600 feet) of work the area.
• If the Contractor elects to remove oversized debris in 2018 directly proceeding dredging operations, turbidity measurements will be collected in real-time utilizing the three automated monitoring buoys stations as described above for dredging, capping, and backfilling operations. Approach and control limits will be consistent with that described above for dredging, capping, and backfilling, operations.
Response Actions and Limitations
Turbidity measurements will be recorded daily. Water quality exceedances or significant changes in control methods or construction practices due to water quality will also be documented.
Should the control limit at a compliance monitoring station be exceeded, the equipment calibration will be verified and an independent measure of turbidity will be made with a second hand-held turbidity monitor to validate the exceedance and to assist in determining the likely source/cause of the turbidity. If the exceedance cannot be reasonably attributed to the site activities, the work will continue. If the exceedance can be reasonably attributed to site activities, there will be a temporary work stoppage, all turbidity controls will be inspected and additional BMPs will be immediately implemented. This may require a change in work practices or the addition or repair of turbidity/erosion control measures.
Work will resume after the cause of the exceedance is identified and corrected and if after a 30 minute period, no single turbidity measurements at the far-field compliance station exceeds the control limit.
The proposed control methods and monitoring procedures are based upon the anticipated site conditions. Changes in site conditions and observations made during construction may dictate the need to modify or change control measures, construction practices, and or monitoring methods.
This notice must be displayed at the site of work.
Laminating this notice or utilizing sheet protectors is recommended.
Please refer to the above Permit Number with any questions or concerns.
Notice of Authorization
Permit Number: WRP004938 v.2 Issued: 04/06/2017 Expiration Date: 04/06/2022
The Michigan Department of Environmental Quality, Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909-7958, under provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended, and specifically:
Part 31, Floodplain Regulatory Authority of the Water Resources Protection Part 301, Inland Lakes and Streams Part 303, Wetlands Protection Part 315, Dam Safety Part 323, Shorelands Protection and Management Part 325, Great Lakes Submerged Lands Part 353, Sand Dunes Protection and Management
Authorized Activity:
Complete remediation activities along approximately 6,000 linear feet of the Lower Rouge River- Old Channel including the following activities: dredge 14,400 cubic yards of material to install 2,540 linear feet of new steel seawall; place 13,000 cubic yards of backfill material and 3,500 cubic yards of riprap along the toe of the new seawall in an area measuring 2,335 feet long by 15 feet wide by 5 feet tall; install a total of 659 linear feet of temporary seawall in four separate locations for shoreline stabilization; place a total of 9,500 cubic yards of sand, gravel and riprap in nine different locations for shoreline stabilization; dredge a total of 69,400 cubic yards of material from the river;
place a total of 17,000 cubic yards of granular fill material in two separate locations of the dredge area; place 5,800 cubic yards of sand, gravel and riprap in two separate locations in the river for sediment caps; place 35,000 cubic yards of material in the 100 year floodplain of the river;
excavate 99,079 cubic yards of material from the 100-year floodplain of the river; temporarily place monitoring buoys in four separate locations; temporarily place a spill plate on four 12-inch dimeter piles in a 25-foot by 20-foot area and four 24-inch diameter steel mooring piles in the river to construct a staging area over the river and near the upland disposal area for offloading operations.
Remove all construction equipment upon completion of the activities. Project site is located along the old channel of Rouge River, City of Detroit, Wayne County. All work shall be completed in accordance with MDEQ approved plans and specific conditions of this permit.
To be conducted at property located: along the old channel of Rouge River, Wayne County, City of Detroit Section 26, 27, 34 N/A Subdivision, Lot N/A Town/Range 2S, 11E
Permittee: Rose Ellison
U.S. Environmental Protection Agency 9311 Groh Road Grosse Ile, MI 48138
Jeremy Richardson Water Resources Division
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY
WATER RESOURCES DIVISION
PERMIT
ISSUED TO:
This permit is being issued by the Michigan Department of Environmental Quality (MDEQ) under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA), and specifically:
Part 301, Inland Lakes and Streams Part 315, Dam Safety Part 325, Great Lakes Submerged Lands Part 323, Shorelands Protection and Management Part 303, Wetlands Protection Part 353, Sand Dunes Protection and Management Part 31, Floodplain/Water Resources Protection
Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:
Permitted Activity:
Water Course Affected: Rouge River Property Location: Wayne County, City of Detroit Section 26, 27, 34, N/A Subdivision, Lot N/A
Town/Range: 2S/11E Authority granted by this permit is subject to the following limitations:
A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.
B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31, Water Resources Protection, of the NREPA.
C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.
Permit No.: WRP004938 v 2.0 Issued: April 6, 2017 Revised: April 9, 2018 Extended:
Expires: April 6, 2022
Rose Ellison U.S. Environmental Protection Agency 9311 Groh Road Grosse Ile, MI 48138
Complete remediation activities along approximately 6,000 linear feet of the Lower Rouge River-Old Channel including the following activities: dredge 14,400 cubic yards of material to install 2,540 linear feet of new steel seawall; place 13,000 cubic yards of backfill material and 3,500 cubic yards of riprap along the toe of the new seawall in an area measuring 2,335 feet long by 15 feet wide by 5 feet tall;
install a total of 659 linear feet of temporary seawall in four separate locations for shoreline stabilization; place a total of 9,500 cubic yards of sand, gravel and riprap in nine different locations for shoreline stabilization; dredge a total of 69,400 cubic yards of material from the river; place a total of 17,000 cubic yards of granular fill material in two separate locations of the dredge area; place 5,800 cubic yards of sand, gravel and riprap in two separate locations in the river for sediment caps; place 35,000 cubic yards of material in the 100 year floodplain of the river; excavate 99,079 cubic yards of material from the 100-year floodplain of the river; temporarily place monitoring buoys in four separate locations; temporarily place a spill plate on four 12-inch dimeter piles in a 25-foot by 20-foot area and four 24-inch diameter steel mooring piles in the river to construct a staging area over the river and near the upland disposal area for offloading operations. Remove all construction equipment upon completion of the activities. Project site is located along the old channel of Rouge River, City of Detroit, Wayne County. All work shall be completed in accordance with MDEQ approved plans and specific conditions of this permit.
U.S. Environmental Protection Agency 2 Permit No. WRP004938 v 2.0
D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.
E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.
F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with Act
53 of the Public Act of 1974 and comply with each of the requirements of that Act.
G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.
H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.
I. Permittee shall notify the MDEQ within one week after the completion of the activity authorized by this permit, by completing and forwarding the attached preaddressed postcard to the office addressed thereon.
J. This permit shall not be assigned or transferred without the written approval of the MDEQ.
K. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.
L. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31, and wetland).
M. In issuing this permit, the MDEQ has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, the MDEQ may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.
N. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee’s obligation to indemnify the State of Michigan applies only if the State: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the State and (2) consents to the permittee’s participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.
O. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, the MDEQ may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.
P. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from the MDEQ. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification. Proposed modifications must be approved, in writing, by the MDEQ prior to being implemented.
Q. This permit may be transferred to another person upon written approval of the MDEQ. The permittee must submit a written request to the MDEQ to transfer the permit to the new owner. The new owner must also submit a written request to the MDEQ to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties which includes all the above information may be provided to the MDEQ. The MDEQ will review the request and if approved, will provide written notification to the new owner.
R. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.
S. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.
T. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent.
U.S. Environmental Protection Agency 3 Permit No. WRP004938 v 2.0
U. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural
Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.
V. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.
W. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the waterbody are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.
X. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the MDNR, Fisheries Division.
Y. Work to be done under authority of this permit is further subject to the following special instructions and specifications:
1. Authority granted by this permit does not waive any jurisdiction of the United States Army Corps of
Engineers or the need for a federal permit, if required.
2. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA). To locate the Soil Erosion Program Administrator for your county visit www.deq.state.mi.us/sesca/.
3. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state or federal approval or authorization, necessary to conduct the activity.
4. Prior to initiating construction, authorized by this permit, the permittee is required to provide a copy of the permit to the contractor(s) for review.
5. The property owner, contractor(s), and any agent involved in exercising this permit are held responsible to ensure the project is constructed in accordance with all drawings and specifications contained in this permit. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by this permit.
6. Permittee agrees to abide by the specifications, timeframes and thresholds for responsive action set forth in the Lower Rouge River - Old Channel: Water Quality Monitoring Approach Memo dated May 6, 2016, prepared by Anchor QEA, LLC (Water Quality Memo). A copy of this memo is attached and shall be located at the project site and kept on file at the DEQ SE Michigan District Office.
7. A fully-enclosing turbidity curtain system (moon pool) shall be constructed & utilized for the purpose of isolating the dredge areas from the open waters of the Rouge River, prior to commencing any dredging activities, and for the entire duration of dredge activities in accordance with the Water Quality Memo.
The fully-enclosing turbidity curtain design, deployment and specifications are detailed in the attached approved plans.
8. Permittee agrees to utilize methods and equipment outlined in the Water Quality Memo to carry out the dredging of the sediment during the entire duration of the project.
9. All dredge material shall be immediately placed into barges using appropriate methods approved in the Water Quality Memo and taken to the approved disposal site. Placement of dredge/excavated material into open water, onto ice, or onto exposed bottomland is not authorized by this permit.
10. Spoils shall be handled in such a manner to prevent nuisance conditions and control the release of fugitive dust or visible emissions as required by Part 55, Air Pollution Control, of the NREPA, or the rules promulgated under this Act.
U.S. Environmental Protection Agency 4 Permit No. WRP004938 v 2.0
11. The spoils shall not be mixed with other waste or materials that are not inert as defined in Part 115, Solid Waste Management, of the NREPA.
12. All dredged spoils including organic and inorganic soils, vegetation, and other material removed shall be immediately taken to the Pointe Mouillee United States Army Corps of Engineers Confined Disposal Facility. Every precaution shall be taken to insure that none of the dredge spoils are placed on upland or introduced into any waterbody, wetland, or floodplain.
13. Proper maintenance and operation of the fully-enclosing turbidity curtain during dredging activities shall include the establishment, performance and implementation of procedures and protocols as referenced in the Water Quality Memo including routine turbidity monitoring, supplemental turbidity monitoring, visual surface/underwater inspections, perimeter monitoring and downstream monitoring.
14. Water quality/turbidity monitoring and subsequent corrective actions, if necessary, shall be completed in accordance with procedures/protocols referenced in the Water Quality Memo.
15. Dewatering activities are NOT authorized by this permit. If at any time a surface water discharge from the dredge spoils occur, a National Pollution Discharge Elimination System (NPDES) permit may be required. For further information regarding the NPDES permit requirements please contact DEQ, Water Resources Division, Lakes Erie and Huron Permits Unit, Permits Section – Lansing.
16. All raw areas resulting from the permitted construction activity shall be promptly and effectively stabilized with sod and/or seed and mulch (or other technology specified by this permit or project plans) in a sufficient quantity and manner to prevent erosion and any potential siltation to surface waters or wetlands.
17. Unless specifically stated under the “Permitted Activity” of this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the waterbody are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.
18. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.
19. The permittee is responsible for acquiring all necessary easements or rights-of-way before commencing any work authorized by this permit. All construction operations relating to or part of this project shall be confined to the existing right-of-way limits or other acquired easements.
20. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representatives of the permittee, undertaken in connection with this permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.
21. In issuing this permit, the MDEQ has relied on the information and data that the permittee has provided in connection with the permit application. If, subsequent to the issuance of this permit, such information and data prove to be false, incomplete, or inaccurate, the MDEQ may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.
22. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity and/or mitigation plan from the MDEQ. Such revision requests shall include complete documentation supporting the modification and revised plans detailing the proposed modification. Proposed modifications must be approved, in writing, by the MDEQ prior to being implemented.
23. This permit may be transferred to another person upon written approval of the MDEQ. The permittee must submit a written request to the MDEQ to transfer the permit to the new owner. The new owner
U.S. Environmental Protection Agency 5 Permit No. WRP004938 v 2.0 must also submit a written request to accept transfer of the permit. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties which includes all the above information may be provided to the MDEQ. The MDEQ will review the request and if approved, will provide written notification to the new owner.
24. Noncompliance with these terms and conditions, and/or the initiation of other regulated activities not specifically authorized by this permit shall be cause for the modification, suspension, or revocation of this permit, in whole or in part.
Further, the MDEQ may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.
cc: Wayne County CEA City of Detroit Clerk City of Detroit Department of Environmental Affairs Bob Morningstar, USACE Detroit District Michael Ciarlo, EA Engineering, Science, and Technology, Inc., PBC Kaitlin McCormick, EA Engineering, Science, and Technology, Inc., PBC
By: ________________________________ Jeremy Richardson Water Resources Division 586-753-3860
OHWM
OHWM
OHWM
OHWM
OHWM
OHWM
OHWM
LWD
LWD
LWD
LWD
LWD
LWD
LWD
LWD
LWD
REVISED
OHWM
OHWM
OHWM
OHWM
OHWM
OHWM
OHWM
OHWM
OHWM
OHWM
O H
W M
O H
W M
LWD
LWD
LWD
LWD
LWD
LWD
LWD
LWD
LWD
LW
D
LWD
LW
D
LW
D
REVISED
S ep
5, 5:
pm rp et rie
H :\S yr ac us e1
\C A
D P ro je ct s\
R ou ge R iv er
\F ig ur es
\P er m it
D ra w in gs \F
IG
-3
P R
O
JE
C T
S U
M M
A R
Y .d w g
FI
G
(2
PROJ. NO. DATE:
DESIGNED BY:
PROJ MGR:
DRAWN BY:
REVIEWED BY:
SCALE:
PREPARED BY: PREPARED FOR:
LOWER ROUGE RIVER OLD CHANNEL
ROUGE RIVER AREA OF CONCERN
DRAFT - NOT FOR CONSTRUCTION
SHEET NO . OF--- AS SHOWN
THE INFORMATION SHOWN ON THE DRAWING IS SOLELY FOR USE BY UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, HONEYWELL INTERNATIONAL INC., OR HONEYWELL INTERNATIONAL INC.'S DESIGNATED REPRESENTATIVE FOR THE SPECIFIC PROJECT AND LOCATION IDENTIFIED ON THE DRAWING. THE DRAWING SHALL NOT BE TRANSFERRED, REUSED, COPIED, OR ALTERED IN ANY MANNER FOR USE AT ANY OTHER LOCATION OR FOR ANY OTHER PURPOSE WITHOUT THE PRIOR WRITTEN CONSENT OF ANCHOR QEA, EA, AMEC FOSTER WHEELER, UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, AND HONEYWELL INTERNATIONAL INC. ANY TRANSFER, REUSE, OR MODIFICATION TO THE DRAWING BY OTHERS, WITHOUT THE PRIOR WRITTEN EXPRESS CONSENT OF ANCHOR QEA, EA, AMEC FOSTER WHEELER, UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, AND HONEYWELL INTERNATIONAL INC., WILL BE AT THE USER'S SOLE RISK AND WITHOUT ANY RISK OR LIABILITY TO ANCHOR QEA, EA, AMEC FOSTER WHEELER, UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY, AND HONEYWELL INTERNATIONAL INC.
amec foster wheeler
SEPTEMBER, 2017
DRAFT DOCUMENT
SUBJECT TO CHANGE IN WHOLE OR IN PART
PRELIMINARY DRAFT - NOT FOR CONSTRUCTION
NORTH
PROJECT SUMMARY (1 OF 2)
FIG 1
J HARRISON-RICE
B HURRY
M CARLINO
P LaROSA
SCALE IN FEET
120 240
DU-19
KEY PLAN
NOT TO SCALE NORTH
LEGEND:
PROPOSED PERMANENT BULKHEAD WALL
PROPOSED TEMPORARY SHORING
EXISTING UTILITIES
NAVIGATION CHANNEL BOUNDARY
NAVIGATION CHANNEL CENTERLINE
DREDGE AREA
STRUCTURAL FILL AREA
DREDGE AND CAP AREA
STAGING AREA
RIP RAP FOR SHEETPILE WALL
SHEETPILE WALL BACKFILL TO 581 FT
SHEETPILE WALL BACKFILL TO 582 FT
UTILITY CROSSING AND OFFSET
100 YEAR FLOOD BOUNDARY
FIG 1
ZUG ISLAND BRIDGE
PROPOSED
TEMPORARY
SHEETPILE WALL
PROPOSED
PERMANENT
BULKHEAD WALL
575.37 FEET NAVD88
(ORDINARY HIGH WATER MARK)
571.27 FEET NAVD88
(LOW WATER DATUM)
OHWM
LWD
PROPOSED
TEMPORARY
SHEETPILE WALL
DREDGE AREA ADREDGE AREA A
STRUCTURAL FILL AREA:
LENGTH: 260 FT
WIDTH: 105 FT
DEPTH: 4 FT
VOLUME: 2400 CY
VOLUME BELOW OHWM: 2400 CY
DREDGE AREA A:
MAXIMUM LENGTH: 4425 FT
MAXIMUM WIDTH: 175 FT
DREDGE DEPTHS: 1 - 22 FT
DREDGE VOLUME: 65,600 CY
DREDGE VOLUME BELOW OHWM: 65,600 CY
STRUCTURAL FILL AREA:
LENGTH: 181 FT
WIDTH: 19 FT
DEPTH: 5 FT
VOLUME: 500 CY
VOLUME BELOW OHWM: 500 CY
STRUCTURAL FILL AREA:
LENGTH: 153 FT
WIDTH: 59 FT
DEPTH: 7 FT
VOLUME: 1200 CY
VOLUME BELOW OHWM: 1200 CY
CAP AREA 1:
MAXIMUM LENGTH: 360 FT
MAXIMUM WIDTH: 120 FT
DEPTH: 4.0 FT
TOTAL VOLUME: 5000 CY
VOLUME BELOW OHWM: 5000 CY
VOLUME OF RIPRAP: 2800 CY
MOORINGS
NOTE:
The volume of rip rap noted is included in the total fill volume.
STRUCTURAL FILL AREA:
LENGTH: 70 FT
WIDTH: 40 FT
DEPTH: 4 FT
VOLUME: 300 CY
VOLUME BELOW OHWM: 300 CY
STRUCTURAL FILL AREA:
LENGTH: 147 FT
WIDTH: 43 FT
DEPTH: 3 FT
VOLUME: 400 CY
VOLUME BELOW OHWM: 400 CY
STRUCTURAL FILL AREA:
LENGTH: 59 FT
WIDTH: 67 FT
DEPTH: 4 FT
VOLUME: 400 CY
VOLUME BELOW OHWM: 400 CY
STRUCTURAL FILL AREA:
LENGTH: 190 FT
WIDTH: 70 FT
DEPTH: 4 FT
VOLUME: 2200 CY
VOLUME BELOW OHWM: 2200 CY
AutoCAD SHX Text
CONTROL POINT 1 5/8 " ROD ELEV=585.93 N=290571.21 E=13463425.74
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
UNPAVED
AutoCAD SHX Text
VACANT PROPERTY
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ZUG ISLAND ROAD
AutoCAD SHX Text
GROUNDWATER TREATMENT FACILITY
AutoCAD SHX Text
VES
AutoCAD SHX Text
UNDERGROUND VAULT
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
BARNES STREET
AutoCAD SHX Text
MEDINA STREET
AutoCAD SHX Text
WEST END STREET
AutoCAD SHX Text
LOWER ROUGE RIVER OLD CHANNEL
AutoCAD SHX Text
METER RACK
AutoCAD SHX Text
CABINET
AutoCAD SHX Text
ELECTRIC MANHOLE MH RIM = 581.88
AutoCAD SHX Text
ELECTRIC MANHOLE MH RIM = 81.03
AutoCAD SHX Text
GRAVEL SURFACE
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
EDGE OF GRAVEL PILE
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
METAL WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
HEADWALL
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CONC. PAD
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
(CONCRETE)
AutoCAD SHX Text
(CONCRETE)
AutoCAD SHX Text
(CONCRETE)
AutoCAD SHX Text
B.M. #200 ELEV=580.63
AutoCAD SHX Text
B.M. #201 ELEV=584.02
AutoCAD SHX Text
B.M. #202 ELEV=586.88
AutoCAD SHX Text
B.M. #203 ELEV=583.52
AutoCAD SHX Text
BARNES STREET
AutoCAD SHX Text
CARY STREET
AutoCAD SHX Text
RAILROAD
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
CP #102 ELEV=581.49 NAVD88
AutoCAD SHX Text
CP #101 ELEV=582.01 NAVD88
AutoCAD SHX Text
CP #104 ELEV=585.49 NAVD88
AutoCAD SHX Text
OVERHEAD POWER
AutoCAD SHX Text
TANK (N.F.L.)
AutoCAD SHX Text
WOOD DOCK
AutoCAD SHX Text
CONCRETE CIRCLE CUTOUTS
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
OLD TANK 544 FOUNDATIONS
AutoCAD SHX Text
ZUG ISLAND ROAD
AutoCAD SHX Text
SOLVAY PROCESS
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
ALLIED
AutoCAD SHX Text
CHEMICAL CORP.
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WRECK
AutoCAD SHX Text
WALL
AutoCAD SHX Text T
AutoCAD SHX Text
FORD MOTOR CO.
AutoCAD SHX Text
WATER WORKS
AutoCAD SHX Text
(INTAKE)
AutoCAD SHX Text
GATE
AutoCAD SHX Text
AERIAL CABLE AT 172'
AutoCAD SHX Text 27-A
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
BULKHEAD
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PIER
AutoCAD SHX Text
WALL
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
TR
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
TANKS
AutoCAD SHX Text
WALL
AutoCAD SHX Text
MEDINA ST.
AutoCAD SHX Text
SOUTH CARY ST.
AutoCAD SHX Text
BARNES
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
OVERHEAD ELEC.
AutoCAD SHX Text
SOLVAY PROCESS CO.
AutoCAD SHX Text
ZUG ISLAND
AutoCAD SHX Text
DELRAY CONNECTING RR
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
TR
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
WALL
AutoCAD SHX Text
OVERHEAD PIPES
AutoCAD SHX Text T
AutoCAD SHX Text
MOORING
AutoCAD SHX Text
GREAT LAKES
AutoCAD SHX Text
STEEL CORPORATION
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
SUBMERGED CABLE AT -30
AutoCAD SHX Text
SUBMERGED CABLE AT -24'
AutoCAD SHX Text
SUBMERGED CABLE AT -31'
AutoCAD SHX Text
PAUL
AutoCAD SHX Text
APPROXIMATE LOCATION
AutoCAD SHX Text
APPROXIMATE LOCATION
AutoCAD SHX Text E
AutoCAD SHX Text
CONTROL POINT 2 CONCRETE MONUMENT ELEV=588.15 N=291210.91 E=13464437.98
AutoCAD SHX Text
CONTROL POINT 1 5/8 " ROD ELEV=585.93 N=290571.21 E=13463425.74
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
FC7
AutoCAD SHX Text 590.03
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
PAVED
AutoCAD SHX Text E
AutoCAD SHX Text
UNPAVED
AutoCAD SHX Text
VACANT PROPERTY
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
PAVED
AutoCAD SHX Text
ZUG ISLAND ROAD
AutoCAD SHX Text
GROUNDWATER TREATMENT FACILITY
AutoCAD SHX Text
VES
AutoCAD SHX Text
UNDERGROUND VAULT
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
15000 GAL DIESEL
AutoCAD SHX Text
2000 GAL MOTOR OIL
AutoCAD SHX Text
FORMER 600 GAL WASTE OIL
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
BARNES STREET
AutoCAD SHX Text
MEDINA STREET
AutoCAD SHX Text
WEST END STREET
AutoCAD SHX Text
LOWER ROUGE RIVER OLD CHANNEL
AutoCAD SHX Text
METER RACK
AutoCAD SHX Text
CABINET
AutoCAD SHX Text
ELECTRIC MANHOLE MH RIM = 581.88
AutoCAD SHX Text
ELECTRIC MANHOLE MH RIM = 81.03
AutoCAD SHX Text
GRAVEL SURFACE
AutoCAD SHX Text
GRAVEL SURFACE
AutoCAD SHX Text
GRAVEL SURFACE
AutoCAD SHX Text
GRAVEL SURFACE
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOE OF SLOPE
AutoCAD SHX Text
EDGE OF GRAVEL PILE
AutoCAD SHX Text
EDGE OF GRAVEL PILE
AutoCAD SHX Text
EDGE OF GRAVEL PILE
AutoCAD SHX Text
EDGE OF GRAVEL PILE
AutoCAD SHX Text
EDGE OF GRAVEL PILE
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
METAL WALL
AutoCAD SHX Text
METAL WALL
AutoCAD SHX Text
METAL WALL
AutoCAD SHX Text
METAL WALL
AutoCAD SHX Text
METAL WALL
AutoCAD SHX Text
METAL WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
HEADWALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CONC WALL
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CONC. PAD
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
WALL
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
(CONCRETE)
AutoCAD SHX Text
(CONCRETE)
AutoCAD SHX Text
(CONCRETE)
AutoCAD SHX Text
B.M. #200 ELEV=580.63
AutoCAD SHX Text
B.M. #201 ELEV=584.02
AutoCAD SHX Text
B.M. #202 ELEV=586.88
AutoCAD SHX Text
B.M. #203 ELEV=583.52
AutoCAD SHX Text
LOADING DOCK
AutoCAD SHX Text
BARNES STREET
AutoCAD SHX Text
CARY STREET
AutoCAD SHX Text
RAILROAD
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
CP #102 ELEV=581.49 NAVD88
AutoCAD SHX Text
CP #101 ELEV=582.01 NAVD88
AutoCAD SHX Text
CP #104 ELEV=585.49 NAVD88
AutoCAD SHX Text
OVERHEAD POWER
AutoCAD SHX Text
TANK (N.F.L.)
AutoCAD SHX Text
WOOD DOCK
AutoCAD SHX Text
CONCRETE CIRCLE CUTOUTS
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
OLD TANK 544 FOUNDATIONS
AutoCAD SHX Text
ZUG ISLAND ROAD
AutoCAD SHX Text
DIKE
AutoCAD SHX Text
DIKE
AutoCAD SHX Text
DIKE
AutoCAD SHX Text
TANK
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
WOODEN DOCK
AutoCAD SHX Text
(RUIN)
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
DIKE
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
LOADING DOCK
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
PIER
AutoCAD SHX Text
PIER
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
PILE
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text
SILOS
AutoCAD SHX Text
SILOS
AutoCAD SHX Text T
AutoCAD SHX Text
PIER
AutoCAD SHX Text
PIER
AutoCAD SHX Text
PILING
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
WALL
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
SPOIL AREA
AutoCAD SHX Text
SPOIL AREA
AutoCAD SHX Text
ZUG ISLAND
AutoCAD SHX Text
WEST JEFFERSON AVE.
AutoCAD SHX Text
DIXIE FUEL
AutoCAD SHX Text
TERMINAL
AutoCAD SHX Text
PEERLESS CEMENT CO.
AutoCAD SHX Text
SCOTT PAPER CO.
AutoCAD SHX Text
SOLVAY PROCESS
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
ALLIED
AutoCAD SHX Text
CHEMICAL CORP.
AutoCAD SHX Text
BULKHEAD
AutoCAD SHX Text T
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
TANKS
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
BULKHEAD
AutoCAD SHX Text
BULKHEAD
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
PILINGS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text
WRECK
AutoCAD SHX Text D.T. & L. R.R.
AutoCAD SHX Text
WEST JEFFERSON AVE.
AutoCAD SHX Text
WALL
AutoCAD SHX Text T
AutoCAD SHX Text
FORD MOTOR CO.
AutoCAD SHX Text
WATER WORKS
AutoCAD SHX Text
(INTAKE)
AutoCAD SHX Text
GATE
AutoCAD SHX Text
SUBMERGED CABLE
AutoCAD SHX Text
SUBMERGED CABLE
AutoCAD SHX Text
AERIAL CABLE AT 172'
AutoCAD SHX Text
AERIAL CABLE AT 173'
AutoCAD SHX Text
SUBMERGED PIPELINE -27'
AutoCAD SHX…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.