W911XK-16-B-0012-0002_FY16_Underwood_Creek_Ecosystem_Restoration_22_Aug_2016.pdf

PDF 22 KB Posted

Attached to
FY16 Underwood Creek Ecosystem Restoration
Solicitation number
W911XK-16-B-0012
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Abstract--W911XK-16-B-0012_FY16_Underwood_Creek.pdf PDF
Projnet_Q A.pdf PDF
33_40_00_Amendment_0003.pdf PDF
W911XK-16-B-0012-0003.pdf PDF
CD101_-_Amendment_0003.pdf PDF
Drawing_CD101_Amendment_0002.pdf PDF
35_31_19_Amendment_0002.pdf PDF
01_99_90_Amendment_0002.pdf PDF
31_00_00_Amendment_0002.pdf PDF
01_99_90_Exhibit_A.pdf PDF
01_99_90_Soil_Disposal_Agreement.pdf PDF
Underwood_Creek_-_Amendment_0001_Plans.pdf PDF
35_31_19_Amendment_0001.pdf PDF
W911XK-16-B-0012-0001_FY16_Underwood_Creek_Ecosystem_Restoration.pdf PDF
01_99_90_Amendment_0001.pdf PDF
Reqd_Site_AMD0001xml.txt TXT text file
31_00_00_Amendment_0001.pdf PDF
01_99_90_DNR_Soils_Disposal_Approval_SWP_Properties.pdf PDF
Reqd_Site_AMD0001DTM.txt TXT text file
01_99_00_Wauwatosa_104th_street_outfall.pdf PDF
01_22_00_Amendment_0001.pdf PDF
Site_Visit.pdf PDF
103rd_st_plan_C_00_PP01_779-06-C901_2016-07-14.pdf PDF
103rd_st_plan_C_00_DETAIL_779-06-C902_2016-07-14.pdf PDF
Pre-Bid_Slides--W911XK-16-B-0012_FY16_Underwood_Creek_Ecosystem_Restoration.pdf PDF
Attendance_Sheet.pdf PDF
01 99 90 1 WDNR Disposal Approval Request.pdf PDF
104th Street References.zip ZIP file
spec_FY16_Underwood_Creek_RTA_27JUL2016.pdf PDF
As_Built_Hanson_Park_Sewer.pdf PDF
Underwood Creek Reference Drawings.zip ZIP file
01 99 90 6 Underwood Geotechnical Borings.pdf PDF
Highway 45 bridge data.zip ZIP file
01 99 90 5 tree survey.csv CSV file
01 99 90 4 pool locations.xlsx XLSX spreadsheet
01 99 90 7 ACQ-PLAT.PDF PDF
Underwood_Creek_Certified_Final_-__Ready_to_Advertise_Plans_13July2016.pdf PDF
Underwood_Creek_Surface_Files.zip ZIP file
01 58 00 gl restoration logo.pdf PDF
01 33 16 attach a b.pdf PDF
01 35 13 Phase 1 Covenant Language.pdf PDF
W911XK-16-B-0012_FY16_Underwood_Creek_Ecosystem_Restoration.pdf PDF
103rd Street Outfall Plans and Specifications.zip ZIP file
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY16 Underw ood Creek Ecosystem Restoration

This amendment is issued to make changes to the specifications and FAR clause 52.211-10 Commencement, Prosecution and Completion of Work. Reference changes on the follow ing page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-16-B-0012

X 9B. DATED (SEE ITEM 11)

27-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2016

CODE

CONTRACTING BRANCH

USACE DETROIT DISTRICT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-16-B-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

CHANGES TO THE SPECIFICATIONS

1. Delete 01 99 90 LISTING OF ENCLOSED DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS Add revised 01 99 90 LISTING OF ENCLOSED DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, see attached file titled ’01 99 90 Amendment 0002.pdf’.

2. Add attachment to 01 99 00; see attached file titled ‘01 99 00 Soil Disposal Agreement.pdf’

3. Add attachment to 01 99 00; see attached file titled ‘01 99 00 Exhibit A.pdf’

4. 31 00 00 EARTHWORK, Paragraph 3.3.2 ‘Disposal of Excavated Soil Material’

Revise tipping fee in the first paragraph from $14.50 per cubic yard to $14.25 per cubic yard.

5. 35 31 19 STONE MATERIALS AND PLACEMENT, Paragraph 2.4 ‘FIELD STONE’

Revise paragraph 2.4.1 ‘General’ to read:

“Provide rounded to sub-rounded glacially derived field stone. Crushed quarry stone is NOT acceptable for use. Angular rip rap product is not acceptable.”

SECTION 00010 - SOLICITATION CONTRACT FORM

The contractor period of performance end date has increased by 270 days from 730 days to 1000 days.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 1000 Calendar days after Notice Proceed . The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .