FY16 Underwood Creek Ecosystem Restoration
Solicitation number
W911XK-16-B-0012
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
Abstract--W911XK-16-B-0012_FY16_Underwood_Creek.pdf PDF
Projnet_Q A.pdf PDF
33_40_00_Amendment_0003.pdf PDF
W911XK-16-B-0012-0003.pdf PDF
CD101_-_Amendment_0003.pdf PDF
Drawing_CD101_Amendment_0002.pdf PDF
35_31_19_Amendment_0002.pdf PDF
01_99_90_Amendment_0002.pdf PDF
W911XK-16-B-0012-0002_FY16_Underwood_Creek_Ecosystem_Restoration_22_Aug_2016.pdf PDF
31_00_00_Amendment_0002.pdf PDF
01_99_90_Exhibit_A.pdf PDF
01_99_90_Soil_Disposal_Agreement.pdf PDF
Underwood_Creek_-_Amendment_0001_Plans.pdf PDF
35_31_19_Amendment_0001.pdf PDF
W911XK-16-B-0012-0001_FY16_Underwood_Creek_Ecosystem_Restoration.pdf PDF
01_99_90_Amendment_0001.pdf PDF
Reqd_Site_AMD0001xml.txt TXT text file
31_00_00_Amendment_0001.pdf PDF
01_99_90_DNR_Soils_Disposal_Approval_SWP_Properties.pdf PDF
Reqd_Site_AMD0001DTM.txt TXT text file
01_99_00_Wauwatosa_104th_street_outfall.pdf PDF
01_22_00_Amendment_0001.pdf PDF
Site_Visit.pdf PDF
103rd_st_plan_C_00_PP01_779-06-C901_2016-07-14.pdf PDF
103rd_st_plan_C_00_DETAIL_779-06-C902_2016-07-14.pdf PDF
Pre-Bid_Slides--W911XK-16-B-0012_FY16_Underwood_Creek_Ecosystem_Restoration.pdf PDF
Attendance_Sheet.pdf PDF
01 99 90 1 WDNR Disposal Approval Request.pdf PDF
104th Street References.zip ZIP file
spec_FY16_Underwood_Creek_RTA_27JUL2016.pdf PDF
As_Built_Hanson_Park_Sewer.pdf PDF
Underwood Creek Reference Drawings.zip ZIP file
01 99 90 6 Underwood Geotechnical Borings.pdf PDF
Highway 45 bridge data.zip ZIP file
01 99 90 5 tree survey.csv CSV file
01 99 90 4 pool locations.xlsx XLSX spreadsheet
01 99 90 7 ACQ-PLAT.PDF PDF
Underwood_Creek_Certified_Final_-__Ready_to_Advertise_Plans_13July2016.pdf PDF
Underwood_Creek_Surface_Files.zip ZIP file
01 58 00 gl restoration logo.pdf PDF
01 35 13 Phase 1 Covenant Language.pdf PDF
W911XK-16-B-0012_FY16_Underwood_Creek_Ecosystem_Restoration.pdf PDF
103rd Street Outfall Plans and Specifications.zip ZIP file
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 33 16 DESIGN AFTER AWARD

ATTACHMENT A: TRACKING COMMENTS IN DRCHECKS

1 General

The Government and Contractor shall set up the project in Dr Checks. Throughout the design process, the parties shall enter, track, and back-check comments using the DrChecks system. Government reviewers enter design review comments into DrChecks. Designers of Record shall annotate comments timely and specifically to indicate exactly what action will be taken or why the action is not required.

Comments considered critical by the conference participants shall be flagged as such.

2 DrChecks Review Comments

The Contractor and the Government shall monitor DrChecks to assure all comments are annotated and agreed to by the designers and reviewers prior to the next submittal. The DrChecks comments and responses shall be printed and included in the design analysis for record.

2.1 Conference participants (reviewers) will expect coordination between Design Analysis calculations and the submitted design. Reviewers will also focus on the design submittal's satisfaction of the contract requirements.

2.2 The Designers of Record shall answer each comment in DrChecks with a formal response prior to the next submittal, clearly indicating what action will be taken and what drawing/spec will change. Designers of Record are encouraged to directly contact reviewers to discuss and agree to the formal comment responses rather than relying only on DrChecks and review meetings to discuss comments.

With the next design conference, reviewers will back-check answers to the comments against the submittal, in addition to reviewing additional design work.

2.3 Comments that, in the Contractor's opinion, require effort outside the scope of the contract shall be clearly indicated as such in DrChecks. The Contractor shall not proceed with work outside the contract until a modification to the contract is properly executed, if one is necessary.

3 DrChecks Initial Account Set-Up

To initialize an office's use of DrChecks, choose a contact person within the office to call the DrChecks Help Desk at 800-428-HELP, M-F, 8AM-5PM, Central time. This POC will be given an office password to distribute to others in the office. Individuals can then go to the hyperlink at {http://www.projnet.org} and register as a first time user. Upon registration, each user will be given a personal password to the DrChecks system.

3.1 Once the office and individuals are registered, the COE’s project manager or lead reviewer will assign the individuals and/or offices to the specific project for review. At this point, persons assigned can make comments, annotate comments, and close comments, depending on their particular assignment.

4 DrChecks Reviewer Role

The Contractor is the technical reviewer and the Government is the compliance reviewer of the designers design documents. Each reviewer enters their own comments into the Dr Checks system. To enter comments:

4.1 Log into DrChecks.

4.2 Click on the appropriate project.

4.3 Click on the appropriate review conference. An Add comment screen will appear.

4.4 Select or fill out the appropriate sections (particularly comment discipline and type of document for sorting) of the comment form and enter the comment in the space provided.

4.5 Click the Add Comment button. The comment will be added to the database and a fresh screen will appear for the next comment you have.

4.6 Once comments are all entered, exit DrChecks by choosing “My Account” and then Logout.

5 DrChecks Comment Evaluation

The role of the designers of record is to evaluate and respond to the comments entered by the Government reviewers and by the Contractor. To respond to comments:

5.1 Log into DrChecks.

5.2 Click on the appropriate project.

5.3 Under “Evaluate” click on the number under “Pending”.

5.4 Locate the comments that require your evaluation. (Note: If you know the comment number you can use the Quick Pick window on your home page in DrChecks; enter the number and click on go.)

5.5 Select the appropriate evaluation (concur, non-concur, for information only, or check and resolve) and add the response.

5.6 Click on the Add button. The evaluation will be added to the database and a fresh screen will appear with the next comment.

5.7 Once evaluations are all entered, exit DrChecks by choosing “My Account” and then Logout.

6 DrChecks Back-check

At the following design conference, participants will back-check comment annotations against newly presented documents to verify that the designers' responses are acceptable and completed. The Contractor and Government reviewers shall either enter additional back-check comments, as necessary or close those that are resolved as a result of the design conferences:

6.1 Log into DrChecks.

6.2 Click on the appropriate project.

6.3 Under “My Backcheck” click on the number under “Pending”.

6.4 If you agree with the designer’s response select “Close Comment” and add a closing response if desired.

6.5 If you do not agree with the designer’s response or the submittal does not reflect the response given, select “Issue Open”, enter additional information.

6.6 Click on the Add button. The back-check will be added to the database and a fresh screen will appear with the next comment.

6.7 Once back-checks are all entered, exit DrChecks by choosing “My Account” and then Logout. The design is completed and final when there are no pending comments to be evaluated and there are no pending or open comments under back-check.

ATTACHMENT B DESIGN SUBMITTAL DIRECTORY AND SUBDIRECTORY FILE

ARRANGEMENT

Organize electronic design submittal files in a subdirectory/file structure in accordance with the following table. The Contractor may suggest a slightly different structure, subject to the discretion of the government.

Design Submittal Directory and Subdirectory File Arrangement.

Directory Sub-Directory Sub-Directory or Files Files

Submittal/Package Name

Drawings PDF (subdirectory) Single PDF file with all applicable drawing sheets

- bookmarked by sheet number and name

MICROSTATION

(subdirectory)

Microstation project folder (with files) per the USACE Workspace. Include an Excel drawing index file with each drawing sheet listed by sheet #, name and corresponding dgn file name (Final Design & Release for Construction only)

Design Documentation Report

Individual PDF files containing design analysis and calculations for each discipline applicable to the submittal

Specifications PDF file with bundled specifications in UFGS format.

SPECSINTACT

(subdirectory)

All SpecsIntact files created for the project in the native software file format. (Final Design and Release for Construction Only)

-- End of Section