W911XK-10-R-0006-0003 Saginaw Electrical Closets and Primary Distribution.pdf

PDF 22 KB Posted

Attached to
VA Saginaw Electrical Closets and Distribution
Solicitation number
W911XK-10-R-0006
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
W911XK-10-R-0006 Amend 0006.pdf PDF
SaginawVA Elec Amend006 Drawings - Part3.pdf PDF
SaginawVA Elec Amend006 Drawings - Part1.pdf PDF
SaginawVA Elec Amend006 Drawings - Part2.pdf PDF
W911XK-10-R-0006 Saginaw Electrical Closets.pdf PDF
Saginaw VA Electrical Upgrade QA —
W911XK-10-R-0006 Amendment 0005.pdf PDF
W911XK-10-R-0006-0004 Saginaw Electrical Closets and Primary Distribution.pdf PDF
Saginaw VA Electrical Upgrade Q A —
Exhibit A Past Performance Relevancy Questionnaire.doc DOC document
Exhibit B .doc DOC document
EXHIBIT E.doc DOC document
EXHIBIT F.doc DOC document
Exhibit C.doc DOC document
VA Saginaw Electical Site Visit Sign In Sheet.pdf PDF
VA Saginaw Electrical Closets Preproposal Presentation.pdf PDF
E1 3-9-1995.pdf PDF
Saginaw VA Electrical Upgrade Q A —
W911XK-10-R-0006-0002 Saginaw Electrical Closets and Primary Distribution.pdf PDF
W911XK-10-R-0006 Saginaw VA Electrical Upgrade Phase 1 2 - Final Spec.pdf PDF
W911XK-10-R-0006-0001 Saginaw Electrical Closets and Primary Distribution.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part7.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part6.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part2.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part5.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part1.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part4.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part3.pdf PDF
W911XK-10-R-0006 Saginaw Electrical Closets.pdf PDF
Complete Specs - Sag VA Electrical Upgrade Phase 1 2.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FY10 Upgrade Electrical Closets and Primary Distribution at Aleda E. Lutz VA Medical Center, Saginaw , Michigan

AMERICAN RECOVERY & REINVESTMENT ACT FUNDED

The purpose of this amendment is to:

1. UPDATE Specification section 01 00 00 General Requirments and 01 22 00.00 13 Measurement and Payment.

2. ADD refence draw ing E1 3-9-1995.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Feb-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-R-0006

X 9B. DATED (SEE ITEM 11)

29-Jan-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Feb-2010

CODE

CONTRACTING DIVISION

DETROIT DISTRICT, USAED

477 MICHIGAN AVE.

DETROIT MI 48226

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-10-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

AMENDMENT 0003

Solicitation Amendment No. 0003

For Solicitation No. W911XK-10-R-0006 FY10 VA Saginaw Upgrade Electrical Closets and Primary Distribution, Aleda E. Lutz VA Medical Center, Saginaw, Michigan

CHANGES TO THE SPECIFICATIONS

SECTION 01 00 00 GENERAL REQUIREMENTS

DELETE: Paragraph 1.2, C “ITEM 0003, OPTION 2 - PHASE I UPGRADE DATA CABLE”

ADD: Revised Paragraph 1.2, C “ITEM 0003, OPTION 2 - PHASE I UPGRADE DATA

CABLE:”

Add the upgrade of the data cabling for Building No.2, Building No.3 and Building No.4 as indicated in the following drawing notes:

Sheet 02 EP-101: All Communications work on the 2nd floor and all communications work on the 1st floor except for work described in Keynote 3.

Sheet 03 ED-100: Keynotes 11, 12 and 13.

Sheet 03 ED-101: Entire Sheet Sheet 03 EP-100: Keynote 4, 5, 6, 13 and 14 Sheet 03 EP-101: Entire Sheet Sheet 04 ED-101: Keynotes 7, 8, 9, 10, 11, 12, 13, 15, 16, and 17.

Sheet 04 EP-101: Keynotes 4, 5, 6, 9, 10, 11, and 12.

SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT

DELETE: Paragraph 1.1.3 “Option 2 - Phase I Data Cable Upgrade to Buildings 2, 3 & 4 (Item No. 0003)”

ADD: Revised Paragraph 1.1.3 “Option 2 - Phase I Data Cable Upgrade to Buildings 2, 3 & 4 (Item No. 0003)”

a) Contractor shall provide all tools, equipment, material, labor and supervision necessary to add the upgrade of data cabling for building No. 2, building No. 3 and building No. 4 as indicated in the following drawing notes:

Sheet 02 EP-101: All Communications work on the 2nd floor and all communications work on the 1st floor except for work described in Keynote 3.

Sheet 03 ED-100: Keynotes 11, 12 and 13.

W911XK-10-R-0006

Sheet 03 ED-101: Entire Sheet Sheet 03 EP-100: Keynote 4, 5, 6, 13 and 14 Sheet 03 EP-101: Entire Sheet Sheet 04 ED-101: Keynotes 7, 8, 9, 10, 11, 12, 13, 15, 16, and 17.

Sheet 04 EP-101: Keynotes 4, 5, 6, 9, 10, 11, and 12.

Unit of measure: Lump sum.

END OF AMENDMENT

(End of Summary of Changes)