W911XK-10-R-0006-0002 Saginaw Electrical Closets and Primary Distribution.pdf

PDF 27 KB Posted

Attached to
VA Saginaw Electrical Closets and Distribution
Solicitation number
W911XK-10-R-0006
Issued by

About this file

W911XK-10-R-0006 Amend 0002

View the file

Other files

File Type Posted
W911XK-10-R-0006 Amend 0006.pdf PDF
SaginawVA Elec Amend006 Drawings - Part3.pdf PDF
SaginawVA Elec Amend006 Drawings - Part1.pdf PDF
SaginawVA Elec Amend006 Drawings - Part2.pdf PDF
W911XK-10-R-0006 Saginaw Electrical Closets.pdf PDF
Saginaw VA Electrical Upgrade QA —
W911XK-10-R-0006 Amendment 0005.pdf PDF
W911XK-10-R-0006-0004 Saginaw Electrical Closets and Primary Distribution.pdf PDF
Saginaw VA Electrical Upgrade Q A —
Exhibit A Past Performance Relevancy Questionnaire.doc DOC document
Exhibit B .doc DOC document
EXHIBIT E.doc DOC document
EXHIBIT F.doc DOC document
Exhibit C.doc DOC document
VA Saginaw Electical Site Visit Sign In Sheet.pdf PDF
VA Saginaw Electrical Closets Preproposal Presentation.pdf PDF
W911XK-10-R-0006-0003 Saginaw Electrical Closets and Primary Distribution.pdf PDF
E1 3-9-1995.pdf PDF
Saginaw VA Electrical Upgrade Q A —
W911XK-10-R-0006 Saginaw VA Electrical Upgrade Phase 1 2 - Final Spec.pdf PDF
W911XK-10-R-0006-0001 Saginaw Electrical Closets and Primary Distribution.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part7.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part6.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part2.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part5.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part1.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part4.pdf PDF
Saginaw VA Electrical Upgrades - Drawings_Part3.pdf PDF
W911XK-10-R-0006 Saginaw Electrical Closets.pdf PDF
Complete Specs - Sag VA Electrical Upgrade Phase 1 2.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FY10 W911XK-10-R-0006 Saginaw Electrical Closets and Primary Distribution

The purpose of this Amendment is to:

1. CHANGE the date of the Preposal Conference/Site Visit for Aleda E. Lutz VA Medical Center, Saginaw , Michigan FROM Wednesday February 10, 2010 TO Wednesday February 17, 2010.

2. UPDATE submission requirments sec. 1.6 Formal Communicaitons, Offerors Explanations

3. UPDATE FAR Clause 52.236-27 Site Visit

All other terms and conditions remain unchanged. The due date/time for submissions remain at 2:00 PM Eastern on Tuesday, 2 March 2010.

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Feb-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-R-0006

X 9B. DATED (SEE ITEM 11)

29-Jan-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Feb-2010

CODE

CONTRACTING DIVISION

DETROIT DISTRICT, USAED

477 MICHIGAN AVE.

DETROIT MI 48226

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-10-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

AMENDMENT 0002

1.6 FORMAL COMMUNICATION, OFFEROR EXPLANATIONS

Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, for proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their proposals. All questions and requests for information (RFIs) must be received NOT LATER THAN CLOSE OF BUSINESS 22 February 2010 and answers will be posted not later than 26 February 2010 at the FedBizOpps website (www.fbo.gov). Questions and RFIs may be submitted to:

LRE-Quotes@usace.army.mil.

The Contracting Officer reserves the right to address questions received after 22 February 2010 following solicitation closing with those offerors in the competitive range should one be established. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to FedBizOpps.

Acknowledgement of each amendment by the offeror must be made in the space provided on the SF 1442, or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site. For security reasons all potential offerors, plan rooms and printing companies are required to register in the Central Contractor’s Registration (CCR), at www.ccr.gov.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

http://www.fbo.gov/ mailto:LRE-Quotes@usace.army.mil http://www.ccr.gov/

W911XK-10-R-0006

(b) Site visits may be arranged during normal duty hours by contacting:

Wednesday, 17 February 2010 at 11:00 AM Eastern. A brief presentation about the solicitation, proposal Preparation, and evaluation process, will be followed by a site walkthrough.

(c) Participants will meet at—

The main auditorium at the Aleda E. Lutz VA Medical Center, Saginaw, Michigan.

1500 Weiss Street Saginaw, MI 48602

(End of provision)

(End of Summary of Changes)