Attachment 6 - Cable Schedule.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Insulation Resistance Testing Services
- Solicitation number
- W911WN26QA564
About this file
This is a Cable Schedule attachment that specifies the insulation resistance testing requirements for electrical cables at four U.S. Army Corps of Engineers facilities: Hildebrand, Morgantown, Opekiska, and Point Marion Locks and Dams in Pennsylvania and West Virginia.
The document provides detailed testing procedures requiring contractors to inspect physical and mechanical conditions of motors and cables, de-energize all circuits, and perform one-minute insulation-resistance tests with readings recorded at 30 seconds and one minute. Test voltage specifications are 500 volts DC for 300-volt rated cables and 1000 volts DC for 600-volt rated cables. Testing must be conducted on phase-to-phase conductors (A-phase to B-phase, B-phase to C-phase, C-phase to A-phase), phase-to-ground connections, and phase-to-neutral connections where applicable, with results verified against NETA Table 100.1. The schedule lists approximately 50+ individual cables across the four facilities, including their source and destination points, conductor configurations (ranging from single to three-conductor cables), wire gauges (from 2 to 6 MCM/AWG), voltage ratings (ranging from 115/230V to 600V), and reference drawing page numbers. Cables include service bridge feeders, main interlocks, lighting transformers, distribution panels, and dam feeders. References include NFPA 70 (National Electric Code), NFPA 70B (Electrical Equipment Maintenance), OSHA 29 CFR 1910, and ANSI/NETA ATS-2025 standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Testing Procedure
| Inspect physical and mechanical condition of the motor and cable. | |
| Remove power and OPEN disconnects or breakers for all circuit to be insulation tested. | |
| All test are to be perform for 1 min. However, readings are to be recorded at 30 sec and 1 min. | |
| Steps below are based from 2‐lead insulation tester, follow insulation tester's manufacture procedure when installing leads. Ensure that leads are inserted for insulation testing. | |
| When placing meter leads on phase wire(s), unused phase wires should be grounded to avoid stray voltages. | |
| Perform insulation-resistance test by applying test voltage on each conductor with respect to ground and adjacent conductors. Applied potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated cable. | |
| 1 | Phase conductor to adjacent Phase conductor |
| A-phase & B-phase | |
| B-phase & C-phase | |
| C-phase & A-phase | |
| 2 | Phase to Ground Bus |
| A-phase & ground | |
| B-phase & ground | |
| C-phase & ground | |
| 3 | Phase to Neutral Bus (if applicable) |
| A-phase & neutral | |
| B-ph & neutral | |
| C-ph & neutral | |
| Test voltage shall be applied to each conductor for one minute. | |
| Verify results in accordance with NETA Table 100.1 | |
| Refer to following references: | |
| NFPA 70, National Electric Code | |
| NFPA 70B, Recommended Practice for Electrical Equipment Maintenance | |
| OSHA 29 CFR 1910, Occupational Safety and Health Standards for General Industr | |
| ANSI/NETA ATS-2025 |
Hildebrand
| CABLE NO | FROM | TO | FOR | NO COND | MCM OR AWG | CIRCUIT V | PAGE |
| ED | Switchboard Panel No 5 | Emergency Dam | Power Emergency Dam | 3/C | 6 | 600V | 29/1.2 |
29/12 DF1 Switchboard Panel No 5 Water Tight Safety Switch No 1 Service Bridge Feeder No 1 3/C 2 600V 29/1.2 29/12 DF2 Switchboard Panel No 5 Water Tight Safety Switch No 2 Service Bridge Feeder No 2 3/C 2 600V 29/1.2 29/12 CABLE 5 Main Interlock MCC Interlock 3-1/C 3/0 600V 29/1.2 29/12 CABLE 6 Lighting Panel LC1 Lighting Panel LC2 Lighting Panel LC2 Power Feed 3/C 600V 29/9.2 29/12 TF1 Switchboard Panel No 5 Lighting Transformer No 1 Lighting Transformer No 1 Feeder 2/1C 8 600V 29/1.2 29/12 LT1 Lighting Transformer No 1 Switchboard Panel No 5 Transformer Transfer Switch 3/1/C 4 600V 29/1.2 29/12 TF2 Switchboard Panel No 5 Lighting Transformer No 1 Lighting Transformer No 2 Feeder 2/1C 8 600V 29/1.2 29/12 LT2 Lighting Transformer No 2 Switchboard Panel No 5 Transformer Transfer Switch 3/1/C 4 600V 29/1.2 29/12 CABLE 10 LTG. TR Tran Switch Lighting Panel LC1 Lighting Panel LC1 Panel Power 3/C 600V 29/1.2 29/12
IDF1
IDF1.1
IDF1.2
IDF1.3
| IDF1.4 | Water Tight Safety Switch No 1 | Controller Cabinet | Gate Hoist | 3-1/C | 2 | 600V | 56/1.1 |
| IDF2 |
IDF2.1
IDF2.2
IDF2.3
IDF2.4 Water Tight Safety Switch No 2 Controller Cabinet Gate Hoist 3-1/C 2 600V 56/1.1
Morgantown
| CABLE NO | FROM | TO | FOR | NO COND | MCM OR AWG | CIRCUIT V | PAGE |
| DF1 | Switchboard | Item 32, Pier 1 | Service Bridge Feeder No 1 | 3/C | 2 | 460V | 29/1.3 |
29/2A DF2 Switchboard Item 32, Pier 1 Service Bridge Feeder No 2 3/C 2 460V 29/1.3 29/2A
DF3 & DF4
DF3.1 & DF4.1
DF3.2 & DF4.2 Item 32, Pier 1 Item 27, Pier 7 Dam Feeder 3/C 2 460V 56/1.1 56/4 56/9
| CABLE 5 | Main Interlock | MCC | Interlock | 3-1/C | 2/0 | 460V | 29/1.3 | ||
| CABLE 7 | Secondary Distribution Panel | LPA Panel (Room A2) | Panel LPA Power Feed | 3/C | 4-#2/0 | ||||
| 1-#4G | 120/208Y | 29/12A.1 |
29/13A.1
| CABLE 8 | Secondary Distribution Panel | LPB Panel (Boiler Room) | Panel LPB Power Feed | 3/C | 4-#2/0 | ||
| 1-#4G | 120/208Y | 29/12A.1 |
29/13A.1
| CABLE 9 | Secondary Distribution Panel | LPC Panel (Storage Area) | Panel LPC Power Feed | 3/C | 4-#2 | ||
| 1-#4G | 120/208Y | 29/12A.1 |
29/13A.1
| TF1 | Switchboard | Lighting Transformer | Transformer Feeder | 2/1C | 4 | 460V | 29/1.3 |
| LT1 | Lighting Transformer No 1 | Switchboard Panel No 5 | Transformer Transfer Switch | 3/1/C | 4 | 600V | 29/1.3 |
| TF2 | Tainter Gate Controller Pier 4 | Lighting Transformer Pier 4 | Spillway Lighting | 2&4 - 1/C |
10 460V 56/1.1 56/3.1
| SL1 | Lighting Transformer | Contactor Cabinet Pier 4 | Spillway Lighting | 3-1/C | 10 | 115/230V | 56/3.1 |
| PRI | Switchboard | JB108 | Power Receptacle | 3/C | 8 | 460V | 29/1.3 |
29/2A
Opekiska
| CABLE NO | FROM | TO | FOR | NO COND | MCM OR AWG | CIRCUIT V | PAGE |
| PRF1 | Switchboard Section 5 | Splice PRF1-S1, Sta. 0+92.5B, R.W. Gallery | Power Recepticles - R.W. | 3/C | 6 | 440V | 29/7 |
| CABLE 1 | 60A, 600V D.T. Transfer Switch | Line Side 30KVA Transformer | Line Side 30KVA Transformer Feeding LP-3 etc. | 3/C | 6 | 440V | 56/3.1 |
| CABLE 2 | Load Side 30KVA Transformer | LP-3 etc. | Load Side 30KVA Transformer Feeding LP-3 etc. | 3/C | 2 | 120/208V | 56/3.1 |
| CABLE 3 | LP-3 Slot 1 Splice | LP-1 | LP-1 Power Feed | 3/C | 2 | 120/208V | 56/3.1 |
| CABLE 4 | LP-3 Slot 1 Splice | LP-2 | LP-2 Power Feed | 3/C | 2 | 120/208V | 56/3.1 |
| CABLE 5 | Main Interlock | MCC | Interlock | 3-1/C | 3/0 | 440V | 29/1 |
29/2 29/2.1
| CABLE 6 | LP-3 Slot 1 | LP-3 Slot 1 Splice | 100A power distribution to LP1, LP2, LP4, LP5 | 3/C | 2 | 120/208V | 56/3.1 |
| CABLE 7 | LP-3 Slot 1 Splice | LP-4 | LP-4 Power Feed | 3/C | 2 | 120/208V | 56/3.1 |
| CABLE 8 | LP-3 Slot 1 Splice | LP-5 | LP-5 Power Feed | 4-S/C | 2 | 120/208V | 56/3.1 |
| LPF1 | Switchboard Section 2 | Ltg. Transformer, Oper. Bldg. | Main Lighting Service | 4-1c | 2 | 120/208V | 29/1 |
29/3 SBF1 Switchboard Section 6 Wireway, L.W. Pier Bridge & Pier Feeder 3c 3/0 440V 29/1 29/7 29/15.1 56/1 56/2.1
SBF1-A
SBF1-A.1
| SBF1-A.2 | Wireway, L.W. Pier | D.T. Switch, L.W. Pier | Bridge & Pier Feeder | 3c | 3/0 | 440V | 29/7 | ||
| SBF2 | Switchboard Section 5 | Wireway, L.W. Pier | Bridge & Pier Feeder | 3c | 3/0 | 440V | 29/1 |
29/7 29/15.1
SBF2-A
SBF2-A.1
| SBF2-A.2 | Wireway, L.W. Pier | D.T. Switch, L.W. Pier | Bridge & Pier Feeder | 3c | 3/0 | 440V | 29/7 |
| LPFA | 30KVA Tansformer Load Side Splice | Panel LPA | Panel LPA Feeder | 4-1c | |||
| Probably | 6 | ||||||
| Probably | 120/208V | 29/1 | |||||
| LPFB | 30KVA Tansformer Load Side Splice | Panel LPB | Panel LPB Feeder | 4-1c | |||
| Probably | 6 | ||||||
| Probably | 120/208V | 29/1 |
Point Marion
| CABLE NO | FROM | TO | FOR | NO COND | MCM OR AWG | CIRCUIT V | PAGE |
| P15 | LW. OPERATIONS BLDG MCC2 | PIER *1 (DAM) | DAM FEEDER *1 | 4/C | 1/0 | 480 | 29/1 |
56/6
P16 LW. OPERATIONS BLDG MCC2 PIER *1 (DAM) DAM FEEDER *2 4/C 1/0 480 29/1
56/6
DF-1
DF-1.1
DF-1.2
DF-1.3
DF-1.4
| DF-1.5 | NORMAL FEEDER | HOIST CONTROL PANEL | DAM POWER | 3/C | #2 |
| #10GRD | 480 | 56/6 | |||
| DF-2 |
DF-2.1
DF-2.2
DF-2.3
DF-2.4
| DF-2.5 | EMERGENCY FEEDER | HOIST CONTROL PANEL | DAM POWER | 3/C | #2 |
| #10GRD | 480 | 56/6 |