W911WN23Q3002 0002.pdf
PDF 367 KB Posted
- Solicitation number
- W911WN23Q3002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0004 Mosquito_Performance_Price_schedule.xlsx | XLSX spreadsheet | |
| 0004 W911WN23Q3002.pdf | ||
| 0004 Attachment 2 Cleaning Services.docx | DOCX document | |
| W911WN23Q3002 0003.pdf | ||
| Attachment 5 Herbicide Application.docx | DOCX document | |
| Mosquito_BG_ Maps.pdf | ||
| Attachment 1 Grass Mowing Requirements.docx | DOCX document | |
| 0001 Mosquito_Performance_Price_schedule.xlsx | XLSX spreadsheet | |
| Attachment 3 Solid Waste Removal.docx | DOCX document | |
| W911WN23Q3002.pdf | ||
| Attachment 2 Cleaning Services.docx | DOCX document | |
| Appendicies.pdf | ||
| Attachment 4 Raw Sewage.docx | DOCX document | |
| Site Visit Sign-In Sheet - W911WN23Q3002 - Mosquito Creek B-G.pdf | ||
| Site Visit Agenda - W911WN23Q3002 - Mosquito Creek B-G.pdf | ||
| Dept of Labor Resources.pdf | ||
| 0001 Mosquito_Performance_Price_schedule.xlsx | XLSX spreadsheet | |
| W911WN23Q3002 0001.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: Mosquito Creek Lake Building and Grounds Maintenance Services
The Purpose of this Amendment is to address Questions from Interested Vendors.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Nov-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN23Q3002
X 9B. DATED (SEE ITEM 11)
15-Nov-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Nov-2022
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-CT
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN23Q3002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Solicitation Questions Mosquito Creek Lake Building and Grounds Maintenance
W911WN23Q3002
Q1: What is the estimated acreage of land that will be serviced in this contract?
A1: The estimated acreage of land serviced by this contract is 55 acres.
Q2: What was the price of the last winning bid.
A2: Value of the Base Plus All Options for the previous contract, W911WN18D3000, was $375,572.50.
Q3: Is the contractor provided space to store janitorial supplies?
A3: The contractor may be provided storage space for janitorial supplies provided it does not adversely affect the mission of Mosquito Creek Lake.
Q4: Is the contractor provided space on property to store lawn mowing equipment?
A4: The contractor may be provided storage space for lawn mowing equipment provided it does not adversely affect the mission of Mosquito Creek Lake.
Q5: Within the price schedule, there are 4 restroom emergency cleanings shown as an example of what was done in the past. If the contractor prices in 4 emergency cleanings, but more are requested, will they be ordered via task order or are they to be included in the overall price from the contractor?
A5: If more than 4 emergency cleanings are needed, a modification will be issued to increase the need for this service only.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ATTACHEMENTS AND APPENDICIES
Attachment 1 Grass Mowing Requirements Attachment 2 Cleaning Services Attachment 3 Solid Waste Removal Attachment 4 Raw Sewage Attachment 5 Herbicide Application Attachement 6 Wage Determination
Appendix I Appendix II Appendix III Appendix IV Appendix V Appendix VI Appendix VII Appendix VIII
W911WN23Q3002
Appendix XI Appendix X
(End of Summary of Changes)
File details come from the government source that posted it. Updated .