Attachment 5 Herbicide Application.docx

DOCX document 3 MB Posted

Attached to
Building and Grounds Maintenance Services Contract at Mosquito Creek
Solicitation number
W911WN23Q3002
Issued by

View the file

Other files

File Type Posted
0004 Mosquito_Performance_Price_schedule.xlsx XLSX spreadsheet
0004 W911WN23Q3002.pdf PDF
0004 Attachment 2 Cleaning Services.docx DOCX document
W911WN23Q3002 0003.pdf PDF
Mosquito_BG_ Maps.pdf PDF
Attachment 1 Grass Mowing Requirements.docx DOCX document
0001 Mosquito_Performance_Price_schedule.xlsx XLSX spreadsheet
Attachment 3 Solid Waste Removal.docx DOCX document
W911WN23Q3002.pdf PDF
Attachment 2 Cleaning Services.docx DOCX document
Appendicies.pdf PDF
Attachment 4 Raw Sewage.docx DOCX document
W911WN23Q3002 0002.pdf PDF
Site Visit Sign-In Sheet - W911WN23Q3002 - Mosquito Creek B-G.pdf PDF
Site Visit Agenda - W911WN23Q3002 - Mosquito Creek B-G.pdf PDF
Dept of Labor Resources.pdf PDF
0001 Mosquito_Performance_Price_schedule.xlsx XLSX spreadsheet
W911WN23Q3002 0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 Section C-7

HERBICIDE APPLICATION

Mosquito Creek Lake

Locations:

Rock Rip-Rap of Dam: the area to be sprayed shall include: approximately

3.5 acres of stone rip-rap located on the breast of the dam, approximately 0.5 acre of rip-rap below the dam on the left abutment (facing downstream), 0.5 acre of rip-rip on the embankment about 300 yards northeast of the Lakeview Recreation Area, and the east leg of The Lakeview Nature Trail, approximately 0.75 acre of gravel trail running north and south.

Weir Drainage Ditch: The area to be sprayed includes: the weir drainage ditch on left abutment below the rip-rap on the downstream face of the dam. The approximate size is 400 ft x l0 ft (4,000 sf). This area contains water and therefore must be sprayed with "Rodeo" or equivalent.

Rock Rip-Rap of 305 Boat Launch: The following area to be sprayed includes: the 30 feet of stone rip-rap north and south of the 305 boat launch. The approximate size is 30 ft.

Maintenance Office: The following area to be sprayed includes: the fence surrounding the maintenance office and pole barn. The approximate size is 921 sf.

B-1

Exhibit B-2 Herbicide Spraying Dam Area

Exhibit B-3 Herbicide Spraying Lakeview, Riprap, and Nature Trail Areas

Exhibit B-4 Herbicide Spraying Drainage Ditch

Exhibit B-5 Hedge Trimming Maintenance Area image1.jpeg image2.jpeg image3.jpeg image4.png

File details come from the government source that posted it. Updated .