Attachment 1 Grass Mowing Requirements.docx
DOCX document 3 MB Posted
- Solicitation number
- W911WN23Q3002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0004 Mosquito_Performance_Price_schedule.xlsx | XLSX spreadsheet | |
| 0004 W911WN23Q3002.pdf | ||
| 0004 Attachment 2 Cleaning Services.docx | DOCX document | |
| W911WN23Q3002 0003.pdf | ||
| Attachment 5 Herbicide Application.docx | DOCX document | |
| Mosquito_BG_ Maps.pdf | ||
| 0001 Mosquito_Performance_Price_schedule.xlsx | XLSX spreadsheet | |
| Attachment 3 Solid Waste Removal.docx | DOCX document | |
| W911WN23Q3002.pdf | ||
| Attachment 2 Cleaning Services.docx | DOCX document | |
| Appendicies.pdf | ||
| Attachment 4 Raw Sewage.docx | DOCX document | |
| W911WN23Q3002 0002.pdf | ||
| Site Visit Sign-In Sheet - W911WN23Q3002 - Mosquito Creek B-G.pdf | ||
| Site Visit Agenda - W911WN23Q3002 - Mosquito Creek B-G.pdf | ||
| Dept of Labor Resources.pdf | ||
| 0001 Mosquito_Performance_Price_schedule.xlsx | XLSX spreadsheet | |
| W911WN23Q3002 0001.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 Section C-2
GRASS MOWING REQUIREMENTS Mosquito Creek Lake
April May June July August September October
November Total )Estimated Frequency of Mowing Total Estimated Mowing 20
Normal Work Hours: Monday through Friday, 7:30-3:00. Area A: (Line Item 000 l) Area B: (Line Item 0002)
2.1.1 The total mowed area consists of approximately 52.5 acres. All areas shall be a Type I Cut. The areas are listed as Area A and Area B. Area A is comprised of the Resource Manager 's Office, Maintenance Area, Dam Site Picnic Area, most of Tailwater Recreation Area and most of Lakeview Recreation Area for approximately 43 acres. The Lakeview Area will be mowed to the edge of road along Rt. 305 and will include the entire upstream and downstream embankment to toe and include all drainage ditches. Area B is comprised of part of Tailwater Recreation Area, part of Lakeview Recreation Area and the Rt. 305 Boat Launch. All areas will be mowed each cycle. All trash, debris, garbage, drift and fallen trees and branches within three feet of all boarders of mowing areas and visible from pathways shall be removed.
Note: The contractor shall receive estimated start dates for each mowing on a work order. However, the COR reserves the right to adjust the estimated start dates according to existing conditions. In such a situation, the contractor shall begin mowing operations within a 24-hour notice from COR. The mowing cycle shall be complete within three consecutive days. All guide rails, fences, and roadway berms adjacent to mowed areas shall also be mowed/ trimmed during each mowing cycle. All required safety equipment and apparel shall be strictly enforced.
Attachment 1 Mowing
Maintenance
Area
Attachment 1- Mowing
Alternate
Intake and
Dam
Areas
Mowing
Dam and
Lakeview
Mowing
Lakeview
Mowing
Boat Launch
Mowing
Tailwater and
Manager’s
Office
Mowing
Mosquito
Picnic
Area image7.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg
File details come from the government source that posted it. Updated .