Appendicies.pdf

PDF 6 MB Posted

Attached to
Building and Grounds Maintenance Services Contract at Mosquito Creek
Solicitation number
W911WN23Q3002
Issued by

View the file

Other files

File Type Posted
0004 Mosquito_Performance_Price_schedule.xlsx XLSX spreadsheet
0004 W911WN23Q3002.pdf PDF
0004 Attachment 2 Cleaning Services.docx DOCX document
W911WN23Q3002 0003.pdf PDF
Attachment 5 Herbicide Application.docx DOCX document
Mosquito_BG_ Maps.pdf PDF
Attachment 1 Grass Mowing Requirements.docx DOCX document
0001 Mosquito_Performance_Price_schedule.xlsx XLSX spreadsheet
Attachment 3 Solid Waste Removal.docx DOCX document
W911WN23Q3002.pdf PDF
Attachment 2 Cleaning Services.docx DOCX document
Attachment 4 Raw Sewage.docx DOCX document
W911WN23Q3002 0002.pdf PDF
Site Visit Sign-In Sheet - W911WN23Q3002 - Mosquito Creek B-G.pdf PDF
Site Visit Agenda - W911WN23Q3002 - Mosquito Creek B-G.pdf PDF
Dept of Labor Resources.pdf PDF
0001 Mosquito_Performance_Price_schedule.xlsx XLSX spreadsheet
W911WN23Q3002 0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Built with Tanida Demo Builder www.demo-builder.com

Vendor Registration Page 1 of 17

Appendix I - Procurement Integrated Enterprise Environment (PIEE) Vendor Registration

Intro

Welcome to Procurement Integrated Enterprise Environment (PIEE). This demonstration contains audio narrative. Please adjust your volume accordingly.

Step 1

This is an overview of the registration process for Vendor users in PIEE. Please note that all data entered in this demo do not reflect actual user requirements and are for purposes of example only.

Vendor Registration Page 2 of 17

Step 2

Vendors will need to take the following steps to establish an account in PIEE:

Complete Vendor activation requirements specified in the Vendors Getting Started section of the Help/Training page.

Self-register as a Vendor or Contractor with the user's CAGE code(s).

Step 3

Review the Privacy Statement and Warning messages and select the Accept button.

Vendor Registration Page 3 of 17

Step 4

To begin the Vendor registration process, select the Start the registration process link.

Step 5

Select the Agree button to accept the Privacy Act Statement.

Vendor Registration Page 4 of 17

Step 6

Select Vendor from the role type list.

Step 7

Select the appropriate authentication type from the dropdown list. For training purposes, this presentation demonstrates the use of user ID and password authentication.

Vendor Registration Page 5 of 17

Step 8

Enter a user ID in the User ID field. Enter and confirm the desired password in the Password and Password Confirmation fields.

Enter the CAPTCHA in the CAPTCHA Image field. Select the Next button to continue.

Step 9

Select the desired security questions from the Question dropdown menus and complete all Answer fields. Select the Next button to continue.

Vendor Registration Page 6 of 17

Step 10

Complete all required fields on the User Profile page. PLEASE NOTE: The data presented in the following demonstrations (CAGE Code, DoDAAC, user profile information, etc.) are for purposes of example only. All users must utilize their own personal information.

Step 11

Upon completion of the User Profile information, the user may save the registration by selecting the Save Registration button.

The user will have 30 days to complete the registration upon saving.

Vendor Registration Page 7 of 17

Step 12

Upon selecting the Save Registration button, the user may select Continue Registration or Exit Registration And Finish Later.

Step 13

Select the Next button to continue.

Vendor Registration Page 8 of 17

Step 14

Complete all required fields on the Additional Profile Information page. Select the Next button to continue.

Step 15

The Roles page is displayed. Expand the Application dropdown menu in Step 1 to view all applications available to Vendors within PIEE.

Vendor Registration Page 9 of 17

Step 16

Select the desired application from the dropdown menu.

Step 17

Upon selection of the desired application, a list of available roles will be displayed in Step 2. Select the appropriate role and select the Add Roles button.

Vendor Registration Page 10 of 17

Step 18

The selected role is displayed in the Roles Summary section. Enter the appropriate CAGE code in the Location Code field. If it is unknown which CAGE should be used, users should contact their Contractor Administrator (CAM).

Step 19

If the CAGE code has an extension, enter it in the Extension field.

Vendor Registration Page 11 of 17

Step 20

Multiple Vendor roles may be added simultaneously. To add another role, select the desired application and role in Steps 1 and

2. Select the Add Roles button.

Step 21

If the user adds a role for which additional information is required, an info message will direct the user to the Group Lookup tool. Select Group Lookup from the Action column for the role requiring additional information.

Vendor Registration Page 12 of 17

Step 22

The user may search the directory using Group Name or Location. Expand the Search dropdown and select the desired option.

Enter the search criteria in the Group Search field and select the Search button.

Step 23

The search criteria will return a list of matching groups. Select the appropriate group from the Group Name list.

Vendor Registration Page 13 of 17

Step 24

The group name is displayed in the Group column. When finished adding roles, select the Next button to continue.

Step 25

Enter appropriate data in the Justification field. Attachments are optional. Select the Next button to continue.

Vendor Registration Page 14 of 17

Step 26

The Registration Summary page is displayed. The user may review all data entered during the registration process. Upon confirming all registration information, select the Next button to continue.

Step 27

The Agreement page is displayed. Review the Statement of Accountability Agreement and Government /Contractor Admin Appointment Letter.

Vendor Registration Page 15 of 17

Step 28

When finished reviewing all Agreements, select the Signature button to confirm agreement and submit the registration.

Step 29

A systematically generated one-time password is required to complete submission of the registration. A notification will be displayed indicating the expiration time of the password.

Vendor Registration Page 16 of 17

Step 30

The one-time password will be sent to the email address provided during registration.

Step 31

Enter the one-time password in the OTP field. Select the Submit Registration button to complete the Vendor registration process.

Vendor Registration Page 17 of 17

Step 32

The Successful Registration page will be displayed to confirm successful completion of the Vendor registration process.

End

This concludes our demonstration.

Appendix II

(Put on Company Letterhead)

QUALITY CONTROL PLAN

W911WN-22-D-XXXX

Building and Grounds Maintenance and Recreational Area Services

Youghiogheny River Lake

Brief statement describing your company’s management philosophy relative to its commitment to quality.

1. Describe inspection process for each section of the contract.

2. List names of inspectors.

3. Describe process to identify deficiencies in quality of services performed before the level of performance is unacceptable.

4. Describe process for retaining records of inspections and corrective actions taken.

5. Accident Prevention:

a. Policy Statement for accident prevention signed by the Contractor

(program and enforcement)

b. Emergency phone numbers

c. Equipment inspections

d. Safety training

e. Personal protective equipment required

6. Combating Trafficking in Persons:

a. Statement that the contractor has read/reviewed and will comply with FAR 52.222-50.

b. The actions the Contractor will take against employees or agents for violations of the policy at 52.222-50 (b). Such actions for employees may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment.

c. Include a statement that the Contractor has notified its employees and their agents of the policy prohibiting trafficking in persons and of the actions that will be taken by the Contractor for violations.

Signature of contractor Date:

Approved by: Date: _ _

COR

on tr ac t at te nd an ce

Contract Number:

Contract Name:

W911WN

Prime Contractor: Roster of employees on predecessor contract provided to current KTR?

Month/Year: Contractor must maintain employee records per FAR 52.222-17.

Number of employees on contract: Number of new employees placed on contract in the last month:

Date of Monthly Safety Meeting:

Date of next Monthly Safety Meeting: COR is to be invited 7 days in advance

Total Hours worked for the Month:

Contractor is to complete Sections a through m.

Appendix III - Contract Overview Workbook a b c d e f g h i j k l m n COR completes Section n.

Date of initial hire on predecesso r

Date

Notification

Actions U

SA

CE

C le ar ed

Cu rr en tl y on

C

Sa fe ty M ee ti ng

Contractor Employee Name: Contract of hire Date Completed Y o r N Y or N 1 AT/OPSEC 1: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, 2 controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after 3 contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, 4 the contractor shall submit submit certificate of completion for each affected contractor employee and subcontractor employee, 5 to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training by all 6 employees and subcontractor personnel AT Level I awareness training is available at the following website:

7 https://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the Contracting Officer Representative (COR) in presentation 8 form which will be documented via memorandum.

10 AT/OPSEC 2. The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area 11 commander installation and facility access and local security policies and procedures (provided by the Government Representative).

12 The contractor shall also provide all information required for background checks to meet installation access requirements to be 13 accomplished by the installation the USACE Security Office. The contractor workforce must comply with all personal identity 14 verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the 15 Changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the 16 Government may require changes in contractor security matters or processes. The contractor must submit the full name, Social 17 Security Number, Date of Birth, and Place of Birth for all associated contractor or subcontractor employees to the USACE Security 18 Stephen Davidson, 412-395-7504, stephen.davidson@usace.army.mil. The District retains the right to deny any contractor and 19 subcontractor employee from working on one of its contracts based on final background investigation results.

21 AT/OPSEC 4. The contractor and all associated sub-contractors shall receive a brief/training (iWatch provided by the COR) on the local 22 suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to 23 watch for and instruct employees to report suspicious activity to the project manager, security representative, or law enforcement entity.

24 This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing 25 performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

Subcontractors:

Solid Waste Subcontractor Name

Contact

Name

Title

Phone

E-mail

AT/OPSEC 13. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or

On Contract? restricted areas.

AT/OPSEC 15. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet NOTE: Only Solid Waste Subcontractor employees are exempt from the AT/OPSEC requirements the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

Subcontractor Name

Subcontractor Name

Contact Name Title Phone E-mail

Contact Name Title Phone E-mail

Subcontractor Name Contact Name Title Phone E-mail n/a

For more information on Activity Hazard Analyses, see USACE Safety Manual:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf To be completed by COR

Activity Analysis on File

Required Submittals

On File Notes

See tab.

7 See tab.

Date Submitted:

BASE OY1 OY2 OY3 OY4

Quality Control Plan Contractor Quality Control Inspector.

List of Quality Control Inspector(s) and contact information.

Contractor Representatives.

List of names of Contractor’s authorized representative(s) and contact information.

Accident Prevention Plan (APP).

A suggested outline for the Contractor’s Accident Prevention Plan is in Attachment 2. See Section C-1.9.b for APP requirements.

a. Accident History

b. Safety Deficiency Tracking Table

c. Emergency Response Plan

d. First Aid & CPR Certificates

e. Hazardous Material Communication Plan

f. Drug and Alcohol Abuse Prevention Program

g. Infectious Disease Exposure Prevention, Preparedness, and Response Plan

Emergency Contacts.

A prioritized list, including phone numbers, of those persons (normally Contractor authorized representatives) to call in case of emergencies.

Certificates of Insurance Does insurance meet requirements in PWS C-1.32?:

Workers's Compensation & Employer's Liability: $100,000 (PA) and as legally required by the state (OH and WV) Comprehensive General Liabilty: Bodily Injury $500,000 per occurrence & Property Damage $100,000 Automotive Liabilty: Bodily Injury $200,000 per person/$500,000 per occurrence & Property Damage $20,000 Security Requirements A letter of compliance and a signed release from the dump site property owner.

A letter from either the sewage plant accepting sewage or the state environmental agency approval of an alternate dump site.

Annual Pest Control Plan by 12/1

For more information on Material Safety Data Sheets/Safety Data Sheets, see USACE Safety Manual https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Product/Material On file

Contractor Representatives.

List of names of Contractor’s authorized representative(s) and contact information.

To be completed by contractor.

Name Title Office Cell E-mail

Emergency Contacts.

A prioritized list, including phone numbers, of those persons (normally Contractor authorized representatives) to call in case of emergencies.

PWS C-1.9 Safety and Security Requirements requires the Contractor to comply with the Occupational Health and Safety Act and USACE Manual EM 385-1-1.

Per 01.A.17 of EM 385-1-1, The Contractor Site Safety and Health Officer (SSHO) is:

Contractor Quality Control Inspector.

List of Quality Control Inspector(s) and contact information.

Executive Order No. 11246, Equal Employment Opportunity, dated 24 September 1965, as amended; Section 503 of the Rehabilitation Act of 1973;

and Section 402 of the Vietnam Era Veterans Readjustment Assistance Act of 1974

Your contract, (see FAR Clause 52.212-5) also requires you to display in conspicuous places, available to employees, applicants for employment, and representatives of each labor union with which you have a collective bargaining agreement, a poster setting forth the provisions of the "Equal Opportunity", the "Equal Opportunity for Workers with Disabilities," and the Equal Opportuniy for Veterans clauses. Your service contract also requires you to display (see FAR Clause 52.222-41) the Employees Rights on Government Contracts poster, WHD1313

Poster Displayed

Business Union USACE Project - fill in where these are located.

Equal Opportunity

Equal Opportunity for Workers with Disabilities

Equal Opportunity for Veterans

Employee Rights on Government Contracts poster WHD1313

Appendix IV

ACCIDENT PREVENTION PLAN

Building and Grounds Maintenance Services

Youghiogheny River Lake.

Contract Number Contractor Name

1. SIGNATURE SHEET.

This Accident Prevention Plan was

Prepared By:

Title of corporate safety staff person

Approved By:

President

2. BACKGROUND INFORMATION

a. Contractor: Name Address City, State Zip

b. Contract Number W911WN-19-D-3###

c. Project Name: Mahoning Creek Lake

d. Project Description: Building and Grounds Maintenance Service

e. Name of Company’s recent accident history is included as Attachment # to this Accident Prevention Plan. Information included includes EMR, OSHA 200 Forms and corporate safety trend analyses.

f. The Major definable features of work are: . An Activity Hazard Analysis (AHA) will be prepared for each Major Definable Feature of Work. AHAs will be prepared in accordance with the format shown on page 4 of EM 385-1-1 and will be presented and discussed at the Preparatory Phase Inspection for the applicable feature of work.

3. STATEMENT OF SAFETY AND HEALTH POLICY

Enter statement which describes the company‘s commitment to safety.

4. RESPONSIBILITIES AND LINES OF AUTHORITIES

a. Name - Describe responsibility and accountability of personnel responsible for safety at corporate level.

b. Name - Describe responsibility and accountability of personnel responsible for safety at project level.

c. Lines of authority - Describe lines of authority (as related to safety) for this project.

5. SUBCONTRACTORS AND SUPPLIERS.

a. The following subcontractors will be working on this project:

1. List

b. The CQC System Manger (if someone else, identify) will be responsible for controlling and coordinating subcontractors and suppliers.

c. All subcontractors and suppliers performing work on site will be expected to conform to the requirements of this Accident Prevention Plan and to the requirements of EM 385-1-1.

6. TRAINING.

a. Each employee will receive a safety indoctrination consisting of a thorough review of applicable AHA’s.

b. The following is a list of mandatory training and certifications which are applicable to this project:

1. Vehicle Operator

2. Personal Protective Equipment)

3. Other

c. The following identifies requirements for periodic retraining or recertification relating to item b above.

d. The following individuals shall be trained in the contents of the Emergency Response Plan discussed in Section 12 of this Accident Prevention Plan:

e. Weekly toolbox safety meeting will be conducted at TIME every ENTER DAY OF WEEK.

Each on site worker will be required to attend. Attendance will be documented. Name will be responsible for conducting these meetings.

7. SAFETY AND HEALTH INSPECTIONS.

a. Name will conduct site safety inspections on a daily basis. Any noted deficiencies will be identified on that day’s CQC Report. Deficiencies will be tracked using the table included as Attachment # to this Accident Prevention Plan.

b. The following external inspections/certifications are required for this project:

List or enter “None Required”.

8. SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND

COMPLIANCE

a. Provide a statement or statements describing the company's written safety program goals, objectives, and accident experience goals for this contract.

b. Provide a brief description of the company's safety incentive programs (if any). If none, so state.

c. Provide a discussion of the company’s policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements).

d. Provide written company procedures for holding managers and supervisors accountable for safety.

9. ACCIDENT REPORTING

a. Name will submit Monthly Manhour Exposure Reports to the Contracting Officer no later than the 5th work day of each month. The report encompasses on-site work including all hourly and salaried employees. The report will include all subcontractors working on this project.

b. Name will complete the report and submit it to the Contracting Officer within five (5) workdays.

c. Name will immediately notify the Contracting Officer and District Safety Officer of any incidents involving a fatality or permanent total disability, accidents in which three or more persons are hospitalized, accidents that result in property damage in excess of $100,000 or any accident regardless of the consequences, if it is suspected that it will result in unfavorable criticism of the Corps of Engineers..

10. MEDICAL SUPPORT

a. A list of emergency telephone numbers and a map of directions to the nearest hospital(s) is included in the Emergency Response Plan section of this Accident Prevention Plan.

b. First aid kits will be maintained on site as required in Section 3 of EM 385-1-1.

c. At least two employees on each shift will be qualified to administer first aid and CPR.

Individuals who are required to work alone in remote areas shall be trained in first aid. The following employees are certified in First Aid and CPR and a copy of their current certificates are included as Attachment # to this Accident Prevention Plan:

11. PERSONAL PROTECTIVE EQUIPMENT.

a. Outline procedures (who, when, how) for conducting hazard assessments and written certifications for use of personal protective equipment.

12. PLANS (PROGRAMS, PROCEDURES) REQUIRED BY THE SAFETY MANUAL (as applicable)

a. Hazard Communication (HAZCOM) Program (01.B.04)

Included as Attachment # to this Accident Prevention Plan is a written hazard communication program addressing as a minimum, the following: training (to include potential safety and health effects from exposure), labeling, current inventory of hazardous chemicals on site, and the location and use of Material Safety Data Sheets (MSDSs).

b. Emergency Response Plans (01.E.01, 01.E.05, 06.A.02, 19.A.04, 09.K.01 and 09.K.02)

An Emergency Response Plan is included as Attachment # to this Accident Prevention

Plan. This Emergency Response Plan includes:

An Emergency Response Plan to ensure employee safety in case of fire or other emergency.

Emergency telephone numbers and reporting instructions for ambulance, physician, hospital, fire, and police. Also included is a map of directions to the nearest hospital(s). This list and map shall be conspicuously posted at the work site.

c. Respiratory Protection Plan (05.E.01)

Name of Company‘s Respiratory Protection Plan is included as Attachment # to this

Accident Prevention Plan.

d. Health Hazard Control Program (06.A.02)

Activity Hazard Analyses (AHA’s) shall consider all substances, agents and environments that present a hazard and will recommend hazard control measures. Engineering and administrative controls shall be used to control hazards. In cases where engineering or administrative controls are not feasible, PPE may be used. The AHA shall serve as certification that a hazard assessment has been conducted.

e. Plan for Prevention of Alcohol and Drug Abuse (Defense Federal Acquisition Regulation Supplement Subpart 252.223-7004, Drug-Free Work Force)

Name of Company‘s plan for prevention of Alcohol and Drug Abuse is included as

Attachment # to the Accident Prevention Plan. This plan meets the minimum requirements of

DFAR 252.223-7004.

13. Detailed site specific hazards and controls will be provided in the activity hazard analysis (AHA) for each phase of the operation (each Major Definable Feature of Work as defined by the Contractor Quality Control Plan). The AHA’s will provide information on how the requirements of major sections of EM 385-1-1 will be met. Particular attention shall be paid to excavations, scaffolding, medical and first aid requirements, sanitation, personal protective equipment, fire prevention, machinery and mechanized equipment, electrical safety, public safety requirements, and chemical, physical agent, and biological occupational exposure prevention requirements.

AHA’s will be prepared utilizing the format shown on page 4 of EM 385-1-1.

Attachments Attachment # - Accident History Attachment # - Safety Deficiency Tracking Table Attachment # - Emergency Response Plan Attachment # - First Aid and CPR certificates Attachment # - Hazard Communication (HAZCOM) Program Attachment # - Emergency Response Plan Attachment # - Plan for Prevention of Alcohol and Drug Abuse

CELRL Form 1259, November 2001 Previous Versions are Obsolete and Should Not Be Used

Date Prepared (dd-mmm-yy):

Project: Job:

Appendix V

ACTIVITY HAZARDS ANALYSIS

Risk Assessment Code (RAC):

Prepared By: Reviewed By:

Recommended Protective Clothing & Equipment:

E = Extremely High Risk

H = High Risk M = Moderate Risk

P r o b a b i l i t y

L = Low Risk

S e v e r i t y

Frequent Likely Occasional Seldom Unlikely

JOB STEPS

HAZARDS

ACTIONS TO ELIMINATE OR

MINIMIZE HAZARDS

EM 385-1-1

(PARA REF)

Catastrophic E E H H M

Critical E H H M L

Marginal H M M L L

Negligible M L L L L

ACTIVITY HAZARDS ANALYSIS Page 2 of 5

Date Prepared (mm-dd-yyyy):

JOB STEPS HAZARDS

MINIMIZE HAZARDS

EM 385-1-1

(PARA REF)

ACTIVITY HAZARDS ANALYSIS Page 3 of 5

MINIMIZE HAZARDS

ACTIVITY HAZARDS ANALYSIS Page 4 of 5

MINIMIZE HAZARDS

ACTIVITY HAZARDS ANALYSIS Page 5 of 5

MINIMIZE HAZARDS

Appendix VI – AT/OPSEC 2 Information Sheet

USACE Pittsburgh District Security Office

Attn: Joe Bali Steve Davidson

Phone: 412-395-7162 Fax: 412-395-7173 Email: Joseph.m.bali@usace.army.mil

Stephen.davidson@usace.army.mil

Background checks are being requested for the following personnel in order to perform work on site at:

Project Information:

Contract Officer’s Representative (COR): _ Project Name: _ Contract Number:

Task Order: _

Personnel Information:

Full Legal Name: _

Social Security Number:

Date of Birth: _

Place of Birth: _

Appendix VI – AT/OPSEC 2 Information Sheet

□ 0

0 □

0 □ □ □ □

(For I REPORT NO. I EROC I Appendix VII

UNITED STATES ARMY CORPS OF ENGINEERS I REQUIREMENT

Safety CODE ACCIDENT INVESTIGATION REPORT CONTROL SYMBOL:

Staff only) /For Use of this Form See Helo Menu and USACE Sunn/ to AR 385-40! CEEC-S-8(R2)

1. ACCIDENT CLASSIFICATION

PERSONNEL CLASSIFICATION INJURY/ILLNESS/FATAL PROPERTY DAMAGE MOTOR VEHICLE INVOLVED DIVING

GOVERNMENT

CIVILIAN □ MILITARY

FIRE

INVOLVED □ OTHER □ □ 0 CONTRACTOR □ 0 FIRE □ OTHER □ □

□ PUBLIC 0 FATAL 0 OTHER I-NVOLVED - □ ><

2. PERSONAL DATA

a.Name (Last, First, Ml) b.AGE c. SEX d.SOCIAL SECURITY NUMBER

I MALE FEMALE

e.GRADE l

f. JOB SERIES/TITLE g. DUTY STATUS AT TIME OF ACCIDENT h. EMPLOYMENT STATUS AT TIME OF ACCIDENT

□ ARMY ACTIVE □ ARMY RESERVE □ VOLUNTEER

ON DUTY TDY PERMANENT FOREIGN NATIONAL SEASONAL

TEMPORARY STUDENT

OFF DUTY OTHER (Specify)

3. GENERAL INFORMATION

a. DATE OF ACCIDENT b. TIME OF ACCIDENT c. EXACT LOCATION OF ACCIDENT d. CONTRACTOR'S NAME

(month/day/year) (Military time) hrs

e. CONTRACT NUMBER f. TYPE OF CONTRACT g. HAZARDOUS/TOXIC WASTE

(1) PRIME:

□ CONSTRUCTION ACTIVITY

SERVICE □ CIVIL WORKS 0 MILITARY □ A/E □ DREDGE SUPERFUND DERP (2) SUBCONTRACTOR:

□ OTHER (Specify) □ OTHER (Specify)

□ IRP □ OTHER (Specify)

4. CONSTRUCTION ACTIVITIES ONLY /Fill in line and corresoondino code number in box from list - see helo menu/

a. CONSTRUCTION ACTIVITY (CODE) b. TYPE OF CONSTRUCTION EQUIPMENT (CODE)

I I

5. INJURY/ILLNESS INFORMATION (Include name on line and corresoondino code number in box for items e f & o - see helo menu

a. SEVERITY OF ILLNESS/INJURY

e. BODY PART AFFECTED

PRIMARY

SECONDARY

f. NATURE OF ILLNESS/INJURY

b. ESTIMATED c. ESTIMATED

(CODE) DAYS LOST DAYS HOSPIT-

ALIZED

I

(CODE) g. TYPE AND SOURCE OF INJURY/ILLNESS

I# I

(CODE)

I# I TYPE

d. ESTIMATED DAYS

RESTRICTED DUTY

I# I

6.

SOURCE

I

PUBLIC FATALITY /Fill in line and corresoondence code number in box - see helo menu/

I# I

a. ACTIVITY AT TIME OF ACCIDENT !CODE! b. PERSONAL FLOATATION DEVICE USED?

I 0 YES O NO □ N/A

7. MOTOR VEHICLE ACCIDENT

a. TYPE OF VEHICLE b. TYPE OF COLLISION c. SEAT BELTS USED NOT USED NOT AVAILABLE

[I] PICKUP/VAN [I] AUTOMOBILE SIDE SWIPE HEAD ON 0 REAR END (1) FRONT SEAT

[I] TRUCK [I] OTHER (Specify) BROADSIDE ROLL OVER BACKING

OTHER (Specify) (2) REAR SEAT

8. PROPERTY/MATERIAL INVOLVED

a. NAME OF ITEM b. OWNERSHIP c. $ AMOUNT OF DAMAGE

(1)

(2)

(3)

9. VESSEL/FLOATING PLANT ACCIDENT /Fill in line and corresnondence code number in box from list - see heln menu/

a. TYPE OF VESSEL/FLOATING PLANT (CODE) b. TYPE OF COLLISION/MISHAP (CODE)

I# I I

10. ACCIDENT DESCRIPTION /Use additional oaoer if necessaNI

ENG FORM 3394, MAR 99 Version 2 EDITION OF SEP 89 IS OBSOLETE. Page 1 of 4 pages (Proponent: CESO )

I#

I#

I

Page 2 of 4 pages

*U.S. GOVERNMENT PRINTING OFFICE: 1993-0-791-757

11. CAUSAL FACTOR(S) /Read Instruction Before Completing)

a. (Explain YES answers in item 13) YES NO

DESIGN: Was design of facility, workplace or D □ equipment a factor? □ □

INSPECTION/MAINTENANCE: Were inspection & mainten-ance procedures a factor? □ □

PERSON'S PHYSICAL CONDITION: In your opinion, was the OPERATING PROCEDURES: Were operating procedures □ □ physical condition of the person a factor?

a factor?

JOB PRACTICES: Were any job safety/health practices D □ not followed when the accident occurred?

HUMAN FACTORS: Did any human factors such as, size or □ □ strength of person, etc., contribute to accident?

ENVIRONMENTAL FACTORS: Did heat, cold, dust, sun, □ □ glare, etc., contribute to the accident?

a. /CONTINUED) YES NO chemical agents, such as dust, fumes, mists, vapors or D □ CHEMICAL AND PHYSICAL AGENT FACTORS: Did exposure to physical agents, such as, noise, radiation, etc., contribute to accident? □ □

OFFICE FACTORS: Did office setting such as, lifting office furniture, carrying, stooping, etc., contribute to the accident?

SUPPORT FACTORS: Were inappropriate tools/resources D provided to properly perform the activity/task? □

PERSONAL PROTECTIVE EQUIPMENT: Did the improper selection, □ □ use or maintenance of personal protective equipment contribute to the accident?

DRUGS/ALCOHOL: In your opinion, was drugs or alcohol a factor to D □ the accident

b. WAS A WRITTEN JOB/ACTIVITY HAZARD ANALYSIS COMPLETED

FOR TASK BEING PERFORMED AT TIME OF ACCIDENT?

□ YES /If yes, attach a copy.) □ NO

TRAINING

a. WAS PERSON TRAINED TO PERFORM ACTIVITY/TASK?

□ YES □ NO

b. TYPE OF TRAINING.

□ CLASSROOM □ ON JOB

c. DATE OF MOST RECENT FORMAL TRAINING.

(Month) (Day) (Year)

13. FULLY EXPLAIN WHAT ALLOWED OR CAUSED THE ACCIDENT; INCLUDE DIRECT AND INDIRECT CAUSES /See instruction for definition of direct and indirect causes.) /Use additional paper, if necessary)

a. DIRECT CAUSE

b. INDIRECT CAUSE(SI

14. ACTION(S) TAKEN, ANTICIPATED OR RECOMMENDED TO ELIMINATE CAUSE(S).

DESCRIBE FULLY:

DATES FOR ACTIONS IDENTIFIED IN BLOCK 14.

a. BEGINNING (Month/Day/Year) I b. ANTICIPATED COMPLETION (Month/Day/Year)

c. SIGNATURE AND TITLE OF SUPERVISOR COMPLETING REPORT

CORPS

CONTRACTOR

d. DATE (Mo/Da/Yr) e. ORGANIZATION IDENTIFIER (Div, Br, Sect) f. OFFICE SYMBOL

MANAGEMENT REVIEW /1st)

SIGNATURE

TITLE

DATE

□ MANAGEMENT REVIEW (2nd - Chief Operations, Construction, Engineering, etc.)

SIGNATURE I TITLE I DATE

b □

SAFETY AND OCCUPATIONAL HEALTH OFFICE REVIEW

SIGNATURE TITLE

DATE

COMMAND APPROVAL

COMMENTS

COMMANDER SIGNATURE I DATE

Page 3 of 4 pages

ACCIDENT DESCRIPTION (Continuation/

13a. DIRECT CAUSE (Continuation/

Page 4 of 4 pages

I 13b. INDIRECT CAUSES (Continuation)

ACTION(S) TAKEN, ANTICIPATED, OR RECOMMENDED TO ELIMINATE CAUSE(S) (Continuation)

II

APPENDIX VIII

CONTRACT DISCREPANCY REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY

3. TO (Contractor and Manager's Name) 4. FROM (Name of QAE)

5. DATES (YYYYMMDD)

a. PREPARED b. RETURNED BY CONTRACTOR c. ACTION COMPLETE

6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF CONTRACTING OFFICER

Ba. TO (Contracting Officer) b. FROM (Contractor)

9. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable Q.C.

program procedures or new Q.C. procedures. Attach continuation sheet(s) if necessary.)

10. SIGNATURE OF CONTRACTOR REPRESENTATIVE b. DATE (YYYYMMDD)

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary)

12. GOVERNMENT ACTIONS (Reduced payment, cure notice, show cause, other)

13. CLOSE OUT

a. CONTRACTOR

NOTIFIED

b. QAE

NAME TITLE SIGNATURE DATE (YYYYMMDD)

(1) (2) (3)

c. ACO

DD FORM 2772, SEP 1998 (EG) REPLACES MT FORM 352-R, WHICH IS OBSOLETE. Designed using Perform Pro, WHS/DIOR, Sep 98

APPENDIX IX

PESTICIDE APPLICATION RECORD 11. START DATE (YYYYMMDD)

2 INSTALLATION

3 SITE TREATED

4. PEST TREATED

5. PURPOSE

SECTION I - CONDITIONS DURING TREATMENT

1. AIR TEMPERATURE (Fahrenheit Degrees) 12. WATER TEMPERATURE (Fahrenheit Degrees if applicable)

3. OVERCAST (Percentage %) 14. WIND DIRECTION (N, NE, E, SE, S, SW, W or NW) 15. WIND VELOCITY (mph)

SECTION II - PESTICIDE RECORD

1. COMMON NAME

2. ACTIVE INGREDIENT AND PERCENTAGE%

3. MANUFACTURER 14. REGISTRATION NUMBER

5. REGISTRERED USE

6. MATERIAL SAFETY DATA SHEETS (MSDS) AVAILABLE 0 YES ONO

7. PERSONAL PROTECTION EQUIPMENT DEVICE WORN DURING APPLICATION O MASK (Dust Unfiltered) □ BREATHING APPARATUS

0 MASK (Filtered) 0 EYEWEAR 0 GLOVES O BOOTS 0 HOOD O PROTECTIVE SUIT 0 TREATED AREA ENCLOSED

0 TREATED AREA OPEN (Ventilated) 0 NONE REQUIRED OR WORN PER MSDS DATA 0 OTHER SAFETY REQUIREMENTS

8. MIXTURE OR FORM APPLIED (e.g., 20 to 1, Spray, paste, poured, fumigation or Solid)

9. APPLICATION RATE 110. APPLICATION METHOD

11. SPECIAL PRECAUTIONS TAKEN (if none so state)

12. NUMBER OF PERSONNEL USED IN APPLICATION (list other personnel in remarks below)

13. OTHER EQUIPMENT USED NOT PREVIOUSLY LISTED

14. ACCUMULATIVE TREATMENT (Quantity of Pesticide applied to a 15. COOPERATING AGENCIES given area during the calendar year)

a. UNITS TREATED b. QUANTITY USED

(1) PREVIOUS (1) PREVIOUS

(2) PRESENT (2) PRESENT

(3) TOTAL

16. REMARKS

(3) TOTAL

SECTION 111- CERTIFIED APPLICATOR'S SIG�ATURE CERTIFICATION

I HEREBY CERTIFY THAT THIS INFORMATION IS A TRUE AND CORRECT RECORD OF THE PESTICIDE APPLICATION.

1. OTHER DOCUMENTATION ATTACHED

0 YES 0 NO

2a. DATE (YYYYMMDD) b. SIGNATURE (Certified Applicator)

CELRI FORM 1031, APR 2010

PREVIOUS EDITIONS ARE OBSOLETE. VERSION 11

Appendix X

Electronic Invoicing Instructions for the USACE Finance Center

In lieu of submitting a hardcopy invoice to the USACE Finance Center (UFC) in Millington, TN via the United States Postal Service per the contract instructions in Block 18a, you may submit an electronic version via email per the instructions below:

1. Save or scan the invoice so that it is an electronic (pdf) file.

2. Circle the amount to be paid. See Attached Example.

3. File name of the INVOICE must be the obligation number. (ex: W911WN-00-X-0000).

4. Attach the Invoice (see # 3) to an email. Make sure the file name is the obligation number.

5. The subject line of the email should contain only the OBLIGATION number (same as the INVOICE file name)

6. Email the PDF file to: CEFC-H4 Invoices@usace.army.mil and CC your contracting POC as well as the USACE project POC to whom the goods or services were delivered to confirm receipt.

7. You can only submit 1 invoice per email to the UFC. If you need to submit 3 invoices then you must send 3 separate emails.

8. See below for a sample email submission to the UFC.

9. This process does not apply to ENG93 payments; i.e. Progress payments for construction and Architect/Engineer contracts.

Items to Note:

1. Circle the dollar amount to be paid on the invoice

2. If you are sending multiple invoices to the Finance Center, each invoice must be sent down in a separate email. Only 1 invoice per email.

3. The attached invoice’s file name must be the obligation number.

4. The subject of the email to the UFC must also be the obligation number.

5. Email is sent to CEFC-H4 Invoices@usace.army.mil AND

6. CC the USACE contracting POC and the USACE Project POC to whom the goods or services were provided.

7. This new process does not apply to ENG93 payments; i.e. Progress payments for construction and Architect/Engineer contracts.