Exhibit E
Raw Sewage and Sludge Removal
Services may be required once a year, normally in September. See map for locations.
There a 3 holding tanks and 2 septic tanks with a total capacity of 14050 gallons.
A. Holding tanks locations #1 Maintenance building area (6000 gallons).
#2 Upper restroom area (6000 gallons).
#3 Outflow picnic area (1000 gallons).
B. Septic tanks locations #4 Administration building area (750 gallons with leach bed).
#5 Outflow dam area (300 gallons).
All tanks have either a cement or plastic built access riser and lid. Contractor shall remove lid and secure lid when work is finished.
Contractor shall ensure COR is provided with a receipt of gallons removed prior to departing the work site.
NOTE:
See Exhibit E-1 for Map of Tank locations.