Attachment 2 - Initial Task Order Specification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| O37a-U1-1019.1_Boring_Logs.pdf | ||
| W911WN19R8000_-_Amendment_0002_-_MATOC_Small_Construction.pdf | ||
| W911WN19R8000_Amendment_0001.pdf | ||
| Attachment_4_-_Wage_Determination_for_Initial_Task_Order.pdf | ||
| Attachment_4_-_Wage_Determination_for_Initial_Task_Order.pdf | ||
| W911WN19R8000-0001,_MATOC_for_Small_Construction_(LRP-Ferguson).pdf | ||
| W911WN19R8000.pdf | ||
| Appendix_E_-_Past_Performance_Questionaire.pdf | ||
| Attachment_1-_Base_Contract_Specifications.pdf | ||
| Attachment_3_-_Drawings_for_Initial_Task_Order.pdf | ||
| Attachment_4_-_Wage_Determination_for_Initial_Task_Order.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911WN19R8000
Resource Manager’s Office Generator Installation Youghiogheny River Lake Fayette Counties Pennsylvania
Certified Final Document RTA Task Order Specifications This is a Task Order under the MATOC for Small Construction Projects May 2019
ATTACHMENT 2
Youghi ogheny Lake, RMO Gener at or I nst al l at i on W911NW19R8000 Task Or der
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00. 00 08 PRI CE AND PAYMENT PROCEDURES
01 57 23. 00 15 TEMPORARY STORM WATER POLLUTI ON CONTROL
DI VI SI ON 26 - ELECTRI CAL
26 20 13. 00 08 ELECTRI CAL DI STRI BUTI ON SYSTEM
26 32 13. 16 08 GOVERNMENT FURNI SHED GENERATOR AND AUTOMATI C TRANSFER
SWITCH
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 29. 00 08 MI SCELLANEOUS SI TE WORK
32 11 23. 00 08 AGGREGATE AND/ OR GRADED- CRUSHED AGGREGATE BASE COURSE
32 12 16. 00 08 BI TUMI NOUS PAVEMENT CONSTRUCTI ON
32 39 13 MANUFACTURED METAL BOLLARDS
DI VI SI ON 33 - UTI LI TI ES
33 51 15. 00 08 LI QUI FI ED PETROLEUM GAS FUEL SYSTEM
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
CERTI FI ED FI NAL DOCUMENT
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL REQUI REMENTS
1. 1 REFERENCES
1. 2 SECTI ON 00 21 00 I NSTRUCTI ONS
1. 2. 1 Poi nt Of Cont act
1. 2. 2 Est i mat ed Cost Of The Wor k
1. 2. 3 Locat i on And Descr i pt i on Of Wor k
1. 2. 3. 1 Locat i on
1. 2. 3. 2 Descr i pt i on of Wor k
1. 2. 4 Access To Si t e
1. 3 SECTI ON 00 70 00 - CONDI TI ONS OF THE CONTRACT
1. 3. 1 52. 211- 10 Commencement , Pr osecut i on, And Compl et i on Of Wor k
( APR 1984)
1. 3. 2 52. 211- 12 Li qui dat ed Damages- - Const r uct i on ( SEP 2000)
1. 3. 3 52. 236- 4 Physi cal Dat a ( APR 1984)
1. 3. 4 Gover nment - Fur ni shed Pr oper t y
1. 4 SECTI ON 00 73 00 SUPPLEMENTARY CONDI TI ONS
1. 4. 1 Wage Rat es
1. 4. 2 Ti me Ext ensi ons f or Unusual l y Sever e Weat her
1. 5 SUBMI TTALS
PART 2 GENERAL I NFORMATI ON
2. 1 SECTI ON 01 30 00. 00 08 ADMI NI STRATI VE REQUI REMENTS
2. 1. 1 RAI LROAD REQUI REMENT I NSURANCE ( 01 30 00. 00 08 - 1. 6)
2. 2 SECTI ON 01 31 10 TASK ORDERS
2. 2. 1 Poi nt s of Cont act ( 01 31 10 - 1. 2. 1)
2. 2. 2 Scope of Wor k ( 01 31 10 - 1. 2. 2)
2. 2. 3 Techni cal Speci f i cat i ons ( 01 31 10 - 1. 2. 3)
2. 2. 4 Request f or Pr oposal ( 01 31 10 - 1. 2. 6)
2. 2. 5 Pr epr oposal Conf er ence ( 01 31 10 - 1. 2. 7. 1)
2. 2. 6 Gover nment - Fur ni shed Pr oper t y ( 01 31 00 - 2. 1. 2)
2. 2. 7 Equi pment and Met hods ( 01 31 10 - 3. 1)
2. 3 SECTI ON 01 31 13 PROJECT MANAGEMENT AND COORDI NATI ON
2. 3. 1 Wor k t o Be Done by Ot her Agenci es ( 01 31 13 - 1. 4)
2. 3. 2 Oper at i on of Pr oj ect Faci l i t i es ( 01 31 13 - 1. 5)
2. 3. 3 Sequence of Wor k ( 01 31 13 - 3. 2)
2. 4 SECTI ON 01 32 01. 00 08 - PROJECT SCHEDULE BAR CHART
2. 4. 1 Submi t t al s ( 01 32 01. 00 08 - 1. 2)
2. 4. 2 Gener al Requi r ement s ( 01 32 01. 00 08 - 3. 1)
2. 5 SECTI ON 01 32 23. 00 08 - SURVEY AND ALI GNMENT CONTROL
2. 6 SECTI ON 01 32 33 - DI GI TAL PROGRESS I MAGES
2. 6. 1 Di gi t al Pr ogr ess I mages ( 01 32 33 - 1. 1)
2. 6. 2 Submi t t al s ( 01 32 33 - 1. 2)
2. 7 SECTI ON 01 33 00 SUBMI TTAL PROCEDURES
2. 7. 1 Quant i t y of Submi t t al s ( 01 33 00 - 1. 6)
SECTI ON 01 11 00 Page 1
2. 7. 2 Pr oj ect Submi t t al Regi st er ( 01 33 00 - 1. 8)
2. 7. 3 Schedul i ng ( 01 33 00 - 1. 10)
2. 8 SECTI ON 01 35 00. 00 08 SPECI AL PROCEDURES
2. 8. 1 Type of Task Or der ( 01 35 00. 00 08 - 1. 2. 1)
2. 8. 2 Gover nment - Fur ni shed Pr oper t y ( 01 35 00. 00 08 - 1. 2. 2. 1)
2. 8. 3 Submi t t al s ( 01 35 00. 00 08 - 1. 3)
2. 8. 4 Cont r act Dr awi ngs ( 01 35 00. 00 08 - 1. 6. 1)
2. 8. 5 Ref er ence Dr awi ngs ( 01 35 00. 00 08 - 1. 6. 2)
2. 8. 6 Wor k Ar eas ( 01 35 00. 00 08 - 1. 7. 1)
2. 8. 7 St or age Ar eas ( 01 35 00. 00 08 - 1. 7. 4)
2. 8. 8 Publ i c Use ( 01 35 00. 00 08 - 1. 7. 5)
2. 8. 9 Ut i l i t i es ( 01 35 00. 00 08 - 1. 7. 6)
2. 8. 10 Ti me of Per f or mance ( 01 35 00. 00 08 - 1. 8)
2. 8. 11 Pr ot ect i on Of Ut i l i t i es ( 01 35 00. 00 08 - 3. 4)
2. 8. 12 Pr ot ect i on of Exi st i ng Faci l i t i es ( 01 35 00. 00 08 - 3. 5)
2. 8. 13 Pr ot ect i on and Mai nt enance of Road Tr af f i c ( 01 35 00. 00 08 -
3.6)
2. 8. 14 Ant i t er r or i sm ( AT) And Pr oj ect Speci f i c Secur i t y Requi r ement s
( 01 35 00. 00 08 - 3. 11)
2. 8. 15 Addi t i onal Requi r ement s
2. 9 SECTI ON 01 35 26. 00 08 - GOVERNMENT SAFETY REQUI REMENTS
2. 9. 1 Submi t t al s ( 01 35 26. 00 08 - 1. 3)
2. 9. 2 Si t e Saf et y and Heal t h Of f i cer ( 01 35 26. 00 08 - 1. 6. 1. 1)
2. 9. 3 Acci dent Pr event i on Pl an ( 01 35 26. 00 08 - 1. 7)
2. 10 SECTI ON 01 45 00. 00 08 - QUALI TY CONTROL
2. 10. 1 Submi t t al s ( 01 45 00. 00 08 - 1. 3)
2. 10. 2 Cont r act or Qual i t y Cont r ol Pl an ( 01 45 00. 00 08 - 3. 2)
2. 10. 3 CQC Syst em Manager ( 01 45 00. 00 08 - 3. 4. 2)
2. 10. 4 CQC Per sonnel ( 01 45 00. 00 08 - 3. 4. 4)
2. 10. 5 Cont r ol ( 01 45 00. 00 08 - 3. 6)
2. 11 SECTI ON 01 45 00. 15 10 - RESI DENT MANAGEMENT SYSTEM CONTRACTOR
MODE( RMS CM)
2. 12 SECTI ON 01 57 19. 00 08 - TEMPORARY ENVI RONMENTAL CONTROLS
2. 12. 1 Submi t t al s ( 01 57 19. 00 08 10 - 1. 3)
2. 12. 2 Speci al Envi r onment al Requi r ement s ( 01 57 19. 00 08 - 1. 5)
2. 12. 3 Descr i pt i ons ( 01 57 19. 00 08 - 1. 7. 1. 2)
2. 12. 4 Li censes and Per mi t s ( 01 57 19. 00 08 - 1. 8)
2. 12. 5 Pr ot ect i on of Nat ur al Resour ces ( 01 57 19. 00 08 - 3. 1)
2. 12. 6 Ar chaeol ogi cal Resour ces ( 01 57 19. 00 08 - 3. 4. 1)
2. 12. 7 Hi st or i cal Resour ces ( 01 57 19. 00 08 - 3. 4. 2)
2. 12. 8 Sampl i ng and Anal ysi s of Wast e ( 01 57 19. 00 08 - 3. 7. 1. 1)
2. 12. 9 Cont r ol and Management of Asbest os- Cont ai ni ng Mat er i al ( ACM)
( 01 57 19. 00 08 - 3. 9)
2. 12. 10 Cont r ol and Management of Lead- Based Pai nt ( LBP) ( 01 57
19. 00 08 - 3. 10)
2. 13 SECTI ON 01 57 23. 00 08 STORMWATER POLLUTI ON PREVENTI ON MEASURES
2. 14 SECTI ON 01 73 00 - CONSTRUCTI ON EXECUTI ON REQUI REMENTS
2. 15 01 74 19. 00 08 - CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
2. 15. 1 Submi t t al s ( 01 74 19. 00 08 - 1. 4)
2. 15. 2 Bur ni ng ( 01 74 19. 00 08 - 1. 11. 4. 6)
2. 16 01 78 02. 00 15 - CLOSEOUT SUBMI TTALS ( AS- BUI LT DRAWI NGS)
2. 16. 1 Submi t t al s ( 01 78 02. 00 15 - 1. 1)
2. 17 SECTI ON 01 78 23. 13 - FACI LI TY OPERATI ON
2. 18 SECTI ON 02 41 00 - DEMOLI TI ON
2. 19 SECTI ON 03 30 53 - MI SCELLANEOUS CAST- I N- PLACE CONCRETE
2. 19. 1 Submi t t al s ( 03 30 53 - 1. 4)
2. 19. 2 Const r uct i on Tol er ances ( 03 30 53 - 1. 3. 2)
2. 19. 3 Concr et e Mi xt ur e Pr opor t i ons ( 03 30 53 - 1. 3. 3)
2. 19. 4 Ready- Mi x Concr et e ( 03 30 53 - 2. 2)
SECTI ON 01 11 00 Page 2
2. 19. 5 Fi ni shi ng Unf or med Sur f aces ( 03 30 53 - 3. 4. 3)
2. 20 SECTI ON 05 50 14 - STRUCTURAL METAL FABRI CATI ONS
2. 21 SECTI ON 05 50 15 - CI VI L WORKS FABRI CATI ONS
2. 22 SECTI ON 06 10 00 - ROUGH CARPENTRY
2. 23 SECTI ON 07 22 00 - ROOF AND DECK I NSULATI ON
2. 24 SECTI ON 07 31 13 - ASPHALT SHI NGLES
2. 25 SECTI ON 07 52 00 - MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG
2. 26 SECTI ON 07 60 00 - FLASHI NG AND SHEET METAL
2. 27 SECTI ON 07 61 14. 00 20 - STEEL STANDI NG SEAM ROOFI NG
2. 28 SECTI ON 09 90 00 - PAI NTS AND COATI NGS
2. 29 SECTI ON 22 00 00 - PLUMBI NG, GENERAL PURPOSE
2. 30 SECTI ON 26 00 00. 00 20 - BASI C ELECTRI CAL MATERI ALS AND METHODS
2. 31 SECTI ON 26 05 00. 00 40 - COMMON WORK RESULTS FOR ELECTRI CAL
2. 32 SECTI ON 26 05 19. 10 10 - I NSULATED WI RE AND CABLE
2. 33 SECTI ON 26 20 00 - I NTERI OR DI STRI BUTI ON SYSTEM
2. 34 SECTI ON 31 00 00 - EARTHWORK
2. 34. 1 Subsur f ace Dat a ( 31 00 00 - 1. 4. 1)
2. 34. 2 Cl assi f i cat i on of Excavat i on ( 31 00 00 - 1. 4. 2)
2. 34. 3 Submi t t al s ( 31 00 00 - 1. 5)
2. 34. 4 St r i ppi ng of Topsoi l ( 31 00 00 - 3. 1)
2. 34. 5 Dewat er i ng ( 31 00 00 - 3. 2. 4)
2. 34. 6 Sel ect i on Of Bor r ow Mat er i al ( 31 00 00 - 3. 3)
2. 34. 7 Geot echni cal Engi neer ( 31 00 00 - 3. 5. 2)
2. 34. 8 Ut i l i zat i on Of Excavat ed Mat er i al s ( 31 00 00 - 3. 9)
2. 34. 9 Excavat i on ( 31 00 00 - 3. 12. 2)
2. 34. 10 Speci al Requi r ement s, Wat er Li nes ( 31 00 00 - 3. 13. 2)
2. 34. 11 Pr oof Rol l i ng ( 31 00 00 - 3. 15. 1)
2. 34. 12 Addi t i onal Wor k not Cover ed i n Base Cont r act
2. 35 SECTI ON 32 16 13. 00 08 - CONCRETE SI DEWALKS, CURBS AND GUTTERS
2. 35. 1 Submi t t al s ( 32 16 13. 00 08 - 1. 2)
2. 36 SECTI ON 32 31 13. 53 - CHAI N LI NK FENCES AND GATES
2. 37 SECTI ON 32 92 19. 00 08 - SEEDI NG
2. 37. 1 Submi t t al s ( 32 92 19. 00 08 - 1. 2)
2. 37. 2 Per manent Seed Speci es and Mi xt ur es ( 32 92 19. 00 08 - 2. 1. 2)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 3
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL REQUI REMENTS
The wor k wi l l be per f or med as a Task Or der under t he Mul t i pl e Awar d Task Or der Cont r act . Thi s sect i on i dent i f i es t he wor k t o be per f or med and t he pr ovi s i ons of t he Cont r act Speci f i cat i ons t hat ar e appl i cabl e t o t hi s Task Order.
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
PENNSYLVANI A DEPARTMENT OF TRANSPORTATI ON ( PDT)
PDT 408 ( 2016) Speci f i cat i ons
1. 2 SECTI ON 00 21 00 I NSTRUCTI ONS
1. 2. 1 Poi nt Of Cont act
I nqui r i es may be made by wr i t i ng t hi s of f i ce, or by cal l i ng ( col l ect cal l s not accept ed) , t he f ol l owi ng i ndi v i dual s:
Conni e Fer guson 412- 395- 7551 f or Cont r act i ng Quest i ons
Emai l : Conni e. L. Fer guson@usace. ar my. mi l
1. 2. 2 Est i mat ed Cost Of The Wor k
The est i mat ed cost of t he pr oposed wor k i s bet ween $250, 000 and $500, 000.
1. 2. 3 Locat i on And Descr i pt i on Of Wor k
1. 2. 3. 1 Location
The wor k i s l ocat ed at Youghi ogheny Dam, near Conf l uence i n Fayet t e Count y, Pennsyl vani a.
1. 2. 3. 2 Descr i pt i on of Wor k
The gener al descr i pt i on of t he wor k i s t o f ur ni sh al l equi pment , l abor , l ayout of wor k, and super vi s i on t o const r uct t he f ol l owi ng:
a. The wor k consi st s of del i ver i ng and i nst al l i ng a Gover nment - f ur ni shed gener at or , f ur ni shi ng and i nst al l i ng an under gr ound pr opane t ank and associ at ed pi pi ng, and r est or at i on of par ki ng l ot , s i dewal ks, gr ass ar eas and ot her ar eas di st ur bed by t he construction.
SECTI ON 01 11 00 Page 4
1. 2. 4 Access To Si t e
The si t e of t he wor k may be r eached f r om st at e hi ghways and l ocal r oads and st r eet s as i ndi cat ed on t he dr awi ngs.
1. 3 SECTI ON 00 70 00 - CONDI TI ONS OF THE CONTRACT
1. 3. 1 52. 211- 10 Commencement , Pr osecut i on, And Compl et i on Of Wor k ( APR 1984)
The Cont r act or shal l be r equi r ed t o ( a) commence wor k under t hi s cont r act wi t hi n 10 cal endar days af t er t he dat e t he Cont r act or r ecei ves t he not i ce t o pr oceed, ( b) pr osecut e t he wor k di l i gent l y, and ( c) compl et e t he ent i r e wor k r eady f or use not l at er t han 180 cal endar days af t er t he dat e of r ecei pt of t he Not i ce To Pr oceed ( NTP) . The t i me st at ed f or compl et i on shal l i ncl ude f i nal c l eanup of t he pr emi ses
1. 3. 2 52. 211- 12 Li qui dat ed Damages- - Const r uct i on ( SEP 2000)
( a) I f t he Cont r act or f ai l s t o compl et e t he wor k wi t hi n t he t i me speci f i ed i n t he cont r act , t he Cont r act or shal l pay l i qui dat ed damages t o t he Gover nment i n t he amount of $320. 00 f or each cal endar day of del ay unt i l t he wor k i s compl et ed or accept ed.
( b) I f t he Gover nment t er mi nat es t he Cont r act or ' s r i ght t o pr oceed, l i qui dat ed damages wi l l cont i nue t o accr ue unt i l t he wor k i s compl et ed. These l i qui dat ed damages ar e i n addi t i on t o excess cost s of r epur chase under t he Ter mi nat i on c l ause.
1. 3. 3 52. 236- 4 Physi cal Dat a ( APR 1984)
Dat a and i nf or mat i on f ur ni shed or r ef er r ed t o bel ow i s f or t he Cont r act or ' s i nf or mat i on. The Gover nment shal l not be r esponsi bl e f or any i nt er pr et at i on of or concl usi on dr awn f r om t he dat a or i nf or mat i on by t he Contractor.
( a) The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons, f i el d sur veys, and as- bui l t const r uct i on dr awi ngs, et c. ) .
( b) Weat her Condi t i ons. Weat her condi t i ons ar e t ypi cal f or Sout hwest er n Pennsyl vani a i n season.
( c) Tr anspor t at i on Faci l i t i es. Roads adj acent t o and l eadi ng t o t he s i t e of t he wor k ar e shown on t he dr awi ngs. The Cont r act or shal l make hi s own i nvest i gat i on of avai l abl e r oads f or t r anspor t at i on, of l oad l i mi t s on br i dges and r oads and of ot her condi t i ons af f ect i ng t r anspor t at i on of mat er i al s and equi pment t o t he s i t e of t he wor k.
( d) Gover nment - f ur ni shed pr oper t y. Gover nment - f ur ni shed pr oper t y wi l l be del i ver ed t o t he Cont r act or as descr i bed i n Sect i on 26 32
13. 16 08 GOVERNMENT FURNI SHED GENERATOR AND AUTOMATI C TRANSFER SWI TCH.
( f ) Cont r act or ' s Responsi bi l i t y f or Tr af f i c . The Cont r act or shal l be sol el y r esponsi bl e f or conduct i ng hi s oper at i ons i n such manner as t o avoi d any i nt er f er ence wi t h t he saf e and uni nt er r upt ed passage of al l est abl i shed and r oad t r af f i c t hr oughout t he per i od of t hi s cont r act .
He shal l be r esponsi bl e f or any act i on, i n connect i on wi t h hi s oper at i ons, whi ch causes i nt er f er ence wi t h or pr event s t he saf e
SECTI ON 01 11 00 Page 5 passage of t r af f i c past t he s i t e of t he wor k.
1. 3. 4 Gover nment - Fur ni shed Pr oper t y
The f ol l owi ng addi t i onal Condi t i on of t he Cont r act appl i es t o t he wor k under t hi s Task Or der :
52. 245- 2 GOVERNMENT PROPERTY I NSTALLATI ON OPERATI ON SERVI CES ( APR 2012)
( a) Thi s Gover nment Pr oper t y l i s t ed i n par agr aph ( e) of t hi s c l ause i s f ur ni shed t o t he Cont r act or i n an ` ` as- i s, wher e i s ' ' condi t i on. The Gover nment makes no war r ant y r egar di ng t he sui t abi l i t y f or use of t he Gover nment pr oper t y speci f i ed i n t hi s cont r act . The Cont r act or shal l be af f or ded t he oppor t uni t y t o i nspect t he Gover nment pr oper t y as speci f i ed i n t he sol i c i t at i on.
( b) The Gover nment bear s no r esponsi bi l i t y f or r epai r or r epl acement of any l ost Gover nment pr oper t y. I f any or al l of t he Gover nment pr oper t y i s l ost or becomes no l onger usabl e, t he Cont r act or shal l be r esponsi bl e f or r epl acement of t he pr oper t y at Cont r act or expense. The Cont r act or shal l have t i t l e t o al l r epl acement pr oper t y and shal l cont i nue t o be r esponsi bl e f or cont r act per f or mance.
( c) Unl ess t he Cont r act i ng Of f i cer det er mi nes ot her wi se, t he Gover nment abandons al l r i ght s and t i t l e t o unser vi ceabl e and scr ap pr oper t y r esul t i ng f r om cont r act per f or mance. Upon not i f i cat i on t o t he Cont r act i ng Of f i cer , t he Cont r act or shal l r emove such pr oper t y f r om t he Gover nment pr emi ses and di spose of i t at Cont r act or expense.
( d) Except as pr ovi ded i n t hi s c l ause, Gover nment pr oper t y f ur ni shed under t hi s cont r act shal l be gover ned by t he Gover nment Pr oper t y c l ause of t hi s cont r act .
( e) Gover nment pr oper t y pr ovi ded under t hi s c l ause:
The f ol l owi ng Gover nment pr oper t y i s mor e f ul l y descr i bed i n Speci f i cat i on 26 32 13. 16 08 GOVERNMENT FURNI SHED GENERATOR AND
AUTOMATI C TRANSFER SWI TCH.
One Kohl er 38RCL- QS2 38KW LP Gas Gener at or and one Kohl er RXT- JFTC- 0200A Aut omat i c Tr ansf er Swi t ch wi l l be f ur ni shed by t he Gover nment at Pi t t sbur gh Engi neer War ehouse and Repai r Shops, 3500 Gr and Avenue, ( Nevi l l e I s l and) , Pi t t sbur gh, PA 15225.
The acqui s i t i on cost of t hi s pr oper t y i s $15, 442.
1. 4 SECTI ON 00 73 00 SUPPLEMENTARY CONDI TI ONS
1. 4. 1 Wage Rat es
The f ol l owi ng schedul e of wage r at es cont ai ns r at es appl i cabl e t o al l wor k under t he cont r act .
Gener al Deci s i on Number : PA 190002 06/ 07/ 2019 PA2 Super seded Gener al Deci s i on Number : PA20180004 St at e: Pennsyl vani a Const r uct i on Types: Heavy and Hi ghway
SECTI ON 01 11 00 Page 6
Count i es: Al l egheny, Ar mst r ong, Beaver , Bedf or d, Bl ai r , But l er , Cambr i a, Camer on, Cent r e, Cl ar i on, Cl ear f i el d, Cl i nt on, Cr awf or d, El k, Er i e, Fayet t e, For est , Fr ankl i n, Ful t on, Gr eene, Hunt i ngdon, I ndi ana, Jef f er son, Lawr ence, McKean, Mer cer , Mi f f l i n, Pot t er , Somer set , Venango, War r en, Washi ngt on and West mor el and Count i es i n Pennsyl vani a.
https://www.wdol.gov/wdol/scafiles/davisbacon/PA2.dvb?v=4
1. 4. 2 Ti me Ext ensi ons f or Unusual l y Sever e Weat her
The f ol l owi ng schedul e of mont hl y ant i c i pat ed adver se weat her del ays i s appl i cabl e t o Sect i on 00 73 00 SUPPLEMENTARY CONDI TI ONS, Cl ause TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER and ar e based on Nat i onal Oceani c and At mospher i c Admi ni st r at i on ( NOAA) or s i mi l ar dat a f or t he pr oj ect l ocat i on and wi l l const i t ut e t he base l i ne f or mont hl y weat her t i me eval uat i ons. The Cont r act or ' s pr ogr ess schedul e must r ef l ect t hese ant i c i pat ed adver se weat her del ays i n al l weat her dependent act i v i t i es.
MONTHLY ANTI CI PATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON ( 5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
15 10 8 8 9 7 7 7 7 7 9 10
1. 5 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng submi t t al s ar e descr i bed i n mor e det ai l wi t hi n t he r ef er enced sect i ons of t he Base Cont r act . See t he Base Cont r act submi t t al r egi st er f or l ocat i on of submi t t al descr i pt i ons. Addi t i onal submi t t al s may be r equi r ed by addi t i onal sect i ons i ncl uded wi t h t hi s Task Or der whi ch ar e not par t of t he Base Cont r act . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on
01 33 00 SUBMI TTAL PROCEDURES.
SD- 01 Pr econst r uct i on Submi t t al s
01 11 00 - Ut i l i t y Pol e Pr ot ect i on; G, RO 01 32 01. 00 08 - Per i odi c Schedul e Updat e; G, RO 01 32 01. 00 08 - Bar Char t Schedul e; G, RO 01 33 00 - Submi t t al Regi st er ; G, RO 01 35 00. 00 08 - Tr af f i c Cont r ol Pl an; G, RO 01 35 26. 00 08 - Acci dent Pr event i on Pl an ( APP) ; G, RO 01 45 00. 00 08 - Cont r act or Qual i t y Cont r ol ( CQC) Pl an; G, RO 01 45 00. 00 08 - CQC Syst em Manager ; G, RO 01 45 00. 00 08 - CQC Per sonnel ; G, RO 01 57 19. 00 08 - Pr econst r uct i on Sur vey 01 57 19. 00 08 - Regul at or y Not i f i cat i ons; G, RO 01 57 19. 00 08 - Envi r onment al Pr ot ect i on Pl an; G, RO 01 57 19. 00 08 - Di r t and Dust Cont r ol Pl an; G, RO 01 74 19. 00 08 - Wast e Management Pl an; G, RO 01 74 19. 00 08 - Di sposal s i t es; G, RO 31 00 00 - Shor i ng; G, RO 31 00 00 - Excavat i on Wor k Pl an; G, RO 32 92 19. 00 08 - Del i ver y Schedul e; G, RO
SECTI ON 01 11 00 Page 7
SD- 02 Shop Dr awi ngs
01 57 23. 00 15 - Si l t Fences; G, RO 01 57 23. 00 15 - Mul ch; G, RO 01 57 23. 00 15 - Seedi ng; G, RO 01 57 23. 00 15 - Er osi on Cont r ol Mat er i al s; G, RO 01 78 02. 00 15 - As- Bui l t Dr awi ngs; G, RO
SD- 03 Pr oduct Dat a
01 57 23. 00 15 - Si l t Fences; G, RO 01 57 23. 00 15 - Or gani c Mul ch Mat er i al s; G, RO 01 57 23. 00 15 - Seedi ng; G, RO 01 57 23. 00 15 - Er osi on Cont r ol Mat er i al s; G, RO 03 30 53 - Ai r - Ent r ai ni ng Admi xt ur e 03 30 53 - Cur i ng Mat er i al s 03 30 53 - St eel Rei nf or cement 03 30 53 - Accessor i es 03 30 53 - Expansi on Joi nt Fi l l er St r i ps, Pr emol ded 03 30 53 - Joi nt Seal ant s - Fi el d Mol ded Seal ant s 03 30 53 - Conveyi ng and Pl aci ng Concr et e 03 30 53 - For mwor k 03 30 53 - For ms 03 30 53 - Ready- Mi x Concr et e 31 00 00 - Ut i l i zat i on of Excavat ed Mat er i al s; G, RO 31 00 00 - Openi ng of any Excavat i on or Bor r ow Pi t 31 00 00 - Shoul der Const r uct i on 32 16 13. 00 08 - Concr et e
SD- 06 Test Repor t s
01 35 26. 00 08 - Mont hl y Exposur e Repor t s 01 35 26. 00 08 - Not i f i cat i ons and Repor t s 01 35 26. 00 08 - Acci dent Repor t s; G, RO 01 35 26. 00 08 - LHE I nspect i on Repor t s 01 45 00. 00 08 - Ver i f i cat i on St at ement 01 57 19. 00 08 - Labor at or y Anal ysi s 01 57 19. 00 08 - I nspect i on Repor t s 01 57 19. 00 08 - Sol i d Wast e Management Repor t ; G, RO 01 57 23. 00 15 - Er osi on and Sedi ment Cont r ol s 03 30 53 - Aggr egat es 03 30 53 - Concr et e Mi xt ur e Pr opor t i ons 03 30 53 - Compr essi ve St r engt h Test i ng 03 30 53 - Sl ump 31 00 00 - Test i ng 32 16 13. 00 08 - Fi el d Qual i t y Cont r ol 32 92 19. 00 08 - Equi pment Cal i br at i on; G, RO
SD- 07 Cer t i f i cat es
01 35 00. 00 08 - AT Level I Tr ai ni ng; G, RO 01 35 00. 00 08 - Suspi c i ous Act i v i t y Repor t i ng Tr ai ni ng; G, RO 01 35 00. 00 08 - OPSEC Tr ai ni ng; G, RO 01 35 26. 00 08 - Cr ane Oper at or s/ Ri gger s 01 35 26. 00 08 - St andar d Li f t Pl an; G, RO
SECTI ON 01 11 00 Page 8
01 35 26. 00 08 - Act i v i t y Hazar d Anal ysi s ( AHA) 01 35 26. 00 08 - Cer t i f i cat e of Compl i ance 01 45 00. 00 08 - CQC Tr ai ni ng 03 30 53 - Cement i t i ous Mat er i al s 03 30 53 - Aggr egat es 31 00 00 - Test i ng 32 92 19. 00 08 - Quant i t y Check; G, RO 32 92 19. 00 08 - Seed Est abl i shment Per i od; G, RO 32 92 19. 00 08 - Mai nt enance Recor d; G, RO
SD- 11 Cl oseout Submi t t al s
01 32 33 - Thumbnai l Har d Copy Pr i nt s of Pr ogr ess I mages; G, RO 01 32 33 - Gl ossy Pr i nt s of Sel ect ed Of f i c i al Pr ogr ess I mages; G, RO
01 32 33 - El ect r oni c Copy of Sel ect ed Of f i c i al Pr ogr ess I mages;
G, RO
01 32 33 - El ect r oni c Copy of Al l Ot her Pr ogr ess I mages; G, RO 01 57 19. 00 08 - Wast e Det er mi nat i on Document at i on; G, RO 01 57 19. 00 08 - Sol i d Wast e Management Repor t ; G, RO 01 74 19. 00 08 - Recor ds 02 41 00 - Recei pt s 32 92 19. 00 08 - Seed; G, RO 32 92 19. 00 08 - Fer t i l i zer ; G, RO 32 92 19. 00 08 - Mul ch; G, RO 32 92 19. 00 08 - Asphal t Adhesi ve; G, RO
PART 2 GENERAL I NFORMATI ON
The f ol l owi ng i nf or mat i on suppl ement s t hat whi ch i s cont ai ned i n t he cont r act . Al l appl i cabl e r equi r ement s of t he cont r act sect i on appl y.
2. 1 SECTI ON 01 30 00. 00 08 ADMI NI STRATI VE REQUI REMENTS
2. 1. 1 RAI LROAD REQUI REMENT I NSURANCE ( 01 30 00. 00 08 - 1. 6)
Rai l r oad Requi r ement I nsur ance wi l l not be r equi r ed f or t hi s Task Or der .
2. 2 SECTI ON 01 31 10 TASK ORDERS
2. 2. 1 Poi nt s of Cont act ( 01 31 10 - 1. 2. 1)
Conni er R. Fer guson, Phone ( 412) 395- 7551 i s desi gnat ed as t he Admi ni st r at i ve Poi nt of Cont act f or t hi s Task Or der .
The desi gnat ed Poi nt of Cont act at t he pr oj ect i s :
Er i c R. Mi l l er Addr ess: Youghi ogheny Ri ver Lake, 497 Fl ani gan Road, Conf l uence, PA 15424-1932 Phone: 814- 395- 3242
Af t er awar d of t he Task Or der , t he desi gnat ed cont act i s :
Ms. Deni se Pol i zzano, Resi dent Engi neer Upper Ohi o Resi dent Of f i ce 3510 Gr and Avenue
SECTI ON 01 11 00 Page 9
Pi t t sbur gh, PA 15225- 1510 ( 412) 395- 7680
2. 2. 2 Scope of Wor k ( 01 31 10 - 1. 2. 2)
Thi s Task Or der i s a f ul l y devel oped pr oj ect desi gn.
2. 2. 3 Techni cal Speci f i cat i ons ( 01 31 10 - 1. 2. 3)
The f ol l owi ng addi t i onal speci f i cat i ons, whi ch ar e not par t of t he Base Cont r act , ar e appl i cabl e t o t hi s Task Or der :
a. 01 22 00. 00 08 PRI CE AND PAYMENT PROCEDURES
b. 01 57 23. 00 15 TEMPORARY STORM WATER POLLUTI ON CONTROL
c. 26 20 13. 00 08 ELECTRI CAL DI STRI BUTI ON SYSTEM
d. 26 32 13. 16 08 GOVERNMENT FURNI SHED GENERATOR AND AUTOMATI C
TRANSFER SWI TCH
e. 32 05 29. 00 08 MI SCELLANEOUS SI TE WORK f . 32 11 23. 00 08 AGGREGATE AND/ OR GRADED- CRUSHED AGGREGATE BASE
COURSE
g. 32 12 16. 00 08 BI TUMI NOUS PAVEMENT CONSTRUCTI ON
h. 32 39 13 MANUFACTURED METAL BOLLARDS i . 33 51 15. 00 08 LI QUI FI ED PETROLEUM GAS FUEL SYSTEM
2. 2. 4 Request f or Pr oposal ( 01 31 10 - 1. 2. 6)
Thi s Request f or Pr oposal wi l l be i ssued t o mul t i pl e Cont r act or s.
Awar d wi l l be based on t he l owest t ot al pr i ce.
2. 2. 5 Pr epr oposal Conf er ence ( 01 31 10 - 1. 2. 7. 1)
A f or mal s i t e v i s i t wi l l not t ake pl ace f or Task Or der 00001. An i nf or mal s i t e v i s i t may however be ar r anged bet ween t he hour s of 8: 30 a. m. and 3: 00
p. m. Monday - Fr i day by pr ovi di ng at l east 48 hour s ' not i ce pr i or t o ant i c i pat ed dat e of v i s i t t o:
Ri ck Mi l l er , Resour ce Manager 814-395-3242 Mai n Of f i ce Youghi ogheny Ri ver – Lake 497 Fl anni gan Road Conf l uence, PA 15424
The Pr oj ect st af f wi l l not answer any quest i ons. Any quest i ons ar i s i ng f or t he s i t e v i s i t must be submi t t ed t o Conni e Fer guson, Cont r act Speci al i st at Conni e. L. Fer guson@usace. ar my. mi l .
2. 2. 6 Gover nment - Fur ni shed Pr oper t y ( 01 31 00 - 2. 1. 2)
One Kohl er 38RCL- QS2 38KW LP Gas Gener at or and one Kohl er RXT- JFTC- 0200A Aut omat i c Tr ansf er Swi t ch wi l l be f ur ni shed by t he Gover nment as speci f i ed
SECTI ON 01 11 00 Page 10 i n par agr aph SECTI ON 00 70 00 - CONDI TI ONS OF THE CONTRACT, subpar agr aph Gover nment - f ur ni shed Pr oper t y.
2. 2. 7 Equi pment and Met hods ( 01 31 10 - 3. 1)
Sel ect i on of equi pment and met hods of const r uct i on shal l be t he r esponsi bi l i t y of t he Cont r act or .
2. 3 SECTI ON 01 31 13 PROJECT MANAGEMENT AND COORDI NATI ON
2. 3. 1 Wor k t o Be Done by Ot her Agenci es ( 01 31 13 - 1. 4)
No wor k r el at ed t o t hi s Task Or der wi l l be per f or med by ot her s.
2. 3. 2 Oper at i on of Pr oj ect Faci l i t i es ( 01 31 13 - 1. 5)
Al l f aci l i t i es shal l r emai n i n oper at i on at al l t i mes.
2. 3. 3 Sequence of Wor k ( 01 31 13 - 3. 2)
The sequence of wor k shal l be t he r esponsi bi l i t y of t he Cont r act or .
2. 4 SECTI ON 01 32 01. 00 08 - PROJECT SCHEDULE BAR CHART
2. 4. 1 Submi t t al s ( 01 32 01. 00 08 - 1. 2)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 32 01. 00 08 CONSTRUCTI ON PROGRESS SCHEDULE shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 4. 2 Gener al Requi r ement s ( 01 32 01. 00 08 - 3. 1)
A bar char t const r uct i on schedul e wi l l be r equi r ed f or t hi s Task Or der .
The const r uct i on pr ogr ess schedul e shal l be submi t t ed wi t h 15 cal endar days af t er r ecei pt of Not i ce t o Pr oceed f or t he Task Or der .
2. 5 SECTI ON 01 32 23. 00 08 - SURVEY AND ALI GNMENT CONTROL
No submi t t al s ar e r equi r ed f or t hi s sect i on.
2. 6 SECTI ON 01 32 33 - DI GI TAL PROGRESS I MAGES
2. 6. 1 Di gi t al Pr ogr ess I mages ( 01 32 33 - 1. 1)
Pr ogr ess i mages wi l l be r equi r ed f or t he wor k under t hi s Task Or der .
2. 6. 2 Submi t t al s ( 01 32 33 - 1. 2)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 32 33 - DI GI TAL PROGRESS I MAGES shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 7 SECTI ON 01 33 00 SUBMI TTAL PROCEDURES
2. 7. 1 Quant i t y of Submi t t al s ( 01 33 00 - 1. 6)
Submi t document s t o Resi dent Engi neer , Upper Ohi o Ar ea Of f i ce.
SECTI ON 01 11 00 Page 11
2. 7. 2 Pr oj ect Submi t t al Regi st er ( 01 33 00 - 1. 8)
The Task Or der Submi t t al Regi st er shal l be submi t t ed wi t hi n 20 cal endar days af t er r ecei pt of Not i ce t o Pr oceed. The at t ached Submi t t al Regi st er cont ai ns submi t t al r equi r ement s f or t he wor k under t hi s Task Or der .
2. 7. 3 Schedul i ng ( 01 33 00 - 1. 10)
A mi ni mum of 20 cal endar days, excl usi ve of mai l i ng t i me, shal l be al l owed and shown on t he r egi st er f or r evi ew and appr oval of submi t t al s.
2. 8 SECTI ON 01 35 00. 00 08 SPECI AL PROCEDURES
2. 8. 1 Type of Task Or der ( 01 35 00. 00 08 - 1. 2. 1)
Thi s Task Or der i s compet i t i ve.
2. 8. 2 Gover nment - Fur ni shed Pr oper t y ( 01 35 00. 00 08 - 1. 2. 2. 1)
The Gover nment - f ur ni shed pr oper t y i dent i f i ed i n par agr aph SECTI ON 00 70 00
- CONDI TI ONS OF THE CONTRACT, subpar agr aph Gover nment - f ur ni shed Pr oper t y wi l l be f ur ni shed by t he Gover nment . Al l ot her mat er i al s shal l be f ur ni shed by t he Cont r act or .
2. 8. 3 Submi t t al s ( 01 35 00. 00 08 - 1. 3)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 35 00. 00 08 - SPECI AL PROCEDURES shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 8. 4 Cont r act Dr awi ngs ( 01 35 00. 00 08 - 1. 6. 1)
The cont r act dr awi ngs l i s t ed on Dr awi ng No. G- 0021 show t he wor k under t hi s Task Or der .
2. 8. 5 Ref er ence Dr awi ngs ( 01 35 00. 00 08 - 1. 6. 2)
The r ef er ence dr awi ngs l i s t ed on Dr awi ng No. G- 0021 ar e appl i cabl e t o t he wor k under t hi s Task Or der .
2. 8. 6 Wor k Ar eas ( 01 35 00. 00 08 - 1. 7. 1)
The Cont r act or ' s oper at i ons shal l be conf i ned t o t he wor k l i mi t s shown on t he dr awi ngs.
2. 8. 7 St or age Ar eas ( 01 35 00. 00 08 - 1. 7. 4)
The Cont r act or ' s St or age Ar ea shal l be conf i ned t o t he Laydown Ar ea shown on t he dr awi ngs.
2. 8. 8 Publ i c Use ( 01 35 00. 00 08 - 1. 7. 5)
The f ol l owi ng addi t i onal r equi r ement s appl y f or t he wor k under t hi s Task:
The Cont r act or ' s at t ent i on i s di r ect ed t o t he f act t hat t he wor k t o be per f or med may be l ocat ed i n ar eas heavi l y used f or r ecr eat i onal act i v i t i es by t he publ i c. I t shal l be t he r esponsi bi l i t y of t he Cont r act or t o pr ovi de t he cont r ol s necessar y t o pr event any i nt er f er ence by t he publ i c t o hi s oper at i ons. The Gover nment wi l l
SECTI ON 01 11 00 Page 12 cooper at e wi t h t he Cont r act or i n keepi ng t he wor k ar eas cl ear so t hat t he wor k may be per f or med wi t h ef f i c i ency. The Cont r act or shal l schedul e hi s wor k t o pr ovi de f or t hese r est r i ct i ons and al l cost s r esul t i ng t her ef r om shal l be consi der ed i nci dent al t o t he cost s of per f or mi ng t he wor k.
2. 8. 9 Ut i l i t i es ( 01 35 00. 00 08 - 1. 7. 6)
No ut i l i t y ser vi ces wi l l be pr ovi ded by t he Gover nment .
2. 8. 10 Ti me of Per f or mance ( 01 35 00. 00 08 - 1. 8)
The f ol l owi ng addi t i onal r equi r ement s appl y f or t he wor k under t hi s Task:
Cont r act or ' s wor k hour s shal l be r est r i ct ed t o 7: 30 AM t o 4: 00 PM, ET, Monday t hr ough Fr i day, except Feder al hol i days, unl ess ot her wi se appr oved by t he Cont r act i ng Of f i cer . The Cont r act or shal l coor di nat e wi t h t he Cont r act i ng Of f i cer t o make sur e Gover nment per sonnel ar e pr esent dur i ng al l f eat ur es of wor k.
2. 8. 11 Pr ot ect i on Of Ut i l i t i es ( 01 35 00. 00 08 - 3. 4)
The f ol l owi ng addi t i onal r equi r ement s appl y f or t he wor k under t hi s Task:
The l ocat i on of known ut i l i t i es ar e shown on t he dr awi ngs.
2. 8. 12 Pr ot ect i on of Exi st i ng Faci l i t i es ( 01 35 00. 00 08 - 3. 5)
The f ol l owi ng addi t i onal r equi r ement s appl y f or t he wor k under t hi s Task:
Exer ci se par t i cul ar car e when excavat i ng near t he bui l di ngs or al ong t he par ki ng ar ea and wal kways t o avoi d ut i l i t i es and st r uct ur es whi ch may be pr esent but not shown on t he dr awi ngs.
2. 8. 13 Pr ot ect i on and Mai nt enance of Road Tr af f i c ( 01 35 00. 00 08 - 3. 6)
A Tr af f i c Cont r ol Pl an wi l l not be r equi r ed under t hi s Task Or der .
2. 8. 14 Ant i t er r or i sm ( AT) And Pr oj ect Speci f i c Secur i t y Requi r ement s ( 01 35 00. 00 08 - 3. 11)
The f ol l owi ng par agr aphs ar e appl i cabl e t o t he wor k under t hi s Task Or der :
3. 11. 2 Access and Gener al Pr ot ect i on/ Secur i t y Pol i cy and Pr ocedur es
3. 11. 3 Suspi c i ous Act i v i t y Repor t i ng Tr ai ni ng
3. 11. 5 OPSEC Tr ai ni ng
3. 11. 6 Escor t of Cont r act or Empl oyees
3. 11. 7 Faci l i t y Cl ear ance and I ndi v i dual Cl ear ances
3. 11. 8 Pr e- scr een Candi dat es Usi ng E- Ver i f y Pr ogr am
3. 11. 9 Changes i n Secur i t y Requi r ement s
2. 8. 15 Addi t i onal Requi r ement s
The f ol l owi ng addi t i onal r equi r ement s appl y t o t hi s sect i on f or t he wor k under t hi s Task Or der :
GOVERNMENT- FURNI SHED PROPERTY
The f ol l owi ng pr oper t y wi l l be f ur ni shed by t he Gover nment . The
SECTI ON 01 11 00 Page 13
Gover nment - f ur ni shed pr oper t y shal l be r ecei ved and i nst al l ed by t he Cont r act or i n accor dance wi t h " FAR 52. 245- 1 - - Gover nment Pr oper t y" .
A Gover nment - f ur ni shed Pr oper t y Pl an shal l be submi t t ed by t he Cont r act or f or appr oval by t he Cont r act i ng Of f i cer pr i or t o obt ai ni ng t he Gover nment - f ur ni shed pr oper t y.
The Cont r act or shal l meet wi t h t he Cont r act i ng Of f i cer at t he del i ver y l ocat i on at l east 30 cal endar days pr i or t o del i ver y of pr oduct s t o coor di nat e condi t i ons of del i ver y.
2. 9 SECTI ON 01 35 26. 00 08 - GOVERNMENT SAFETY REQUI REMENTS
2. 9. 1 Submi t t al s ( 01 35 26. 00 08 - 1. 3)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 35 26. 00 08 - GOVERNMENT SAFETY REQUI REMENTS shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 9. 2 Si t e Saf et y and Heal t h Of f i cer ( 01 35 26. 00 08 - 1. 6. 1. 1)
The Si t e Saf et y and Heal t h Of f i cer ( SSHO) may be t he Qual i t y Cont r ol Manager.
2. 9. 3 Acci dent Pr event i on Pl an ( 01 35 26. 00 08 - 1. 7)
. The Cont r act or shal l submi t t he Si t e Speci f i c Acci dent Pr event i on Pl an f or al l t asks under t hi s Task Or der at l east 15 cal endar days pr i or t o begi nni ng any wor k at t he s i t e.
2. 10 SECTI ON 01 45 00. 00 08 - QUALI TY CONTROL
2. 10. 1 Submi t t al s ( 01 45 00. 00 08 - 1. 3)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 45 00. 00 08 - QUALI TY CONTROL shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 10. 2 Cont r act or Qual i t y Cont r ol Pl an ( 01 45 00. 00 08 - 3. 2)
The Cont r act or shal l submi t a suppl ement t o t he Cont r act or Qual i t y Cont r ol Pl an f or t he wor k under t hi s Task Or der wi t hi n 15 cal endar days af t er r ecei pt of Not i ce t o Pr oceed f or t he Task Or der .
2. 10. 3 CQC Syst em Manager ( 01 45 00. 00 08 - 3. 4. 2)
The CQC Syst em Manager may not be t he pr oj ect super i nt endent . The CQC Syst em Manager may be t he Si t e Saf et y and Heal t h Of f i cer .
2. 10. 4 CQC Per sonnel ( 01 45 00. 00 08 - 3. 4. 4)
The f ol l owi ng CQC per ssonnel shal l be pr ovi ded, as a mi ni mum:
Electrical
2. 10. 5 Cont r ol ( 01 45 00. 00 08 - 3. 6)
The Cont r act or shal l per f or m al l phases of qual i t y cont r ol .
SECTI ON 01 11 00 Page 14
2. 11 SECTI ON 01 45 00. 15 10 - RESI DENT MANAGEMENT SYSTEM CONTRACTOR
MODE( RMS CM)
Thi s sect i on i s appl i cabl e t o t he wor k under t hi s Task Or der
2. 12 SECTI ON 01 57 19. 00 08 - TEMPORARY ENVI RONMENTAL CONTROLS
2. 12. 1 Submi t t al s ( 01 57 19. 00 08 10 - 1. 3)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 57 19. 00 08 - TEMPORARY ENVI RONMENTAL CONTROLS shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 12. 2 Speci al Envi r onment al Requi r ement s ( 01 57 19. 00 08 - 1. 5)
Ther e ar e no speci al envi r onment al r equi r ement s appl i cabl e t o t hi s Task Order.
2. 12. 3 Descr i pt i ons ( 01 57 19. 00 08 - 1. 7. 1. 2)
Ther e ar e no speci al envi r onment al pl ans r equi r ed f or t hi s Task Or der .
2. 12. 4 Li censes and Per mi t s ( 01 57 19. 00 08 - 1. 8)
The Gover nment has not obt ai ned any l i censes or per mi t s f or t he wor k under t hi s Task Or der .
2. 12. 5 Pr ot ect i on of Nat ur al Resour ces ( 01 57 19. 00 08 - 3. 1)
The Gover nment has not i dent i f i ed any speci es t hat coul d be adver sel y af f ect ed by t he wor k under t hi s Task Or der .
2. 12. 6 Ar chaeol ogi cal Resour ces ( 01 57 19. 00 08 - 3. 4. 1)
The Gover nment has not i dent i f i ed any ar chaeol ogi cal r esour ces t hat coul d be adver sel y af f ect ed by t he wor k under t hi s Task Or der .
2. 12. 7 Hi st or i cal Resour ces ( 01 57 19. 00 08 - 3. 4. 2)
The Gover nment has not i dent i f i ed any hi st or i cal r esour ces t hat coul d be adver sel y af f ect ed by t he wor k under t hi s Task Or der .
2. 12. 8 Sampl i ng and Anal ysi s of Wast e ( 01 57 19. 00 08 - 3. 7. 1. 1)
No wast e sampl i ng or anal ysi s i s ant i c i pat ed f or t hi s Task Or der .
2. 12. 9 Cont r ol and Management of Asbest os- Cont ai ni ng Mat er i al ( ACM) ( 01 57
19. 00 08 - 3. 9)
No asbest os- cont ai ni ng mat er i al i s ant i c i pat ed f or t hi s Task Or der .
2. 12. 10 Cont r ol and Management of Lead- Based Pai nt ( LBP) ( 01 57 19. 00 08 - 3.10)
No l ead- based pai nt i s ant i c i pat ed f or t hi s Task Or der .
2. 13 SECTI ON 01 57 23. 00 08 STORMWATER POLLUTI ON PREVENTI ON MEASURES
Ref er t o at t ached speci f i cat i on 01 57 23. 00 15 TEMPORARY STORM WATER
SECTI ON 01 11 00 Page 15
POLLUTI ON CONTROL f or st or mwat er pol l ut i on pr event i on measur es f or t hi s Task Or der .
2. 14 SECTI ON 01 73 00 - CONSTRUCTI ON EXECUTI ON REQUI REMENTS
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 15 01 74 19. 00 08 - CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
2. 15. 1 Submi t t al s ( 01 74 19. 00 08 - 1. 4)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 74 19. 00 08 - CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 15. 2 Bur ni ng ( 01 74 19. 00 08 - 1. 11. 4. 6)
Bur ni ng wi l l not be per mi t t ed.
2. 16 01 78 02. 00 15 - CLOSEOUT SUBMI TTALS ( AS- BUI LT DRAWI NGS)
2. 16. 1 Submi t t al s ( 01 78 02. 00 15 - 1. 1)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 01 78 02. 00 15 CLOSEOUT SUBMI TTALS ( AS- BUI LT DRAWI NGS) shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 17 SECTI ON 01 78 23. 13 - FACI LI TY OPERATI ON
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 18 SECTI ON 02 41 00 - DEMOLI TI ON
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 19 SECTI ON 03 30 53 - MI SCELLANEOUS CAST- I N- PLACE CONCRETE
2. 19. 1 Submi t t al s ( 03 30 53 - 1. 4)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 03 30 53 - MI SCELLANEOUS CAST- I N- PLACE CONCRETE shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 19. 2 Const r uct i on Tol er ances ( 03 30 53 - 1. 3. 2)
The f ol l owi ng sur f aces shal l r ecei ve a Cl ass B f i ni sh.
Si dewal ks and cur bs
2. 19. 3 Concr et e Mi xt ur e Pr opor t i ons ( 03 30 53 - 1. 3. 3)
Speci f i ed compr essi ve st r engt h f ' c shal l be 4, 500 psi at 28 days. The maxi mum nomi nal s i ze coar se aggr egat e i s 1- 1/ 2 i nch. The maxi mum wat er cement r at i o i s 0. 45.
2. 19. 4 Ready- Mi x Concr et e ( 03 30 53 - 2. 2)
Concr et e shal l conf or m t o PDT 408, Sect i on , Cl ass AAA.
SECTI ON 01 11 00 Page 16
2. 19. 5 Fi ni shi ng Unf or med Sur f aces ( 03 30 53 - 3. 4. 3)
Tr owel f i ni sh shal l be appl i ed t o hor i zont al sur f aces not exposed af t er compl et i on of const r uct i on. Br oom f i ni sh shal l be appl i ed t o exposed hor i zont al s l ab sur f aces.
2. 20 SECTI ON 05 50 14 - STRUCTURAL METAL FABRI CATI ONS
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 21 SECTI ON 05 50 15 - CI VI L WORKS FABRI CATI ONS
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 22 SECTI ON 06 10 00 - ROUGH CARPENTRY
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 23 SECTI ON 07 22 00 - ROOF AND DECK I NSULATI ON
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 24 SECTI ON 07 31 13 - ASPHALT SHI NGLES
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 25 SECTI ON 07 52 00 - MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 26 SECTI ON 07 60 00 - FLASHI NG AND SHEET METAL
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 27 SECTI ON 07 61 14. 00 20 - STEEL STANDI NG SEAM ROOFI NG
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 28 SECTI ON 09 90 00 - PAI NTS AND COATI NGS
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 29 SECTI ON 22 00 00 - PLUMBI NG, GENERAL PURPOSE
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 30 SECTI ON 26 00 00. 00 20 - BASI C ELECTRI CAL MATERI ALS AND METHODS
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 31 SECTI ON 26 05 00. 00 40 - COMMON WORK RESULTS FOR ELECTRI CAL
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 32 SECTI ON 26 05 19. 10 10 - I NSULATED WI RE AND CABLE
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
SECTI ON 01 11 00 Page 17
2. 33 SECTI ON 26 20 00 - I NTERI OR DI STRI BUTI ON SYSTEM
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 34 SECTI ON 31 00 00 - EARTHWORK
2. 34. 1 Subsur f ace Dat a ( 31 00 00 - 1. 4. 1)
No subsur f ace i nf or mat i on i s avai l abl e f or t hi s Task Or der .
2. 34. 2 Cl assi f i cat i on of Excavat i on ( 31 00 00 - 1. 4. 2)
Al l excavat i on under t hi s Task Or der wi l l be uncl assi f i ed.
2. 34. 3 Submi t t al s ( 31 00 00 - 1. 5)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 31 00 00 EARTHWORK shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 34. 4 St r i ppi ng of Topsoi l ( 31 00 00 - 3. 1)
St r i ppi ng and st ockpi l i ng of t opsoi l wi l l be r equi r ed. Topsoi l shal l be st r i pped t o a dept h of 4 i nches.
2. 34. 5 Dewat er i ng ( 31 00 00 - 3. 2. 4)
No dewat er i ng measur es ar e r equi r ed f or t hi s Task Or der .
2. 34. 6 Sel ect i on Of Bor r ow Mat er i al ( 31 00 00 - 3. 3)
I t i s not ant i c i pat ed t hat bor r ow mat er i al wi l l be r equi r ed f or t he wor k under t hi s Task Or der .
2. 34. 7 Geot echni cal Engi neer ( 31 00 00 - 3. 5. 2)
A geot echni cal engi neer wi l l not be r equi r ed f or moni t or i ng excavat i on under t hi s Task Or der .
2. 34. 8 Ut i l i zat i on Of Excavat ed Mat er i al s ( 31 00 00 - 3. 9)
Excess sat i sf act or y excavat ed mat er i al shal l be di sposed of i n accor dance wi t h Sect i on 01 74 19. 00 08 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT.
2. 34. 9 Excavat i on ( 31 00 00 - 3. 12. 2)
Fi nal gr adi ng shal l be as shown on t he dr awi ngs.
2. 34. 10 Speci al Requi r ement s, Wat er Li nes ( 31 00 00 - 3. 13. 2)
The mi ni mum cover f or wat er l i nes shal l be 36 i nches.
2. 34. 11 Pr oof Rol l i ng ( 31 00 00 - 3. 15. 1)
Pr oof r ol l i ng wi l l not be r equi r ed.
2. 34. 12 Addi t i onal Wor k not Cover ed i n Base Cont r act
The f ol l owi ng wor k i s r equi r ed f or t hi s Task Or der , but i s not addr essed
SECTI ON 01 11 00 Page 18 i n t he Base Cont r act .
Ut i l i t y Pol e Pr ot ect i on
The Cont r act or i s r esponsi bl e f or pr ot ect i on of ut i l i t y pol es i n t he v i c i ni t y of t r enchi ng and excavat i on oper at i ons. Pr epar e a pl an showi ng means and met hods of ut i l i t y pol e pr ot ect i on/ suppor t t o Cont r act i ng Of f i cer f or r evi ew and appr oval pr i or t o excavat i ng near ut i l i t y pol es.
2. 35 SECTI ON 32 16 13. 00 08 - CONCRETE SI DEWALKS, CURBS AND GUTTERS
2. 35. 1 Submi t t al s ( 32 16 13. 00 08 - 1. 2)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 32 16 13. 00 08 CONCRETE SI DEWALKS, CURBS AND GUTTERS shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 36 SECTI ON 32 31 13. 53 - CHAI N LI NK FENCES AND GATES
Thi s sect i on i s not appl i cabl e t o t he wor k under t hi s Task Or der .
2. 37 SECTI ON 32 92 19. 00 08 - SEEDI NG
2. 37. 1 Submi t t al s ( 32 92 19. 00 08 - 1. 2)
The i t ems l i s t ed i n par agr aph SUBMI TTALS f or Sect i on 32 92 19. 00 08 SEEDI NG shal l be submi t t ed f or r evi ew pr i or t o begi nni ng t he r el evant wor k under t hi s Task Or der .
2. 37. 2 Per manent Seed Speci es and Mi xt ur es ( 32 92 19. 00 08 - 2. 1. 2)
Seed mi xt ur es shal l conf or m t o PDT 408, Sect i on 804. 2, For mul a B.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 19
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00. 00 08
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 JOB PAYMENT I TEMS
1. 1. 1 Rei mbur sement For Act ual Per f or mance And Payment Bond Pr emi ums
1. 1. 2 Si t e Demol i t i on and Er osi on Cont r ol
1. 1. 2. 1 Payment
1. 1. 2. 2 Uni t of Measur e
1. 1. 2. 3 Payment I t em
1. 1. 3 Gener at or and Fuel Syst em
1. 1. 3. 1 Payment
1. 1. 3. 2 Uni t of Measur e
1. 1. 3. 3 Payment I t em
1. 1. 4 Si t e Rest or at i on
1. 1. 4. 1 Payment
1. 1. 4. 2 Uni t of Measur e
1. 1. 4. 3 Payment I t em
1. 2 UNI T PRI CE PAYMENT I TEMS
1. 2. 1 Di gi t al Pr ogr ess I mages
1. 2. 1. 1 Payment
1. 2. 1. 2 Measur ement
1. 2. 1. 3 Uni t of Measur e
1. 2. 1. 4 Payment I t ems
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00. 00 08 Page 1
SECTI ON 01 22 00. 00 08
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he PRI CE SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob i t em, shal l be i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 1. 1 Rei mbur sement For Act ual Per f or mance And Payment Bond Pr emi ums
Payment f or r ei mbur sement f or act ual per f or mance and payment bond pr emi ums wi l l be made as speci f i ed i n 00 73 00 SUPPLEMENTARY CONDI TI ONS, par agr aph
PAYMENT FOR PERFORMANCE AND PAYMENT BONDS.
0001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMI UMS
1. 1. 2 Si t e Demol i t i on and Er osi on Cont r ol
1. 1. 2. 1 Payment
Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or r emoval and st or i ng of t he exi st i ng pr oj ect i dent i f i cat i on s i gn and r emoval and pr oper di sposal of exi st i ng bi t umi nous concr et e pavement and subbase mat er i al , concr et e s i dewal k, concr et e cur b, and pl ant i ngs, gr adi ng t o accommodat e t he emer gency power suppl y syst em, and pr ovi di ng er osi on cont r ol measur es as speci f i ed and as shown on t he dr awi ngs. The pr i ce shal l i ncl ude t he cost of al l l abor , mat er i al s, and t he use of al l equi pment and t ool s r equi r ed t o compl et e t he wor k.
1. 1. 2. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 2. 3 Payment I t em
0003 SI TE DEMOLI TI ON AND EROSI ON CONTROL
1. 1. 3 Gener at or and Fuel Syst em
1. 1. 3. 1 Payment
Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al s and suppl y cost s t o pi ckup, del i ver and i nst al l t he Gover nment - f ur ni shed gener at or and t r ansf er swi t ch, f ur ni sh and i nst al l t he gener at or f uel syst em, and connect t he gener at or t o t he exi st i ng
SECTI ON 01 22 00. 00 08 Page 2
Resour ce Manager ' s Of f i ce el ect r i cal syst em as shown on t he dr awi ngs and as speci f i ed. Payment shal l i ncl ude excavat i on, t r enchi ng and backf i l l f or t he under gr ound st or age t ank, concr et e gener at or pad, and associ at ed ut i l i t i es. Payment shal l al so i ncl ude cost s of associ at ed pi pi ng, wi r i ng, t est i ng and f i nal st ar t up of t he gener at or , t est i ng of t he compl et ed syst em, and pr ovi di ng ser vi ces of manuf act ur er ' s r epr esent at i ve f or st ar t up and t est i ng of t he equi pment . The payment shal l al so i ncl ude f uel f or t est i ng and f i l l i ng t he t ank upon compl et i on of t est i ng.
1. 1. 3. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 3. 3 Payment I t em
0004 DELI VER AND I NSTALL GOVERNMENT- FURNI SHED GENERATOR AND
CONTRACTOR- FURNI SHED FUEL SYSTEM
1. 1. 4 Si t e Rest or at i on
1. 1. 4. 1 Payment
Payment s f or t hi s i t em shal l const i t ut e f ul l compensat i on f or compact ed subbase, aggr egat e base cour…