Revised_Technical_Drawings_-_Amendment_0002.pdf
PDF 14 MB Posted
- Attached to
- Loyalhanna Dam Service Bridge Rehabilitation
- Solicitation number
- W911WN19B8011
About this file
Revised Technical Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
C O
N T
R A
C T A
N D R
E F
E R
E N
C E D
R A
W
IN
G I
N D
E X
S T
A N
D A
R D L
E G
E N
D
R T
Y S
Z K
IE
W
IC
Z
R T
Y S
Z K
IE
W
IC
Z
B Y
A G
L A
/s
G R
E G N M
E Y
E R P .E
J
U L
G-0002-A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
/0
/1
A
A
A
A
A
OPTION 1 CONTRACT DRAWING INDEX
FILE NAME
NO.
INDENT.
SHEET
TITLE
STRUCTURAL DEMOLITION
038aa_540_SD1013-A SD1013-A DEMOLITION PLAN AT MONOLITHS #7, #8 AND #9
038aa_540_SD1019 SD1019 NOT IN USE
STRUCTURAL
038aa_540_S-1034-A S-1034-A MONOLITHS #7, #8 AND #9 REPAIR - PLAN
038aa_540_S-1040 S-1040 NOT IN USE
REFERENCE INDEX
NO.
SHEET INDENT.
TITLE
038aa-U1-40_1.2 LOYALHANNA DAM PLAN, ELEVATIONS AND SECTIONS
038aa-U1-40_3A.3 LOYALHANNA DAM RIGHT ABUTMENT PLAN, ELEVATION AND SECTIONS W/ REVISIONS
038aa-U1-40_4.2 LOYALHANNA DAM LEFT ABUTMENT PLAN, ELEVATION AND DETAILS
038aa-U1-40_5A.1 LOYALHANNA DAM LEFT ABUTMENT SECTIONS, ELEVATION AND DETAILS W/ REVISIONS
038aa-U1-40_6.2 LOYALHANNA DAM SPILLWAY PLAN, ELEVATION AND SECTIONS
038aa-U1-40_7.2 LOYALHANNA DAM GALLERIES AND ADITS
038aa-U1-40_8.2 LOYALHANNA DAM MONOLITHS 11 AND 12 SECTIONS AND ELEVATIONS
038aa-U1-40_9.5 LOYALHANNA DAM MONOLITHS 11, 12 AND 13 SECTIONS NO. 1
038aa-U1-40_10A.8 LOYALHANNA DAM MONOLITHS 11 AND 12 SECTIONS NO. 2 W/ REVISIONS
038aa-U1-40_11A.5 LOYALHANNA DAM MONOLITHS 11, 12 AND 13 SECTIONS NO. 3 W/ REVISIONS
038aa-U1-40_13.4 LOYALHANNA DAM MONOLITHS 11, 12 AND 13 PLANS
038aa-U1-40_14.3 LOYALHANNA DAM MONOLITH 6 PLANS AND SECTIONS
038aa-U1-40_15.2 LOYALHANNA DAM STAIR DETAILS
038aa-U1-40_18.1 LOYALHANNA DAM SPILLWAY SERVICE BRIDGE TYPICAL PIER
038aa-U1-40_19.2 LOYALHANNA DAM PARAPET WALLS
038aa-U1-40_20.1 LOYALHANNA DAM MONOLITHS 11 AND 12 STEEL REINFORCEMENT NO. 1
038aa-U1-40_21.2 LOYALHANNA DAM MONOLITHS 11, 12 AND 13 STEEL REINFORCEMENT NO. 2
038aa-U1-40_22.1 LOYALHANNA DAM MONOLITHS 11 AND 12 STEEL REINFORCEMENT NO. 3A
038aa-U1-40_23A.2 LOYALHANNA DAM MONOLITHS 11 AND 12 STEEL REINFORCEMENT NO. 4 W/ REVISIONS
038aa-U1-40_24A.3 LOYALHANNA DAM MONOLITHS 11 AND 12 STEEL REINFORCEMENT NO. 5 W/ REVISIONS
038aa-U1-40_25.3 LOYALHANNA DAM MONOLITHS 5 AND 6 STEEL REINFORCEMENT NO. 6
038aa-U1-40_27.1 LOYALHANNA DAM SPILLWAY SERVICE BRIDGE PIER STEEL REINFORCEMENT NO. 8
038aa-U1-40_29.1 LOYALHANNA DAM CONCRETE REPAIRS PLANS, ELEVATION, SECTIONS, AND DETAILS
038aa-U1-40_30.1 LOYALHANNA DAM CONCRETE REPAIRS PLANS, ELEVATION, SECTIONS, AND DETAILS
038aa-U1-40_31.1 LOYALHANNA DAM CONCRETE REPAIRS PLANS, ELEVATION, SECTIONS, AND DETAILS
038aa-U1-53_1.2 LOYALHANNA DAM SPILLWAY SERVICE BRIDGE GENERAL PLAN
038aa-U1-53_2.1 LOYALHANNA DAM SPILLWAY SERVICE BRIDGE CONCRETE DECK AND DETAILS
038aa-U1-53_3.1 LOYALHANNA DAM SPILLWAY SERVICE BRIDGE DOGGING DEVICE
038aa-U1-53_4 LOYALHANNA DAM SERVICE BRIDGE DOGGING LEVER EXTENSION
038aa-U1-53_5 LOYALHANNA DAM SERVICE BRIDGE DOGGING DEVICE EXTENSION
038aa-U1-56_15.1 LOYALHANNA DAM ELECTRICAL RENOVATION POWER RISER DIAGRAM
038aa-U1-56_16 LOYALHANNA DAM ELECTRICAL RENOVATION EXISTING CONDITIONS DEMOLITION
038aa-U1-56_17.1 LOYALHANNA DAM ELECTRICAL RENOVATION POWER AND LIGHTING
038aa-U1-56_19.1 LOYALHANNA DAM ELECTRICAL RENOVATION OPERATIONS GALLERY AND STAIRS
A
A
A
BASE CONTRACT DRAWING INDEX
FILE NAME
NO.
INDENT.
SHEET
TITLE
GENERAL
038aa_100_G-0001 G-0001 COVER SHEET
038aa_100_G-0002-A G-0002-A CONTRACT AND REFERENCE DRAWING INDEX
038aa_203_G-0003 G-0003 ABBREVIATIONS
038aa_204_G-0004-A G-0004-A GENERAL NOTES AND STANDARD LEGEND
038aa_204_G-0005 G-0005 NOT IN USE
038aa_204_G-1006 G-1006 OVERALL PLANS AND ELEVATIONS
038aa_204_G-1007 G-1007 CONSTRUCTION SEQUENCE - BASE CONTRACT
038aa_204_G-1008 G-1008 CONSTRUCTION SEQUENCE - OPTION 1 PART A
038aa_204_G-1009 G-1009 CONSTRUCTION SEQUENCE - OPTION 1 PART B
038aa_204_G-1010 G-1010 CONSTRUCTION SEQUENCE - OPTION 2
038aa_204_G-1011 G-1011 LOYALHANNA DAM WORK AND STORAGE AND CONTRACTOR WORK LIMITS
038aa_204_G-1012 G-1012
WORK LIMITS
BUSH RECREATION AREA EXISTING SITE CONDITIONS AND CONTRACTOR
SURVEY
038aa_204_V-1005 V-1005 SURVEY CONTROL PLAN
CIVIL
038aa_993_C-5020 C-5020 PLAYGROUND AREA TEMPORARY SECURITY FENCE DETAILS
038aa_993_C-5021 C-5021 NOT IN USE
038aa_553_C-3022 C-3022 MONOLITH #5 DRAINAGE SYSTEM - PLANS, DETAILS AND SECTIONS
STRUCTURAL DEMOLITION
038aa_540_SD1001-A SD1001-A DEMOLITION MONOLITHS #5, #6 AND #7 - PLAN
038aa_540_SD3002-A SD3002-A DEMOLITION PARAPET WALL - SECTIONS
038aa_540_SD3003-A SD3003-A DEMOLITION BAY STAIRS - SECTIONS
038aa_540_SD3004 SD3004 DEMOLITION MONOLITH #5 - SECTIONS
038aa_540_SD3005 SD3005 DEMOLITION MONOLITH #6 - SECTIONS
038aa_540_SD3006 SD3006 NOT IN USE
038aa_540_SD3007 SD3007 NOT IN USE
038aa_546_SD3008 SD3008 DEMOLITION - PIER #7 - SECTIONS
038aa_546_SD3009 SD3009 NOT IN USE
038aa_553_SD3010 SD3010 NOT IN USE
038aa_553_SD3011 SD3011 NOT IN USE
038aa_553_SD3012-A SD3012-A
SECTIONS
DEMOLITION - SPILLWAY SERVICE BRIDGE CONCRETE DECK - PLAN AND
STRUCTURAL
038aa_557_S-3013-A S-3013-A EXISTING GANTRY RAIL - SCHEMATIC & SECTIONS
038aa_540_S-1014-A S-1014-A MONOLITHS #5, #6 AND #7 - PLAN
038aa_540_S-3015-A S-3015-A PARAPET WALL - SECTIONS & DETAIL
038aa_540_S-3016 S-3016 WORK BAY STAIRS REPAIR - SECTIONS AND DETAILS
038aa_540_S-3017 S-3017 NOT IN USE
038aa_540_S-3018 S-3018 NOT IN USE
038aa_540_S-3019-A S-3019-A MONOLITH #5 AND #6 CONCRETE REPAIR - SECTIONS AND DETAILS
038aa_540_S-3020 S-3020 MONOLITH #5 - STAND BY UNIT WELL FRAME - SECTIONS AND DETAIL
038aa_540_S-5021 S-5021 CONCRETE REPAIR - DETAILS
038aa_540_S-5022-A S-5022-A CONCRETE OVERLAY - DETAILS
038aa_553_S-3023-A S-3023-A SPILLWAY SERVICE BRIDGE - DETAIL AND SECTION
038aa_553_S-3024-A S-3024-A SPILLWAY SERVICE BRIDGE - SECTION
038aa_553_S-3025-A S-3025-A SPILLWAY SERVICE BRIDGE CONCRETE DECK - SECTIONS AND DETAIL
038aa_553_S-1026 S-1026 STRUCTURAL STEEL SUPPORT @ ELEVATION 967.38 - PLAN AND SECTION
038aa_553_S-5027-A S-5027-A STRUCTURAL STEEL SUPPORT @ ELEVATION 967.38 - DETAILS
038aa_553_S-1028-A S-1028-A NEW AND EXISTING CRANE RAIL ELEVATIONS - PLAN
ELECTRICAL
038aa_556_E-1001-A E-1001-A DAM SERVICE BRIDGE ELECTRICAL - PLAN AND SECTION
HYDROGRAPHS
038aa_314_V-6010 V-6010 POOL HYDROGRAPHS 1998 - 2007 INCLUSIVE
038aa_314_V-6011 V-6011 POOL HYDROGRAPHS 2007 - 2014 INCLUSIVE
038aa_314_V-6012 V-6012 POOL HYDROGRAPHS 2015 - 2018 INCLUSIVE
038aa_314_V-6013 V-6013 POOL AND FREQUENCT DURATION
OPTION 2 CONTRACT DRAWING INDEX
FILE NAME
NO.
INDENT.
SHEET
TITLE
STRUCTURAL DEMOLITION
038aa_540_SD-1020-A SD1020-A DEMOLITION MONOLITHS #9, #10, #11 AND #12 - PLAN
038aa_540_SD-3021-A SD3021-A DEMOLITION PARAPET WALL - SECTIONS
038aa_553_SD-3022 SD3022 NOT IN USE
038aa_553_SD-3023 SD3023 DEMOLITION MONOLITH #11 - SECTIONS
038aa_553_SD-3024-A SD3024-A DEMOLITION MONOLITH #10 - SECTIONS
STRUCTURAL
038aa_540_S-1041-A S-1041-A MONOLITHS #9, #10, #11, AND #12 - PLAN
038aa_540_S-3042-A S-3042-A PARAPET WALL - SECTIONS
038aa_540_S-3065 S-3065 NOT IN USEA
OPTION 3 CONTRACT DRAWING INDEX
FILE NAME
NO.
INDENT.
SHEET
TITLE
ELECTRICAL
038aa_556_E-1002 E-1002
DIAGRAM
DAM SERVICE BRIDGE ELECTRICAL - DAM LIGHTING PLAN AND POWER LINE
038aa_556_E-1003 E-1003 DAM SERVICE BRIDGE ELECTRICAL - LIGHTING POLE CONCRETE SUPPORTS
STRUCTURAL
038aa_556_S-3070-A S-3070-A
ELEVATIONS AND SECTIONS
SERVICE BRIDGE- LIGHTING POLE SUPPORTS TYPES 1 AND 2 - PLANS,
038aa_556_S-3071 S-3071
AND SECTIONS
SERVICE BRIDGE- LIGHTING POLE SUPPORTS TYPE 3 - PLANS, ELEVATIONS
R E
V
IS
E D P
E R A
M E
N D
M E
N T
G
M
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:4
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
STRUCTURAL STEEL:
GENERAL NOTES
R
Y S
Z K
IE
W
IC
Z
G E
N E
R A
L N
O T
E S A
N D S
T A
N D
A R
D L
E G
E N
D
CONCRETE
EARTH
ROCK
GRAVEL
RIPRAP/DERRICK STONE
STANDARD LEGENDS:
SEE LEGENDS ON INDIVIDUAL PLANS FOR ALTERNATIVES OR ADDITIONSNOTE:
DURING CONCRETE PLACMENT.
MAINTAINING ALIGNMENT OF ALL EMBEDDED METALS WITHIN SPECIFIED TOLERANCES
17. CONTRACTOR SHALL SUBMIT FOR APPROVAL A PLAN FOR ANCHORING, ALIGNING AND
16. ALL HOOKS SHALL BE ACI STANDARD HOOKS UNLESS DIMENSIONED OTHERWISE.
15. ALL REINFORCING DETAILS SHALL CONFORM TO "ACI DETAILING MANUAL", SP66.
INDICATED ON THE DRAWINGS.
REINFORCEMENT WILL BE DICTATED BY THE CONCRETE GEOMETRY AND THE DIMENSION
14. BAR SPACING INDICATED ON REINFORCING DRAWINGS IS A MAXIMUM. ACTUAL SPACING OF
13. NO WELDING WILL BE PERMITTED ON ANY REINFORCEMENT UNLESS SHOWN ON DRAWINGS.
12. ALL REINFORCEMENT SHALL BE DISCONTINUOUS AT ALL MONOLITH JOINTS.
IN THE FIELD OR FABRICATED TO MISS EMBEDDED ITEMS AND OBSTRUCTIONS.
11. SUBJECT TO THE CONTRACTING OFFICER'S APPROVAL, BARS MAY BE SHIFTED SLIGHTLY, BENT
RECOMMENDATIONS.
10. INSTALL AND TIGHTEN POST-INSTALLED ANCHORS AS PER MANUFACTURER'S
THE REQUIREMENTS OF ASTM A193 GRADE B7 UNO.
" DIAMETER THREADED ROD MEETING 4
39. ALL POST-INSTALLED ADHESIVE ANCHORS SHALL BE
AS PER ACI 318-14 FOR DOWEL REINFORCEMENT.
8. UNLESS NOTED OTHERWISE, PROVIDE MINIMUM EMBEDMENT DEPTH IN EXISTING CONCRETE
APPROVED EQUAL FOR DRY CONDITIONS.
7. ADHESIVE FOR POST-INSTALLED ANCHORS AND DOWELS SHALL BE HILTI HIT-HY 200 OR
MANUFACTURER'S WRITTEN INSTRUCTIONS.
AND POST-INSTALLED ANCHORS. HOLE DIAMETERS SHALL BE ACCORDING TO ADHESIVE
6. REFER TO SPECIFICATIONS FOR REQUIREMENTS FOR DRILLING AND BONDING OF DOWELS
SHOWN ON THE PLANS IN ORDER TO ACHIEVE THE REQUIRED DEPTH IN SOUND CONCRETE.
AND POST-INSTALLED ANCHOR LENGTHS MAY HAVE TO BE INCREASED FROM WHAT IS
CONCRETE SHALL BE THE DEPTH REQUIRED INTO SOUND CONCRETE. REINFORCING BAR
ANCHOR DRILLED AND GROUTED INTO EXISTING AND PREVIOUSLY PLACED AND HARDENED
5. THE MINIMUM DEPTH SHOWN ON THE PLANS FOR REINFORCING AND POST-INSTALLED
APPROVED. VERTICAL REINFORCING MAY HAVE ONE SPLICE FOR EACH TWO LIFTS.
REASONABLE CONSTRUCTABILITY BY THE CONTRACTING OFFICER WILL NOT BE
WILL BE AT THE CONTRACTOR'S EXPENSE. ANY SPLICES CONSIDERED EXCESS TO
AND OTHER THAN ANY ADDITIONAL SPLICES REQUIRED BY THE CONTRACTING OFFICER
BY THE CONTRACTING OFFICER. SPLICES OTHER THOSE SHOWN ON THE DRAWINGS
DRAWINGS, WHERE ESSENTIAL TO CONSTRUCTABILITY AND SUBJECT TO APPROVAL
BE ALLOWED TO MAKE SPLICES IN ADDITION TO THOSE INDICATED ON THE
SHALL BE THE SPLICE LENGTH OF THE LARGER BAR. THE CONTRACTOR WILL
4. WHEN BARS OF DIFFERENT DIAMETER ARE LAP SPLICED, SPLICE LENGTHS
3. PROVIDE LAP SPLICE LENGTHS DETERMINE USING ACI 318-14,25.5.
2. REINFORCING SHALL BE ASTM A615, GRADE 60 (FY = 60,000 PSI)
UNLESS OTHERWISE NOTED.
1. THE MINIMUM COVER REQUIREMENTS FOR ALL REINFORCEMENT SHALL BE 2"
G M
E Y
E R
B Y
A G
L A
/s
G R
E G N M
E Y
E R P .E
A
U G
A
G-0004-A
/0
/1
ELECTRICAL NOTES:
DURING CONSTRUCTION.
MAINTAIN AND PROTECT EXISTING ELECTRICAL CONDUITS ON SERVICE BRIDGE 1.
A
R E
V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:4
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
CONCRETE NOTES:
REINFORCEMENT NOTES:
BRIDGE SUPERSTRUCTURE DESIGN:
DESIGN LOAD AND CRITERIA
REQUIREMENTS.
REFER TO SPECIFICATIONS FOR HOT WEATHER AND COLD WEATHER CONCRETE 7.
TO PLACING NEW CONCRETE.
WIRE BRUSH CLEAN AND MOISTEN ALL CONSTRUCTION JOINTS IMMEDIATELY PRIOR 6.
BE SECURED IN PLACE BEFORE CONCRETE IS PLACED.
ALL EMBEDDED STEEL, ANCHORS, DRAIN OUTLETS, EMBEDDED METAL, ETC. SHALL 5.
CONCRETE SURFACE FINISHES SHALL BE AS NOTED IN THE SPECIFICATIONS.4.
ALL EXPOSED EDGES SHALL BE PROVIDED WITH 1/2" CHAMFER, EXCEPT AS NOTED.3.
SEE SPECIFICATIONS FOR CONCRETE SLUMP AND AIR ENTRAINMENT.2.
SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRESS (f'c) OF 4500 PSI.
CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF THE SPECIFICATIONS AND 1.
9. ALL ELEVATIONS SHOWN ON THE CONTRACT DRAWINGS ARE NAVD88.
NGVD29. THE CONVERSION FROM NGVD29 TO NAVD88 IS -0.45.
8. ALL DAM ELEVATIONS SHOWN ON THE REFERNECE DRAWINGS ARE
OF CONSTRUCTION.
APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL 7.
DIMENSIONS ARE IN FEET AND INCHES.6.
STATIONS AND ELEVATIONS ARE IN FEET.5.
TEMPORARY BRACING OR OTHER ITEMS THAT MAY BE NECESSARY.
INSTALLATION. THIS INCLUDES PROVISIONS FOR ADEQUATE
OF THE STRUCTURE AND ITS COMPONENT PARTS DURING
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE DESIGN SAFETY
STABLE AFTER THE STRUCTURE IS FULLY COMPLETED. IT IS THE
THE STRUCTURES ARE DESIGNATED TO BE SELF-SUPPORTING AND 4
THE SPECIFICATIONS FOR ENVIRONEMTNAL REQUIREMENTS.
CONSTRUCTION ACTIVITIES IS OF PRIME IMPORTANCE. REFER TO
PROTECTION OF THE RESERVOIR AND SURROUNDING AREA FROM
THE CONTRACTOR SHALL NOTE THAT DURING CONSTRUCTION THE 3.
TO REMAIN IN-PLACE.
THE CONTRACTOR SHALL PREVENT DAMAGE TO FEATURES OF WORK
SPECIFICATIONS. ALL DEMOLITION WORK SHALL BE DONE WITH CARE.
AND PROTECT EXISTING FACILITIES, IN ACCORDANCE WITH THE
VARIOUS ITEMS, PROVIDE ACCESS TO GOVERNMENT PERSONNEL
CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE
IN CONJUNCTION WITH THE DEMOLITION ACTIVITIES, THE 2.
WITH WORK.
CONTRACTING OFFICER OF ANY DEVIATIONS BEFORE PROCEEDING
FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS. NOTIFY THE
ON EXISTING REFERENCE DRAWINGS. THE CONTRACTOR SHALL
ALL DIMENSIONS AND ELEVATIONS ARE APPROXIMATE AND BASED 1.
REPLACEMENT.
ENCOUNTERED ON THE STEEL BRIDGE MEMBERS THAT WOULD WARRANT
LOSS AND DETERIORATION BY THE GOVERNMENT. DETERIORATION MAY BE
THAT SUPPORT THE CONCRETE DECKS SHALL BE EVALUATED FOR SECTION
OF THE STEEL MEMBERS ONCE CLEANING IS COMPLETE. ALL STEEL MEMBERS
THE CONTRACTOR SHALL PROVIDE ACCESS FOR INSPECTION8.
STAINLESS STEEL SHALL BE GALVANIZED UNO.
ALL NUTS, BOLTS, WASHERS, AND FASTENERS EXCEPT FOR THOSE MADE OF 7.
GRADE 50, Fy=50KSI MIN, UNO
SPECIFICATIONS: PLATES, CHANNELS, ANGLES, AND MISC STEEL - ASTM A572,
ALL STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING ASTM 6.
EXISTING BOLTS SHALL NOT BE REUSED.5.
GR A325 BOLTS TIGHTENED TO SNUG-TIGHT CONDITION UNO.
ALL STEEL TO STEEL CONNECTIONS SHALL BE MADE WITH NEW ASTM F3125 4.
WELDING SOCIETY'S STRUCTURAL WELDING CODE AWS D1.1 OR AWS D1.5.
ALL WELDING SHALL CONFORM TO APPLICABLE PORTIONS OF THE AMERICAN 3.
WELD MATERIAL SHALL BE E70XX IN CONFORMANCE WITH AWS.2.
PRACTICE FOR STEEL BUILDINGS AND BRIDGES."
STRUCTURAL STEEL WORK SHALL CONFORM TO AISC "CODE OF STANDARD 1.
BRIDGE DEAD LOADS INCLUDES SELF WEIGHT ONLY.3.
CONCRETE BRIDGE DECK LIVE LOADS H-10.2.
APPROX 300,000 LBS.
REFERENCE DRAWING O38aa-U1-53/1.2. NOTE THAT ACTUAL GANTRY WEIGHT IS
LOADING IS CONSISTENT WITH THE GANTRY CRANE LOADING. REFER TO
BRIDGE DECK LOADING IS CONSISTENT WITH AN H-10 TRUCK LOADING. BRIDGE 1.
CONCRETE DECK
HP
BRIDGE
SPILLWAY
MONOLITH #7MONOLITH #6MONOLITH #5
25'-0" 25'-0"
SEALANT. SEE NOTE 2.
WITH POURABLE JOINT
MONOLITH JOINT, SEAL
THIS SHEET.
SHEET S-5022 AND NOTE 2
AND REPLACE, SEE DETAIL
MONOLITH JOINT, REMOVE
SEE DWG S-3013
MATCH EXISTING,
REINSTALL TO
REMOVE AND
GANTRY RAIL (TYP)
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
H S-3015 S-3015
G
E N
D O
F M
O N
O L
IT
H
CLPIER #7
E N
D O
F M
O N
O L
IT
H
LEGEND
SEE SPECIFICATION
GFRP OVERLAY
F L
O W
S-3016
A S-3015
B S-3015
S-3023
S-3025
S-3020
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPE SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
DRAIN LP
AND SPECIFICATION
SEE SHEET S-5022 FOR DETAILS
CONCRETE OVERLAY REPAIR
LATEX MODIFIED
PLAN - MONOLITHS #5, #6 AND #7
S-3025
SEE DWG C-3022
PLANS FOR MONOLITH #5
FOR NEW DRAINAGE
DRAIN LP
3/16"=1'-0"
A
IF NECESSARY.
DETERIORATED EXISTING JOINT MATERIAL AND ROUT EXISTING JOINTS FIRST
THE DAM. APPLY PER MANUFACTURER'S INSTRUCTIONS. REMOVE
PAST DECK ELEVATION ON THE UPSTREAM AND DOWNSTREAM FACES OF
ACROSS TRAVEL SURFACE, UP AND OVER PARAPETS, AND 2 FEET DOWN
TO ASTM C920 TYPE M GRADE NS CLASS 25 USE T1. SEAL SHALL EXTEND
2. SEAL MONOLITH JOINTS WITH FIELD MOLDED JOINT SEALANT CONFORMING
THE GANTRY CRANE RAIL BEARING PLATE.
THE FINISHED CONCRETE SURFACE ELEVATION SHALL NOT EXTEND ABOVE
EDGE OF THE SLAB AT STA 4+55.00 SHALL SERVE AS THE HIGH POINT.
TOWARDS THE DRAINS AT MONOLITH 5 AS MUCH AS REASONABLE. THE
1. THE CONTRACTOR SHALL SLOPE THE SURFACE OF THE CONCRETE SLAB
NOTE:
A
A
Y S
Z K
IE
W
IC
Z
P L
A N
M O
N O
L
IT
H S
A
N D
G M
E Y
E R
B Y
A G
L A
/s
G R
E G N M
E Y
E R P .E
J
U L
S-1014-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:4
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
F S-3015
J S-3019
N
EMBEDDED FRAME
COVER AND
STAND BY UNIT BAY
MONOLITH #5 MONOLITH #6 MONOLITH #7 MONOLITH #8 MONOLITH #9 MONOLITH #10 MONOLITH #11 MONOLITH #12
MONOLITH #5 MONOLITH #6 MONOLITH #7 MONOLITH #8 MONOLITH #9 MONOLITH #10 MONOLITH #11 MONOLITH #12
Y S
Z K
IE
W
IC
Z
B Y
A G
L A
D A
M B
R
ID
G E D
E C
K
P L
A N
0 8' 32'16'
SCALE: 1/16"=1'
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
EL 982.94
T/RAIL
EL 982.94
T/RAIL
EL 982.95
T/RAIL
EL 982.95
T/RAIL
EL 982.94
T/RAIL
EL 982.95
T/RAIL
EL 982.96
T/RAIL
EL 982.98
T/RAIL
EL 982.98
T/RAIL
EL 982.99
T/RAIL
EL 982.98
T/RAIL
EL 982.98
T/RAIL
EL 983.00
T/RAIL
EL 983.00
T/RAIL
EL 982.98
T/RAIL
EL 982.99
T/RAIL
EL 982.98
T/RAIL
EL 983.00
T/RAIL
EL 983.00
T/RAIL
EL 982.99
T/RAIL
EL 983.03
T/RAIL
EL 983.01
T/RAIL
EL 983.02
T/RAIL
EL 983.00
T/RAIL
EL 983.03
T/RAIL
EL 983.03
T/RAIL
EL 983.00
T/RAIL
EL 983.00
T/RAIL
EL 982.98
T/RAIL
EL 983.00
T/RAIL
EL 982.97
T/RAIL
EL 982.94
T/RAIL
EL 982.94
T/RAIL
EL 982.92
T/RAIL
EL 982.91
T/RAIL
x x x x
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
LC CRANE RAIL
CRANE RAILLC
CRANE RAILLC
CRANE RAILLC
F L
O W
LC PIER #7 LC PIER #8 LC PIER #9 LC PIER #10
N
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
EL 982.55
T/DECK
x x
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
LC CRANE RAIL
CRANE RAILLC
CRANE RAILLC
CRANE RAILLC
F L
O W
LC PIER #7 LC PIER #8 LC PIER #9 LC PIER #10
N
S T
A
S T
A
S T
A
S T
A
S T
A
S T
A
EL 982.55
T/DECK
N E
W A
N D E
X
IS
T
IN
G C
R A
N E R
A
IL
E
L E
V A
T
IO
N S
T/RAIL EL 982.98
T/RAIL EL 982.98
T/RAIL EL 982.98
T/RAIL EL 982.98
CRANE RAIL EXISTING ELEVATION PLAN
1/16"=1'-0"
CRANE RAIL NEW ELEVATION PLAN
1/16"=1'-0"
G M
E Y
E R
/s
G R
E G N M
E Y
E R P .E
J
U L
S-1028-A
R E
V
IS
E D P
E R A
M E
N D
M E
N T
/0
/1
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:0
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
MONOLITH #8
CONCRETE DECKCONCRETE DECK
LEGEND
AND SPECIFICATION
SEE SHEET S-5022 FOR DETAILS
CONCRETE OVERLAY REPAIR
LATEX MODIFIED
SEE DWG S-3013
MATCH EXISTING
REINSTALL TO
REMOVE AND
GANTRY RAIL (TYP)
S T
A
.0
PHOTO 1
F L
O W
CL PIER #7 CL PIER #8
MONOLITH #7 PARTIAL MONOLITH #9 PARTIAL
E N
D O
F M
O N
O L
IT
H
E N
D O
F M
O N
O L
IT
H
PLAN - MONOLITHS #7, #8 AND #9
3/16"=1'-0"
SEE PHOTO 1, THIS SHEET
FOR BEARING MOVEMENT,
CUT BOLT TO ALLOW
N
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPE SLOPE
BRIDGE
SPILLWAY
BRIDGE
SPILLWAY
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPE SLOPE
CL PIER #9
ASPECIFICATIONS.
HEX NUTS. REPAINT EXPOSED AREA PER
MOVEMENT OF BEARING. DO NOT DAMAGE
WITH GIRDER BEARING PLATE TO ALLOW
CUT BOLT 1/8" BELOW INTERFERENCE
A
A
A A
Y S
Z K
IE
W
IC
Z
P L
A N
M O
N O
L
IT
H S
A
N D
R
E P
A
IR
B Y
A G
L A
G M
E Y
E R
/s
G R
E G N M
E Y
E R P .E
J
U L
S-1034-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:0
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
O P
T
IO
N
CERTIFIED FINAL DOCUMENTS
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S-3025
S-3025
S-3023
S-3023
CONCRETE DECKCONCRETE DECK
CONCRETE DECK
DRAINAGE SYSTEM
8'-6"
25'-0"
AXIS OF DAM
BRIDGE
SPILLWAY
BRIDGE
SPILLWAY
SEE DWG S-3013
MATCH EXISTING
REINSTALL TO
REMOVE AND
GANTRY RAIL (TYP)
BRIDGE
SPILLWAY
BRIDGE
SPILLWAY
AND NOTE 2 THIS SHEET
SEE DETAIL SHEET S-5022
MONOLITH JOINT, REMOVE AND REPLACE,
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPESLOPE
SLOPE SLOPE
UNIT BAY
STAND BY
STORAGE WELL
BULKHEAD
REPAIR WELL
CREST GATE
MONOLITHS #9, #10, #11 AND #12 WORK AREA PLAN
3/16"=1'-0"
SEALANT. SEE NOTE 2
POURABLE JOINT
JOINT SEAL WITH
MONOLITH
N
F L
O W
LEGEND
AND SPECIFICATION
SEE SHEET S-5022 FOR DETAILS
CONCRETE OVERLAY REPAIR
LATEX MODIFIED
FIRST IF NECESSARY.
DETERIORATED EXISTING JOINT MATERIAL AND ROUT EXISTING JOINTS
THE DAM. APPLY PER MANUFACTURER'S INSTRUCTIONS. REMOVE
PAST DECK ELEVATION ON THE UPSTREAM AND DOWNSTREAM FACES OF
ACROSS TRAVEL SURFACE, UP AND OVER PARAPETS, AND 2 FEET DOWN
TO ASTM C920 TYPE M GRADE NS CLASS 25 USE T1. SEAL SHALL EXTEND
2. SEAL MONOLITH JOINTS WITH FIELD MOLDED JOINT SEALANT CONFORMING
THE GANTRY CRANE RAIL BEARING PLATE.
THE FINISHED CONCRETE SURFACE ELEVATION SHALL NOT EXTEND ABOVE
EDGE OF THE SLAB AT STA 6+45.00 SHALL SERVE AS THE HIGH POINT.
TOWARDS THE DRAINS AT MONOLITH 12 AS MUCH AS REASONABLE. THE
1. THE CONTRACTOR SHALL SLOPE THE SURFACE OF THE CONCRETE SLAB
NOTE:
LC
RAIL
CRANE
LC
RAIL
CRANE
LC
RAIL
CRANE
H S-3042
G S-3042
PIN A8
A
A
A A
A A
A
A
A
A
N O
L
IT
H S
A N
D
P L
A N
R T
Y S
Z K
IE
W
IC
Z
B Y
A G
L A
G M
E Y
E R
/s
G R
E G N M
E Y
E R P .E
J
U L
S-1041-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
O P
T
IO
N
CERTIFIED FINAL DOCUMENTS
A S-3042
B S-3042
S-3025
S-3023
S-3020
S-3025
S-3025
S-3025
S-3023
S-3023
S-3023
F S-3042
S T
A
.0
S T
A
.0
MONOLITH #10 MONOLITH #11 MONOLITH #12
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
M O
N O
L
IT
H
E N
D
F
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
CLPIER #10CLPIER #9
PARTIAL MONOLITH #9
46'-0"
6'-10"
1'
6'-0"
CONTROL JOINT FILLER
MONOLITH AND APPLY
FORM JOINT USING ADJACENT
REMOVE AND REPLACE,
CONTRACTION JOINT,
PARAPET REPAIR
EL 982.55
TOP OF CONCRETE DECK
EL 982.55
TOP OF CONCRETE DECK
TOP OF ROADWAY EL 982.55
TOP OF ROADWAY EL 982.55
#4 BARS @ 12" TYP
4-#4 BAR CONT.
EMBEDMENT 9 1/2"
MINIMUM
GROUT #4 BARS
DRILL AND EPOXY
2 1/2 " 2 1/2 "
/2
C L E
A R
/2
EMBEDMENT 9 1/2"
MINIMUM
GROUT #4 BARS
DRILL AND EPOXY
4-#4 BAR CONT.
E
X
IS
T W
A L L
M A
T C
H H
E
IG
H T
CONCRETE.
TO PLACEMENT OF NEW
BONDING AGENT PRIOR
AMPLITUDE, APPLY
SCARIFY SURFACE TO 1/4"
O F E
X
IS
T W
A L L
M A
T C
H H
E
IG
H T
CONCRETE.
TO PLACEMENT OF NEW
BONDING AGENT PRIOR
AMPLITUDE, APPLY
SCARIFY SURFACE TO 1/4" REDUCED-DEPTH SECTON
ELIMINATE THIS BAR IN
REMOVE AND REPLACE,
CONTRACTION JOINT,
#4 BARS @ 12" TYP
PARAPET REPAIR
AND NOTIFY COR OF ANY DISCREPANCIES PRIOR TO START OF WORK.
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS.
NOTE:
H S-1014 1/2"=1'-0"
SECTION PARAPET
8'0 4' 16'
SCALE: 3/16"=1'
0 2' 4'1'
SCALE: 1/2"=1'
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
A S-1014 3/16"=1'-0"
SECTION INNER UPSTREAM WALL
B S-1014 3/16"=1'-0"
SECTION OUTER DOWNSTREAM WALL
1'-9"
2 1/2 "
/2
C L E
A R
1'-0"
/2
2 1/2 "
REPAIR DEPTH
AT LOCATION OF REDUCED
USE ALTERNATE REBAR DETAIL
WALL ABOVE LIGHT RECESS.
LIGHT RECESS. DO NOT DRILL INTO INNER SIDE OF
REDUCED REPAIR DEPTH TO ACCOMODATE EXISTING
Y S
Z K
IE
W
IC
Z
P A
R A
P E
T W
A L L S
S E
C T
IO
N S A
N D D
E T
IL
- 1 1/2"=1'-0"
DETAIL STEEL REINFORCEMENT 2
- 1 1/2"=1'-0"
DETAIL STEEL REINFORCEMENT
G M
E Y
E R
J R
A G
A N
/s
G R
E G N M
E Y
E R P .E
J
U L
S-3015-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
G S-1014 1/2"=1'-0"
SECTION PARAPET
F S-1014 1/2"=1'-0"
SECTION PARAPET
PARAPET REPAIR
TOP OF ROADWAY EL 982.55
PARAPET REPAIR
WALL ABOVE LIGHT RECESS.
LIGHT RECESS. DO NOT DRILL INTO INNER SIDE OF
REDUCED REPAIR DEPTH TO ACCOMODATE EXISTING
4-#4 BAR CONT.
EL 982.55
TOP OF CONCRETE DECK
7'-3"32'-9"
EL 982.55
TOP OF CONCRETE DECK
24'-3" 27'-9" 5'-0" 7'-3"9"
EMBEDMENT 9 1/2"
MINIMUM
GROUT #4 BARS
DRILL AND EPOXY
E X
IS
T
IN
G W
A L L
M A
T C
H H
E
IG
H T
E X
IS
T
IN
G W
A L L
M A
T C
H H
E
IG
H T
#4 BARS @ 12" TYP
CONCRETE.
TO PLACEMENT OF NEW
BONDING AGENT PRIOR
AMPLITUDE, APPLY
SCARIFY SURFACE TO 1/4"
CONTRACTION JOINT, REMOVE AND REPLACE.
#4 BARS @ 12" TYP
4-#4 BAR CONT.
2 1/2 " 2 1/2 "
/2
C L E
A R
/2
CONCRETE.
TO PLACEMENT OF NEW
BONDING AGENT PRIOR
AMPLITUDE, APPLY
SCARIFY SURFACE TO 1/4"
EMBEDMENT 9 1/2"
MINIMUM
GROUT #4 BARS
DRILL AND EPOXY
S T
A
.0
S T
A
.0
A S-1041 3/16"=1'-0"
SECTION INNER UPSTREAM WALL
B S-1041 3/16"=1'-0"
SECTION OUTER DOWNSTREAM WALL
F S-1041 1/2"=1'-0"
SECTION PARAPET
H S-1041 1/2"=1'-0"
SECTION PARAPET
G S-1041 1/2"=1'-0"
SECTION PARAPET
A
A
A
REMOVE AND REPLACE.
CONTRACTION JOINT,
R A
P E
T W
A L L S
E C
T
IO
N S
S E
C T
IO
N S
R T
Y S
Z K
IE
W
IC
Z
NOTE:
B Y
A G
L A
0 2' 4'1'
SCALE: 1/2"=1'
8'0 4' 16'
SCALE: 3/16"=1'
AND NOTIFY COR OF ANY DISCREPANCIES PRIOR TO START OF WORK.
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS.
J R
A G
A N
/s
G R
E G N M
E Y
E R P .E
J
U L
S-3042-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
O P
T
IO
N
CERTIFIED FINAL DOCUMENTS
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
MONOLITH #11 MONOLITH #12MONOLITH #10
25'-0"
S T
A
.0
2 1/2 "
/2
C L E
A R
1'-0"
/2
2 1/2 "
REPAIR DEPTH
AT LOCATION OF REDUCED
USE ALTERNATE REBAR DETAIL
M O
N O
L
IT
H
E N
D
MONOLITH
END OF
M O
N O
L
IT
H
E N
D
MONOLITH
END OF
1'-9"
- 1 1/2"=1'-0"
DETAIL STEEL REINFORCEMENT
- 1 1/2"=1'-0"
DETAIL STEEL REINFORCEMENT
CLPIER #10CLPIER #9
CLPIER #9
GFRP TERMINATION
REPAIR
GFRP
RESIN
GFRP LAYERS 3"
CONCRETE
EXISTING
" AMPLITUDE4
1TO
INTENTIONALLY ROUGHENED
SURFACE TO BE
DECK SURFACE
NEW CONCRETE
DECK SURFACE
NEW CONCRETE
APPROX 1"
JOINT WIDTH
DECK SURFACE
NEW CONCRETE
EXISTING MONOLITH JOINT
EXISTING REBAR
LMC OVERLAY
TO FIT SNUGLY IN JOINT
NONREACTIVE BACKER ROD
NONMOISTURE ABSORPTIVE
CONCRETE WHERE GFRP IS USED
A SMOOTH TRANSITION FROM GFRP TO
APPLY ADDITIONAL RESIN TO ALLOW FOR
GREATER UP TO A MAXIMUM OF 4"
REBAR OR TO SOUND CONCRETE, WHICHEVER IS
OFFICER, HAND CHIP 3/4" MINIMUM BELOW BOTTOM OF
WHERE PERMITTED/REQUIRED BY THE CONTRACTING
PLANS)
(WHERE SHOWN ON
GFRP LAYERS, NTS.
DETAIL
JOINT REPLACEMENT
" AMPLITUDE4
1ROUGHENED TO
SURFACE TO BE INTENTIONALLY
E
T A
IL
S
R T
Y S
Z K
IE
W
IC
Z
C O
N C
R E
T E O
V E
R L
A Y
MONOLITH 5 MONOLITH 6
LONGITUDINAL SECTION - CONCRETE OVERLAY
NTS
JOINT REPLACEMENT
NTS
TRANSVERSE SECTION - TYPICAL CONCRETE OVERLAY
NTS
G M
E Y
E R
J R
A G
A N
TYPE M GRADE NS CLASS 25 USE T1
CONFORMING TO ASTM C920
FIELD MOLDED JOINT SEALANT
SURFACE PRIOR TO PLACING LMC OVERLAY.
AROUND CRACK IS REQUIRED. THE EPOXY MUST BE REMOVED FROM CONCRETE
THE CONTRACTOR SHALL NOT PLACE EPOXY BY THE AREA METHOD. USE OF DAM 5.
ACCORDING TO ACI 548.4, EXCEPT AS MODIFIED BY THE CONTRACT DOCUMENTS.
DESCRIBED IN NOTE 1 ON DRAWING S-1014. OVERLAY SHALL BE INSTALLED
OVERLAY. THE CONTRACTOR SHALL ADJUST THE DECK SURFACE ELEVATION AS
BRIDGE DECK AND SPECIFIED AREAS SHALL HAVE 2 1/2" LATEX MODIFIED CONCRETE 4.
MODIFIED CONCRETE OVERLAY.
ACHIEVE A MINIMUM PENETRATION OF 1" PRIOR TO THE INSTALLATION OF LATEX
WITH AN APPROVED LOW-VISCOSITY CONCRETE SEALANT FOR VERTICAL CRACKS TO
CONTRACTOR SHALL SEAL ALL CRACKS GREATER THAN 1/16" WIDTH IN THE DECK
AFTER MILLING AND CHIPPING TO ACHIEVE A SOUND DECK SURFACE, THE 3.
CONTRACTING OFFICER.
SHALL BE CUT OFF AND NEW REBAR SHALL BE INSTALLED PER THE DIRECTION OF THE
IS DETERMINED THAT REBAR NEEDS TO BE REPLACED, THE DETERIORATED MATERIAL
INSPECT THE REBAR TO DETERMINE WHETHER IT IS IN NEED OF REPLACEMENT. IF IT
DEMOLITION OF THE CONCRETE SLAB IS COMPLETE. GOVERNMENT PERSONNEL WILL
OVERLAY. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER WHEN
CONCRETE DEBRIS PRIOR TO THE INSTALLATION OF LATEX MODIFIED CONCRETE
METAL OR CLEANED WITH WIRE BRUSHES TO REMOVE ANY SURFACE CORROSION OR
REBAR EXPOSED AFTER MILLING AND CHIPPING SHALL BE BLAST CLEANED TO GRAY 2.
AREAS.
MATERIALS SHALL BE DISPOSED OF BY THE CONTRACTOR IN APPROVED DISPOSAL
THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER. ALL REMOVED
OR PARTS OF THE EXPOSED DECK SLAB ARE FOUND DETERIORATED OR UNSOUND,
INSPECT THE SURFACES FOR CRACKS AND SOUNDNESS OF CONCRETE. IF ANY PART
EXPOSED SURFACES OF DECK SLAB ARE CLEANED, THE CONTRACTOR SHALL
SURFACES INACCESSIBLE TO MACHINES FOR MILLING AND FINISHING. AFTER THE
EQUIPMENT NECESSARY FOR HAND CHIPPING AND CLEANING OF CONCRETE
WHICHEVER DEPTH IS LESS. THE CONTRACTOR SHALL FURNISH ALL LABOR AND
THE EXISTING CONCRETE DECK SHALL BE MILLED 2 1/2" OR TO THE TOP OF REBAR, 1.
NOTES:
/s
G R
E G N M
E Y
E R P .E
J
U L
S-5022-A
A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
/2
L M
C O
V E
R L
PINS AND RMG TO REMAIN (TYP)
6"x6" SQUARE CONCRETE AROUND
48'-10"
8'-6"
AND DWG S-3013
PRIOR TO DEMOLITION. SEE NOTE 5
CRANE RAILS TO BE REMOVED
TO REMAIN
DRAINAGE SYSTEM
CONTRACTION JOINT
MONOLITH #7MONOLITH #6MONOLITH #5
25'-0" 25'-0"
1'-2"
32'-4"
1'-2"
IN
S
ID
E E
D G
E T
O I
N S
ID
E E
D G
E
CONTRACTION JOINT
NOTES:
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
UNIT BAY
STAND BY
SD3012
SD3003
LEGEND
SEE NOTE 6
AS NECESSARY PREPARE FOR GFRP.
REMOVE TO SOUND CONCRETE
NOTE 6
SURFACE. PREPARE FOR LMC. SEE
REMOVE 2 1/2" OF TOP CONCRETE
DEMOLITION SITE PLAN
3/16"=1'-0"
8'0 4' 16'
SCALE: 3/16"=1'
A
SD3002
R T
Y S
Z K
IE
W
IC
Z
P L
A N
D E
M O
L
IT
IO
N
M O
N O
L
IT
H S
A
N D
G M
E Y
E R
B Y
A G
L A
/s
G R
E G N M
E Y
E R P .E
A
U G
SD1001-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:4
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
c
SD3003
B
SD3002
H
SD3002
G
SD3002
H
SD3002
N
REMAIN
TO BE REMOVED. STEEL MEMBERS TO
CONCRETE DECK AREA
CONCRETE REMOVAL PARAPET
E
SD3008
RMG #5 RMG #4
PIN A2
F
SD3002
CLPIER #7
E N
D O
F M
O N
O L
IT
H
E N
D O
F M
O N
O L
IT
H
E N
D O
F M
O N
O L
IT
H
F L
O W
DECK
CONCRETE
LC RAILS
LC RAILS
LC RAILS
LC RAILS
SIM
D
SD3005
A
9. FOR CONSTRUCTION PLAN, SEE DRAWING S-1014.
8. SEE SHEET C-3022 FOR DRAIN DETAILS FOR MONOLITH 5.
7. SCARIFY CONCRETE SURFACE TO 1/4" AMPLITUDE PRIOR TO PLACING CONCRETE.
OPERATIONS IN THE AFFECTED AREA.
LOOSE OR UNSOUND CONCRETE EXCEED 2 1/2" IN TOTAL DEPTH AND CEASE DEMOLITION
DISTRESS. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IF AREAS OF
6. SOUND CONCRETE AREAS ON DECK OF MONOLITHS 5 AND 6 TO DETERMINE AREAS OF
SEE SPECIFICATIONS.
5. SURVEYING IS REQUIRED PRIOR TO REMOVAL OF THE CRANE RAILS.
LIGHTING COMPONENTS.
4. REMOVE AND SALVAGE FOR REINSTALLATION ALL ELECTRICAL AND
DURING CONCRETE REMOVAL.
3. PROTECT ALL EXISTING UTILITIES (ELECTRICAL, GREASE LINES, ETC)
LEAVE A 6"x6" SECTION OF CONCRETE AROUND PINS AND RMG DURING DEMOLITION.
JOINT BETWEEN MONOLITH 4 AND 5, 1.5 FEET FROM US WALL.
RMG #5 (RELATIVE MOVEMENT GROUP) AT STA 3+90 THE CONTRACTION
JOINT BETWEEN MONOLITH 5 AND 6, 1.5 FEET FROM US WALL.
RMG #4 (RELATIVE MOVEMENT GROUP) AT STA 4+30 THE CONTRACTION
PIN A4 STATION 4+90 AT CENTERLINE OF PIER #7, 2.5 FEET FROM US WALL
4+30 AND 2.5 FEET FROM US WALL)
PIN A3 STATION 4+52.1 (22.1 FEET UP FROM CONTRACTION JOINT AT
3+90 AND 2.5 FEET FROM US WALL)
PIN A2 STATION 4+11.5 (21.5 FEET UP FROM CONTRACTION JOINT AT
POINTS (BRASS BOLTS FLUSH WITH CONCRETE SURFACE). SEE SPECIFICATIONS.
2. PROTECT EXISTING SURVEY ALIGNMENT PINS AND SURVEY CONTROL
AND NOTIFY COR OF ANY DISCREPANCIES PRIOR TO START OF WORK.
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS.
A
A
PIN A3
PIN A4
AROUND PINS TO REMAIN (TYP)
6"x6" SQUARE CONCRETE
MONOLITH #8
32'-2"32'-2"
SEE DWG S-3013.
REINSTALLED. TYP ALL 4 RAILS.
ON SITE. RAILS ARE TO BE
TO BE REMOVED AND STORED
EXISTING GANTRY CRANE RAILS
NOTES:
LEGEND
NOTE 6
SURFACE. PREPARE FOR LMC. SEE
REMOVE 2 1/2" OF TOP CONCRETE
SD3012
SD3012
REMAIN
TO BE REMOVED. STEEL MEMBERS TO
CONCRETE DECK AREA
DEMOLITION SITE PLAN
3/16"=1'-0"
F L
O W
CONCRETE DECK
CL PIER #7 CL PIER #8
MONOLITH #7 PARTIAL MONOLITH #9 PARTIAL
E N
D O
F M
O N
O L
IT
H
E N
D O
F M
O N
O L
IT
H
PIN A6PIN A5
CONCRETE DECK
LC RAILS
RAILSLC
RAILSLC
RAILSLC
A A
M O
L
IT
IO
N P
L A
N
R T
Y S
Z K
IE
W
IC
Z
8'0 4' 16'
SCALE: 3/16"=1'
A T M
O N
O L
IT
H S
A
N D
B Y
A G
L A
G M
E Y
E R
/s
G R
E G N M
E Y
E R P .E
J
U L
/0
/1
SD1013-A
R E
V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:0
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
O P
T
IO
N
CERTIFIED FINAL DOCUMENTS
CL PIER #9
N
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
S T
A
7. FOR CONSTRUCTION PLAN, SEE DRAWINGS S-1034.
IN THE AFFECTED AREA. AREA SHALL BE SCARIFIED TO 1/4" AMPLITUDE.
CONCRETE EXCEED 2 1/2" IN TOTAL DEPTH AND CEASE DEMOLITION OPERATIONS
SHALL NOTIFY THE CONTRACTING OFFICER IF AREAS OF LOOSE OR UNSOUND
6. SOUND CONCRETE AREAS TO DETERMINE AREAS OF DISTRESS. THE CONTRACTOR
SEE SPECIFICATIONS.
5. SURVEYING IS REQUIRED PRIOR TO REMOVAL OF THE CRANE RAILS.
LIGHTING COMPONENTS.
4. REMOVE AND SALVAGE FOR REINSTALLATION ALL ELECTRICAL AND
DURING CONCRETE REMOVAL.
3. PROTECT ALL EXISTING UTILITIES (ELECTRICAL, GREASE LINES, ETC)
PIN A6 STATION 5+70 AT CENTERLINE OF PIER #9, 2.5 FEET FROM US WALL
PIN A5 STATION 5+30 AT CENTERLINE OF PIER #8, 2.5 FEET FROM US WALL
POINTS (BRASS BOLTS FLUSH WITH CONCRETE SURFACE). SEE SPECIFICATIONS
2. PROTECT EXISTING SURVEY ALIGNMENT PINS AND SURVEY CONTROL
AND NOTIFY COR OF ANY DISCREPANCIES PRIOR TO START OF WORK.
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS.
DRAINAGE SYSTEM
8'-6"
IN
S
ID
E E
D G
E T
O I
N S
ID
E E
D G
55'-1"
LEGEND
REMAIN
MEMBERS AT CONCRETE DECK TO
AREA TO BE REMOVED. STEEL
NOTE 6
SURFACE. PREPARE FOR LMC. SEE
REMOVE 2 1/2" OF TOP CONCRETE
CONCRETE REMOVAL AT PARAPET
NOTES:
UNIT BAY
STAND BY
STORAGE WELL
BULKHEAD
REPAIR WELL
CREST GATE
DEMOLITION PLAN
3/16"=1'-0"
Y S
Z K
IE
W
IC
Z
P L
A N
JOINT
CONTRACTION
M O
N O
L
IT
H S
A
N D
D E
M O
L
IT
IO
N
A
SD3021
B
SD3021
8'0 4' 16'
SCALE: 3/16"=1'
B Y
A G
L A
G M
E Y
E R
/s
G R
E G N M
E Y
E R P .E
J
U L
SD1020-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:0
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
O P
T
IO
N
CERTIFIED FINAL DOCUMENTS
N
8. FOR CONSTRUCTION PLAN, SEE DRAWING S-1041.
NEW CONCRETE.
7. SCARIFY EXPOSED CONCRETE SURFACE TO 1/4" AMPLITUDE PRIOR TO PLACING
SCARIFIED TO 1/4" AMPLITUDE
CEASE DEMOLITION OPERATIONS IN THE AFFECTED AREA. AREA SHALL BE
IF AREAS OF LOOSE OR UNSOUND CONCRETE EXCEED 2 1/2" IN TOTAL DEPTH AND
AREAS OF DISTRESS. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
6. SOUND CONCRETE AREAS ON DECK OF MONOLITHS #11 AND #12 TO DETERMINE
SEE SPECIFICATIONS.
5. SURVEYING IS REQUIRED PRIOR TO REMOVAL OF THE CRANE RAILS.
LIGHTING COMPONENTS.
4. REMOVE AND SALVAGE FOR REINSTALLATION ALL ELECTRICAL AND
DURING CONCRETE REMOVAL.
3. PROTECT ALL EXISTING UTILITIES (ELECTRICAL, GREASE LINES, ETC)
PIN A8 STATION 6+53.5 2.5 FEET FROM US WALL
PIN A7 STATION 6+10 AT CENTERLINE OF PIER #10, 2.5 FEET FROM US WALL
LEAVE A 6"x6" SECTION OF CONCRETE AROUND PINS AND RMG DURING DEMOLITION.
POINTS (BRASS BOLTS FLUSH WITH CONCRETE SURFACE). SEE SPECIFICATIONS.
2. PROTECT EXISTING SURVEY ALIGNMENT PINS AND SURVEY CONTROL
AND NOTIFY COR OF ANY DISCREPANCIES PRIOR TO START OF WORK.
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS.
A
A
A
A
F
SD3021
G
SD30213
SD3012
PIN A7 PIN A8
H
SD3021
F L
O W
CONCRETE DECK
CRANE RAILLC
LC CRANE RAIL
LC CRANE RAIL
LC CRANE RAIL
JOINT
CONTRACTION
JOINT
CONTRACTION
JK
AROUND PINS TO REMAIN (TYP)
6"x6" SQUARE CONCRETE
SD3024 SD30233
SD3012
CONCRETE DECK
REINSTALLED (TYP ALL 4 RAILS). SEE DWG S-3013
AND STORED ON SITE. RAILS ARE TO BE
EXISTING GANTRY CRANE RAILS TO BE REMOVED
S T
A
.0
S T
A
.0
MONOLITH #10 MONOLITH #11 MONOLITH 1#2
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
M O
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
CLPIER #10CLPIER #9
46'-0"6'-0"
EL 982.55
TOP OF CONCRETE DECK
TOP OF ROADWAY EL 982.55
EL 982.55
TOP OF CONCRETE DECK
1'-0"
1'-9"
1'-0"
VARIES
6'-10"
1'-0"
AREA TO BE REMOVED
F
SD1001 1/2"=1'-0"
SECTION G
SD1001 1/2"=1'-0"
SECTION H
SD1001 1/2"=1'-0"
SECTION
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
DEMOLITION SECTION INNER UPSTREAM WALL
LEGEND
0 2' 4'1'
SCALE: 1/2"=1'
8'0 4' 16'
SCALE: 3/16"=1'
T/CONCRETE DECK T/CONCRETE DECK T/CONCRETE DECK
A
SD1001 3/16"=1'-0"
SECTION
B
SD1001 3/16"=1'-0"
SECTION
DEMOLITION SECTION OUTER DOWNSTREAM WALL
T/EXIST PARAPET
T/EXIST PARAPET
T/EXIST PARAPET
PER 2 UNITS HORIZONTAL.
SIDE OF EXISTING LIGHT RECESS. TRANSITION SLOPE TO BE 1 UNIT VERTCAL
3. REDUCE DEPTH OF DEMOLITION TO 8", FOR A DISTANCE OF 6" ON EITHER
INCLUDING SPALLS, EXPOSED REINFORCING AND DELAMINATIONS.
2. VERIFY SIZE AND LOCATION OF ALL DETERIORATED CONCRETE
AND NOTIFY COR OF ANY DISCREPANCIES PRIOR TO START OF WORK.
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS.
NOTES:
Y S
Z K
IE
W
IC
Z
D E
M O
L
IT
IO
N
P A
R A
P E
T W
A
S
C T
IO
N S
G M
E Y
E R
B Y
A G
L A
/s
G R
E G N M
E Y
E R P .E
J
U L
SD3002-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:4
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
/4
4'-0"
12'-6"
14'-5"
R
IS
E R
S
1'-0"
3'-0"
5'-0"18 TREADS @ 10" =15'-0"
22'-0" 11'-0" 6'-0"
1'-0"
6'-0"3'-0" 3'-0"
1'-0"
2'-0"
4'-0"
FIELD JOINT
REINSTALLED.
AND STORE ON SITE. RAIL IS TO BE
EXISTING GANTRY RAIL, REMOVE
FIELD JOINT
EXISTING CONCRETE
4"
EL 982.55
EL 983.0
SEE NOTE 6 ON DWG SD1001.
AND REMOVED AS NECESSARY.
CONCRETE TO BE SOUNDED
B
WORK BAY
UNIT ROOM
STAND - BY
LEGEND:
0 4' 8'2'
SCALE: 1/4"=1'
EL 982.55
EL 967.38
SEE SHEETS C-3022, E-1001 AND REFERENCE DRAWINGS.
6. DRAINAGE PIPE AND EXISTING UTILITIES NOT SHOWN FOR CLARITY.
TO NOTE 6 ON SHEET SD1001.
LOOSE CONCRETE SHALL BE REMOVED TO SOUND CONCRETE. REFER
HATCHED AREAS TO VERIFY ADEQUACY. ALL DETERIORATED AND
5. THE CONTRACTOR SHALL SOUND THE CONCRETE SHOWN IN THE
SEE SPECIFICATIONS.
4. SURVEYING IS REQUIRED PRIOR TO REMOVAL OF THE CRANE RAILS.
AND LIGHTING COMPONENTS.
3. REMOVE AND SALVAGE FOR REINSTALLATION ALL ELECTRICAL
INCLUDING SPALLS, EXPOSED REINFORCING AND DELAMINATIONS.
2. VERIFY SIZE AND LOCATION OF ALL DETERIORATED CONCRETE
TO START OF WORK.
CONDITIONS AND NOTIFY COR OF ANY DISCREPANCIES PRIOR
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND
NOTES:
A
A
STAIRWELL ENCLOSURE
Y S
Z K
IE
W
IC
Z
AREA TO BE REMOVED
MONOLITH #5 MONOLITH #6
D E
M O
L
IT
IO
N
S E
C T
IO
N S
EL 988.80
EL 970.55
EL 971.47
SD1001 1/4"=1'-0'
DEMOLITION WORK BAY STAIRS
M O
N O
L
IT
H
S
E R
V
IC
E B
A Y S
T A
IR
S5 THIS SHEET.
AS NECESSARY. REFER TO NOTE
REMOVE TO SOUND CONCRETE
G M
E Y
E R
B Y
A G
L A
/s
G R
E G N M
E Y
E R P .E
J
U L
SD3003-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:4
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
E
SD3004
C
SD1001 1/4"=1'-0'
SECTION DEMOLITION WORK BAY STAIRS
B
- 1/4"=1'-0'
SECTION DEMOLITION WORK BAY STAIRS
9"
1'-0"
1'-9"
1'-0"
VARIES
56'-7 1/2"
52'-0"
AREA TO BE REMOVED
DEMOLITION SECTION INNER UPSTREAM WALL
A
SD1020 3/16"=1'-0"
SECTION
F
SD1020 1/2"=1'-0"
SECTION G
SD1020 1/2"=1'-0"
SECTION H
SD1020 1/2"=1'-0"
SECTION
B
SD1020 3/16"=1'-0"
SECTION
DEMOLITION SECTION OUTER DOWNSTREAM WALL
TOP OF ROADWAY ELEV. 982.55
ELEV. 982.55
TOP OF CONCRETE DECK
S T
A
.0
MONOLITH #10 MONOLITH #11
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
MONOLITH #12
T/CONCRETE DECK
T/EXIST PARAPET
T/CONCRETE DECK
T/EXIST PARAPET
T/EXIST PARAPET
A1
LEGEND
P A
R A
P E
T W
A
M O
L
IT
IO
N
C T
IO
N S
R T
Y S
Z K
IE
W
IC
Z
0 2' 4'1'
SCALE: 1/2"=1'
8'0 4' 16'
SCALE: 3/16"=1'
J K
E L L
Y
B Y
A G
L A
PER 2 UNITS HORIZONTAL.
SIDE OF EXISTING LIGHT RECESS. TRANSITION SLOPE TO BE 1 UNIT VERTICAL
3. REDUCE DEPTH OF DEMOLITION TO 8" FOR A DISTANCE OF 6" ON EITHER
INCLUDING SPALLS, EXPOSED REINFORCING AND DELAMINATIONS.
2. VERIFY SIZE AND LOCATION OF ALL DETERIORATED CONCRETE
AND NOTIFY COR OF ANY DISCREPANCIES PRIOR TO START OF WORK.
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS.
NOTES:
/s
G R
E G N M
E Y
E R P .E
J
U L
SD3021-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:0
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
O P
T
IO
N
CERTIFIED FINAL DOCUMENTS
M O
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
N O
L
IT
H
E N
D
CLPIER #10
(TYP)
CONCRETE RECESS
FRAME AND GRATING
AIR VENT GRILLE
BRIDGE NOT SHOWN
SPILLWAY SERVICE
CONDUIT RECESS
BRIDGE NOT SHOWN
SPILLWAY SERVICE
GATE
BRIDGE RAILING
SPILLWAY SERVICE
4'-0"
A P
P R
O X
RECESS
DEVICE
DOGGING
10"
6'-3"
41'-6"
1'-6"
4'-3"
2'-6"
4'-3"
6"
2'-6"
"2 11'-8
"2 117'-3"2
13'-31'-10"
33'-6"
2'-9"
3'-0"
GATE RECESS
SPILLWAY CREST
5'-8" X 7'-0" SLUICE
15" AIR VENTS FROM
9'-6"
9"
9"
9'-6"7'-3"
9"9" 10"
4'-9"
9"
9'-0"
9"
9"
LEGEND
CONCRETE REPAIR AREA
0 4' 8'2'
SCALE: 1/4"=1'
OPERATIONS IN THE AFFECTED AREA.
LOOSE OR UNSOUND CONCRETE EXCEED 4" IN DEPTH AND CEASE DEMOLITION
THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IF AREAS OF 3.
CONCRETE REMOVAL.
PROTECT ALL EXISTING UTILITIES (ELECTRICAL, GREASE LINES, ETC) DURING 2.
FIELD VERIFY DIMENSIONS1.
NOTES:
K
SD1020 1/4"=1'-0"
SECTION
DEMOLITION SECTION PIER #10
FOR DETAILS
SEE SHEET S-5021
CONCRETE REPAIR
ELEV. 989.25
ELEV. 987.5
ELEV. 980.08
EL 982.55
EL 979.05
EL 977.39
EL 978.05
EL 974.55
A P
P R
X
Y S
Z K
IE
W
IC
Z
D E
M O
L
IT
IO
N
P
IE
R
E Y
E R
J R
A G
A N
S E
C T
IO
N
/s
G R
E G N M
E Y
E R P .E
J
U L
/0
/1
SD3024-A
R E
V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:0
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
O P
T
IO
N
CERTIFIED FINAL DOCUMENTS
A
2'-0"
1'-0"
2"
6"
EL 978.05
A P
P R
O X
MONOLITHS 7
PIER CHAMBER IN
AIR VENT GRILLE FOR
FLOW
L 6x4x1/2
4"
9"
31'-6" C/C BRIDGE BEARINGS
27 WF 106
9"
4"
30'-0" F/F PIERS
32'-2" OUTSIDE TO OUTSIDE
L4x3x3/8 FS
L3x3x3/8 NS
L2 1/2x2 1/2x5/16
/4
/8
/8
2 - L4x3x3/8
L4x3x3/8
2 - L4x3x3/8 L6x4x1/2 2 - L4x3x3/8
L4x3x3/8
L4x3x3/8 FS
L3x3x3/8 NS
L2 1/2x2 1/2x5/16
L 5x3 1/2x3/8
"C /C G
IR
D E
R S
32'-9" O/O WALKWAY W1
HOOKED AT END OF SPAN
GRATING BOLTS FOR FASTENING,
1" GRATING
27WF106
1L6X4X
27 WF 106
6" MAX SPACING
29'-10 1/4 " O/O GRATING AND HANDRAIL
/8
6'-6 5/8 " 5'-10 3/4 " 5'-10 3/4 " 5'-10 3/4 " 6'-6 5/8 "
34'-6 9/16 " O/O HAND RAIL
1'-4 1/8" 1'-4 1/8"
3 3/4x1/8 FILL PL 6x3/8 PL 6x3/8 PL
5 SPACES @ 5'-10 3/4" = 29'-5 3/4"
3/8" STIFF PL ABT 24" C/C
B S-3024
A
F L
O W
N
A
- 1/2"=1'-0"
SECTION
A
A
STRUCTURE CONTAINS LEAD BASED PAINT.5.
WHEN PAINTING IS COMPLETE.
BEARINGS PRIOR TO PAINTING. REINSTALL GREASE LINES
REMOVE GREASE LINES, PLUG ANY OPENINGS AND PROTECT 4.
LIMITED TO, GIRDERS AND BRACING PER SPECIFICATION.
CLEAN AND PAINT ALL STEEL SURFACES INCLUDING, BUT NOT 3.
FIELD VERIFY DIMENSIONS.2.
WHOLE STRUCTURE IS EXISTING, UNLESS NOTED OTHERWISE.1.
NOTES:
S-1041 S-1034
DETAIL SPILLWAY SERVICE BRIDGE (TYP)
T A
IL
A
N D S
E C
T
IO
N
R T
Y S
Z K
IE
W
IC
Z
0 2' 4'1'
SCALE: 1/2"=1'
E X
IS
T
IN
G S
P
IL
L W
A Y S
E R
V
IC
E B
R
ID
E Y
E R
J
R A
G A
N
/s
G R
E G N M
E Y
E R P .E
J
U L
S-3023-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
/8
/4
W1
W
F
W
F
W
F
W
F
W
F
W
F
L x x /8
L x x /8
L x x /8
L x x /8
L x x /8
3/8" RAISED PATT PL
8 1/4"
7 3/4"
3 1/2"
7 3/4"
8 1/4"
3 1/2 "
16 WF 40
80.2 # RAIL
A.S.C.E.
SPANS ONLY
DOWNSTREAM
U-BOLTS U4 FOR
OPPOSITE)
2'-0" CTRS
STUD B1 (SPACED
12 I 31.8
OPPOSITE
RAIL CLIP, 2'-0" CTRS
L 5x3 1/2x3/8
4" 1'-1"
5" 6"
2"3" 3"
U5
SLOT, HOLE, ANGLES & U-BOLTS
U1
PIPE
BLACK
4" STD
L 2 1/2x2 1/2x5/16
4x3/8 PL
1 1/2" HOLE
L 3x2 1/2x5/16
3/8" BOLTS & LOCK WASHERS
1/ 2"
/8
1'-6" 9'-6"
8"
2'-6"
3'-9"
4 x 4 M13.8
27 WF 106BEARING BRACKET
DOGGING DEVICE
3/4"
1/4"
L 2 1/2x2 1/2x5/16
L 5x31/2x3/8
5x3/8 FILL
1 1/32" SHIM
1 1/16" SHIM
1 1/2" STD BLACK PIPE
1 1/16" HOLE
1/8" FILL
6x3/8 PL 4"x3/8 PL
FLOW
B S-3023 1"=1'-0"
SECTION
PAINTING IS COMPLETE.
REPAINTING OF SERVICE BRIDGE STEEL. RAIL AND GRATING TO BE REINSTALLED AFTER
REMOVE CRANE RAIL AND GALVANIZED STEEL GRATING PRIOR TO CLEANING AND 6.
DRAWINGS 038aa-U1-53/3.1 AND L9038aa-553_S-509.
DOGGING DEVICE COMPONENTS WHEN PAINTING IS COMPLETE. SEE REFERENCE
THE WEATHER, DUST, DIRT, AND DAMAGE FROM CONSTRUCTION WORK. REINSTALL
THE REMOVED COMPONENTS SHALL BE STORED ON SITE AND PROTECTED AGAINST
FIXTURES SHALL BE REMOVED SO THAT WORK CAN BE DONE ON THE BRIDGE GIRDERS.
SHAFT, BEARINGS, GREASE LINES, PINION SHAFT, OPERATING LEVER, AND ASSOCIATED
LEADING UP TO THE CONNECTOR SHAFT SHALL REMAIN IN PLACE. THE CONNECTOR
CREST GATE DOGGING MECHANISM. THE DOGGING DEVICES AND LINKAGE ARMS
THE CONSTRUCTION WORK REQUIRES PARTIAL DISASSEMBLY AND REMOVAL OF THE 5.
PAINTING. REINSTALL GREASE LINES WHEN PAINTING IS COMPLETE.
REMOVE GREASE LINES, PLUG ANY OPENINGS AND PROTECT BEARINGS PRIOR TO 4
AND BRACING PER SPECIFICATIONS.
CLEAN AND REPAINT ALL STEEL SURFACES INCLUDING BUT NOT LIMITED TO GIRDER 3.
FIELD VERIFY ALL DIMENSIONS.2.
EXISTING, UNLESS NOTED OTHERWISE.1.
NOTES:
0 1' 2'6"
SCALE: 1"=1'
S E
C T
IO
N
R T
Y S
Z K
IE
W
IC
Z
IL
L W
A Y S
E R
V
IC
E B
R
ID
G E
G M
E Y
E R
J R
A G
A N
/s
G R
E G N M
E Y
E R P .E
J
U L
S-3024-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
7 1/4"
A
A
A
2" R
FOR EACH RAIL CLIP
ELEV 983.0
1'-0" R
3 3/8" R
3/8" PL
(CONCRETE NOT SHOWN FOR CLARITY)
SPILLWAY SERVICE BRIDGE
3"
3 3/8"
2 1/4"
3 1/2"
/2
/2
4'-3"
/1
6 1/8"
2 1/2"
/4
/4
HP EL 982.55
HP EL 982.55
EL 982.43
T/DRAIN
EL 982.43
T/DRAIN
EL 982.43
T/DRAIN
PIPE (TYP)
" DIA SCH 40 STD 2
3/4" "V" JOINTS
WATERPROOFING IN
ASPHALT TYPE
C /C G
IR
D E
R S
HP EL 982.55
HP EL 982.55
#4 BARS @ 6" MAX CC
#4 BARS @ 6" MAX CC
3/4" "V" JOINTS
ASPHALT TYPE WATERPROOFING IN
2"
CONCRETE SLAB
STEEL TO PVC COUPLER
BEAM
FLANGE. TIE TO FLOOR
BOTTOM OF GIRDER
TO EXTEND 4" MIN BELOW
1 1/2" DIA SCH 40 PVC PIPE
INTO SLAB (TYP).
STEEL PIPE CAST
1 1/2" DIA SCH 40 STD
M
IN
#4 BARS @ 6" MAX CC
#4 BARS @ 6" MAX CC
32'-2" OUTSIDE TO OUTSIDE OF SLAB
2"
9'-6" CC GIRDERS
"16 79'-5
N
F L
O W
0 1' 2'6"
SCALE: 1"=1'
0 2' 4'1'
SCALE: 1/2"=1'
STRUCTURAL MEMBERS OMITTED
B
A
/2 F
IE
L D V
E R
IF
Y
#4 BARS @ 12" MAX CC
#5 BARS @ 9" MAX CC
A
- 1/2"=1'-0"
SECTION
S-1041 S-1034
DETAIL - PLAN CONCRETE DECK
Y S
Z K
IE
W
IC
Z
D E
T A
IL
A
N D S
E C
T
IO
N S
S P
IL
L W
A Y S
E R
V
IC
E B
R
ID
G E C
O N
C R
E T
E D
E
K
B
A G
L A
J K
E L L
Y
/s
G R
E G N M
E Y
E R P .E
J
U L
S-3025-A
/0
/1
R
E V
IS
E D P
E R A
M E
N D
M E
N T
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
C O
N T
R A
C T N
O
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
-S
E P -2
:5
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
W
W N
B
P L
O T D
A T
E
O H
IO
R
IV
E R B
A S
IN
L O
Y A
L H
A N
N A R
E S
E R
V O
IR
S E
R V
IC
E B
R
ID
G E R
E H
A B
IL
IT
A T
IO
N
B A
S E C
O N
T R
A C
T
CERTIFIED FINAL DOCUMENTS
#4 BARS @ 12" MAX CC
#5 BARS @ 9" MAX CC
B
- 1"=1'-0"
SECTION
SLOPE
SLOPE SLOPE SLOPESLOPE SLOPE SLOPE
SLOPE SLOPE SLOPESLOPE SLOPE
S L
O P
E
S L
O P
E
WALKWAY NOT SHOWN
WALKWAY NOT SHOWN
S L
O P
E
S L
O P
E
S L
O P
E
S L
O P
E
6. TOP BARS TO HAVE A 2 1/2" MINIMUM CLEAR COVER UNLESS NOTED OTHERWISE.
5. BOTTOM BARS TO HAVE A 2" MINIMUM CLEAR COVER UNLESS NOTED OTHERWISE.
4. MINIMUM 28 DAY COMPRESSIVE STRENGTH OF CONCRETE 4500 psi.
3. ALL REINFORCEMENT TO CONFORM TO ASTM A615, GRADE 60.
2. CONCRETE SLABS SHALL BE PLACED AS A SINGLE MONOLITH POUR.
1. FIELD VERIFY DIMENSIONS.
NOTES:
SLOPE SLOPE
/2
C L
R
/2
C L
R
C L
R
/2
C L
R
A
A
A
A
A
EXISTING REBAR
EXISTING REBAR
/2
CONCRETE SLAB
REMOVE CONCRETE SLAB ONLY
32'-2"
"2 12 "2
9'-6" C/C GIRDERS
C /C G
IR
D E
R S
32'-2" OUT TO OUT OF SLAB
AREA TO BE REMOVED
A
A A A A A A
B
A
LEGEND:
A
- 1/2"=1'-0"
SECTION
B
- 1"=1'-0"
SECTION
3. ALL STEEL MEMBERS TO REMAIN.
PROCEDURES IN ACCORDANCE WITH THE SPECIFICATIONS.
THE EXISTING DAM GATE. SUBMIT PLAN TO SHOW DEMOLITION
2. CARE SHALL BE TAKEN TO PREVENT DEBRIS FROM DAMAGING
DISCREPANCIES PRIOR TO START OF WORK.
CONDITIONS AND NOTIFY CONTRACTING OFFICER OF ANY
1.…
This is the start of the file's text. The full file is on GovTribe.