Certified_Final_Documents_(Technical_Specifications)_Allegheny_River_Basin_-_Loyalhanna_Dam_Service_Bridge_Rehab.pdf

PDF 25 MB Posted

Attached to
Loyalhanna Dam Service Bridge Rehabilitation
Solicitation number
W911WN19B8011
Issued by

About this file

Technical Specifications

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911WN19B8011

Allegheny River Basin Loyalhanna Dam Westmoreland County, Pennsylvania

Service Bridge Rehabilitation

Certified Final Document - RTA Technical Specifications July 2019

Loyal hanna, Ser v i ce Br i dge Repai r s

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 13. 00 08 SUMMARY OF WORK - BASE CONTRACT AND AWARDABLE OPTI ONS

01 22 00. 00 08 PRI CE AND PAYMENT PROCEDURES

01 30 00. 00 08 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 08 PROJECT SCHEDULE NETWORK ANALYSI S

01 32 23. 00 08 SURVEY AND ALI GNMENT CONTROL

01 32 33 DI GI TAL PROGRESS I MAGES

01 33 00 SUBMI TTAL PROCEDURES

01 35 00. 00 08 SPECI AL PROCEDURES

01 35 26. 00 08 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 08 QUALI TY CONTROL

01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19. 00 08 TEMPORARY ENVI RONMENTAL CONTROLS

01 74 19. 00 08 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 02. 00 15 CLOSEOUT SUBMI TTALS ( AS- BUI LT DRAWI NGS)

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 01 00 REHABI LI TATI ON OF CONCRETE

03 01 40. 13 REPAI R AND RETROFI T OF REI NFORCED CONCRETE BEAMS USI NG

BONDED CFRP COMPOSI TES

03 01 40. 15 REPAI R AND RETROFI T OF REI NFORCED CONCRETE SLAB USI NG

BONDED GFRP COMPOSI TES

03 20 01. 00 10 CONCRETE REI NFORCEMENT

03 30 53 MI SCELLANEOUS CAST- I N- PLACE CONCRETE

DI VI SI ON 05 - METALS

05 50 14 STRUCTURAL METAL FABRI CATI ONS

05 50 15 CI VI L WORKS FABRI CATI ONS

05 52 00 METAL RAI LI NGS

DI VI SI ON 09 - FI NI SHES

09 97 02 PAI NTI NG: HYDRAULI C STRUCTURES

DI VI SI ON 22 - PLUMBI NG

22 00 00. 00 08 DRAINS

DI VI SI ON 26 - ELECTRI CAL

26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 31 13 CHAI N LI NK FENCES AND GATES

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1 Cer t i f i ed Fi nal Document - RTA

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 13. 00 08

SUMMARY OF WORK - BASE CONTRACT AND AWARDABLE OPTI ONS

PART 1 GENERAL

1. 1 GENERAL I NFORMATI ON

1. 2 BASE CONTRACT

1. 3 AWARDABLE OPTI ON 1

1. 4 AWARDABLE OPTI ON 2

1. 5 AWARDABLE OPTI ON 3

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 13. 00 08 Page 1

SECTI ON 01 11 13. 00 08

SUMMARY OF WORK - BASE CONTRACT AND AWARDABLE OPTI ONS

PART 1 GENERAL

1. 1 GENERAL I NFORMATI ON

Thi s cont r act has been di v i ded i nt o a base cont r act and t hr ee awar dabl e opt i ons. Awar d of t he awar dabl e opt i ons wi l l be made i n accor dance wi t h Sect i on 00 73 00 SUPPLEMENTARY CONDI TI ONS. The f ol l owi ng par agr aphs ar e f or i nf or mat i on onl y t o descr i be i n gener al t er ms t he wor k t o be per f or med. Act ual wor k t o be per f or med under t he base cont r act and opt i ons shal l be as i dent i f i ed on t he dr awi ngs. A gener al sequence of wor k and r est r i c t i ons ar e pr esent ed on dr awi ngs G- 1007 t hr ough G- 1010.

1. 2 BASE CONTRACT

The base cont r act consi st s of wor k associ at ed wi t h t he Monol i t hs 5, 6, and 7 and i ncl udes Ser vi ce Br i dge Span 6 - 7 and Pi er 7. Speci f i c f eat ur es of wor k under t he base cont r act ment i oned bel ow do not r epr esent a const r uct i on sequence. A gener al sequence of wor k and r est r i c t i ons ar e pr esent ed on dr awi ngs G- 1007. The base cont r act f eat ur es of wor k i ncl ude, but ar e not l i mi t ed t o t he f ol l owi ng:

a. I nst al l saf et y f ence at pl aygr ound al ong dam access r oad.

b. Removal and r ei nst al l at i on of t he exi st i ng cr ane r ai l s , i ncl udi ng sur vey of r ai l l ocat i on bef or e r emoval and af t er r ei nst al l at i on, and i nst al l i ng gant r y cr ane r ai l s t ops.

c. Remove Ut i l i t i es.

d. Remove and c l ean dr ai ns, gr at es, and f l anges. I nst al l dr ai ns i n Monol i t h 5.

e. Remove, c l ean, and pai nt r ecessed f r ame and r epl ace r ecess cover .

f . I nst al l at i on of car bon f i ber r ei nf or ced pol ymer and gl ass f i ber r ei nf or ced pol ymer over l ay t he exi st i ng wor kbay cover s l ab and beams on Monol i t h 5

g. Repai r of t he t op sur f ace of Monol i t h 6.

h. Repai r of t he t op sur f ace of Br i dge Pi er 7.

i . Repl acement of t he concr et e deck, and cl eani ng and pai nt i ng t he st r uct ur al st eel on Ser vi ce Br i dge Span 6 - 7 i nc l udi ng r emoval of l ead- based pai nt and necessar y r epai r s t o t he ser v i ce br i dge.

j . Repai r of t he concr et e par apet on Monol i t hs 5 and 6.

k. Concr et e r epai r s on t he ver t i cal f ace of Monol i t h 6 and Pi er 7.

l . El ect r i cal wor k i n t he wor k bay i n Monol i t hs 5 and 6.

SECTI ON 01 11 13. 00 08 Page 2

m. I nst al l at i on of embedded i t ems f or el ect r i cal wor k on par apet s.

n. Mi scel l aneous concr et e r epai r s wi t hi n st ai r way wi t hi n Monol i t h 5.

o. Fabr i cat i on and i nst al l at i on of st eel suppor t st r uct ur e wi t hi n t he wor kbay i n Monol i t h 5.

p. Cl eanup and r est or e al l l aydown ar eas and access r oads.

1. 3 AWARDABLE OPTI ON 1

Awar dabl e Opt i on 1 consi st s of wor k associ at ed wi t h Monol i t hs 7, 8, and 9 and i ncl udes Ser vi ce Br i dge Spans 7 - 8 and 8 - 9 and Pi er s 8 and 9.

Speci f i c f eat ur es of wor k under t he Awar dabl e Opt i on 1 bel ow do not r epr esent a const r uct i on sequence. A gener al sequence of wor k and r est r i c t i ons ar e pr esent ed on dr awi ngs G- 1008 and G- 1009. Speci f i c f eat ur es of wor k under t he Awar dabl e Opt i on 1 i ncl ude, but ar e not l i mi t ed t o t he f ol l owi ng:

a. Removal and r ei nst al l at i on of t he exi st i ng cr ane r ai l s , i ncl udi ng sur vey of r ai l l ocat i on bef or e r emoval and af t er r ei nst al l at i on, and i nst al l i ng gant r y cr ane r ai l s t ops and t he i nst al l at i on and r emoval of t he t empor ar y cr ane r ai l s .

b. Remove Ut i l i t i es.

c. Remove and c l ean dr ai ns, gr at es, and f l anges.

d. Repai r of t he t op sur f ace of Br i dge Pi er s 8 and 9.

e. Repl acement of t he concr et e deck, and cl eani ng and pai nt i ng t he st r uct ur al st eel on Ser vi ce Br i dge Spans 7 - 8 and 8 - 9 i ncl udi ng r emoval of l ead- based pai nt and necessar y r epai r s t o t he ser vi ce br i dge. .

f . Concr et e r epai r s on t he ver t i cal f ace of Pi er s 7, 8 and 9.

g. I nst al l at i on of embedded i t ems f or el ect r i cal wor k on par apet s.

h. Cl eanup and r est or e al l l aydown ar eas and access r oads.

1. 4 AWARDABLE OPTI ON 2

Awar dabl e Opt i on 2 consi st s of wor k associ at ed wi t h Monol i t hs 9, 10, 11 and 12 and i ncl udes Ser vi ce Br i dge Spans 9 - 10 and 10 - 11, and Pi er 10.

Speci f i c f eat ur es of wor k under t he Awar dabl e Opt i on 2 bel ow do not r epr esent a const r uct i on sequence. A gener al sequence of wor k and r est r i c t i ons ar e pr esent ed on dr awi ng G- 1010. Speci f i c f eat ur es of wor k under t he Awar dabl e Opt i on 2 i ncl ude, but ar e not l i mi t ed t o t he f ol l owi ng:

a. Removal and r ei nst al l at i on of t he exi st i ng cr ane r ai l s , i ncl udi ng sur vey of r ai l l ocat i on bef or e r emoval and af t er r ei nst al l at i on, and i nst al l i ng gant r y cr ane r ai l s t ops and t he i nst al l at i on and r emoval of t he t empor ar y cr ane r ai l s .

b. Remove Ut i l i t i es.

c. Remove and c l ean dr ai ns, gr at es, and f l anges.

d. Repai r of t he t op sur f ace of Br i dge Pi er 10.

SECTI ON 01 11 13. 00 08 Page 3

e. Repl acement of t he concr et e deck, and cl eani ng and pai nt i ng t he st r uct ur al st eel on Ser vi ce Br i dge Spans 9 - 10 and 10 - 11 i ncl udi ng r emoval of l ead- based pai nt and necessar y r epai r s t o t he ser vi ce br i dge.

f . Concr et e r epai r s on t he ver t i cal f ace of Pi er s 9 and 10 and Monol i t h 11.

g. Repai r t o t he t op sur f ace of Monol i t h 11 and 12.

h. Repai r of t he concr et e par apet on Monol i t h 11 and 12.

i . Remove, c l ean and pai nt r ecess f r ame and r epl ace r ecess cover .

j . Remove f ence ar ound pl aygr ound al ong t he dam access r oad and r est or e t he ar ea t o pr econst r uct i on condi t i on.

k. I nst al l at i on of embedded i t ems f or el ect r i cal wor k on par apet s.

SECTI ON 01 11 13. 00 08 Page 4

p. Cl eanup and r est or e al l l aydown ar eas and access r oads.

1. 5 AWARDABLE OPTI ON 3

Awar dabl e Opt i on 3 consi st s of wor k associ at ed wi t h t he gener al el ect r i cal wor k on t he dam. Speci f i c f eat ur es of wor k under t he Awar dabl e Opt i on 3 i ncl ude, but ar e not l i mi t ed t o t he f ol l owi ng:

a. Fur ni sh and i nst al l i ng new el ect r i cal l i ght i ng pol es al ong t he t op of t he dam.

b. Gener al el ect r i cal wor k i ncl udi ng gr ound, conduct or wi r e, condui t s, j unct i on boxes and connect i on of t he el ect r i cal component s t o t he exi st i ng dam el ect r i cal syst em wi t h t he associ at ed t est i ng of component s.

c. Fur ni shi ng and i nst al l i ng any el ect r i cal or r el at ed component s not pr evi ousl y i nst al l ed i n t he pr evi ous Base Cont r act or Awar dabl e Opt i ons 1 and 2.

SECTI ON 01 11 13. 00 08 Page 5

d. Cl eanup and r est or e al l l aydown ar eas and access r oads.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTI ON

NOT USED

- - End of Sect i on - -

SECTI ON 01 11 13. 00 08 Page 6

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 08

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SI NGLE JOB PAYMENT I TEMS

1. 2. 1 Rei mbur sement For Act ual Per f or mance And Payment Bond Pr emi ums

1. 2. 2 Mobi l i zat i on and Demobi l i zat i on

1. 2. 2. 1 Payment

1. 2. 2. 2 Uni t of Measur e

1. 2. 2. 3 Payment I t ems

1. 2. 3 Pl aygr ound Ar ea Fence

1. 2. 3. 1 Payment

1. 2. 3. 2 Uni t of Measur e

1. 2. 3. 3 Payment I t ems

1. 2. 4 Removal and Rei nst al l at i on of Gant r y Cr ane Rai l s

1. 2. 4. 1 Payment

1. 2. 4. 2 Uni t of Measur e

1. 2. 4. 3 Payment I t ems

1. 2. 5 Tempor ar y Gant r y Cr ane Rai l s and Rai l St ops

1. 2. 5. 1 Payment

1. 2. 5. 2 Uni t of Measur e

1. 2. 5. 3 Payment I t ems

1. 2. 6 Revi se Deck Dr ai n Syst em, Monol i t h 5

1. 2. 6. 1 Payment

1. 2. 6. 2 Uni t of Measur e

1. 2. 6. 3 Payment I t em

1. 2. 7 Removal and Rei nst al l at i on of Ut i l i t i es

1. 2. 7. 1 Payment

1. 2. 7. 2 Uni t of Measur e

1. 2. 7. 3 Payment I t em

1. 2. 8 Cl eani ng and Pai nt i ng

1. 2. 8. 1 Payment

1. 2. 8. 2 Uni t of Measur e

1. 2. 8. 3 Payment I t ems

1. 2. 9 Concr et e St ai r Repai r , Monol i t h 5

1. 2. 9. 1 Payment

1. 2. 9. 2 Uni t of Measur e

1. 2. 9. 3 Payment I t em

1. 2. 10 Monol i t h 5 Suppl ement al Suppor t Fr ame

1. 2. 10. 1 Payment

1. 2. 10. 2 Uni t of Measur e

1. 2. 10. 3 Payment I t em

1. 2. 11 Li ght i ng Pol e Suppor t Pedest al s

1. 2. 11. 1 Payment

1. 2. 11. 2 Uni t of Measur e

1. 2. 11. 3 Payment I t ems

1. 2. 12 Ser vi ce Br i dge El ect r i cal Wor k

SECTI ON 01 22 00. 00 08 Page 1

1. 2. 12. 1 Payment

1. 2. 12. 2 Uni t of Measur e

1. 2. 12. 3 Payment I t em

1. 3 UNI T PRI CE PAYMENT I TEMS

1. 3. 1 Di gi t al Pr ogr ess I mages

1. 3. 1. 1 Payment

1. 3. 1. 2 Measur ement

1. 3. 1. 3 Uni t of Measur e

1. 3. 1. 4 Payment I t ems

1. 3. 2 Subst r at e Pr epar at i on

1. 3. 2. 1 Payment

1. 3. 2. 2 Measur ement

1. 3. 2. 3 Uni t of Measur e

1. 3. 2. 4 Payment I t ems

1. 3. 3 Subst r at e Repai r

1. 3. 3. 1 Payment

1. 3. 3. 2 Measur ement

1. 3. 3. 3 Uni t of Measur e

1. 3. 3. 4 Payment I t ems

1. 3. 4 Wet Lay- up FRP Syst em

1. 3. 4. 1 Payment

1. 3. 4. 2 Measur ement

1. 3. 4. 3 Uni t of Measur e

1. 3. 4. 4 Payment I t ems

1. 3. 5 Concr et e Demol i t i on

1. 3. 5. 1 Payment

1. 3. 5. 2 Measur ement

1. 3. 5. 3 Uni t of Measur e

1. 3. 5. 4 Payment I t ems

1. 3. 6 Lat ex Modi f i ed Concr et e Deck Sl ab Over l ay

1. 3. 6. 1 Payment

1. 3. 6. 2 Measur ement

1. 3. 6. 3 Uni t of Measur e

1. 3. 6. 4 Payment I t ems

1. 3. 7 Concr et e Pl acement

1. 3. 7. 1 Payment

1. 3. 7. 2 Measur ement

1. 3. 7. 3 Uni t of Measur e

1. 3. 7. 4 Payment I t ems

1. 3. 8 Rei nf or c i ng St eel

1. 3. 8. 1 Payment

1. 3. 8. 2 Measur ement

1. 3. 8. 3 Uni t of Measur e

1. 3. 8. 4 Payment I t ems

1. 3. 9 Seal Deck Joi nt s

1. 3. 9. 1 Payment

1. 3. 9. 2 Measur ement

1. 3. 9. 3 Uni t of Measur e

1. 3. 9. 4 Payment I t ems

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 08 Page 2

SECTI ON 01 22 00. 00 08

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM A615/ A615M ( 2016) St andar d Speci f i cat i on f or Def or med and Pl ai n Car bon- St eel Bar s f or Concr et e Reinforcement

1. 2 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i nc l uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 2. 1 Rei mbur sement For Act ual Per f or mance And Payment Bond Pr emi ums

Payment f or r ei mbur sement f or act ual per f or mance and payment bond pr emi ums wi l l be made as speci f i ed i n 00 73 00 SUPPLEMENTARY CONDI TI ONS, c l ause

PAYMENT FOR PERFORMANCE AND PAYMENT BONDS.

0001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMI UMS,

BASE CONTRACT

1001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMI UMS,

AWARDABLE OPTI ON 1

2001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMI UMS,

AWARDABLE OPTI ON 2

3001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMI UMS,

AWARDABLE OPTI ON 3

1. 2. 2 Mobi l i zat i on and Demobi l i zat i on

1. 2. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on, as def i ned i n Sect i on 00 73 00 SUPPLEMENTARY CONDI TI ONS, DFARS 252. 236- 7004 PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON. Payment wi l l onl y be made f or Mobi l i zat i on and Demobi l i zat i on f or Awar dabl e Opt i ons i f demobi l i zat i on i s r equi r ed bet ween t he pr evi ous Base or Awar dabl e Opt i on

SECTI ON 01 22 00. 00 08 Page 3 and t he cur r ent Awar dabl e Opt i ons or i f demobi l i zat i on i s r equi r ed dur i ng t he per i od of t he cur r ent Awar dabl e Opt i on. No payment wi l l be made i f no demobi l i zat i on and r emobi l i zat i on occur s dur i ng a speci f i c cont r act per i od.

1. 2. 2. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 2. 2. 3 Payment I t ems

0003 PAYMENT FOR MOBI LI ZATI ON AND AND DEMOBI LI ZATI ON, BASE CONTRACT

1003 PAYMENT FOR MOBI LI ZATI ON AND AND DEMOBI LI ZATI ON, AWARDABLE OPTI ON

2003 PAYMENT FOR MOBI LI ZATI ON AND AND DEMOBI LI ZATI ON, AWARDABLE OPTI ON

1. 2. 3 Pl aygr ound Ar ea Fence

1. 2. 3. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng t he pr oj ect saf et y f enci ng at t he pl aygr ound ar ea al ong t he dam access r oad and f or r emovi ng t he f ence upon compl et i on of t he wor k as speci f i ed i n Sect i on 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS. Thi s i t em al so i ncl udes r emoval of t he f ence af t er al l cont r act wor k i s compl et ed.

1. 2. 3. 2 Uni t of Measur e

Uni t of measur e: Job

1. 2. 3. 3 Payment I t ems

0004 PLAYGROUND AREA FENCE

2017 REMOVE PLAYGROUND AREA FENCE

1. 2. 4 Removal and Rei nst al l at i on of Gant r y Cr ane Rai l s

1. 2. 4. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h r emoval and r ei nst al l at i on of t he gant r y cr ane r ai l s , as speci f i ed i n Sect i on 02 41 00 DEMOLI TI ON.

1. 2. 4. 2 Uni t of Measur e

Uni t of measur e: Job

1. 2. 4. 3 Payment I t ems

0005 REMOVE AND REI NSTALL GANTRY CRANE RAI LS, BASE CONTRACT

1004 REMOVE AND REI NSTALL GANTRY CRANE RAI LS, AWARDABLE OPTI ON 1

2004 REMOVE AND REI NSTALL GANTRY CRANE RAI LS, AWARDABLE OPTI ON 2

1. 2. 5 Tempor ar y Gant r y Cr ane Rai l s and Rai l St ops

1. 2. 5. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, i nst al l i ng, and r emovi ng t empor ar y r ai l s t ops; and f ur ni shi ng, i nst al l i ng, and r emovi ng t empor ar y cr ane r ai l s , as speci f i ed i n Sect i on 02 41 00 DEMOLI TI ON.

SECTI ON 01 22 00. 00 08 Page 4

1. 2. 5. 2 Uni t of Measur e

Uni t of measur e: Job

1. 2. 5. 3 Payment I t ems

0006 FURNI SH, I NSTALL AND REMOVE TEMPORARY CRANE RAI LS AND RAI L STOPS,

BASE CONTRACT

1005 FURNI SH, I NSTALL AND REMOVE TEMPORARY CRANE RAI LS AND RAI L STOPS,

AWARDABLE OPTI ON 1

2005 FURNI SH, I NSTALL AND REMOVE TEMPORARY CRANE RAI LS AND RAI L STOPS,

AWARDABLE OPTI ON 2

1. 2. 6 Revi se Deck Dr ai n Syst em, Monol i t h 5

1. 2. 6. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h i nst al l at i on of new deck dr ai n syst ems as speci f i ed and as shown on t he dr awi ngs.

1. 2. 6. 2 Uni t of Measur e

Uni t of measur e: Job

1. 2. 6. 3 Payment I t em

0007 REROUTE PI PI NG AND I NSTALL DRAI NS - MONOLI TH 5

1. 2. 7 Removal and Rei nst al l at i on of Ut i l i t i es

1. 2. 7. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h Removal and Repl acement / Rei nst al l at i on of al l ut i l i t i es af f ect ed by t he r equi r ed wor k as shown on t he pl ans and r ef er ence dr awi ngs.

1. 2. 7. 2 Uni t of Measur e

Uni t of measur e: Job

1. 2. 7. 3 Payment I t em

0008 REMOVE AND REI NSTALL UTI LI TI ES

1. 2. 8 Cl eani ng and Pai nt i ng

1. 2. 8. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h l ead- based pai nt r emoval and di sposal , sur f ace pr epar at i on and pai nt i ng t he r ecess f r ame, dr ai ns, and st eel br i dge st r uct ur e as descr i bed i n Sect i on 09 97 02 PAI NTI NG:

HYDRAULI C STRUCTURES. Payment under t hi s i t em i nc l udes cont ai nment and di sposal of r emoved mat er i al s.

1. 2. 8. 2 Uni t of Measur e

Uni t of measur e: Job

SECTI ON 01 22 00. 00 08 Page 5

1. 2. 8. 3 Payment I t ems

0009 CLEAN AND PAI NT RECESS FRAME AND DRAI NS

0030 CLEAN AND PAI NT SERVI CE BRI DGE STRUCTURE, SPAN 6 - 7

1011 CLEAN AND PAI NT SERVI CE BRI DGE STRUCTURE, SPANS 7 - 8 AND 8 - 9

2016 CLEAN AND PAI NT SERVI CE BRI DGE STRUCTURE, SPANS 9 - 10 AND 10 - 11

1. 2. 9 Concr et e St ai r Repai r , Monol i t h 5

1. 2. 9. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h r epai r of t he concr et e st ai r s i n Monol i t h 5. Payment under t hi s i t em i nc l udes r epai r of t he st ai r s and r epl acement of t he handr ai l .

1. 2. 9. 2 Uni t of Measur e

Uni t of measur e: Job

1. 2. 9. 3 Payment I t em

0010 MONOLI TH 5 CONCRETE STAI R REPAI R

1. 2. 10 Monol i t h 5 Suppl ement al Suppor t Fr ame

1. 2. 10. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng t he suppl ement al suppor t f r ame i n Monol i t h 5 as speci f i ed and as shown on t he dr awi ngs. Payment under t hi s i t em i ncl udes f ur ni shi ng and i nst al l i ng t he suppl ement al suppor t i ncl udi ng f abr i cat i on and i nst al l at i on of br acket s.

1. 2. 10. 2 Uni t of Measur e

Uni t of measur e: Job

1. 2. 10. 3 Payment I t em

0017 MONOLI TH 5 SUPPLEMENTAL SUPPORT FRAME

1. 2. 11 Li ght i ng Pol e Suppor t Pedest al s

1. 2. 11. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h const r uct i on of l i ght pol e suppor t s, i ncl udi ng demol i t i on wher e r equi r ed, const r uct i ng concr et e pedest al s, and f ur ni shi ng and i nst al l i ng embedded condui t s, j unct i on boxes, and anchor s as speci f i ed and as shown on t he dr awi ngs.

1. 2. 11. 2 Uni t of Measur e

1. 2. 11. 3 Payment I t ems

0023 LI GHTI NG POLE SUPPORT PEDESTALS, BASE CONTRACT

2011 LI GHTI NG POLE SUPPORT PEDESTALS, AWARDABLE OPTI ON 2

SECTI ON 01 22 00. 00 08 Page 6

1. 2. 12 Ser vi ce Br i dge El ect r i cal Wor k

1. 2. 12. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng t he el ect r i cal f eat ur es on t he Ser vi ce Br i dge as descr i bed i n Sect i on 26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL. Payment f or const r uct i ng t he pedest al bases i s i ncl uded I t ems LI GHTI NG POLE SUPPORT PEDESTALS. El ect r i cal wor k i n connect i on wi t h t he concr et e r epai r s i n t he Wor k Bay i n Monol i t h 5 ar e i ncl uded i n I t em REMOVE AND REI NSTALL UTI LI TI ES.

1. 2. 12. 2 Uni t of Measur e

1. 2. 12. 3 Payment I t em

3003 SERVI CE BRI DGE ELECTRI CAL WORK

1. 3 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 3. 1 Di gi t al Pr ogr ess I mages

1. 3. 1. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l cost s i n connect i on wi t h compl et i ng t hi s i t em of wor k as speci f i ed i n Sect i on 01 32 33 DI GI TAL

PROGRESS I MAGES.

1. 3. 1. 2 Measurement

Measur ement shal l be based on mont hl y set s of pr ogr ess phot ogr aphs t hat ar e appr oved and accept ed by t he Cont r act i ng Of f i cer ' s r epr esent at i ve.

1. 3. 1. 3 Uni t of Measur e

Uni t of measur e: Set s.

1. 3. 1. 4 Payment I t ems

0002 DI GI TAL PROGRESS I MAGES, BASE CONTRACT

1002 DI GI TAL PROGRESS I MAGES, AWARDABLE OPTI ON 1

2002 DI GI TAL PROGRESS I MAGES, AWARDABLE OPTI ON 2

3002 DI GI TAL PROGRESS I MAGES, AWARDABLE OPTI ON 3

1. 3. 2 Subst r at e Pr epar at i on

1. 3. 2. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , SECTI ON 01 22 00. 00 08 Page 7 equi pment , mat er i al , and suppl y cost s f or sur f ace pr epar at i on f or t he FRP syst em, and ot her i nci dent al s as shown on t he dr awi ngs and speci f i ed i n Sect i on 03 01 40. 13 REPAI R AND RETROFI T OF REI NFORCED CONCRETE BEAMS USI NG BONDED CFRP COMPOSI TES and Sect i on 03 01 40. 15 REPAI R AND RETROFI T OF

REI NFORCED CONCRETE SLAB USI NG BONDED GFRP COMPOSI TES.

1. 3. 2. 2 Measurement

The quant i t y of subst r at e pr epar at i on wi l l be measur ed f or payment t o t he near est squar e f oot , based on t he ar ea of t he appl i ed FRP syst em, as appr oved by t he Cont r act i ng Of f i cer ' s r epr esent at i ve.

1. 3. 2. 3 Uni t of Measur e

Uni t of measur e: Squar e Feet

1. 3. 2. 4 Payment I t ems

0011 MONOLI TH 5 SUBSTRATE PREPARATI ON FOR GFRP

0014 MONOLI TH 5 SUBSTRATE PREPARATI ON FOR CFRP

1. 3. 3 Subst r at e Repai r

1. 3. 3. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al , and suppl y cost s f or pr epar at i on and pl acement of subst r at e r epai r s t o i ncl ude r emoval of unsound concr et e, r epai r and c l eani ng of r ei nf or cement , appl i cat i on of cor r osi on i nhi bi t or , sawcut t i ng, r est or at i on of t he concr et e sect i on, and ot her i nc i dent al s as shown on t he dr awi ngs and speci f i ed i n Sect i on 03 01 40. 13 REPAI R AND RETROFI T OF REI NFORCED CONCRETE BEAMS USI NG BONDED CFRP COMPOSI TES and Sect i on

03 01 40. 15 REPAI R AND RETROFI T OF REI NFORCED CONCRETE SLAB USI NG BONDED

GFRP COMPOSI TES.

1. 3. 3. 2 Measurement

The quant i t y of subst r at e r epai r and pr epar at i on wi l l be measur ed f or payment t o t he near est cubi c f oot of ar ea r epai r ed, based on t he ar ea of di st r ess est abl i shed by v i sual means, soundi ng, and pr essur e washi ng as speci f i ed i n t hese speci f i cat i ons and as appr oved by t he Cont r act i ng Of f i cer ' s r epr esent at i ve.

1. 3. 3. 3 Uni t of Measur e

Uni t of measur e: Cubi c Feet

1. 3. 3. 4 Payment I t ems

0012 MONOLI TH 5 SUBSTRATE REPAI R FOR GFRP

0015 MONOLI TH 5 SUBSTRATE REPAI R FOR CFRP

1. 3. 4 Wet Lay- up FRP Syst em

1. 3. 4. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al , and suppl y cost s f or pl acement of t he FRP syst em t o i ncl ude pr i mer , put t y, sat ur ant , r esi n, f i ber f abr i c, and ot her i nc i dent al s

SECTI ON 01 22 00. 00 08 Page 8 as shown on t he dr awi ngs and speci f i ed i n Sect i on 03 01 40. 13 REPAI R AND RETROFI T OF REI NFORCED CONCRETE BEAMS USI NG BONDED CFRP COMPOSI TES and Sect i on 03 01 40. 15 REPAI R AND RETROFI T OF REI NFORCED CONCRETE SLAB USI NG

BONDED GFRP COMPOSI TES.

1. 3. 4. 2 Measurement

The quant i t y of wet l ay- up CFRP syst em wi l l be measur ed f or payment t o t he near est squar e f oot of each l ayer appl i ed, based on t he ar ea of act ual CFRP l ami nat e i nst al l ed.

1. 3. 4. 3 Uni t of Measur e

Uni t of measur e: Squar e Feet

1. 3. 4. 4 Payment I t ems

0013 MONOLI TH 5 WET LAY- UP GFRP SYSTEM

0016 MONOLI TH 5 WET LAY- UP CFRP SYSTEM

1. 3. 5 Concr et e Demol i t i on

1. 3. 5. 1 Payment

Payment wi l l be made f or al l wor k necessar y f or concr et e r emoval and di sposal as speci f i ed i n 02 41 00 DEMOLI TI ON and shown on t he pl ans.

Payment f or i t ems associ at ed wi t h di sassembl y, assembl y, and pr ot ect i on of t he doggi ng devi ces shal l be i ncl uded under t hese i t ems.

1. 3. 5. 2 Measurement

Concr et e Demol i t i on wi l l be measur ed f or payment by squar e f oot , cubi c f oot , or cubi c yar d, i n t he pr esence of t he Cont r act i ng Of f i cer ' s r epr esent at i ve, by f i el d measur ement s t o t he near est i nch. The payment wi l l be made at t he appl i cabl e cont r act uni t pr i ce per squar e f oot or cubi c f oot f or t he payment i t ems. Quant i t i es wi l l be comput ed t o t he near est whol e squar e f oot .

1. 3. 5. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Feet , Cubi c Yar d

1. 3. 5. 4 Payment I t ems

The f ol l owi ng i t ems ar e measur ed by Cubi c Feet :

0018 MONOLI TH 6 AND PI ER 7 CONCRETE DEMOLI TI ON

0020 PARAPET CONCRETE DEMOLI TI ON, BASE CONTRACT

0028 MI SCELLANEOUS CONCRETE DEMOLI TI ON, BASE CONTRACT

1006 PI ERS 8 AND 9 CONCRETE DEMOLI TI ON

2006 PI ER 10, MONOLI THS 11 AND 12 CONCRETE DEMOLI TI ON

2008 PARAPET CONCRETE DEMOLI TI ON, AWARDABLE OPTI ON 2

The f ol l owi ng i t ems ar e measur ed by Cubi c Yar d:

0024 CONCRETE BRI DGE DECK SLAB DEMOLI TI ON, SPAN 6 - 7

1008 CONCRETE BRI DGE DECK SLAB DEMOLI TI ON, SPANS 7 - 8 AND 8 - 9

2012 CONCRETE BRI DGE DECK SLAB DEMOLI TI ON, SPANS 9 - 10 AND 10 - 11

SECTI ON 01 22 00. 00 08 Page 9

1. 3. 6 Lat ex Modi f i ed Concr et e Deck Sl ab Over l ay

1. 3. 6. 1 Payment

Payment wi l l be made f or al l wor k necessar y f or concr et e pl acement as speci f i ed i n 03 01 00 REHABI LI TATI ON OF CONCRETE, and as shown on t he pl ans. Cont r act or shal l f ur ni sh al l necessar y mat er i al s t o compl et e t he work.

1. 3. 6. 2 Measurement

The Lat ex Modi f i ed Concr et e Deck Sl ab Over l ay wi l l be measur ed f or payment by t he cubi c f oot pl aced, i n t he pr esence of t he Cont r act i ng Of f i cer ' s r epr esent at i ve, by f i el d measur ement s t o t he near est i nch. The payment wi l l be made at t he appl i cabl e cont r act uni t pr i ce per cubi c f oot f or t he payment i t ems. Quant i t i es wi l l be comput ed t o t he near est cubi c f oot .

1. 3. 6. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Feet

1. 3. 6. 4 Payment I t ems

0019 MONOLI TH 6 AND PI ER 7 LATEX MODI FI ED CONCRETE DECK SLAB OVERLAY

1007 PI ER 8 AND 9 LATEX MODI FI ED CONCRETE DECK SLAB OVERLAY

2007 PI ER 10, MONOLI THS 11 AND 12 LATEX MODI FI ED CONCRETE DECK SLAB

OVERLAY

1. 3. 7 Concr et e Pl acement

1. 3. 7. 1 Payment

Payment wi l l be made f or al l wor k necessar y f or f ur ni shi ng and i nst al l i ng concr et e, i ncl udi ng r ei nf or cement as speci f i ed i n Sect i ons 03 01 00 REHABI LI TATI ON OF CONCRETE, 03 20 01. 00 10 CONCRETE REI NFORCEMENT, and 03 20 01. 00 10 CONCRETE REI NFORCEMENT, and as shown on t he pl ans.

1. 3. 7. 2 Measurement

Concr et e Pl acement wi l l be measur ed f or payment by t he cubi c f oot pl aced or squar e f oot pl aced, by t he di mensi ons l i s t ed on t he pr oj ect dr awi ngs. The payment wi l l be made at t he appl i cabl e cont r act uni t pr i ce per cubi c f oot or squar e f oot f or t he payment i t ems. Quant i t i es wi l l be comput ed t o t he near est cubi c f oot or squar e f oot . Wast ed concr et e wi l l not be measur ed f or payment . Payment f or Mi scel l aneous Concr et e Repai r Type 2 wi l l i nc l ude f ur ni shi ng and i nst al l i ng anchor age and r ei nf or c i ng st eel .

1. 3. 7. 3 Uni t of Measur e

Uni t of Measur e: Cubi c Feet , Cubi c Yar d

1. 3. 7. 4 Payment I t ems

The f ol l owi ng i t ems ar e measur ed by Cubi c Feet :

0021 PARAPET CONCRETE REPAI R, BASE CONTRACT

0029 MI SCELLANEOUS CONCRETE REPAI R, BASE CONTRACT

2009 PARAPET CONCRETE REPAI R, AWARDABLE OPTI ON 2

SECTI ON 01 22 00. 00 08 Page 10

The f ol l owi ng i t ems ar e measur ed by Cubi c Yar d:

0025 CONCRETE BRI DGE DECK SLAB CONCRETE, SPAN 6- 7

1009 CONCRETE BRI DGE DECK SLAB CONCRETE, SPANS 7- 8 AND 8- 9

2013 CONCRETE BRI DGE DECK SLAB CONCRETE, SPANS 9- 10 AND 10- 11

1. 3. 8 Rei nf or c i ng St eel

1. 3. 8. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, t r anspor t i ng, del i ver i ng, and pl aci ng def or med st eel bar s f or concr et e r ei nf or cement , whi ch i ncl udes st eel i n l aps as i ndi cat ed or as r equi r ed. No payment wi l l be made f or t he addi t i onal st eel i n l aps whi ch ar e aut hor i zed f or t he conveni ence of t he Cont r act or . Payment f or r ei nf or c i ng st eel i n Concr et e Repai r Type 2 wi l l be i ncl uded i n t he cont r act uni t pr i ce f or MI SCELLANEOUS

CONCRETE REPAI R.

1. 3. 8. 2 Measurement

Measur ement of r ei nf or c i ng st eel wi l l be based on t he act ual wei ght of mat er i al s as shown on t he appr oved shop dr awi ngs and as appr oved by t he Cont r act i ng Of f i cer ' s r epr esent at i ve. The measur ed l engt hs wi l l be conver t ed t o wei ght s f or t he s i ze of bar s l i s t ed by t he use of t he nomi nal wei ght s per l i near f oot speci f i ed i n ASTM A615/ A615M. St eel i n l aps i ndi cat ed on t he dr awi ngs or r equi r ed by t he Cont r act i ng Of f i cer ' s r epr esent at i ve wi l l be pai d f or at t he cont r act uni t pr i ce. No payment wi l l be made f or t he addi t i onal s t eel i n l aps whi ch ar e aut hor i zed f or t he conveni ence of t he Cont r act or .

1. 3. 8. 3 Uni t of Measur e

Uni t of Measur e: Pounds.

1. 3. 8. 4 Payment I t ems

0022 PARAPET REI NFORCI NG STEEL, BASE CONTRACT

0026 CONCRETE BRI DGE DECK SLAB, SPAN 6 - 7, REI NFORCI NG STEEL

1010 CONCRETE BRI DGE DECK SLAB, SPANS 7 - 8 AND 8 - 9, REI NFORCI NG

STEEL

2010 PARAPET REI NFORCI NG STEEL, AWARDABLE OPTI ON 2

2014 CONCRETE BRI DGE DECK SLAB, SPANS 9 - 10 AND 10 - 11, REI NFORCI NG

STEEL

1. 3. 9 Seal Deck Joi nt s

1. 3. 9. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h c l eani ng out and r eseal i ng t he monol i t h j oi nt s at Monol i t h 5 and Monol i t h 6. The pr i ce shal l i ncl ude t he cost of al l l abor , mat er i al s, and t he use of al l equi pment and t ool s r equi r ed t o r emove veget at i on, exi st i ng j oi nt mat er i al and ot her debr i s, c l ean t he j oi nt s, and r eseal t he j oi nt s as shown on t he dr awi ngs and as specified.

1. 3. 9. 2 Measurement

The quant i t y of t o be pai d f or shal l be det er mi ned by act ual measur ement of t he number of l i near f eet of i n- pl ace mat er i al t hat has been accept ed by

SECTI ON 01 22 00. 00 08 Page 11 t he Cont r act i ng Of f i cer ' s r epr esent at i ve.

1. 3. 9. 3 Uni t of Measur e

Uni t of Measur e: Li near Feet

1. 3. 9. 4 Payment I t ems

0027 SEAL DECK JOI NTS, BASE CONTRACT

2015 SEAL DECK JOI NTS, AWARDABLE OPTI ON 2

3004 SEAL DECK JOI NTS, AWARDABLE OPTI ON 3

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

The Cont r act or must f ur ni sh wi t hi n 30 cal endar days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer ' s r epr esent at i ve as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .

- - End of Sect i on - -

SECTI ON 01 22 00. 00 08 Page 12

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 30 00. 00 08

ADMI NI STRATI VE REQUI REMENTS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 REFERENCES

1. 3 ACRONYMS

1. 4 CONTRACT ADMI NI STRATI ON

1. 5 USACE ACQUI SI TI ON I NSTRUCTI ONS ( UAI )

1. 5. 1 UAI 5122. 1302- 100 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY

CORPS OF ENGI NEERS CONTRACTS

1. 6 SUPERVI SI ON

1. 6. 1 Mi ni mum Communi cat i on Requi r ement s

1. 6. 2 Super i nt endent Qual i f i cat i ons

1. 6. 2. 1 Dut i es

1. 6. 3 Non- Compl i ance Act i ons

1. 7 PRECONSTRUCTI ON CONFERENCE

1. 8 PARTNERI NG

1. 8. 1 I nf or mal Par t ner i ng

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 30 00. 00 08 Page 1

SECTI ON 01 30 00. 00 08

ADMI NI STRATI VE REQUI REMENTS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i ons cont ai ns cont r act admi ni st r at i ve r equi r ement s whi ch ar e not cover ed i n Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT or Sect i on 00 73 00

SUPPLEMENTARY CONDI TI ONS.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

1. 3 ACRONYMS

DFARS - Def ense Feder al Acqui s i t i on Regul at i ons Suppl ement EP - Engi neer Pamphl et FAR - Feder al Acqui s i t i on Regul at i ons SAT - Si mpl i f i ed Acqui s i t i on Thr eshol d UAI - USACE Acqui s i t i on I nst r uct i ons

1. 4 CONTRACT ADMI NI STRATI ON

An Admi ni st r at i ve Cont r act i ng Of f i cer ( ACO) wi l l be desi gnat ed on t hi s cont r act t o act wi t hi n t he l i mi t s del egat ed by t he Cont r act i ng Of f i cer .

The ACO desi gnat i on l et t er wi l l c l ear l y det ai l what t he aut hor i t i es of t he

ACO.

1. 5 USACE ACQUI SI TI ON I NSTRUCTI ONS ( UAI )

1. 5. 1 UAI 5122. 1302- 100 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS

OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause

52. 222- 37, DFARS 222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each efforts:

U. S. Depar t ment of Labor Vet er ans' Empl oyment and Tr ai ni ng Ser vi ce

SECTI ON 01 30 00. 00 08 Page 2

(VETS): http://www.dol.gov/vets /

Feder al vet er an empl oyment i nf or mat i on: www.fedshirevets.gov/

Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am: http://benefits.va.gov/vow/

U. S. Ar my War r i or Tr ansi t i on Command Empl oyment I ndex:

https://wct.army.mil/modules/employers/index.html

Hi r i ng Our Her oes i ni t i at i ve:

www.uschamberfoundation.org/hiring-our-heroes

1. 6 SUPERVISION

1. 6. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on skills.

1. 6. 2 Super i nt endent Qual i f i cat i ons

The pr oj ect super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

1. 6. 2. 1 Duties

The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect .

The super i nt endent i s r equi r ed t o at t end par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.

1. 6. 3 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o i nsur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .

1. 7 PRECONSTRUCTION CONFERENCE

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he

SECTI ON 01 30 00. 00 08 Page 3 si t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, c l ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so attend.

1. 8 PARTNERING

To most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment r equi r es t he f or mat i on of a cohesi ve par t ner shi p wi t hi n t he Pr oj ect Team whose member s ar e f r om t he Gover nment , t he Cont r act or and t hei r Subcont r act or s. Key per sonnel f r om t he Suppor t ed Command, t he End User ( who wi l l occupy t he f aci l i t y) , t he Gover nment Desi gn and Const r uct i on t eam and Subj ect Mat t er Exper t s, t he I nst al l at i on, t he Cont r act or and Subcont r act or s, and t he Desi gner of Recor d wi l l be i nvi t ed t o par t i c i pat e i n t he Par t ner i ng pr ocess. The Par t ner shi p wi l l dr aw on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a pr oj ect t hat i s wi t hout any saf et y mi shaps, conf or ms t o t he Cont r act , and st ays wi t hi n budget and on schedul e.

The Cont r act i ng Of f i cer wi l l pr ovi de I nf or mat i on on t he Par t ner i ng Pr ocess and a l i s t of key and opt i onal per sonnel who shoul d at t end t he Par t ner i ng meeting.

1. 8. 1 I nf or mal Par t ner i ng

The Cont r act i ng Of f i cer wi l l or gani ze t he Par t ner i ng Sessi ons wi t h key per sonnel of t he pr oj ect t eam, i ncl udi ng Cont r act or per sonnel and Gover nment per sonnel .

The I ni t i al Par t ner i ng sessi on shoul d be a par t of t he Pr e- Const r uct i on Meet i ng. Par t ner i ng sessi ons wi l l be hel d at a l ocat i on agr eed t o by t he Cont r act i ng Of f i cer and t he Cont r act or ( t ypi cal l y a conf er ence r oom pr ovi ded by t he Resi dent Engi neer of f i ce or t he Cont r act or ) . The I ni t i al I nf or mal Par t ner i ng Sessi on wi l l be conduct ed and f aci l i t at ed usi ng el ect r oni c medi a ( a v i deo and accompanyi ng f or ms) pr ovi ded by t he Cont r act i ng Of f i cer . The Par t ner s wi l l det er mi ne t he f r equency of t he f ol l ow- on sessi ons, at no mor e t han t hr ee t o s i x mont h i nt er val s.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTI ON

NOT USED

- - End of Sect i on - -

SECTI ON 01 30 00. 00 08 Page 4

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 32 01. 00 08

PROJECT SCHEDULE NETWORK ANALYSI S

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

PART 2 PRODUCTS

2. 1 SOFTWARE

2. 1. 1 Gover nment Def aul t Sof t war e

2. 1. 2 Cont r act or Sof t war e

2. 1. 2. 1 Pr i maver a

2. 1. 2. 2 Ot her Than Pr i maver a

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

3. 2 BASI S FOR PAYMENT AND COST LOADI NG

3. 2. 1 Act i v i t y Cost Loadi ng

3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on

3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS

3. 3. 1 Level of Det ai l Requi r ed

3. 3. 2 Act i v i t y Dur at i ons

3. 3. 3 Pr ocur ement Act i v i t i es

3. 3. 4 Mandat or y Tasks

3. 3. 5 Gover nment Act i v i t i es

3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y

3. 3. 6. 1 Wor ker s Per Day ( WRKP)

3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)

3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)

3. 3. 6. 4 Modi f i cat i on Number ( MODF)

3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )

3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)

3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)

3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)

3. 3. 7 Cont r act Mi l est ones and Const r ai nt s

3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt

3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt

3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s

3. 3. 7. 3. 1 St ar t Phase

3. 3. 7. 3. 2 End Phase

3. 3. 8 Cal endar s

3. 3. 9 Open Ended Logi c

3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed

3. 3. 11 Out - of - Sequence Pr ogr ess

3. 3. 12 Added and Del et ed Act i v i t i es

SECTI ON 01 32 01. 00 08 Page 1

3. 3. 13 Or i gi nal Dur at i ons

3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps

3. 3. 15 Ret ai ned Logi c

3. 3. 16 Per cent Compl et e

3. 3. 17 Remai ni ng Dur at i on

3. 3. 18 Cost Loadi ng of Cl oseout Act i v i t i es

3. 3. 18. 1 As- Bui l t Dr awi ngs

3. 3. 18. 2 O & M Manual s

3. 3. 19 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y

3. 4 PROJECT SCHEDULE SUBMI SSI ONS

3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on

3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on

3. 4. 3 Per i odi c Schedul e Updat es

3. 5 SUBMI SSI ON REQUI REMENTS

3. 5. 1 Dat a CD/ DVDs

3. 5. 2 Nar r at i ve Repor t

3. 5. 3 Schedul e Repor t s

3. 5. 3. 1 Act i v i t y Repor t

3. 5. 3. 2 Logi c Repor t

3. 5. 3. 3 Tot al Fl oat Repor t

3. 5. 3. 4 Ear ni ngs Repor t by CLI N

3. 5. 3. 5 Schedul e Log

3. 5. 4 Net wor k Di agr am

3. 5. 4. 1 Cont i nuous Fl ow

3. 5. 4. 2 Pr oj ect Mi l est one Dat es

3. 5. 4. 3 Cr i t i cal Pat h

3. 5. 4. 4 Bandi ng

3. 5. 4. 5 Cash Fl ow / Schedul e Var i ance Cont r ol ( SVC) Di agr am

3. 6 PERI ODI C SCHEDULE UPDATE

3. 6. 1 Per i odi c Schedul e Updat e Meet i ngs

3. 6. 2 Updat e Submi ssi on Fol l owi ng Pr ogr ess Meet i ng

3. 7 WEEKLY PROGRESS MEETI NGS

3. 8 REQUESTS FOR TI ME EXTENSI ONS

3. 8. 1 Just i f i cat i on of Del ay

3. 8. 2 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)

3. 8. 3 For ensi c Schedul e Anal ysi s ( Ret r ospect i ve Anal ysi s)

3. 8. 4 Fr agment ar y Net wor k ( Fr agnet )

3. 8. 5 Ti me Ext ensi on

3. 8. 6 I mpact t o Ear l y Compl et i on Schedul e

3. 9 FAI LURE TO ACHI EVE PROGRESS

3. 9. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess

3. 9. 2 Fai l ur e t o Per f or m

3. 9. 3 Recover y Schedul e

3. 10 OWNERSHI P OF FLOAT

3. 11 TRANSFER OF SCHEDULE DATA I NTO RMS/ QCS

3. 12 PRI MAVERA P6 MANDATORY REQUI REMENTS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 32 01. 00 08 Page 2

SECTI ON 01 32 01. 00 08

PROJECT SCHEDULE NETWORK ANALYSI S

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AACE I NTERNATI ONAL ( AACE)

AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s

AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 1- 1- 11 ( 1995) Admi ni st r at i on - - Pr ogr ess, Schedul es, and Net wor k Anal ysi s Syst ems

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr oj ect Schedul er Qual i f i cat i ons; G, RO

Pr el i mi nar y Pr oj ect Schedul e; G, RO

Initial Pr oj ect Schedul e; G, RO

Per i odi c Schedul e Updat e; G, RO

1. 3 PROJECT SCHEDULER QUALI FI CATI ONS

Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nc i pl es and appl i cat i on.

SECTI ON 01 32 01. 00 08 Page 3

PART 2 PRODUCTS

2. 1 SOFTWARE

The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s specification.

2. 1. 1 Gover nment Def aul t Sof t war e

The Gover nment i nt ends t o use Pr i maver a P6.

2. 1. 2 Cont r act or Sof t war e

Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .

2. 1. 2. 1 Primavera

I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em.

2. 1. 2. 2 Ot her Than Pr i maver a

I f t he cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s wi l l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes wi l l be r et ur ned at pr oj ect completion.

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT, FAR 52. 236- 15 SCHEDULES FOR CONSTRUCTI ON CONTRACTS. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed.

The schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or .

Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e.

Pr ovi de a schedul e t…