G-0010
ISSUE DATE:
of Engineers
US Army Corps
AND APPROVAL OF ALL DRAWINGS LISTED ON THE INDEX SHEET.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
SUBMITTED BY:
SECTION CHIEF
APPROVAL RECOMMENDED BY:
BRANCH CHIEF
APPROVED BY:
CONSTRUCTION DIVISION
CHIEF, ENGINEERING AND
DATE
DATE
DATE
THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF
DESIGNATIONS OF U.S. ARMY CORPS OF ENGINEERS INDIVIDUALS
THIS SHEET. THE INITIALS OR SIGNATURES AND REGISTRATION
U.S. ARMY CORPS OF ENGINEERS AND THE A/E FIRMS IDENTIFIED ON
THIS PROJECT WAS DESIGNED BY THE PITTSBURGH DISTRICT OF THE
Pittsburgh District
C O
V E
R S
H E
E T
LOCATION
PROJECT
NTS
PROJECT VICINITY MAP
NTS
PROJECT LOCATION MAP
W911WN-17-X-XXXX
W911WN-17-B-8007
B
B A
K E
R
CONTRACT NO:
SOLICITATION NO:
J F
A R
M E
R
S
M
IS
S E
N D
A
LOCATION
PROJECT
CERTIFIED FINAL DOCUMENTS
JULY 2017
/s J E
S S
IC
A C F
A R
M E
R P .E
J
U L
Y
/s/ JESSICA C. FARMER, P.E. 14 JULY 2017
/s/ BETH L. SCHNELLER, P.E. 14 JULY 2017
/s/ JEANINE M. HOEY, P.E. 14 JULY 2017
BLAIRSVILLE, INDIANA COUNTY PA
CULVERT REPAIR PROJECT
PERMANENT EMBANKMENT AND
CONEMAUGH RIVER LAKE
ALLEGHENY RIVER BASIN
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
G -0
.d g n
-A
U G -2
:4
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8 www.pa1call.org
PENNSYLVANIA ONE CALL SYSTEM, INC.
1-800-242-1776 or 8-1-1
CALL 3 BUSINESS DAYS BEFORE YOU DIG!
POCS Serial NO.:
Date:
LEGEND:
ZONE A - 100 YEAR FLOOD PLAIN BOUNDARY
(ABD)
EDGE OF WATER SURFACE
FENCE LINE
EXISTING OVERHEAD ELECTRIC LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING STORM SEWER LINE
EXISTING NATURAL GAS LINE
EXISTING WATER LINE
PIPING ABANDONED IN-PLACE
(FORCE)
EXISTING SANITARY SEWER FORCE MAIN
EXISTING SANITARY SEWER GRAVITY LINE
S
G
CO
SANITARY SEWER MANHOLE
STORM INLET
GAS METER
SANITARY SEWER CLEAN-OUT
UTILITY POLE
UTILITY POLE GUY WIRE
VALVE
BORING LOCATIONS/NUMBER
CONTRACTOR WORK LIMITS
LIMITS OF DISTURBANCE
PROPERTY LINE
LEGAL RIGHT-OF-WAY LINE
NEW STORM SEWER LINE
ST NEW 5' DIAMETER STORM SEWER MANHOLE
990 MAJOR CONTOUR (PROPOSED)
MAJOR CONTOUR (EXISTING)
GEOTEXTILEGT
UNLESS NOTEDUN
CENTRIFUGALLY CAST CONCRETE PIPECCCP
DIAMETERD
PUMPED WATER FILTER BAGPWFB
ROCK CONSTRUCTION ENTRANCERCE
BEST MANAGEMENT PRACTICEBMP
COMPOST FILTER SOCKCFS
WITHW/
HIGHWAY AND TRANSPORTATION OFFICIALS
AMERICAN ASSOCIATION OF STATE AASHTO
IDENTIFICATION ID
HIGH DENSITY POLYETHYLENEHDPE
POLYVINYL CHLORIDEPVC
CORRUGATED METAL PIPECMP
ROOMRM
GENERATORGEN
MANHOLEMH
INVERTINV
TOP GRATETG
APPROXIMATEAPPROX
ABANDONEDABD
HOUSEHSE
CONTROLCTR
CENTERLINEC
EQUALEQ
EACHEA
CONTRACTOR WORK LIMITSCWL
CUBIC YARDCY
CONCRETECONC
CENTER TO CENTERC/C
TYPICALTYP
MINIMUMMIN
MAXIMUMMAX
REQUIREDREQ'D
DRAWING(S)DWGS(S)
TOP OFT/
ELEVATIONEL
STATIONSTA
NOT TO SCALENTS
U.S. ARMY CORPS OF ENGINEERSUSACE
ABBREVIATIONS:
TB-2
TREE
AND NEW STORM SEWER RIPRAP APRON
SULPHUR RUN BANK STABILIZATION AREA
AREA OF RIPRAP EMBANKMENT PROTECTION
EMBANKMENT CREST FILL AREAEMBANKMENT CREST FILL AREA
EXISTING VEGETATION LINE
S
M
IS
S E
N D
A
DRAWINGSREFERENCE
NAMEFILE TITLEDRAWING
PLATE_01-B
PLATE_02-A CONDITIONS EMBANKMENT PROPOSED &EXISTING
PLATE_03-B
VIEW PLANBERM
STABILIZATION TEMPORARY OF FOOTPRINT AND PLAN CONTROL SEDIMENT ANDEROSION
PLATE_04-A
ABBREVIATIONS AND NOTESMAINTENANCE
AND INSTALLATION PRACTICE MANAGEMENT BEST PLAN CONTROL SEDIMENTATION &EROSION
1FIG 1952-1963 HYDROGRAPHS STAGEPOOL
2FIG 1964-1975 HYDROGRAPHS STAGEPOOL
3FIG 1976-1987 HYDROGRAPHS STAGEPOOL
4FIG 1988-1999 HYDROGRAPHS STAGEPOOL
5FIG 2000-2011 HYDROGRAPHS STAGEPOOL
6FIG 2012-2016 HYDROGRAPHS STAGEPOOL
7FIG CONSTRUCTION BERM STABILIZATION TEMPORARY - DETAILSMISCELLANEOUS
R
A W
IN
G I
N D
E X
S
M
IS
S E
N D
A
B
B A
K
N T
R A
C T A
N D R
E F
E R
E N
C E
J F
A R
M E
R
/s J E
S S
IC
A C F
A R
M E
R P .E
J
U L
Y
EXISTING CONDITIONS, SLOPE AREA FAILURE PLAN VIEW
G-0011-B
-1
-2
R E
V
IS
E D A
M E
N D
M E
N
J
F
R E
V
IS
E D A
M E
N D
M E
N
F -2
-2
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
G -0
-B .d g n
-A
U G -2
:4
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
DRAWINGSCONTRACT
NAMEFILE
NO.
ID
SHEET
TITLEDRAWING
GENERAL
AO38ab_100_G-0010 G-0010 SHEETCOVER
INDEX DRAWING REFERENCE ANDCONTRACT
VIEW PLAN CONDITIONSEXISTING
AO38ab_100_G-1013 G-0013 PLAN LIMITS WORKCONTRACTOR
SURVEY
AO38ab_204_V-1001 V-1001 PLAN CONTROLSURVEY
CIVIL
SEQUENCECONSTRUCTION
PLAN LAYOUTPROPOSED
SECTION AND PLAN LINING AND REPLACEMENTCULVERT
CONTROL SEDIMENTATION ANDEROSION
PLAN CONTROL SEDIMENT ANDEROSION
AO38ab_886_X-5002 X-5002 DETAILS PRACTICE MANAGEMENT BEST PLAN CONTROL SEDIMENT ANDEROSION
AO38ab_886_X-5003 X-5003 DETAILS PRACTICE MANAGEMENT BEST PLAN CONTROL SEDIMENT ANDEROSION
AO38ab_886_X-5004 X-5004 DETAILS PRACTICE MANAGEMENT BEST PLAN CONTROL SEDIMENT ANDEROSION
AO38ab_886_X-5005 X-5005 DETAILS PRACTICE MANAGEMENT BEST PLAN CONTROL SEDIMENT ANDEROSION
AO38ab_886_X-0006 X-0006 ABBREVIATIONS AND NOTES MAINTENANCE AND INSTALLATION PRACTICE MANAGEMENT BEST PLAN CONTROL SEDIMENT ANDEROSION
EMBANKMENT REPAIR SECTIONS
C-5021AO38ab_204_C-5021
SULPHUR RUN BANK STABILIZATION DETAILS
CHAIN LINK SECURITY FENCE TYPE FE-5 DETAILS
EXISTING CONDITIONS CULVERT SECTIONS
CULVERT REPAIR DETAILS - SHEET 1 OF 3
CULVERT REPAIR DETAILS - SHEET 2 OF 3
HEADWALL DETAILS - SHEET 1 OF 2
HEADWALL DETAILS - SHEET 2 OF 2
CULVERT REPAIR DETAILS - SHEET 3 OF 3
AO38ab_100_G-0011-B G-0011-B
AO38ab_204_C-0010-B C-0010-B
AO38ab_204_C-4012-B C-4012-B
AO38ab_204_C-5014-B C-5014-B
C-5016-BAO38ab_204_C-5016-B
AO38ab_204_C-3017-B C-3017-B
AO38ab_204_C-5018-B C-5018-B
AO38ab_204_C-1011-A C-1011-A
2 AO38ab_204_C-5013-A C-5013-A
AO38ab_204_C-5020-A
2 AO38ab_100_G-1012-A G-1012-A
C-5020-A
2 AO38ab_204_C-5019-A C-5019-A
AO38ab_886_X-1001-A X-1001-A
AO38ab_204_C-5015-B C-5015-B
G
C U
LVER
T (S
U
LP
H U R R
U N
ACCESS ROAD
TEMPORARY
EXISTING
AASHTO NO. 1 STONE
S
S
S
S
S
10+0
S
SEE NOTE 11
SEE NOTE 10
SEE NOTE 12
TREE
DEAD
SEE NOTE 13
S
S
G
CO
ZONE A - 100 YEAR FLOOD PLAIN BOUNDARY
(ABD)
MAJOR CONTOUR (EXISTING) - SEE NOTE 2
EDGE OF WATER SURFACE
FENCE LINE
EXISTING OVERHEAD ELECTRIC LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING STORM SEWER LINE
EXISTING NATURAL GAS LINE
EXISTING WATER LINE
PIPING ABANDONED IN-PLACE
SANITARY SEWER MANHOLE
STORM INLET
GAS METER
SANITARY SEWER CLEAN-OUT
UTILITY POLE
UTILITY POLE GUY WIRE
VALVE
(FORCE)
EXISTING SANITARY SEWER FORCE MAIN
EXISTING SANITARY SEWER GRAVITY LINE
S
S
CO
S
S
ZONE A - 100 YEAR
FLOODPLAIN BOUNDARY
SEE NOTE 1
SCALE: 1" - 20'
PLAN - EXISTING CONDITIONS
SEE NOTE 5
SEE NOTE 2
(APPROX 20' x 40')
STEEL PLATE
S U L P
H U
R R
U N
F L O
W
(APPROX)
STREAM BANK
TOP OF EXISTING
ENTRANCE
CONSTRUCTION
EXISTING ROCK
CULVERT
BRICK ARCH
POST
FENCE
(APPROX 12" DIA)
PIPE IN HEADWALL
EXISTING STEEL
LAYDOWN AREA
CONTRACTOR
EXISTING
APRON
CONCRETE
SEE NOTE 8
SEE NOTE 9
SEE NOTE 6
HEADWALL
CONCRETE
EXISTING
TB-1
TB-2
TB-3
TO BE FIELD VERIFIED
OUTFALL APPROX LOCATION
TO REMAIN
BORING LOCATIONS/NUMBER
EXISTING VEGETATION LINE
TB-2
NOTES:
PLACING R4.
DEAD TREE TO BE REMOVED DURNING EXCAVATION OF SLOPES PRIOR TO 13.
EXISTING TREE SHALL BE REMOVED PRIOR TO ANY CONSTRUCTION.12.
INLETS, TIRES ETC.) THAT SHALL BE REMOVED AND DISPOSED OF.
DOWNSTREAM CHANNEL AND SIDE SLOPES CONTAIN LARGE DEBRIS (ROCK, SEWER11.
COVERED WITH SILTY SAND. SEE NOTE 8.
AREA HAS BEEN SUBJECT TO DEPOSITION OF FINES FROM HILLSIDE. AGGREGATE IS10.
AT THE CONCLUSION OF THE CONTRACT.
NORTH SPRING STREET. SANDBAGS SHALL BE REMOVED AND STORED FOR REUSE
DISPOSED. STORM WATER RUNOFF IS CONTROLLED BY SANDBAG DIKES ALONG
EXPOSED SLOPE COVERED BY GEOTEXTILE. GEOTEXTILE TO BE REMOVED AND 9.
LOCATED DOWNHILL AS SHOWN AND SHALL BE REMOVED PRIOR TO CONSTRUCTION.
CURB HAS BEEN REMOVED IN THIS AREA DUE TO UTILITY WORK. A DEAD TREE IS
SURFACE EROSION OBSERVED IN THIS AREA DUE TO CHANNELING OF RUNOFF.8.
SPECIFICATIONS.
VIDEO CONDUIT INSPECTIONS ARE PROVIDED IN THE ATTACHMENTS TO
PRECIPITATION, LAKE LEVELS AT CONEMAUGH DAM, EXISTING UTILITIES, AND
INFORMATION PERTAINING TO GEOTECHNICAL CONDITIONS, HISTORICAL 7.
INTO NEW ARCH CULVERT.
AND IS APPROXIMATELY 3'x4'x4'. CONTRACTOR SHALL INCORPORATE MANHOLE
SANITARY MANHOLE 101 IS LOCATED INSIDE THE EXISTING STRUCTURAL PLATE6.
ATTACHMENTS TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
APPROXIMATELY 7 FEET DOWNSTREAM OF THE STONE/BRICK TRANSITION. SEE
A PLASTIC PIPE IS ENTERING THE CROWN OF THE STONE ARCH CULVERT5.
SECTION 01 18 00.
ALL UTILITIES SHALL BE CONFIRMED IN ACCORDANCE WITH SPECIFICATION
EXISTING UTILITIES LOCATIONS PROVIDED BY THE BOROUGH OF BLAIRSVILLE.4.
INTERVALS.
AND LABELED WITH THE ELEVATION; MINOR CONTOURS ARE SHOWN AT 2-FOOT
MAJOR CONTOURS ARE SHOWN ON THIS DRAWING AT INTERVALS OF 10 FEET3.
ADDITIONAL INFORMATION.
BLOCKS TO BRIDGE THE CULVERT. SEE REFERENCE DRAWING (FIGURE 7) FOR
THE EXISTING CULVERT. A SERIES OF WELDED PLATES WERE ANCHORED TO THE
2'X2'6' JUMBO BLOCKS KEYED TOGETHER TO FORM SUPPORT OUTSIDE OF
SUPPORT BLOCKS FOR TEMPORARY STABILIZATION MEASURES CONSIST OF2.
REPAIR.
SEE REFERENCE DRAWING (PLATE 2A) FOR SCHEMATIC CROSS-SECTION OF
(PA DOT R-4) PLACED AS SHOWN AT THE TOE OF THE FAILURE SURFACE.
TEMPORARY STABILIZATION PERFORMED IN SPRING 2017 ROCK BUTTRESS 1.
INV OUT: 971.68
INV IN: 972.05
INV IN: 972.05
RIM: 981.70
MH-3
INV OUT: 972.48
INV IN: 972.63
INV IN: 974.19
RIM: 983.29
MH-4
INV OUT: 973.13
INV IN: 973.24
RIM: 982.88
MH-5
INV OUT: 968.33
INV IN: 968.42
RIM: 977.02
MH-2
BY-PASS
" P
LASTIC
" C
MP
12" (ABD)
(A B
D )(A
B D ) 3
" P
L A
S T
IC
INLET
INV OUT: 978.31
INV IN: 978.31
TG: 981.91
INLET
INV: 978.01
TG: 981.61
INLET
18" TILE
" C
M P
" P
L A
S T
IC
" P
V C
6" P
VC
3/4" WL AND 2" GL
(A B
D
ANTENNA TOWER
(F O
R C E
RIM: 947.81
MH-102
RIM: 947.8
MH-10121
" P
VC
INV: 947.18
INV OUT: 947.71
RIM: 957.37
MH
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
GENERATOR
RM
GEN
HSE
CTRL
STATION
PUMP
CONC WALL
SHED
N
CENTER STREET
N O
R T
H S
P R
IN
G S
T R
E E
T
DRIVEWAY (ASPHALT)
P E N
N S
T R E E T
SHEET ID
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
40'
X
IS
T
IN
G C
O N
D
IT
IO
N S
P L
A N V
IE
W
G-1012-A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
20'
SCALE: 1"=20'
S
IZ
E
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F
IL
E N
A M
E
P L
O T D
A T
E
A O a b
G -1
-A .d g n
-A
U G -2
:4
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
CERTIFIED FINAL DOCUMENTS
B
B A
K E
R
S
M
IS
S E
N D
A
J F
A R
M E
R
/s J E
S S
IC
A C F
A R
M E
R P .E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
C O
N T
R A
C T N
O
IS
S
U E D
A T
E
W
W N -1
-B -8
J
U L
Y
R E
V
IS
E D A
M E
N D
M E
N
F
D A
T
-2
-2 of Engineers
US Army Corps
10987654
20.00004:1H4TSDRST
A
B
C
D
E
F
G
ACCESS ROAD
TEMPORARY
EXISTING
STONE
AASHTO NO. 1
SANDBAGS
APPROXIMATE AREA OF EROSION
PROTECTION
AREA OF RIPRAP EMBANKMENT
EXISTING TREE (SINGLE)
RIM: 964.39
MH
CONTRACTOR WORK LIMITS
POINT NO. NORTHING EASTING
405135.89
405134.53
1546156.78405063.05
405020.65 1546133.31
1546143.49404935.70
404923.30 1546128.73
1546117.67404882.18
404861.26 1546125.18
404853.53 1546167.93
1546197.61404845.56
404844.58 1546214.52
1546237.98404852.73
404871.89 1546258.07
1546314.60404936.97
404942.61 1546318.64
404979.44 1546384.64
1546408.24404980.90
405041.46 1546404.51
1546423.96405051.89
405089.05 1546472.30
1546465.67405098.03
405077.79 1546438.39
1546403.55405057.0228
1 1546398.68
1546376.70
18 404945.29 1546364.36
404932.54 1546365.01
404933.67 1546386.98
404839.46 1546164.04
404831.27 1546193.66
C U
LVER
T (S
U
LP
H U R R
U N
EX. STEEL PLATE
10+0
CULVERT
STONE ARCH
S U L P
H U
R R
U N
F L O
W
CONTRACTOR WORK LIMITS
(APPROX)
STREAM BANK
TOP OF EXISTING
ZONE A - 100 YEAR FLOOD PLAIN BOUNDARY
ZONE A - 100 YEAR
FLOODPLAIN BOUNDERY
LIMITS OF DISTURBANCE
ENTRANCE
CONSTRUCTION
EXISTING ROCK
CULVERT
BRICK ARCH
SCALE: 1" - 20'
PLAN - CONTRACTOR WORK LIMITS
SEE NOTE 1
PROPERTY LINE
LEGAL RIGHT-OF-WAY LINE
21 22
REPRESENT EXISTING FEATURES.
ITEMS CALLED OUT IN ITALICS AND/OR DISPLAYED IN GRAYSCALE2.
WITHIN THE EXISTING CULVERT.
SPRING STREET SHALL BE CONSTRAINED TO UNDERGROUND
WORK UPSTREAM OF THE LEGAL RIGHT-OF-WAY LINE FOR NORTH1.
NOTES:DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
GENERATOR
RM
GEN
HSE
CTRL
STATION
PUMP
CONC WALL
SHED
N
CENTER STREET
N O
R T
H S
P R
IN
G S
T R
E E
T
DRIVEWAY (ASPHALT)
L E
G A
L R
IG
H T -O
F -W
A Y
L E
G A
L R
IG
H T -O
F -W
A Y
L E
G A
L R
IG
H T -O
F -W
A Y
Z=1000.00
X=1546196.75
Y=404832.08
SHEET ID
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
20' 40'
SCALE: 1"=20'
G-1013
N T
R A
C T
O R W
O R
K L
IM
IT
S
P L
A N
S
IZ
E
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
CERTIFIED FINAL DOCUMENTS
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S U
B M
IT
T E
D B
Y
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
F
IL
E N
A M
E
P L
O T D
A T
E
A O a b
G -1
.d g n
-A
U G -2
:4
W
W N -1
-B -8
B
C R
A T
Y
R U
S N
K
M A
R T
IN
/s J
A M
E S T S
H
IB
A T
A P .E
J
U L
Y
T
1098765
20.00004:1
A
H4TSDRST
B
C
D
E
F
G
HSE
CTRL
POST
FENCE
MH-NSP-100
GEN RM
STA 0+81.80
TOWER
ANTENNA
(DESTROYED)
STA 1+69.12
N
PLAN - SURVEY CONTROL
SCALE: 1" = 40'
CENTER STREET
G A
T E
STATION
PUMP
D R
IV
E
C O
N C
DRIVEWAY
ASPHALT
G A
T E
M
IN
WALL
CONC
GEN
SHED
R P
R
IC
E
40' 80'0
SCALE: 1"=40'
LEGEND:
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
D W
E L L
IN
G F
R A
M
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
D W
E L L
IN
G F
R A
W
E
LL
IN
G
F R
A
N
R T
H S
P R
IN
G S
T R
E E
T
A C
C E S S R
O A
D C C
U L V
E R
T
L
L
A C
C E
S S
R O
A D
948A-F
F-980-C
QUARRY
CREEK
GEOSPATIAL SECTION.
6. FILED DATA WAS COLLECTED IN JANUARY, MARCH, AND MAY OF 2017 BY USACE PITTSBURGH
5. THE AVERAGE COMBINED SCALE FACTOR (PA SOUTH ZONE) FOR THE PROJECT IS 0.99991766.
THE EXISTING BOROUGH OF BLAIRSVILLE MAPPING TO NAVD88.
4. THE EXISTING DROP MANHOLE NSP-100 WAS USED AS THE REFERENCE POINT TO LOWER
SINCE BEEN DESTROYED.
SURVEYORS AND USED TO MOVE MAPPING TO THE SPCS. STA 1+69.12 HAS
STA 0+81.80 AND 1+69.12, BOTH 5/8” REBAR, WERE RECOVERED AND OBSERVED BY USACE
HORIZONTAL COORDINATE SYSTEM AND AN ASSUMED VERTICAL DATUM. CONTROL POINTS
3. THE EXISTING MAPPING PROVIDED BY THE BOROUGH OF BLAIRSVILLE WAS ON AN ASSUMED
BASED ON GEOID12B.
2. THE VERTICAL DATUM IS NAVD88. THE ELEVATION UNITS ARE FEET. ALL GNSS ELEVATIONS ARE
CALCULATED BY NGS OPUS, AND CHECKED AGAINST NGS PID KX1056.
COORDINATES WERE DERIVED FROM A FIVE HOUR GNSS OCCUPATION OF 1001,
SPCS SOUTH ZONE (FIPS 3702). THE UNITS ARE US SURVEY FEET. THE NAD83(2011)
1. THE HORIZONTAL DATUM IS NAD83(2011). THE GRID COORDINATE SYSTEM IS PENNSYLVANIA
NOTES:
B
B A
K
V-1001
U
R V
E Y C
O N
T R
O L
P L
A N
R P
R
IC
E
J J
A L
B R
Z
IK
O W
S K I
J
U N
E
/s
B E
T H L S
C H
N E
L L E
R P .E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
V -1
.d g n
-A
U G -2
:4
40.00008:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
S
F L O
W
S U L P
H U
R R
U N
EDGE OF WATER SURFACE
FENCE LINE
C CENTER LINE
PROPERTY LINE
CONTROLSURVEY
NAMESTATION NORTHINGGRID EASTINGGRID ELEVATION DESCRIPTION
QUARRY 405140.25 1546154.45 992.85
30" X 5/8" ON"QUARRY"
STAMPED DISKALUMINUM
CREEK 404656.11 1546073.89 940.09
"CREEK"
STAMPED DISKALUMINUM
1001 405130.83 1546345.15 983.67 NAIL
1002 405017.73 1546287.11 976.50 CONCRETE INSCRIBE
0+81.80STA 404897.78 1546126.61 945.43 REBAR5/8"
1+69.12STA 404939.43 1546203.33 --- DESTROYED
MH-NSP-100 --- --- 989.81 MANHOLE SEWERSANITARY
948A-F 405059.46 1546139.56 --- PIPE ON DISK BOUNDRYUSACE
F-980-C 404702.51 1546249.78 --- PIPE ON DISK BOUNDRYUSACE
IS
S
E N
N S
T R
U C
T
IO
N S
E Q
U E
N
Y S
Z K
IE
W
IC
Z
J F
A R
M E
R
J
U L
Y
/s J E
S S
IC
A C F
A R
M E
R P .E
C-0010-B
-1
-1
R
E V
IS
E D A
M E
N D
M E
N
F
R E
V
IS
E D A
M E
N D
M E
N
F -2
-2
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
C -0
-B .d g n
-A
U G -2
:4
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
PROPERLY FOLLOWING THE BMP INSTALLATION NOTES.
SOCKS SHALL BE CUT OPEN AND THE WOODEN STAKES AND MESH SHALL BE REMOVED FROM THE SITE AND DISPOSED OF
ONCE THE SITE HAS BEEN STABILIZED AND REACHED A UNIFORM 70% PERENNIAL VEGETATIVE COVER, THE COMPOST FILTER 31.
DISPOSED OF OFF-SITE AT AN APPROVED FACILITY.
TREES, BRUSH, EXCESS SOIL AND CONSTRUCTION WASTE FROM THE CONSTRUCTION AND DEMOLITION ACTIVITIES SHALL BE 30.
USED TO CONSTRUCT CROSSING SHALL BE SPREAD ALONG TEMPORARY ACCESS ROAD.
TEMPORARY STREAM CROSSING SHALL BE REMOVED AND RESTORED TO PRE-CONSTRUCTION CONDITIONS AS SHOWN. STONE 29.
INSTALL TEMPORARY EROSION CONTROL BLANKETS ON ALL SLOPES GREATER THAN 3:1 AND ALONG THE STREAM BANKS.28.
SEED, FERTILIZE, LIME, AND MULCH AREAS THAT HAVE BEEN DISTURBED BY THE CONSTRUCTION ACTIVITY.27.
REMOVE TEMPORARY INLETS AND TEMPORARY SLOPE PIPES.26.
INSTALL NEW CHAIN LINK SECURITY FENCE.25.
(IF AWARDED) REMOVE FLOW DIVERSION STRUCTURES FOR EXTENDED BANK ARMORING.24.
(IF AWARDED) INSTALL EXTENDED BANK ARMORING.23.
(IF AWARDED) INSTALL APPROVED FLOW DIVERSION STRUCTURES FOR EXTENDED BANK ARMORING.22.
REMOVE DOWNSTREAM ROCK FILTER, PIPE FLUME AND TEMPORARY UPSTREAM SANDBAG DAM.21.
INSTALL REQUIRED BANK ARMORING (BASE AWARD).20.
MATERIAL FROM APPROVED SOURCES.
TEMPORARY STABILIZATION BUTTRESS AS APPROVED BY THE CONTRACTING OFFICER. COMPLETE CONSTRUCTION USING NEW R-4
SAND BEDDING LAYER, ANCHOR TRENCHES, AND EMBANKMENT CREST AND TRANSITION ZONES. RE-USE STORED R-4 FROM
INSTALL GEOTEXTILE FABRIC AND ROCK FILL EMBANKMENT TO THE LINES AND GRADES SHOWN ON CONTRACT DRAWINGS, INCLUDING 19.
OF THIS WORK.
STATIONS 2+71 AND 2+95 (SEE PLAN ON SHEET C-4012). ALTER POSITIONING OF PIPE FLUME AS REQUIRED FOR LATERAL PHASING
(IF AWARDED) INSTALL DOWNSTREAM OPTION CCCP LINER IN EXISTING STRUCTURAL PLATE AND CULVERT EXTENSION BETWEEN 18.
POSITIONING OF PIPE FLUME AS REQUIRED FOR LATERAL PHASING OF THIS WORK.
(IF AWARDED) INSTALL UPSTREAM OPTION CCCP LINER IN STONE ARCH CULVERT BETWEEN STATIONS 3+80 AND 4+20. ALTER 17.
LATERAL PHASING OF THIS WORK.
2+78 AND STATION 4+20. ALTER POSITIONING OF PIPE FLUME OR OTHER APPROVED DIVERSION TECHNIQUES AS REQUIRED FOR
AND STATION 3+80 (SEE PLAN ON SHEET C-4012). FLOWLINE SHALL BE LINED WITH INVERT REPAIR MORTAR BETWEEN STATION
(BASE AWARD) INSTALL CCCP LINER IN STONE ARCH CULVERT AND CULVERT REPLACEMENT SECTION BETWEEN STATION 2+95 16.
INSTALL UPSTREAM CUT-OFF-KEY (SEE PLAN ON SHEET C-4012).15.
INSTALL STRUCTURAL BACKFILL AND GEOTEXTILE SEPARATION LAYER AT CULVERT EXTENSION AND BEHIND HEADWALL/WINGWALLS.14.
FORM AND POUR CONCRETE HEADWALL END TREATMENT FOR ARCH CULVERT EXTENSION.13.
INSTALL STRUCTURAL BACKFILL AND GEOTEXTILE SEPARATION LAYER AT CULVERT REPLACEMENT.12.
GROUT CULVERT KEY.11.
INSTALL STRUCTURAL PLATE OVER FOOTERS FOR CULVERT REPLACEMENT AND EXTENSION SECTIONS10.
WINGWALL FOUNDATIONS.
INSTALL MICROPILES AND FOOTER FOR CULVERT REPLACEMENT AND EXTENSION SECTIONS AND CONCRETE HEADWALL AND 9.
AREA FOR RE-USE.
FROM TEMPORARY STABILIZATION BUTTRESS. STORE R-4 FROM TEMPORARY STABILIZATION BERM AT CONTRACTOR LAYDOWN
INSTALL SHORING, SHEETING, AND BRACING AS NEEDED. REMOVE AND DISPOSE OF STEEL PLATE AND CONCRETE BLOCKS
MATERIAL THAN NECESSARY IS REMOVED AT ANY TIME PRIOR TO BACKFILLING WITH THE PERMANENT EMBANKMENT MATERIAL.
FOR PLACEMENT OF GEOTEXTILE AND BEDDING MATERIAL. PERFORM THIS EXCAVATION IN A SEQUENCE SUCH THAT NO MORE
GRADES SHOWN IN THE CONTRACT DOCUMENTS. PREPARE EXPOSED SOIL SLOPES TO EFFECT A SMOOTH, UNIFORM SURFACE
EXCAVATE TEMPORARY STABILIZATION FEATURES AND MATERIAL FROM THE FAILED STONE ARCH CULVERT TO THE LINES AND8.
DIVERSION TECHNIQUES.
INSTALL PIPE FLUME, TEMPORARY UPSTREAM SANDBAG DAM, AND DOWNSTREAM ROCK FILTER OR OTHER APPROVED 7.
INSTALL STONE ARCH CULVERT SUPPORT SYSTEM FROM STATION 3+53 TO 3+63.6.
BAGS AND R-5 RIPRAP AT TEMPORARY SLOPE PIPE DISCHARGES.
INSTALL SANDBAG DIVERSION ALONG NORTH SPRING STREET, TEMPORARY INLETS, TEMPORARY SLOPE PIPES, INLET FILTER
INSTALL TEMPORARY STREAM CROSSING, COMPOST FILTER SOCKS, PERFORM CLEARING AND GRUBBING AND TREE REMOVAL;5.
PERFORM A VIDEO SURVEY OF THE EXISTING CULVERT.4.
TO ENSURE WORKER SAFETY WITHIN EXISTING CULVERT IN ACCORDANCE WITH APPROVED CONFINED SPACE ENTRY PLAN.
PROVIDE CONFINED SPACE ENTRY PERMIT PRIOR TO ANY WORK WITH THE EXISTING CULVERT STRUCTURE. INITIATE MONITORING 3.
THE SITE.
REMOVE EXISTING FENCING AND INSTALL ANY TEMPORARY FENCES AND GATES AS REQUIRED TO RESTRICT ACCESS TO
FACILITIES TO BOROUGH PERSONNEL. COORDINATE WITH CONTRACTING OFFICER AND BOROUGH OF BLAIRSVILLE TO
COORDINATE WITH CONTRACTING OFFICER AND BOROUGH OF BLAIRSVILLE TO PROVIDE ACCESS TO PUMP STATION 2.
VERIFY AND CLEARLY MARK ALL EXISTING UTILITIES WITHIN THE CONTRACTOR’S WORK LIMITS.1.
MODIFICATIONS SHALL BE APPROVED BY THE CONTRACTING OFFICER.
TO ALL DEFINED CONSTRUCTION RESTRICTIONS. IF THE CONTRACTOR ELECTS TO MODIFY THIS SEQUENCE, ANY
CONTRACTOR HAS THE ABILITY TO MODIFY THE SEQUENCE TO SUIT THEIR MEANS AND METHODS WHILE ADHERING
THE PROPOSED CONSTRUCTION SEQUENCE PRESENTS ONE POSSIBLE METHOD OF PERFORMING THE WORK. THE
PROPOSED SEQUENCE OF WORK – BLAIRSVILLE PERMANENT EMBANKMENT REPAIRS:
5'
G
C U
LVER
T (S
U
LP
H U R R
U N
SEE NOTE 8
SANDBAGS TO DIVERT FLOW (SEE NOTE 12)
(SEE NOTE 12)
SANDBAGS TO DIVERT FLOW
10+0
S
S
S
S
S
S
S
ZONE A - 100 YEAR FLOOD PLAIN BOUNDARY
990 MAJOR CONTOUR (EXISTING) - SEE NOTE 3
EDGE OF WATER SURFACE
MAJOR CONTOUR (PROPOSED) - SEE NOTE 3990
CONTRACTOR WORK LIMITS
AREA OF R-4 RIPRAP EMBANKMENT PROTECTION
SULPHUR RUN BANK STABILIZATION AREA
NEW CHAIN-LINK SECURITY FENCE
EMBANKMENT CREST FILL AREA
APPROXIMATE AREA OF EROSION GULLY
S
S
CO
S
S
S U L P
H U
R R
U N
F L O
W
ZONE A - 100 YEAR
FLOODPLAIN BOUNDARY
SEE DETAIL 1, SHEET C-5018
NEW CONCRETE HEADWALL
SCALE: 1" - 20'
PLAN - PROPOSED LAYOUT
AND NOTES
SHEET C-5021 FOR DETAILS
FENCE (APPROX 135 LF) - SEE
NEW CHAIN-LINK SECURITY
E X T E
N D
E D B
A N
K A
R M
O R
IN
G
(I N S T
A L L I F O
P T
IO
N I S A
W A
R D
E D
B A N
K A
R M
O R
IN
G
R E Q
U
IR
E D M
IN
IM
U
ARCH CULVERT
EXISTING BRICK
CONCRETE
END OF INLET WITH
PLUG DOWNSTREAM
DRIVEWAY APRON
EXISTING CONCRETE
EXISTING ASPHALT DRIVEWAY
DETAILS AND NOTES
SEE SHEET C-5020 FOR
ARMORING (R-5 STONE)
SULPHUR RUN BANK
INV EL 947.18
EXIST 21" PVC
SECTIONS, DETAILS AND NOTES
C-4012 THRU C-5015 FOR PLANS,
CULVERT REPAIRS - SEE SHEETS
SEE NOTE 13
OUTFALL.
EXISTING SANITARY SEWERS, AND MANHOLES AND THE EMERGENCY SANITARY
BANK TO PREVENT DAMAGES TO EXISTING STRUCTURES SUCH AS THE PUMP STATION,
THE CONTRACTOR SHALL TAKE SPECIAL CARE DURING EXCAVATION ALONG THE RIGHT 13.
FLOW DEPTH OF UP TO 6 INCHES.
RUNNING BETWEEN ADJACENT BAGS. SANDBAGS SHALL BE ABLE TO DIVERT A
PLACED SUCH THAT ROWS ARE OFFSET TO PREVENT SURFACE FLOW FROM
ARE RE-USED, THEY SHALL BE FREE OF RIPS AND TEARS. SANDBAGS SHALL BE
STORED SANDBAGS AS APPROVED BY THE CONTRACTING OFFICER. IF SANDBAGS
CONTRACTOR TO INSTALL SANDBAGS AS SHOWN. CONTRACTOR MAY RE-USE12.
BEYOND EXTENTS OF WINGWALLS TO EFFECT DRAINAGE.
THE EMBANKMENT - SSP INTERFACE SHALL EXTEND A MINIMUM OF 2 FEET
EMBANKMENT ROCK FILL SHALL DIRECTLY CONTACT SSP FOR BANK ARMORING.11.
FLATTEN OR SHORE TEMPORARY SLOPES TO ENSURE ACCEPTABLE STABILITY.
IN THE CASE OF AN IMPENDING HIGH WATER EVENT, THE CONTRACTOR SHALL
FILLED. SHORING, SHEETING, AND BRACING SHALL BE INSTALLED AS NEEDED.
PORTION OF THE SLOPE SHALL BE OPENED WHICH CANNOT BE QUICKLY BACK-
ARE OBSERVED FOLLOWING REMOVAL OF THE TEMPORARY STABILITY BERM, NO
FILLING WITH THE PERMANENT EMBANKMENT MATERIAL. IF SLOPE INSTABILITIES
MORE MATERIAL THAN NECESSARY IS REMOVED AT ANY TIME PRIOR TO BACK-
THE CONTRACTOR SHALL PERFORM EXCAVATIONS IN A SEQUENCE SUCH THAT NO10.
FOR ADDITIONAL REQUIREMENTS.
TO PROTECT WORKERS FROM HIGH FLOWS. SEE SPECIFICATION SECTION 01 35 00
THE EXISTING CULVERT. CONTRACTOR SHALL ENSURE THAT A SYSTEM IS IN PLACE
THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS WHEN WORKING WITHIN 9.
ANY CONSTRUCTION.
EXISTING TREE ADJACENT TO HEADWALL TO BE REMOVED PRIOR TO 8.
FOR ADDITIONAL LEGEND SYMBOLS, SEE SHEET G-1012. 7.
SECTION 01 18 00.
ALL UTILITIES SHALL BE CONFIRMED IN ACCORDANCE WITH SPECIFICATION
EXISTING UTILITIES LOCATIONS PROVIDED BY THE BOROUGH OF BLAIRSVILLE. 6.
DETAILS AND NOTES. ADDITIONAL ARMORING INSTALLATION TO STATION 2+03.
MINIMUM BANK ARMORING TO BE PERFORMED TO STATION 1+30. SEE SHEET C-5020 FOR 5.
ALONG CENTER OF CULVERT. SEE SHEET C-3017 FOR ADDITIONAL DETAILS.
SEE SHEET C-4012 FOR TYPICAL CROSS SECTION FOR BUTTRESS CONSTRUCTION 4.
INTERVALS.
AND LABELED WITH THE ELEVATION; MINOR CONTOURS ARE SHOWN AT 2-FOOT
MAJOR CONTOURS ARE SHOWN ON THIS DRAWING AT INTERVALS OF 10 FEET 3.
SLOPING, BENCHING, OR SHORING.
WHERE ADDITIONAL EXCAVATION IS NECESSARY FOR INSTALLING APPROVED
UNIFORM SURFACE FOR PLACEMENT OF GEOTEXTILE AND BEDDING LAYER, EXCEPT
EXCAVATE NO MORE OF THE SOIL SLOPES THAN NECESSARY TO EFFECT A SMOOTH,
ONCE TEMPORARY STABILIZATION BERM HAS BEEN REMOVED, CONTRACTOR SHALL 2.
CONDITIONS AND PERFORM SURVEY AS NECESSARY PRIOR TO BEGINNING WORK.
DRAWINGS FOR DESIGN SECTIONS. THE CONTRACTOR SHALL VERIFY EXISTING
HAS BEEN REMOVED ALONG NORTH SPRING STREET IN THIS AREA. SEE REFERENCE
INSTALLATION OF TEMPORARY STABILIZATION MEASURES. EXISTING PAVEMENT
CONTOURS IN THE AREA OF FAILURE REPRESENT THE CONDITIONS AFTER 1.
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
DWELLING
FRAME
GENERATOR
RM
GEN
HSE
CTRL
STATION
PUMP
CONC WALL
SHED
N
CENTER STREET
N O
R T
H S
P R
IN
G S
T R
E E
T
P E N
N S
T R E E T
B C-3017
A C-3017
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C
CERTIFIED FINAL DOCUMENTS
20' 40'0
SCALE: 1"=20'
P
O P
O S
E D L
A Y
O U
T
P L
A N
C-1011-A
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
F
IL
E N
A M
E
P L
O T D
A T
E
A O a b
C -1
-A .d g n
-A
U G -2
:4
W
W N -1
-B -8
B
C R
A T
T
J
U L
Y
A
M A
R C
G U
Y
/s E
R
IC
H D
G U
Y P .E
R E
V
IS
E D B
Y A
M E
N D
M E
N
-2
-2
®of Engineers
97 864 5
H4TSDRST 20.00004:1
2 3
B
C
D
E
F
30' (APPROX) CULVERT
STA 3+80 TO STA 4+20
UPSTREAM CCCP LINING
STA 2+95 TO STA 3+80
CCCP LINING (BASE AWARD)
2' (MIN)
20'
EX. STONE ARCH CULVERT- SEE DETAIL 1, SHEET C-5014
67' (APPROX)
EXISTING STONE ARCH CULVERT LINING- SEE DETAIL 1, SHEET C-5014
67' (APPROX)
30' (APPROX) EXISTING
STA 2+71 TO STA 2+95
DOWNSTREAM CCCP LINING
EL 947.72
TOP FOOTER
EL 946.00
TOP FOOTER
DETAIL 4, SHEET C-5015
EXTENSION - SEE
SS
SEE DETAIL 1, SHEET C-5018
NEW CONCRETE HEADWALL
SCALE: 1" - 10'
PLAN - CULVERT LINING AND REPLACEMENT
AASHTO #1
AASHTO #57
STONE
R-4
C-4012 NTS
DETAIL - EMBANKMENT CREST
SELECT GRANULAR FILL (2RC)
(SEE DETAIL 2, SHEET C-3017)
GEOTEXTILE WITH BEDDING
(SEE DETAIL 1, SHEET C-3017)
ANCHOR TRENCH
GEOTEXTILE
DETAIL 2, SHEET C-5014
REPLACEMENT - SEE
23' (APPROX) CULVERT
SEE DETAIL 3, SHEET C-5014
STRUCTURAL PLATE ARCH
(AWARDABLE OPTION)(AWARDABLE OPTION)
EL. 980.5
1 1 1
C
C
NOTES:
BENCHING, OR SHORING.
EXCAVATION IS NECESSARY FOR INSTALLING APPROVED SLOPING,
OF GEOTEXTILE AND BEDDING LAYER, EXCEPT WHERE ADDITIONAL
NECESSARY TO EFFECT A SMOOTH, UNIFORM SURFACE FOR PLACEMENT
CONTRACTOR SHALL EXCAVATE NO MORE OF THE SOIL SLOPES THAN
ONCE TEMPORARY STABILIZATION BERM HAS BEEN REMOVED,5.
ENTERING THE SYSTEM SHALL BE COVERED TO PREVENT LINING.
OF SPEC SECTION 33 01 30.72. EXISTING SANITARY MANHOLES AND PIPES
4. CCCP LINER AND FLOWABLE MORTAR SHALL MEET THE REQUIREMENTS
STATION 2+71 AND STATION 2+95, IF OPTIONS ARE AWARDED.
STATION 4+20, AND IN THE DOWNSTREAM CULVERT EXTENSION BETWEEN
UPSTREAM IN THE STONE ARCH CULVERT BETWEEN STATION 3+80 AND
CCCP LINER, OR OTHER APPROVED MATERIAL, SHALL BE INSTALLED3.
AND STATION 2+71.
BE LINED WITH OF INVERT REPAIR MORTAR BETWEEN STATION 4+26
MATERIAL, BETWEEN STATION 3+80 AND STATION 2+95. FLOWLINE SHALL
BASE AWARD SHALL BE LINED WITH CCCP LINER, OR OTHER APPROVED2.
(STA 0+81.80) AND NO MONUMENT (DESTROYED) (STA 1+69.12).
SHOWN ON SURVEY CONTROL SHEET V-1001, SPECIFICALLY 5/8" REBAR1.
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
C -4
-B .d g n
-A
U G -2
:4
10.00002:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
M A
R K
U M
C U
L V
E R
T R
E P
L A
C E
M E
N T A
N D L
IN
IN
G
P L
A N A
N D S
E C
T
IO
N
0 10' 20'
SCALE: 1"=10'
B
C R
A T
T Y /B
B A
K E
R
J
U L
Y
E
G U
Y
/s E
R
IC
H D
G U
Y P .E
C-4012-B
-1
-2
R E
V
IS
E D A
M E
N D
M E
N
R E
V
IS
E D A
M E
N D
M E
N
-2
-2
SCALE: 1" = 10'
PROFILE - CULVERT LINING AND REPLACEMENT AND EMBANKMENT REPAIR ALONG C OF CULVERTL
1.75
(WINGWALL)
NEW HEADWALL
C NORTH SPRING STREET (APPROX)L
SHEET C-3017
GT - SEE DETAIL 1,
ANCHOR TRENCH FOR
GROUND
EXISTING
BACKFILL
STRUCTURE
ROCK FILL (R-4)
EMBANKMENT
SEE DETAIL 1, SHEET C-5018
NEW CULVERT HEADWALL
STA 2+71.09
CULVERT HEADWALL
FACE OF NEW
INFORMATION
SHEET, FOR ADDITIONAL
EL 980.5 - SEE DETAIL 1, THIS
NEW EMBANKMENT CREST AT
GT
(SEE DETAIL 2, SHEET C-3017)
LAYER (GT) WITH BEDDING
GEOTEXTILE SEPARATION
CONCRETE ENCASEMENT
SANITARY SEWER WITH
EXISTING 21" DIAMETER
EL 945.63
EL 947.14
947.81
EL T/EL
MH-102
EL 947.72
TOP FOOTER
EL. 947.72
TOP FOOTER
SHEET C-5015
STA 4+26 UPSTREAM CUT-OFF KEY - SEE DETAIL 6,
EL 960.00
SEE DETAIL 3, SHEET C-5018-B
PILE CAP / HEADWALL INTERFACE -
SHEET C-5015 (TYP.)
SEE DETAIL C,
CULVERT TRANSITION
EL 980.50
5.5
BERM SEE NOTE 5
TEMPORARY STABILIZATION
EXISTING SOIL SLOPE BEHIND
3+00 4+00
N
LC
C
U L
V E
R T S
E E N
O T
E
FLOW
SULPHUR RUN
BOROUGH OF BLAIRSVILLE.
FINISHED PAVEMENT GRADE TO BE DETERMINED BY 2.
PAVEMENT LINE TO EDGE OF CREST.
5-FT SHOULDER ALLOWANCE FROM EDGE OF ORIGINAL 1.
GROUND
EXISTING
TO REMAIN IN PLACE
EXISTING STRUCTURAL PLATE ARCH
FAILURE AREA
BEYOND EXISTING EMBANKMENT
EXISTING STONE ARCH CULVERT
LOCATION APPROXIMATE
SEE DETAIL 2 C-5014
NEW CONCRETE FOOTERS
LOCATION APPROXIMATE
SEE DETAIL 4 & 5 C-5015
NEW CONCRETE FOOTERS
CONCRETE
SEWER ENCASED IN
EXISTING 21" SANITARY
ARCH CULVERT
EXISTING STONE
2+40 2+304+30 4+20 4+10 4+00 3+90 3+80 3+70 3+403+60 3+50 3+30 3+20 3+10 3+00 2+90 2+80 2+70 2+60 2+50
EXTENTS
SHEET C-1011 FOR
STABILIZATION - SEE
R-5 STREAMBANK
T/EL 947.74
MH-101
EL 943.50
T/ HEADWALL FOOTER
EL 955.50
T/ HEADWALL
SEE DETAIL 2, SHEET C-5014
CULVERT REPLACEMENT -
23' (APPROX)
SEE DETAIL 4, SHEET C-5015
CULVERT EXTENSION -
30' (APPROX)
SEE DETAIL 3, SHEET C-5014
EX. STRUCTURAL PLATE -
30' (APPROX)
EL 947.72
T/FOOTER
EL 947.72
T/FOOTER
EL 947.72
T/FOOTER
EL 947.72
T/FOOTER EL 946.00
T/FOOTER
EL 946.00
T/FOOTER
EL 943.50
FOOTER
T/ HEADWALL
EL 943.50
FOOTER
T/ HEADWALL
EL 947.72
T/FOOTER
EL 947.72
T/FOOTER
A R
C H T
R A
N S
IT
IO
N
B R
IC
K A
R C
H T
O S
T O
C H T
R A
N S
IT
IO
N
B R
IC
K A
R C
H T
O S
T O
3'-8" ±
2" 5"
1'-0" 1'-0"
10'-0"
9'-8"
1'-0"
2" 3"
D E
P T
H U
N K
N O
W N
D E
P T
H U
N K
N O
W N
1'-0"
10'-4"
10'-0"
9'-4"
10'-7"
9'-9"
11'-1"
EL. 947.72 EL. 947.72
EL. 952.99
EL. 944.93
EL. 944.13
EL. 945.33
TOP EL. 947.74
FLOOR
CULVERT
EXISTING
SEWER MANHOLE
EXISTING SANITARY
C CULVERTL
PLATE
STRUCTURAL
EXISTING
EXISTING STRUCTURAL PLATE, CONCRETE, AND FLOWLINE SHALL BE LINED AS INDICATED ON DETAIL 3 ON SHEET C-5014.2.
EXISTING MANHOLE SHALL BE PROTECTED TO AVOID LINING.1.
NOTES:
EL. 947.72
EL. 952.54
EL. 947.72
EL. 945.78
PLATE
STRUCTURAL
EXISTING
ENCASEMENT
WITH CONCRETE
SANITARY SEWER
EXISTING 21"
EL. 945.77
EL. 946.20
FLOOR
CULVERT
EXISTING
C CULVERTL
EL. 952.58
C CULVERTL
EL. 949.88
R = 5.38'
EL. 946.29
R = 8.78R = 9.81
EL. 947.38 EL. 947.38
ENCASEMENT
WITH CONCRETE
SANITARY SEWER
EXISTING 21"
EL. 946.27
EL. 947.88 EL. 947.88
EL. 949.88
CULVERT
STONE ARCH
EXISTING
FLOOR
CULVERT
EXISTING
C-5013 NTS
EXISTING STRUCTURAL PLATE LOOKING UPSTREAM STA 3+03.44 2
C-5013 NTS
EXISTING STRUCTURAL PLATE LOOKING UPSTREAM STA 3+31.44
C-5013 NTS
EXISTING STONE ARCH CULVERT LOOKING UPSTREAM STA 3+53.44
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
C -5
-A .d g n
-A
U G -2
:4
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
J
U L
Y
J F
R E
E M
A N
E
G U
Y
/s E
R
IC
H D
G U
Y P .E
B
B A
K E
R
E X
IS
T
IN
G C
O N
D
IT
IO
N S
C U
L V
E R
T S
E C
T
IO
N S
C-5013-A
R E
V
IS
E D A
M E
N D
M E
N
-2
-2
± 3'-8"
MIN.
2'-0"
2' -0
± 3'-8"
L (PADOT CLASS 4 TYPE A)
GEOTEXTILE SEPARATION LAYER
C CULVERT
EL. VARIES
ENCASEMENT
WITH CONCRETE
SANITARY SEWER
EXISTING 21"
RISE = 6'-3"
SPAN = 12'-0"
R = 6'-0"
PLATE ARCH
NEW STRUCTURAL
AS NEEDED
REMOVE DEBRIS
BACKFILL
STRUCTURE
MIN. 2' THICK
(BASE AWARD)
CCCP LINER
SHEET C-5015
SIDE) - SEE DETAIL 5,
FOOTER (TYP EACH
NEW CONCRETE
(TYP.)
MICROPILE CASING
7" DIA. API-N80 BATTER
947.72
T/FOOTER
944.72
B/FOOTER
CULVERT FLOOR
EXISTING
(BASE AWARD)
MORTAR
INVERT REPAIR
SEE DETAIL 12, C-5016-B SEE DETAIL 11, C-5016-B
C-5016-B
SEE DETAIL 10,
C CULVERTL
ENCASEMENT
WITH CONCRETE
SANITARY SEWER
EXISTING 21"
FLOOR
CULVERT
EXISTING
AS NEEDED
REMOVE DEBRIS
CULVERT
STONE ARCH
EXISTING
(SEE NOTE 5)
CCCP LINER
(BASE AWARD)
MORTAR
INVERT REPAIR
FLOOR
CULVERT
EXISTING
C CULVERTL
MANHOLES WITH CCCP LINER
DO NOT LINE EXISTING
(SEE NOTE 1)
CCCP LINER
PLATE
EXISTING STRUCTURAL
(BASE AWARD)
MORTAR
INVERT REPAIR
C-5016-B
SEE DETAIL 10,
NEW STRUCTURAL PLATE SHALL BE LINED WITH A CCCP OR OTHER APPROVED ALTERNATIVE.3.
PLATE FOR APPROVAL.
MANUFACTURER'S RECOMMENDATIONS UNLESS OTHERWISE NOTED. CONTRACTOR MAY SUBMIT ALTERNATIVES TO THE STRUCTURAL
2. MINIMUM THICKNESS FOR STRUCTURAL PLATE SHALL BE 8 GAUGE. THE STRUCTURAL PLATE SHALL BE INSTALLED PER THE
SHALL MEET THE REQUIREMENTS OF SECTION 31 05 19 GEOTEXTILE.
FABRIC SHALL BE PLACED CONTINUOUSLY BETWEEN THE STRUCTURE BACKFILL AND THE EMBANKMENT ROCK FILL. GEOTEXTILE FABRIC
AND COMPACTION SHALL MEET THE REQUIREMENTS OF 31 00 00 FOR EARTHWORK, SECTION 3.11.1.2 STRUCTURE BACKFILL. GEOTEXTILE
1. STRUCTURE BACKFILL SHALL BE PLACED AND COMPACTED AS SHOWN AROUND ALL STRUCTURAL ARCH CULVERT. STRUCTURE BACKFILL
NOTES:
NOTES:
OPTION.
TO STATION 2+95 TO BE INSTALLED AS AN AWARDABLE
AN AWARDABLE OPTION. CCCP LINING FROM STATION 2+71
FROM STATION 3+80 TO STATION 4+20 TO BE INSTALLED AS
BETWEEN STATION 2+95 AND STATION 3+80; CCCP LINING
5. BASE AWARD FOR CCCP LINING OF EXISTING STONE ARCH
MEETING THE REQUIREMENTS OF SECTION 33 01 30.72.
BOTTOMLESS ARCH CULVERT WITH INVERT REPAIR MORTAR
4. CONTRACTOR SHALL LINE THE FLOWLINE/INVERT OF THE
LOCATIONS OF KNOWN PIPES.
FOR REFERENCE. SEE SHEET G-1012 FOR APPROXIMATE
SEE CONDUIT INSPECTION MEMORANDUM ATTACHMENT
WITH THE APPROPRIATE AUTHORITY/OWNER OF THE PIPE.
PIPES SHALL BE APPROVED BY USACE AND COORDINATED
ABANDON AS APPLICABLE. ANY EFFORTS TO ABANDON
A PLAN TO INCORPORATE THE PIPES INTO THE SYSTEM OR
CONTRACTOR SHALL FIELD LOCATE ALL PIPES AND SUBMIT
WORK AREA INSIDE THE CULVERT AND HEADWALL. THE
3. MULTIPLE PIPES CAN BE FOUND IN THE VICINITY OF THE
SHEET G-1012 FOR APPROXIMATE LOCATION.
CONTRACTOR SHALL FIELD-VERIFY THE LOCATION. SEE
ARCH CULVERT. EXACT DIMENSIONS ARE UNKNOWN. THE
LOCATED ALONG THE RIGHT DESCENDING BASE OF THE
2. AN EXISTING, CONCRETE-ENCASED 21" SANITARY SEWER IS
MEET THE REQUIREMENTS OF 33 01 30.72 08.
OTHERWISE NOTED. THICKNESS OF LINER MATERIAL SHALL
MANUFACTURER'S RECOMMENDATIONS UNLESS
THE LINER MATERIAL SHALL BE INSTALLED PER THE
SHALL MEET THE REQUIREMENTS OF SECTION 33 01 30.72.
OR OTHER APPROVED ALTERNATIVE. LINER MATERIAL
SHALL BE A CENTRIFUGALLY CAST CONCRETE PIPE (CCCP)
1. LINER MATERIAL FOR EXISTING STONE ARCH CULVERT
C-4012 NTS
CCCP LINER FOR EXISTING STONE ARCH CULVERT LINING
1 1
C-4012 NTS
(STA 3+30 TO 3+53)
STRUCTURAL PLATE ARCH FOR CULVERT REPLACEMENT
C-4012 NTS
(STA 3+00 TO 3+30)
CCCP LINER FOR EX. STRUCTURAL PLATE ARCH
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
C -5
-B .d g n
-A
U G -2
:4
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
B
C R
A T
T Y /B
B A
K E
R
C U
L V
E R
T R
E P
A
IR
D
E T
A
IL
S
J
U L
Y
J F
R E
E M
A N
E
G U
Y
/s E
R
IC
H D
G U
Y P .E
S H
E E
T O
F
C-5014-B
-1
-2
R E
V
IS
E D A
M E
N D
M E
N
R E
V
IS
E D A
M E
N D
M E
N
-2
-2
2' -0
MIN.
2'-0"
(MIN)
8"
CLR
3"
(M
IN
(MIN)
12"
SEE NOTE 1
1'-6"
SEE NOTE 1
1'-6"
L
(PADOT CLASS 4 TYPE A)
GEOTEXTILE SEPARATION LAYER
DESCRIBED IN SPECIFICATIONS
PREPARE SURFACE AS
EXISTING CULVERT FLOOR,
C CULVERT
EL. VARIES
AS NEEDED
REMOVE DEBRIS
RISE = 5'-3"
SPAN = 10'-0"
R = 5'-0"
PLATE ARCH
NEW STRUCTURAL
BACKFILL
MIN. 2' THICK STRUCTURE
OPTION)
(AWARDABLE
CCCP LINER
THIS SHEET
SIDE) - SEE DETAIL 5,
FOOTER (TYP EACH
NEW CONCRETE
SEE C-4012
947.72-946.00
T/FOOTER
SEE C-4012
944.72-943.00
B/FOOTER
(BASE AWARD)
MORTAR
INVERT REPAIR
SEE DETAIL 10, C-5016-B
SEE DETAIL 10, C-5016
SEE DETAIL 11, C-5016
AWARDABLE OPTION.
1. CCCP LINING OF THE STRUCTURAL PLATE ARCH FOR CULVERT EXTENSION TO BE INSTALLED AS AN
DIMENSIONS ACCORDINGLY.
5. THE CONTRACTOR SHALL COORDINATE KEYWAY DIMENSIONS WITH THE MANUFACTURER AND REVISE
SECTION 31 73 00.
KEYWAY/SLOT (SEE FOOTER DETAIL, THIS SHEET). GROUT SHALL MEET THE REQUIREMENTS OF
THE CONNECTION OF THE STRUCTURAL PLATE TO THE FOOTING SHALL BE MADE BY A GROUTED 4.
PLACING.
STANDING WATER, SNOW, ICE, AND OTHER DELETERIOUS SUBSTANCES BEFORE START OF CONCRETE
SURFACES AGAINST WHICH CONCRETE IS TO BE PLACED MUST BE FREE OF DEBRIS, LOOSE MATERIAL, 3.
BRIDGES.
FOOTERS SHALL MEET THE REQUIREMENTS OF THE AASHTO STANDARD SPECIFICATION FOR HIGHWAY 2.
CAST-IN-PLACE CONCRETE.
THE FOOTERS SHALL BE CAST-IN-PLACE CONCRETE MEETING THE REQUIREMENTS OF 03 30 00 1.
STAT 3+53STAT 3+30
TEMPORARY FORM TO BE REMOVED PRIOR TO PLACING CCCP LINER.4.
TRANSITION SEAL AND CCCP LINER.
MORE THAN 6" ACROSS A SINGLE STATION PRIOR TO PLACEMENT OF THE
CONSTRUCTION. THE STONE SHALL BE REMOVED TO A LINE THAT VARIES NO
A SURFACE APPLIED TREATMENT AS NEEDED TO ACCOMMODATE THE NEW
CONTRACTOR SHALL STABILIZE THE INSIDE OF THE STONE ARCH CULVERT WITH 3.
REQUIREMENTS OF SECTION 31 73 00.00 OR OTHER APPROVED ALTERNATIVES.
CULVERT TRANSITION SEAL SHALL BE NON-SHRINK GROUT MEETING THE 2.
EXISTING ARCHES MIN. 18".
1. STRUCTURAL PLATE ARCH AT CULVERT REPLACEMENT SHALL OVERLAP
ARCH PLATE
MATCHING THE MATERIALS OF THE STRUCTURAL
A CUSTOM FABRICATED CULVERT TRANSITION
1. CONTRACTOR SHALL SUBMIT FOR APPPROVAL
FLOOR
CULVERT
EXISTING
FLOW
SULPHUR RUN
OR TOP OF BEDROCK
DEPTH = 18" (MIN)
MORTAR
INVERT REPAIR
R = 6'
CULVERT REPLACEMENT
STRUCTURAL PLATE ARCH AT
18" C/C
6" SHEAR PINS
C C -5015
SEAL
TRANSITION
CULVERT
OR STONE ARCH CULVERT R = 5'
EXISTING STRUCTURAL PLATE ARCH
CULVERT REPLACEMENT
STRUCTURAL PLATE ARCH AT
SHEAR PINS
ARCH CULVERT
EXISTING STONE
SEAL
TRANSITION
CULVERT
FORM
TEMPORARY
CCCP LINER
SHEAR PINS
FORM
TEMPORARY
ARCH CULVERT
EXISTING STONE
CULVERT REPLACEMENT
STRUCTURAL PLATE ARCH AT
CCCP LINER
SEAL
TRANSITION
CULVERT
PLATE ARCH CULVERT
EXISTING STRUCTURAL
SEE NOTE 1
CULVERT TRANSITION(BASE AWARD)
CCCP LINER
STRUCTURE BACK FILL
TO REMAIN
EXISTING HEADWALL
KEYWAY
GROUT
FOOTING
REINFORCED CONCRETE
PLATE
STRUCTURAL
VARIES.
FLOOR. ELEVATION
EXISTING CULVERT
(2) #4 @ 14" O.C.
(2) #8 EA FACE CONT
(4) #8 CONT T&B
NOTE:
NOTE:
NOTE:
STRUCTURAL PLATE ARCH FOOTER NOTES:
C-4012 NTS
UPSTREAM CUT-OFF KEY
C-4012 NTS
STRUCTURAL PLATE ARCH FOR CULVERT EXTENSION
C
C-5015 NTS
TRANSITION SECTION
C-4012 NTS
CULVERT TRANSITION (STA 3+30 AND 3+53)
C-5015
C-5014
C-4012 NTS
FOOTER REINFORCEMENT DETAIL
C-4012 NTS
UPSTREAM CUT-OFF KEY
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
C -5
-B .d g n
-A
U G -2
:4
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
C R
A T
T Y /B
B A
K E
R
C U
L V
E R
T R
E P
A
IR
D
E T
A
IL
S
J
U L
Y
J F
R E
E M
A N
E
G U
Y
/s E
R
IC
H D
G U
Y P .E
S H
E E
T O
F
C-5015-B
-1
-2
R E
V
IS
E D A
M E
N D
M E
N
R E
V
IS
E D A
M E
N D
M E
N
-2
-2
(M
S E E N
O T E
(M
IN
(MIN)
2'-0"
(MIN)
2'-0"
27'-0"
1'-1" 1'-1"
3'-9"
1'-9" 1'-9"
3'-9"
7'-7" 7'-10" 7'-7"
6'-11" 6'-11"5'-8"
23'-0"
2'-0" 2'-0"
11 MICRO PILES EQUALLY SPACED
IN
(M
IN
S E E N
O T E
(M
IN
STA 2+73 TO 3+00 5FT LEFT (REVERSED)
STA 2+73 TO 3+00 5FT RIGHT
STA 3+30 TO 3+53 FT RIGHT
STA 3+30 TO 3+53 5FT LEFT
7. ALL BENDS AND HOOKS OF REINFORCEMENT SHALL BE PER ACI DETAILING MANUAL.
MICOPILE CASING SHALL EXTEND A MINIMUM OF 1 FOOT INTO BEDROCK.6.
BATTER PILES TOWARD CENTERLINE STATION 2+73 TO 3+00.
BATTERED PILE CULVERT EXTENSION SECTION:5.
TO 3+53 OFFSET 5 FT RIGHT.
STATION 3+30 TO 3+53 OFFSET 5 FT LEFT. BATTER PILES TOWARD CENTERLINE STATION 3+30
BATTERED PILE CULVERT REPLACEMENT SECTION: BATTER PILES AWAY FROM CENTERLINE 4.
BATTERED PILES SHALL CONTAIN NO. 10 BAR. VERTICAL PILES SHALL CONTAIN NO. 18 BAR.3.
BATTERED: 10 FEETVERTICAL: 21 FEET
CULVERT EXTENSION (STA 2+73 TO 3+00)
BATTERED: 10 FEETVERTICAL: 21 FEET
CULVERT REPLACEMENT (STA 3+30 TO 3+53)
2. GROUTED MICROPILE BOND LENGTH SHALL BE AS SHOWN BELOW:
0.498 IN.
1. 7" DIA API N-80 CASING IS TO HAVE AN OUTER DIAMETER OF 7 IN. AND A WALL THICKNESS OF
B C-5015
A C-5015
30°
30°
BEDROCK
FOOTER
CONCRETE
LENGTH
BOND
MICROPILE
GROUTED
NOTE 6
SEE
GRADE 75
#10 BAR
GROUT
BATTERED CASING
7" DIA API-N80
(VARIES)
CULVERT INVERT
STD 180° HOOK
CASING
7" DIA API-N80
GROUT
SEE NOTE 3
GRADE 75
BAR
GROUT
SEE NOTE 3
GRADE 75
BAR
SEE DETAILS 11 THIS SHEET
BATTERED MICROPILE (TYP.)
DETAILS 10 THIS SHEET
MICROPILE (TYP.) SEE
SHEET
SEE DETAILS 11 AND 12, THIS
BATTERED MICROPILE (TYP.)
DETAILS 10 THIS SHEET
MICROPILE (TYP.) SEE
FOOTER
CONCRETE
GROUT
BATTERED CASING
7" DIA API-N80
NOTE 6
SEE
GRADE 75
#10 BAR
LENGTH
BOND
MICROPILE
GROUTED
BEDROCK
VARIES)
(EL VARIES, SIDE
CULVERT INVERT
CASING
7" DIA API-N80
BEDROCK
FOOTER
CONCRETE
GROUT
NOTE 6
SEE
SEE NOTE 2
BOND LENGTH
GROUTED MICROPILE
GRADE 75
#18 BAR
VARIES)
(EL VARIES, SIDE
CULVERT INVERT
NOTE:
A
C-5015 NTS
IN SOIL
MICROPILE SECTION
C-4012 NTS
CULVERT EXTENSION MICROPILES (STA 2+73 TO 3+00)
C-4012 NTS
CULVERT REPLACEMENT MICROPILES (STA 3+30 TO 3+53)
C-5015 NTS
DETIAIL - VERTICAL MICROPILE 11
C-5015 NTS
DETAIL - BATTERED COMPRESSION MICROPILE
C-5015 NTS
DETAIL - BATTERED TENSION MICROPILE
B
C-5015 NTS
IN BEDROCK
MICROPILE SECTION
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
C -5
-B .d g n
-A
U G -2
:2
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
L V
E R
T R
E P
A
IR
D
E T
A
IL
S
J
U L
Y
J F
R E
E M
A N
E
G U
Y
/s E
R
IC
H D
G U
Y P .E
S H
E E
T O
F
B
B A
K E
R
C-5016-B
-1
-2
R E
V
IS
E D A
M E
N D
M E
N
R E
V
IS
E D A
M E
N D
M E
N
-2
-2
(MIN)
2'-0"
(M
IN
A
C-1011 SCALE: 1" = 10'
SECTION - EMBANKMENT REPAIR
B
C-1011 SCALE: 1" = 10'
SECTION - EMBANKMENT REPAIR
C-4012
C-3017 NTS
DETAIL - ANCHOR TRENCH (TYP)
C-4012
C-3017 NTS
DETAIL - GEOTEXTILE WITH BEDDING
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
G
D E
S C
R
IP
T
IO
N D
A T
E
F
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
F
IL
E N
A M
E
P L
O T D
A T
E
D
E
A O a b
C -3
-B .d g n
-A
U G -2
:4
A
N S I
D
W
W N -1
-B -8
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B
C
P
IT
T S
B U
R G
H D
IS
T R
IC
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
SHEET ID
A
H4TSDRST 10.00002:1
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
M A
R K
U M
0 10' 20'
SCALE: 1"=10'
E M
B A
N K
M E
N T R
E P
A
IR
S
S E
C T
IO
N S
B
C R
A T
T Y
J
U L
Y
E
G U
Y
/s E
R
IC
H D
G U
Y P .E
-1
-2
R E
V
IS
E D A
M E
N D
M E
N
R E
V
IS
E D A
M E
N D
M E
N
-2
-2
C-3017-B
940 940
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 1+100+90 1+00
ASPHALT DRIVEWAY
EDGE OF EXISTING
GROUND
EXISTING
1.75
BACKFILL
STRUCTURE
STABILIZATION (R-5)
STREAMBANK
(WINGWALL)
NEW HEADWALL
BACKFILL
STRUCTURE
ROCK FILL (R-4)
EMBANKMENT
TO DETAIL 1, THIS SHEET)
ANCHOR TRENCH (SIMILAR
(SEE DETAIL 2, THIS SHEET)
LAYER (GT) WITH BEDDING
GEOTEXTILE SEPARATION
GROUND
EXISTING
SHEET
GT - SEE DETAIL 1, THIS
ANCHOR TRENCH FOR
1+30
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 1+100+90 1+00
STA 12+10.4 (APPROX)
NORTH SPRING STREET BASELINE
1.75
BACKFILL
STRUCTURE
STABILIZATION (R-5)
STREAMBANK
(WINGWALL)
NEW HEADWALL
BACKFILL
STRUCTURE
ROCK FILL (R-4)
EMBANKMENT
GROUND
EXISTING
(SEE DETAIL 2, THIS SHEET)
LAYER (GT) WITH BEDDING
GEOTEXTILE SEPARATION
1+20
DETAIL 1, SHEET C-4012
CREST EL 980.5 - SEE
T/NEW EMBANKMENT
SAND BEDDING SHALL MEET THE REQUIREMENTS OF SPEC SECTION 31 00 00 SECTION 3.12.5.1.
NOTES:
GROUND
EXISTING
GRADE
FINISHED
(SEE DETAIL 2, THIS SHEET)
GEOTEXTILE WITH BEDDING
GRADE
6" BELOW
GEOTEXTILE
STOP
R-4 OR 2RC FILL
1'-0 MIN FOR 2RC
2'-0 MIN FOR R-42
GROUND
EXISTING
GEOTEXTILE
R-4 FILL
SEE NOTE 1.
SAND BEDDING.
15'-8" '-0
2' -0
3' -0
45°
(A P P R
O X
8' -4 /4
(MIN)
2'-0"
(M
IN
(M
IN
(M
IN
15'-8"
(APPROX)
5'-10 1/4 " (A P
P R
O X
/4
(M
IN
2'-0"
(A P
P R
O X
/2
(APPROX)
8'-4 3/4 "
1'-10"'
V A
R
IE
S
10'-0"
1'-6"
2'-0"
C O
V E
R
M
IN
C O
V E
R
M
IN
V A
R
IE
S
3'-0"
COVER
2" MIN
COVER
2" MIN
L A
P S
P L
IC
E
M
IN
COVER (TYP)
3" MIN
S
C CULVERTL
OUT INV EL 947.18
OVERFLOW PIPE
PVC SEWER
EXISTING 21" DIA
INV OUT 947.71
RIM ELEV 957.37
OVERFLOW MANHOLE
EXISTING SEWER
C CULVERTL
EL 940.50
B/FOOTER
FORM WINGWALL AROUND PIPE
COMPRESSIBLE FILL MATERIAL.
BETWEEN PIPES WITH
OVERFLOW PIPE; FILL VOID
WRAP AROUND EXISTING SEWER
SPLIT 24" DIA PVC PIPE AND
RIM ELEV 957.37
OVERFLOW MANHOLE
EXISTING SEWER
OVERFLOW PIPE
PVC SEWER
EXISTING 21" DIA
THIS SHEET
AT 18" C/C - SEE DETAIL 2,
3/4" x 19" x 5" HOOK BOLTS
ON FRONT MAT ABOVE CULVERT ARCH
2 ADDITIONAL HORIZONTAL #6 BARS
OF CULVERT ARCH)
ON BACK FACE (TYP EACH SIDE
2 ADDITIONAL VERTICAL #7 BARS
EL 943.50
T/FOOTER
RIM ELEV 957.37
OVERFLOW MANHOLE
EXISTING SEWER
OVERFLOW PIPE
PVC SEWER
EXISTING 21" DIA
FORM WINGWALL AROUND PIPE
COMPRESSIBLE FILL MATERIAL.
BETWEEN PIPES WITH
OVERFLOW PIPE; FILL VOID
WRAP AROUND EXISTING SEWER
SPLIT 24" DIA PVC PIPE AND
SEE DETAIL 3, SHEET C-5019
AROUND PIPE PENETRATION,
FOR ADDITIONAL REINFORCING
NOTE:
EL 940.50
B/FOOTER
HOOK BOLT
3/4" x 19" x 5"
(OUTSIDE FACE)
CULVERT HEADWALL
OF CULVERT)
(DOWNSTREAM FACE
STRUCTURAL PLATE
EL 940.50
B/FOOTER
PLAN VIEW
FRONT ELEVATION
A C-5019
OF APPROXIMATELY 1/4 INCH
ROUGHENED TO A FULL AMPLITUDE
OF LAITANCE, AND INTENTIONALLY
CONCRETE SHALL BE CLEAN, FREE
BATTERED MICROPILE VERTICAL MICROPILE
THIS SHEET
SEE DETAIL 3,
#4 U-BAR
LEFT WINGWALL - FRONT ELEVATION
LEFT WINGWALL - REAR ELEVATION
8 - #6 (EQUALLY SPACED)
#7 AT 12" C/C
13 - #6 (EQUALLY SPACED)
#4 AT 18" C/C
#5 AT 18" C/C
#6 AT 12" C/C
8 - #5 (EQUALLY SPACED)
3 - #5 (EQUALLY SPACED)
BOTH ENDS
STD 90° HOOK
#6 @ 12" C/C
GRADE
FINISHED
GRADE
FINISHED
2 - #5
APPROXIMATELY 1/4 INCH
TO A FULL AMPLITUDE OF
INTENTIONALLY ROUGHENED
FREE OF LAITANCE, AND
CONCRETE SHALL BE CLEAN,
8 - #6 (EQUALLY SPACED)
#7 AT 12" C/C
13 - #6 (EQUALLY SPACED)
#4 AT 18" C/C
#5 AT 18" C/C
#6 AT 12" C/C
8 - #5 (EQUALLY SPACED)
3 - #5 (EQUALLY SPACED)
BOTH ENDS
STD 90° HOOK
#6 @ 12" C/C
GRADE
FINISHED
GRADE
FINISHED
2 - #5
APPROXIMATELY 1/4 INCH
TO A FULL AMPLITUDE OF
INTENTIONALLY ROUGHENED
FREE OF LAITANCE, AND
CONCRETE SHALL BE CLEAN,
ALL BENDS AND HOOKS OF REINFORCEMENT SHALL BE PER ACI DETAIL MANUAL.6.
SECTION 31 05 19 GEOTEXTILE.
THE STRUCTURE BACKFILL AND THE EMBANKMENT ROCK FILL. GEOTEXTILE FABRIC SHALL MEET THE REQUIREMENTS OF
EARTHWORK, SECTION 3.11.1.2 STRUCTURE BACKFILL. GEOTEXTILE FABRIC SHALL BE PLACED CONTINUOUSLY BETWEEN
WINGWALLS. STRUCTURE BACKFILL AND COMPACTION SHALL MEET THE REQUIREMENTS OF SECTION 31 00 00 FOR
AND THE PROFILE ON C-4012. THE STRUCTURE BACKFILL SHALL TERMINATE 2' BELOW THE TOP OF THE HEADWALL AND
5. THE STRUCTURE BACKFILL SHALL BE INSTALLED AS SHOWN ON DETAIL 1, SHEET C-5015, SECTIONS A AND B ON C-3017, COVER FOR REINFORCING SHALL BE AS SHOWN IN THE DETAILS.
4. ALL REINFORCING STEEL SHALL BE EPOXY COATED BARS, UNLESS OTHERWISE NOTED ON THE DETAIL. MINIMUM
CONTINUED A MINIMUM OF 1-FT BELOW FINISHED GROUND LINE.
3. ALL EXPOSED CONCRETE EDGES SHALL HAVE A 3/4" x 45° CHAMFER. CHAMFER ON VERTICAL EDGES SHALL BE
CONCRETE SHALL BE 5,000 PSI COMPRESSIVE STRENGTH CONCRETE.2.
CONCRETE.
CAST-IN-PLACE OR PRECAST. CONCRETE SHALL MEET THE REQUIREMENTS OF SECTION 03 30 00 CAST-IN-PLACE
AND WINGWALLS SHALL BE REINFORCED CONCRETE UNLESS OTHERWISE APPROVED. THE HEADWALL MAY BE EITHER
A HEADWALL WITH WINGWALLS SHALL BE INSTALLED AS AN END TREATMENT FOR THE ARCH CULVERT. THE HEADWALL 1.
NOTES:
B C-5018
B
C-5018 SCALE: 3/8" = 1'-0"
TYPICAL WALL SECTION
WALLS
TYP ALL
C-5018 SCALE: 3/4" = 1'-0"
DETAIL - STRUCTURAL PLATE ANCHORAGE
C-4012
C-1011 SCALE: 1/8" = 1'-0"
DETAIL - CULVERT HEADWALL
C-4012 SCALE: 3/8" = 1'-0"
DETAIL - PILE CAP / HEADWALL INTERFACE
C-4012 SCALE: 3/8" = 1'-0"
DETAIL - U-BAR
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDRST
A O a b
C -5
-B .d g n
-A
U G -2
:4
0.083334:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
A L L E
G H
E N
Y R
IV
E R B
A S
IN
C O
N E
M A
U G
H R
IV
E R L
A K
E
B L
A
IR
S V
IL
L E P
A
P E
R M
A N
E N
T E
M B
A N
K M
E N
T A
N D C
U L
V E
R T R
E P
A
IR
P
R O J E
C T
CERTIFIED FINAL DOCUMENTS
W
W N -1
-B -8
C R
A T
T Y /B
B A
K E
R
H E
A D
W A
L L D
E T
A
IL
S
0 8'4' 16'
SCALE: 1/8"=1'
4'0 2' 8'
SCALE: 3/8"=1'
J
U L
Y
J F
R E
E M
A N
E
G U
Y G
M E
Y E
R
/s E
R
IC
H D
G U
Y P .E
2'0 1' 4'
SCALE: 3/4"=1'
S H
E E
T O
F
C-5018-B
-1
-2
R E
V
IS
E D A
M E
N D
M E
N
R E
V
IS
E D A
M E
N D
M E
N
-2
-2
Q S
P A
C E
D
8 - #5
E Q S
P A
C E
D
E Q S
P A
C E
D
3 - #5
E Q S
P A
C E
D
(TYP)
2"
CLR
(TYP)
1'-
0"
.1
L
#6 A
T 2" C /C
#7 V E
R T
IC
A L B
A R
S A
T
12" C /C (U
P F
R O
M B
O T
T O
M
18" C /C (U
P F
R O
M B
O T
T O
M
#5 S
LA
N T
E D B
A R
S A
T
C CULVERT
NOTE:
ABOUT CENTERLINE OF CULVERT
FOOTER REINFORCING SYMMETRICAL
#5 A
T 8" C /C
#7 A
T 2" C /C
LC CULVERT
NOTE:
ABOUT CENTERLINE OF CULVERT
FOOTER REINFORCING…