PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 32 01 PROJECT SCHEDULE

01 32 33 DIGITAL PROGRESS IMAGES

01 33 00 SUBMITTAL PROCEDURES

01 35 00 SPECIAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 50 DIVING SERVICES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 05 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 57 20 ENVIRONMENTAL PROTECTION

01 57 23 STORMWATER POLLUTION PREVENTION MEASURES

01 71 23 SURVEY REQUIREMENTS

01 74 19 OPERATION OF VICTORY HOLLOW SITE

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 31 - EARTHWORK

31 32 11 TURF REINFORCEMENT MAT

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 19 SEEDING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

-- End of Project Table of Contents --

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

PROJECT TABLE OF CONTENTS Page 1 Revised by Amendment No. 0001

This page was intentionally left blank for duplex printing.

S U

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

P oo l 3 D re dg e an d V ic to ry H ol lo w R ep la ce m en t C on tra ct

S D

-0

P re co ns tru ct io n

S ub m itt al s

G R

O P ay ro ll B as ic

R ec or ds

S ta te m en ts o f C om pl ia nc e

G R

O A ffi rm at iv e A ct io n C om pl ia nc e P la n

S D

-0

C er tif ic at es

G R

O C er tif ic at e of

In su ra nc e

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

R O

P ro je ct

S ch ed ul er Q ua lif ic at io ns

3.

4.

G

R O

P re lim in ar y

P ro je ct

S ch ed ul e 3.

4.

G R

O In iti al

P ro je ct

S ch ed ul e 3.

6.

G R

O P er io di c

S ch ed ul e U pd at e

S

D -0

P re co ns tru ct io n S ub m itt al s G

R E

P ho to gr ap he r Q ua lif ic at io ns S

D -1

C lo se ou t S ub m itt al s G

R E

Th um bn ai l H ar d C op y

P rin ts o f P ro gr es s

Im ag es G

R E

G lo ss y

P rin ts o f S el ec te d O ffi ci al P ro gr es s

Im ag es G

R E

E le ct ro ni c

C op y of

S el ec te d O ffi ci al P ro gr es s

Im ag es G

R E

E le ct ro ni c

C op y of

A ll

O th er P ro gr es s

Im ag es

S

D -0

P re co ns tru ct io n S ub m itt al s 1.

G

R O

S ub m itt al R eg is te r

S D

-0

P re co ns tru ct io n

S ub m itt al s

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

Section 01 33 00 Page 15

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

P oo l 3 D re dg e an d V ic to ry H ol lo w R ep la ce m en t C on tra ct

G R

O C om pl et e

Li st

O f E m pl oy ee s W ho W ill B e W or ki ng O n G ov er nm en t P ro pe rty

G R

O C or re sp on de nc e w ith U til ity

C om pa ni es G

R O

C or re sp on de nc e w ith

P en nD O

T G

R O

C or re sp on de nc e w ith

W at er In ta ke

O w ne rs

G R

O C op y of R eq ue st to

U S

C G fo r

N ot ic e to M ar in er s

G R

O C op y of R eq ue st to

U S

C G fo r

M ov em en t o f N av ig at io n A id s

S D

-0

S ho p D ra w in gs

1.

6.

G

R O

A cc es s

P la n 1.

G

R O

M ai nt en an ce a nd

P ro te ct io n of V eh ic ul ar

T ra ffi c

S D

-0

C er tif ic at es

G R

O A

T Le ve l I

T ra in in g G

R O

IW

at ch T ra in in g

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

G R

O A cc id en t P re ve nt io n P la n

(A P

P

G R

O N am es a nd

Q ua lif ic at io ns G

R O

C on tra ct or A cc id en t P re ve nt io n P la n

(A P

P ) C he ck lis t

S D

-0

Te st

R ep or ts

1.

G R

O M on th ly E xp os ur e

R ep or tsSU

B M

IT

TA

L R

EG

IS

TE

R

C O

N

TR

A C

T N

O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

Section 01 33 00 Page 16

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

P oo l 3 D re dg e an d V ic to ry H ol lo w R ep la ce m en t C on tra ct

1.

G R

O N ot ifi ca tio ns a nd R ep or ts 1.

.2

G R

O A cc id en t R ep or ts 1.

.3

G R

O

LH

E In sp ec tio n

R ep or ts

S D

-0

C er tif ic at es

1.

6.

1.

G R

O C ra ne

O pe ra to rs /R ig ge rs 1.

7.

2.

G

R O

S ta nd ar d Li ft P la n

1.

7.

2.

G R

O C rit ic al L ift P la n

1.

7.

2.

G R

O N av al

A rc hi te ct ur e A na ly si s

1.

G R

O A ct iv ity H az ar d A na ly si s

(A H

A

1.

9.

G

R O

C on fin ed

S pa ce E nt ry

P er m it

1.

9.

G

R O

H ot

W or k P er m it 1.

.4

G R

O C er tif ic at e of

C om pl ia nc e

1.

G R

O Li ce ns e C er tif ic at es

S

D -0

C er tif ic at es 1.

G

R O

D iv in g

P la n 1.

G

R O

A ct iv ity

H az ar d

A na ly si s P la n

1.

G R

O E m er ge nc y M an ag em en t P la n 1.

G

R O

D iv in g

O pe ra tio ns M an ua l 1.

G

R O

D iv e P er so nn el

Q ua lif ic at io ns 1.

G

R O

A ir

Q ua lit y

C er tif ic at io ns 1.

G

R O

D ai ly L og s

S D

-0

P re co ns tru ct io n

S ub m itt al s

3.

G R

O C on tra ct or

Q ua lit y

C on tro l (

C Q

C

P la n S

D -0

Te st R ep or ts 3.

G

R O

V er ifi ca tio n

S ta te m en t

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

Section 01 33 00 Page 17

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

P oo l 3 D re dg e an d V ic to ry H ol lo w R ep la ce m en t C on tra ct

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

G R

O E nv iro nm en ta l P ro te ct io n P la n

1.

9.

G

R O

E nv iro nm en ta l S en io r

C om pl ia nc e

R ep re se nt at iv e

(E S

C R

1.

9.

G R

O E nv iro nm en ta l F ie ld

T ec hn ic ia n

C om pl ia nc e

R ep re se nt at iv e

(E

FT

C R

1.

7.

G R

O A ct iv ity E nv iro nm en ta l A na ly si s

1.

7.

G

R O

E nv iro nm en ta l C er tif ic at io n S ta te m en t

S

D -0

Te st R ep or ts 3.

3.

G R

O In sp ec tio n an d

M ai nt en an ce

R ep or ts

S D

-0

C er tif ic at es

1.

3.

2.

G R

O Fi lte r F ab ric

F en ce s

G R

O Fi lte r F ab ric

G R

O S to ne

G R

O A gg re ga te

G R

O P um pe d S ed im en t C on tro l D ev ic e G

R O

W ei gh te d S ed im en t F ilt er

T ub e G

R O

S lo pe P ip e

M at er ia l G

R O

S ed im en t F ilt er L og G

R O

E ro si on

C on tro l B la nk et

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

Section 01 33 00 Page 18

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

P oo l 3 D re dg e an d V ic to ry H ol lo w R ep la ce m en t C on tra ct

G R

O M ai nt en an ce M at er ia l f or E xi st in g

Fe at ur es

S D

-0

P re co ns tru ct io n

S ub m itt al s

1.

G R

O Q ua lif ic at io ns

G E

D S ur ve yi ng

P ro ce du re s an d

E qu ip m en t

S D

-0

C er tif ic at es

G E

D S ur ve y Lo gs G

E D

A fte r S ub gr ad e C on st ru ct io n

S ur ve ys a nd

A fte r C on st ru ct io n S ur ve ys G

R O

B ef or e-a nd

A fte r- S ur ve ys o f t he

S ed im en t D ew at er in g

A re a 3.

G

E D

M et ad at a

S

D -0

P re co ns tru ct io n S ub m itt al s G

E D

O ff-lo ad in g

Fa ci lit y

W or k P la n

G R

O W or k

P la n fo r E xc av at ed M at er ia l an d

C on cr et e P la ce m en t W or k G

E D

Fi ll

P la ce m en t P la n

3.

G R

O S ed im en t B as in

C le an in g P la n

3.

G R

O Tr af fic

C on tro l

G E

D E xi st in g

O ff-

Lo ad in g

Fa ci lit y

D es ig n

G E

D M od ifi ca tio ns to

O ff-

Lo ad in g

Fa ci lit y

D es ig n

G E

D M on ito rin g

W el l M od ifi ca tio n

P la n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

Section 01 33 00 Page 19

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

P oo l 3 D re dg e an d V ic to ry H ol lo w R ep la ce m en t C on tra ct

S D

-0

D es ig n

D at a G

E D

C on st ru ct io n Lo ad in g D es ig n D at a fo r t he R ai lro ad B rid ge

S D

-0

Te st

R ep or ts

G R

O M oi st ur e

C on di tio n S

D -0

C er tif ic at es

FI

O C er tif ie d

W ei gh t S ca le

T ic ke ts

FI

O

B ar ge D is pl ac em en t Q ua nt iti es

S D

-1

C lo se ou t S ub m itt al s

3.

G R

O U pl an d Fi ll P la ce m en t A re a G

R O

E nv iro nm en ta l a nd

N P

D E

S D oc um en ts a nd

R ec or ds

S D

-1

C lo se ou t S ub m itt al s

3.

G E

D A s- B ui lt

D ra w in gs 3.

G

E D

R ec or d

D ra w in gs G

D O

A s-

B ui lt R ec or d of

E qu ip m en t an d

M at er ia ls

S

D -0

P re co ns tru ct io n S ub m itt al s G

D O

W or k P la n

S D

-0

P ro du ct

D at a G

D O

M an uf ac tu re r's C at al og D at a

S D

-0

S am pl es

G D

O Tu rf R ei nf or ce m en t M at

S D

-0

Te st

R ep or ts

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

Section 01 33 00 Page 20

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

P oo l 3 D re dg e an d V ic to ry H ol lo w R ep la ce m en t C on tra ct

G D

O H ig h

V el oc ity

F lo w T es ts

U nd er B ar e

S oi l a nd

V eg et at ed C on di tio ns

S D

-0

C er tif ic at es

G D

O Tu rf R ei nf or ce m en t M at

S D

-0

P re co ns tru ct io n

S ub m itt al s

G R

O S ee di ng P la n

G R

O S ee d

E st ab lis hm en t P er io d

S D

-0

P ro du ct

D at a 2.

G

R O

S ee d S

D -0

C er tif ic at es 2.

G

R O se ed

S D

-0

M an uf ac tu re r’s In st ru ct io ns 2.

G

D O

S ee d

S

D -0

P re co ns tru ct io n S ub m itt al s G

R O

V es se l a nd E qu ip m en t L is t G

R O

D re dg in g P er so nn el

Q ua lif ic at io ns S

D -0

Te st R ep or ts 1.

G

R O

D G

P S

P os iti on in g

G R

O D ai ly

C la m sh el l B uc ke t P os iti on in g R ec or ds G

R O

In sp ec to r's R ep or t G

R O

Fa ll

P ro te ct io n

In sp ec tio n R ep or t

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

Section 01 33 00 Page 21

This page was intentionally left blank for duplex printing.

CERTIFIED FINAL DOCUMENTS - RTA W911WN-17-B-8005

SECTION 01 35 00

SPECIAL PROCEDURES

PART 1 GENERAL

1.1 GENERAL REQUIREMENTS

This section contains information of a general nature, and covers general requirements applicable to the performance of the work under this contract. The information provided, and the requirements specified are in addition to those specified in other sections of the contract.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION (PDT)

PDT 408 (2016) Specifications

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. COAST GUARD (USCG)

NAVIGATION RULES (August 2014) Navigation Rules and Regulations Handbook

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 81 72 COLREGS: Implementing Rules

33 CFR 84 Annex I: Positioning and Technical Details of Lights and Shapes

33 CFR 89 Inland Navigation Rules: Implementing Rules

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Complete List Of Employees Who Will Be Working On Government Property; G, RO

Submit the list pre-screened employees.

Section 01 35 00 Page 1

Correspondence with Utility Companies; G, RO

Submit all correspondence between the Contractor and the utility companies regarding utility locations and depths showing that the required information was obtained.

Correspondence with PennDOT; G, RO

Submit all correspondence between the Contractor and PennDOT regarding dredging near bridge piers.

Correspondence with Water Intake Owners; G, RO

Submit all correspondence between the Contractor and water intake owners regarding dredging near water intakes.

Copy of Request to USCG for Notice to Mariners; G, RO

Copy of Request to USCG for Movement of Navigation Aids; G, RO

SD-02 Shop Drawings

Access Plan; G, RO

Contractor's proposed plan for accessing the site and performing the work.

Maintenance and Protection of Vehicular Traffic; G, RO

Contractor's proposed plan(s) for maintaining and protecting traffic, including any measures required by any permits, for all construction sites covered under this contract.

SD-07 Certificates

AT Level I Training; G, RO IWatch Training; G, RO

1.4 DRAWINGS

The drawings reflect the work to be performed under this contract. The Contractor shall check all drawings immediately upon receipt, and verify the figures, dimensions, and representation of the work. The Contractor shall compare all drawings and verify the figures before laying out the work. Dimensions marked on drawings shall, in general, be followed in preference to scale measurements. The Contractor shall promptly notify the Contracting Officer of any discrepancies, and shall be responsible for an errors which might have been avoided by complying with this paragraph. Any omissions from the drawings and specifications or incorrect description of details of the work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or incorrectly described details of work, but shall be performed as if fully and correctly set forth and described in the drawings and specifications.

Unless otherwise noted, dimensions and elevations, and other features shown on drawings are generally based on site surveys and measurements, and as-built drawings. The Government cannot guarantee the accuracy of the

Section 01 35 00 Page 2 dimensions, elevations, and features shown on the drawings which are based on the reference drawings, and it shall be the responsibility of the Contractor to verify all elevations and the dimensions shown by measurements in the field, at no additional cost to the Government.

1.5 WORK UNDER OTHER CONTRACTS

Attention is directed to the fact that other Contractors may be employed by the Government at or in the vicinity of the work covered by these specifications. It is noted that the information provided is for the Contractor's information, and no attempt has been made to list all the work activities required under those contracts. Unless specified otherwise, all Contractors shall have equal rights to the use of access roads and other areas which are not identified on the drawings as work areas or laydown areas for specific contractors, so far as practicable, and the Contractor employed under this contract shall cooperate with other Contractors so that the work may be performed with maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern. See also Section 00700 CONTRACT CLAUSES, FAR 52.236-8 OTHER CONTRACTS. See also paragraph Protection of Existing Roads and Property.

1.6 ACCESS AND WORK AREAS

1.6.1 General Access to Project Site

The only area permitted to be used for access to the river and for on-loading and off-loading operations shall be at the Victory Hollow Site, as shown on the drawings. Any other areas proposed by the Contractor for access to the river and for on-loading and off-loading operations shall be existing permitted commercial marine facilities.

1.6.2 Access Plan

The Contractor shall prepare a plan to address maintaining access to existing facilities and temporary access as required for construction of the various features of work. The plan shall address all requirements or conditions given in paragraphs WORK UNDER OTHER CONTRACTS, ACCESS AND WORK AREAS, CONTRACTOR'S FLOATING PLANT, CONDITIONS OF WORK, and POOL LEVELS, herein.

1.6.3 General Work Area Restrictions

As required by Section 00700 CONTRACT CLAUSES, FAR 236-10 OPERATIONS AND STORAGE AREAS, all operations of the Contractor shall be confined to areas shown on the drawings and as authorized and approved by the Contracting Officer. The limits of the Contractor's work areas are shown on the drawings. In accordance with Section 00700 CONTRACT CLAUSES, FAR 52.236-17 LAYOUT OF WORK, the Contractor shall maintain and preserve all existing survey control points established by the Government.

1.6.4 Protection of Existing Roads and Property

1.6.4.1 General

The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic. The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads. The Contractor shall be responsible

Section 01 35 00 Page 3 for all damage to existing roads and property occasioned by any of his operations. When intending to transport any heavy loads on roadways, the Contractor shall investigate all weight limits for the roads he intends to use and shall secure any required bond(s) from the respective owner(s).

The Contractor shall document the existing condition of the roadways that he will be using, with the owners thereof. In the past, video recordings of the original roadway conditions have provided satisfactory documentation. Prior to beginning any construction, the Contractor shall videorecord on DVD format all existing structures including, but not limited to, local roads, public and private property, and any other areas as directed by the Contracting Officer. The owners of such roadways and other property should be present at the time of the documentation. An unedited copy of all video recordings shall be given to the owners and the Contracting officer with 5 days after documented. All damage to transportation facilities, public or private property, or utilities caused by the Contractor's operations shall be repaired to the satisfaction of the owner and the Contracting Officer, at no additional cost to the Government. Any damage to the roadways, caused by the Contractor's operations, shall be repaired in kind by the Contractor. Roads shall be kept clear of all debris generated by the Contractor's operations. Roads shall be cleaned of any spillage. Upon completion of all work requiring use of the local roads, the roadways shall be restored to their preconstruction condition by cleaning and or reconstruction of damaged drainage facilities, base courses, and pavements as necessary. Repairs shall be made in the same manner as the original construction.

The Contractor will be permitted to use only public roads and highways for access to the project area. The Contractor will not be permitted to make arrangements with private landowners for access.

1.6.4.2 Hauling Permits

The Contractor shall be responsible for acquiring all necessary oversized hauling permits and general hauling permits for equipment or debris transported via roadways, as required. No heavy hauling on public roads will be permitted until all permits and bonds have been obtained as required. All costs associated with securing these permits shall be borne by the Contractor.

1.6.5 Utilities

The Contractor shall be responsible for the coordination of all existing utilities with the work and for providing utilities for construction purposes.

a. For marking underground utility lines, call for free markouts a minimum of 3 work days before you dig at 811 or 1-800-242-1776.

b. Coordinate the construction of the new navigation channel with the locations of many privately owned submerged utility crossings, consisting of natural gas, propane gas transmission lines, and a telephone line.

These crossings are permitted by Pittsburgh District and the PA Department of Environmental Protection. The utility crossings will be required to meet their permitted submergence criteria when Pool 3 is lowered, which is

708.1 NAVD88 to the top of the line. This has resulted in the owners having identified lines that will require relocation and lines that will not require relocation. All required relocations are anticipated to be completed prior to award of this contract. All required relocations are to

Section 01 35 00 Page 4 be completed prior to any dredging activities taking place near those lines. The owners have been required to provide verified, "as-built" drawings and other information, which show the alignment of the lines both horizontally and vertically.

c. The existing utility locations shown on the drawings and listed below are approximate and may not be complete. The Government does not insure the accuracy of the utility locations shown. The Contractor is responsible to confirm all utility data, including, but not limited to, horizontal and vertical coordinates, type and number of lines, points of contact, datum, etc., prior to any dredging taking place in this contract. Contact all of the utility companies to verify this information and to obtain "as-built" drawings of all utilities crossing the Monongahela River. Submit all correspondence between the Contractor and the utility companies to the Contracting Officer. A list of utility contact information is included as Appendix H, however, this list may not be complete. For those Utilities that are not yet known, unclaimed, unmarked, or unidentified, the Contractor shall employ reasonable due diligence, exercise best professional judgment, and use best management practices customary to the industry prior to and during dredging operations. In the event that the Contractor encounters Utilities that were previously unknown, unclaimed, unmarked, or unidentified, notify the Contracting Officer immediately.

d. Prior to dredging in any area where a utility line, known, not yet known, unclaimed, unmarked, or unidentified, crosses the Monongahela River, the Contractor shall make sure a representative of the utility company is on-site to verify the utility line location.

e. If it is determined that a utility line needs to be relocated because it does not meet the submergence criteria for dredging to take place, the Contractor shall dredge to within 50 feet on each side of the utility line. Once the utility line is relocated at a later date, the Contractor shall be required to return to the location and dredge the remaining area.

This will be handled as a modification to the contract.

f. The following utilities are known to cross the Monongahela River at approximately the below locations:

CROSSING

NUMBER DESCRIPTION OWNER STATION

1 (1) 9" Propane Enterprise Products 41+10

(TEPPCO)

2 (2) 20" Natural Gas TransCanada 41+64 (Columbia Gas Trans) 3 (1) 6" Propane Enterprise Products 46+25

(TEPPCO)

4 Unknown Unknown 51+50 5 (4) 10" Gas Equitrans (Equitable 88+04 (abandoned) Gas Co.)

6 (1) 10" Gas Equitrans (Equitable 88+10 (abandoned) Gas Co.)

7 (1) 10" Gas Equitrans (Equitable 88+35 (abandoned) Gas Co.)

8 (1) 12" Gas Equitrans (Equitable 89+89 (abandoned) Gas Co.)

9 (1) 16" Gas Equitrans (Equitable 90+01 Gas Co.)

10 (1) 16" Gas Equitrans (Equitable 92+27

Section 01 35 00 Page 5

Gas Co.)

10R (1) 16" Gas Equitrans (Equitable 94+55 Gas Co.)

11 (1) 20" Gas Sunoco 251+54 12 (1) 12" Liquid Natural Sunoco 251+79 Gas 13 (1) 8" Gas Equitrans (Equitable 378+93 Gas Co.)

14 (9) 4" Telephone Verizon 438+41 14A (9) 4" Telephone Verizon 438+58 (abandoned) 15 (1) 16" Gas Equitrans (Equitable 460+40 Gas Co.)

16A (5) 10" Gas Equitrans (Equitable 461+68 Gas Co.)

17 (1) 24" Gas EQT (PO Dominion 486+16 Peoples) 18 (2) 10" Propane Dominion Transmission 489+62 19 (5) 10" Gas Peoples-Gas/Dominion 490+43 Peoples 20 (2) 13" Gas Dominion Transmission 543+99 (abandoned) 21-1 (2) 10" Natural Gas TransCanada (Columbia 556+06 Gas Trans) 21-2 (2) 10" Natural Gas TransCanada (Columbia 559+70 Gas Trans) 22-1 (2) 24" Natural Gas Dominion Transmission 594+39 22-2 (2) 24" Natural Gas Dominion Transmission 598+48 23 (2) 24" Natural Gas Dominion Transmission 603+46 24 (1) 8" Natural Gas NiSource (Columbia 692+28 Gas of PA) 25 (1) 8" Natural Gas NiSource (Columbia 695+34 Gas of PA) 26 (1) 16" Force Mon Valley Sewage 780+35 Sanitary Authority 27 (2) 16" Water Borough of Charleroi 793+25 28 (2) 8" Natural Gas Peoples-Gas (Peoples 794+20 Natural Gas Co) 29 (1) 12" Gas Peoples-Gas (Dominion 902+55 Peoples) 29PR (1) 12" Gas Peoples-Gas (Dominion 903+63 Peoples) 30 (1) 20" Water Borough of Charleroi 915+23 31 (1) 6" Natural Gas TransCanada (Columbia 925+11 Gas Trans)

1.6.6 Dredging Requirements near Highway Bridge Piers

One week prior to any dredging operations in the vicinity of highway bridge piers contact PennDOT personnel. Submit all correspondence between the Contractor and PennDOT to the Contracting Officer. Contact information is as follows:

Monongahela Highway Bridge S.R. 136 at River Mile 32.27 (Station 455+50)

Lou Ruzzi, P.E. - District Bridge Engineer PA Department of Transportation Engineering District 11-0, Bridge Management Unit 45 Thoms Run Road, Bridgeville, PA 15017

Section 01 35 00 Page 6

Phone: 412.429.4893

Keith Cornelius, P.E. - Assistant District Bridge Engineer PA Department of Transportation Engineering District 11-0 - Bridge Management Unit 45 Thoms Run Road, Bridgeville, PA 15017 Phone: 412.429.2855 Cell: 412.699.9334

Donora-Monessen Bridge at River Mile 38 (Station 757+68) and Charleroi-Monessen Bridge at River Mile 41 (Station 914+03)

Stephen J. Hoyer, P.E.

Assistant District Bridge Engineer - Inspection PA Department of Transportation Engineering District 12-0 825 North Gallatin Avenue Extension Uniontown, PA 15401 Phone: 724.439.7266 Email: sthoyer@pa.gov

1.6.7 Dredging Requirements near Water Intakes

Prior to any dredging operations make contact with commercial and public water supply intake owners to get a list of water intakes in the vicinity of the work. One week prior to any dredging operations in the vicinity of an intake, notify intake owners of dredging activities. Submit all correspondence between the Contractor and intake owners to the Contracting Officer.

1.7 EXISTING SURVEY CONTROLS

The locations of Corps of Engineer survey controls are shown on the drawings.

1.7.1 Project Alignment

All new work to be constructed under this contract shall be constructed level, plumb, and accurately from measurements made from the survey controls indicated. Additional survey control points shall be established by the Contractor as necessary to construct all work within the proper alignment. The Contractor shall verify the elevations and positions of the Corps of Engineers survey controls before using them to layout the work under this contract, and shall notify the Contracting Officer of any discrepancies prior to commencing work.

1.8 LAYOUT OF WORK

The Contractor shall lay out its work from Government-provided channel coordinates and survey control points, furnished as part of each work assignment. The Contractor shall furnish, at its own expense, such stakes, templates, platforms, equipment, range markers and labor as may be required in laying out any part of the work, from the channel coordinates and surveying benchmarks furnished by the Government and shall be responsible for all measurements in connection therewith. If any Government control is found disturbed or destroyed, this must be communicated to the Pittsburgh District Surveys Branch through the Contractor Officer's Representative (COR) before any control is re-established. The Contractor shall be responsible for executing the work to such lines and grades as may be

Section 01 35 00 Page 7 established or indicated by the Contracting Officer. The Contractor shall have real time differential GPS positioning in accordance with the Corps surveying manual, EM 1110-2-1003, for class 1 survey requirements for dredge positioning. The Contractor shall provide real time positioning on a computer screen during dredging, and have the capability of playback in 15 minute intervals. The position must be recorded on disk every 15 minutes and submitted to the Contracting Officer on a daily basis.

1.9 MAINTENANCE AND PROTECTION OF VEHICULAR TRAFFIC

During construction the Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flaggers, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by any permits or whenever the Contractor's operations interfere with the movement or safety of traffic along the public roads. Such measures shall be in accordance with the applicable provisions of PDT 408, Section 900, and local authorities having jurisdiction. The traveling public shall be protected from damage to person and property. The Contractor shall submit his proposed traffic control plan for approval and shall include documentation that his proposed plan has been coordinated and approved by the local authority having jurisdiction. Where such measures are on Government property, the Contractor shall coordinate such measures with the Contracting Officer.

1.10 MAINTENANCE AND PROTECTION OF RAILROAD TRAFFIC

The safety and continuity of operation of the traffic of the railroad at the Victory Hollow Site is a high concern and the contract has been developed accordingly; the safe operation of the railroad which passes under the bridge shall be protected at all times.

The following items have been incorporated into the contract to assure the safe operation of the railroad:

1. The existing railroad crossing from State Route 837 at the entrance to the Off-loading Facility may be used for mobilizing and demobilizing equipment at the Off-loading Facility, and for passage of light vehicles such as pickup trucks and automobiles. No materials can be taken over the crossing without prior approval from the Government.

2. Mobilization and demobilization of equipment over the existing railroad crossing shall be performed during daylight hours. Railroad flaggers will be required when heavy equipment is being mobilized to or demobilized from the site using the existing railroad crossing.

No separate payment will be made for flagger services or other protective measures required, and all costs of providing such services or protective measures shall be borne by the Contractor. The Contractor shall give the Chief Engineer of the railroad five working days written notice before any work is started that requires flagger services. All flaggers shall be provided by the railroad company. The Contractor shall inform himself of the base rates of pay, including all overheads required to be added to those base rates, for protective services on the basis of a minimum eight hour day with premium time beyond eight hours, as well as premium time for

Section 01 35 00 Page 8 work on Saturdays, Sundays and legal holidays. The Contractor shall also inform himself of the railroad's policies concerning travel time to-and from headquarters and point of work.

The Contractor shall prepare his work plans as required to comply with these requirements. The Contractor shall contact representatives from the Norfolk Southern Corporation to arrange for railroad flaggers.

All costs related to coordination with the railroad, including the cost of flaggers, work delays, etc… shall be borne by the Contractor and will not be subject to reimbursement by the Government.

1.11 PROJECT SITE CONDITIONS

1.11.1 Interpretation of Geologic Information, Data and Samples

Logs of borings and laboratory test data are made available in Appendix A -Geotechnical Data For Channel Sediments for the Contractor's information and for his interpretation. Logs and test data are not represented as a complete description of the site soil, rock, and water information, but only display what was found in borings at the indicated locations on the date holes were drilled. The soil and groundwater conditions may be different from those interpreted by the subsurface investigation. It is the Contractor's responsibility to obtain additional information, if necessary in his judgment.

1.11.2 Previous Remediation Work

Past environmental characterization investigations identified HTRW-impacted sediments in the proposed Pool 3 navigation channel. These HTRW-impacted materials were removed under a previous dredging contract that excavated management units MV-3, MV-59, and MV-102 as identified in the locations plans included in Appendix A. No sediments containing HTRW in excess of permissible limits are anticipated to be encountered under this contract.

1.12 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in Section 00700 CONTRACT CLAUSES, FAR 52.236-7 PERMITS AND RESPONSIBILITIES. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to the Section 00700 CONTRACT CLAUSES, FAR 52.243-4 CHANGES, will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices.

Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

Section 01 35 00 Page 9

1.13 CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specifications requirements shall be executed in triplicate copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies.

Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

1.14 CONTRACTOR'S FLOATING PLANT

1.14.1 General

Floating plant, and the operation of such plant, shall comply with the requirements of EM 385-1-1, Section 19. Floating plant which is not being used in the performance of the work shall be secured in a manner that does not interfere with navigation on the river. Coordinate dredging operations and make provisions for work stoppage in a way that will allow river traffic to pass. Any work stoppages required to allow river traffic to pass, will not be paid for by the Government. Emergency plans for removing or securing floating plant and evacuating personnel in the event of severe weather shall be prepared in accordance with EM 385-1-1, Section 19.A.03.

The Contractor shall provide personnel as necessary to adjust moorings to provide for fluctuations of pool level. Propelling units capable of moving the floating plant must be on site at all times. The written Propelling Unit Agreement between the Contractor and the lessor that documents this requirement shall be provided to the Contracting Officer prior to beginning work. The agreement shall also include documentation that the propelling unit operator currently possesses a U.S. Coast Guard First Class Pilot's license. The Contractor shall be fully responsible for selection of floating plant which is suitable for the performance of the work under this contract. Contractor's floating plant shall operate only within the areas of work shown on the drawings, unless such areas are modified with the approval of the Contracting Officer and Lockmaster. Except as otherwise indicated, Contractor shall utilize existing permitted commercial marine facilities for access to the river and for on-loading and off-loading operations. The Off-loading Facility at the Government furnished Victory Hollow Site shall be used for the off-loading of excavated river sediments, and concrete debris. An area adjacent to the Sediment Dewatering Area at the Government furnished Victory Hollow Site may be used for the temporary storage of non-erodable materials, e.g. pipe, steel, etc. Exact storage area to be approved by Contracting Officer.

1.14.2 Floating Plant

The Contractor shall select floating plant and towboats of a size and capacity suitable for performance of the work under this contract.

Towboats shall have sufficient horsepower capacity to control the floating plant used, considering the size and draft of the plant, for the expected river velocities and wind conditions. The minimum size of towboats shall be 800 horsepower. The Contractor shall submit a plan of all floating plant, floating plant based equipment (i.e. cranes, derricks), temporary operating systems (i.e. generators, compressors, welding machines, etc.), Section 01 35 00 Page 10 and other appurtenant features which he will have present during the contract period for any fleet. The Contractor shall use sketches, diagrams, and narratives to indicate location of all floating plant-equipment. The Contractor shall use manufacturer's catalog information or other suitable data to describe the specific equipment to be used. The Contractor shall also indicate the methods and procedures that will be used to deliver materials, supplies and equipment via floating plant. Floating plant shall be suitably sized and arranged so that it may be efficiently withdrawn under the conditions described in paragraph Suspension of Construction.

1.14.3 Signal Lights

The Contractor shall display signal lights and conduct his operations in accordance with the General Regulations of the Coast Guard, as set forth in NAVIGATION RULES or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (inland) as applicable.

1.14.4 Obstruction of Channel

The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor is required to conduct the work in such a manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. The Contractor shall request the U.S. Coast Guard to issue a Notice to Mariners advising navigation interests that the Contractor's dredging plant will be operating in the project waterway. The Contractor shall submit this request to: Commander, Eighth Coast Guard District, Hale Boggs Federal Building, 500 Poydras Street, New Orleans, LA 70130. The Contractor shall furnish a copy of this request to the Contracting Officer not less than five days prior to the start of dredging. The Contractor shall also notify the U.S. Coast Guard of the approximate time required for completion of dredging. Upon completion of the work, the Contractor shall promptly remove his plant, including ranges, buoys, piles and other marks placed by him under the contract in navigable waters or on shore. The Contractor shall coordinate with USACE to develop a Notice to Navigation Interest when work is performed in the navigation channel.

1.14.5 Navigation Aids

The Contractor shall not relocate or move any aids to navigation that have been established by the U.S. Coast Guard. If it becomes necessary to have any aid to navigation moved in order to complete dredging operations under this contract, the Contractor shall notify the Eighth Coast Guard District at least three weeks prior to the desired date for movement of the aid.

The Eighth Coast Guard District will coordinate all temporary relocations or discontinuances. A copy of each request (including records of telephone conversations) shall be furnished to the Contracting Officer.

1.14.6 Maintenance of Floating Plant

The Contractor shall maintain all floating plant equipment in good working condition throughout the contract period.

Section 01 35 00 Page 11

1.14.7 Mooring of Floating Plant

The Contractor shall be responsible for all mooring of floating plant.

When not in use, the Contractor's floating plant shall be securely moored.

The Contractor shall also be solely responsible for providing personnel in order to adjust mooring lines as required by the prevailing river conditions. Floating plant and barges will not be allowed to nose-into the bank or tie-off to trees on the shoreline.

1.15 CONDITIONS OF WORK

1.15.1 Government Access to the Site

Government access to the site shall be maintained at all times. See Paragraphs "INSPECTION" and "Access to Work" for additional requirements.

1.15.2 Contractor Coordination and Scheduling

In accordance with Section 01 32 01 PROJECT SCHEDULE, the Contractor shall submit a detailed project schedule for his work to the Contracting Officer. All necessary adjustments in the Contractor's work schedule shall be coordinated and approved by the Contracting Officer.

1.16 POOL LEVELS

The Government will not attempt to vary the pool levels for the convenience of the Contractor during the progress of the work. The Contractor should refer to the hydrographs, Stage-Discharge relationships, and the Stage-Duration curves when planning the various work activities for this project. This information is shown on the drawings.

1.16.1 Hydrographs

The stage hydrographs represent water surface elevations, and should be used by the Contractor to have knowledge of historical trends. The hydrographs were developed from actual Lockmaster stage records.

1.16.2 Stage-Discharge

The Contractor shall refer to the stage-discharge curves on the drawings to determine river discharge (cubic feet per second) for various river stages.

1.16.3 Stage-Duration

The Contractor shall refer to the Stage-Duration curves on the drawings to determine the percentage of time for which various water surface elevations were equaled or exceeded during the hydrograph's period of record. To assist in determining discharge-duration relationships, obtain the relevant stage for a particular discharge from the appropriate stage-discharge relationship, and relate it to the stage-duration curve.

1.17 SAFETY AND HEALTH REQUIREMENTS

Safety and Health Requirements shall conform to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, EM 385-1-1, and the requirements of the Occupational Safety and Health Administration. Where provisions of EM 385-1-1 vary with OSHA requirements, the more stringent requirements shall be applied.

Section 01 35 00 Page 12

1.18 INSPECTION

The presence of the inspector shall not relieve the Contractor of responsibility for the proper execution of the work in accordance with the specifications. The Contractor will be required:

a. To furnish, on the request of the Contracting Officer or any inspector, the use of such boats, boatmen, laborers, a part of the ordinary and usual equipment and crew of the dredging plant as may be reasonably necessary in inspecting and supervising the work.

b. To furnish, on the request of the Contracting Officer or any inspector, suitable transportation from all points on shore designated by the Contracting Officer to and from the various pieces of plant and to and from the disposal area.

1.19 INSPECTIONS AND ACCEPTANCE OF WORK

1.19.1 General

Not withstanding other provisions of this contract, all materials and work to be performed under this contract shall be inspected and accepted by the Contracting Officer. Inspections and acceptance will be performed on phases of the work, before the next definable sequential phase of work commences, OR may be performed at the completion of all of the work, as determined appropriate by the Contracting Officer. The Contracting Officer so authorized shall be the individual(s) solely authorized to reject materials, disapprove or approve any work in progress, or order or direct any revision or change to the plans and specifications as presently shown and stated.

1.19.2 Access to Work

The Contractor shall provide safe access to all areas of work for inspection by the Government and shall provide boats for transporting Government inspectors to the various areas of work. The Contractor shall make the boat available for Government inspectors within 15 minutes of the request.

1.20 FINAL EXAMINATION AND ACCEPTANCE

a. As soon as practicable after the completion of the entire work or any section thereof (if the work is divided into sections) as in the opinion of the Contracting Officer will not be subject to damage by further operations under the contract, such work will be thoroughly examined at the cost and expense of the Government by sounding or by sweeping, or both, as determined by the Contracting Officer. Should any shoals, lumps, or other lack of contract depth be disclosed by this examination the Contractor will be required to remove same by dragging the bottom or by dredging at the contract rate for dredging, but if the bottom is soft and the shoal areas are small and form no material obstruction to navigation, the removal of such shoal may be waived by the discretion of the Contracting Officer. The Contractor or his authorized representative will be notified when soundings and/or sweepings are to be made, and will be permitted to accompany the survey party. When the area is found to be in a satisfactory condition, it will be accepted finally. Should more than two soundings or sweeping operations by the Government over an area be necessary by reason of work for the removal of shoals disclosed at a prior sounding or sweeping, the cost of such third and any subsequent sounding or sweeping operations will

Section 01 35 00 Page 13 be charged against the Contractor. The rate of each day in which the Government plant is engaged in such sounding or sweeping operations and/or is enroute to or from the site or held, for the Contractor's convenience, at or near the site for these operations shall be $5,500.00, except on Saturday, Sunday and holidays when the rate shall be $6,000.00.

b. Final acceptance of the whole or a part of the work and the deductions or corrections of deductions made thereon will not be reopened after having once been made, except on evidence of collusion, fraud, or obvious error, and the acceptance of a completed section shall not change the time of payment of the retained percentages of the whole or any part of the work.

1.21 CONTINUITY OF WORK

No payment will be made for work done in any area designated by the Contracting Officer until the full depth required under the contract is secured in the whole of such area, unless prevented…