Solicitation Site Visit Lower Monongahela River Project, Pool 3 Dredging, Monongahela River, PA August 30, 2017 at 10:00 am

1. W911WN-17-B-8005 issued on 8/16/17 on Standard Form (SF) 1442.

2. BID OPENING, FRIDAY, 15 SEPTEMBER 2017 AT 11:00 A.M. EST on the 22nd Floor of the Federal Building in Pittsburgh, PA (see block 7); bids/revisions to bids received by email or FAX will NOT be considered.

3. NAICS Code 237990 (Dredging) – SB Size Standard $27.5 Million.

4. Estimated Magnitude of Construction is between $25M and $100M.

5. Unrestricted. Full and Open Procurement. FAR 19.1307, the project requires the HUBZone 10% price evaluation.

6. System for Award Management (SAM) –must have an ACTIVE registration, AND IT MUST BE CURRENT including the your Representations and Certifications (Reps & Certs), PRIOR to award and maintain the status throughout the contract period (if you are not already registered be sure to do it right after the site visit because it can take a few days to process. Registration is FREE.

7. This is a Firm Fixed Price, Indefinite Delivery Requirements Contract.

8. Term of the contract will be 1 base year plus 2 one year options.

9. Bid guarantee REQUIRED (see page 10, para 00100-4, Standard Form 24 was REVISED as 8/2016 PREVIOUS EDITION IS NOT USABLE)

10. Block 14 through 20 of the SF 1442 must be completed.

11. If there are any amendments to this solicitation, they must be acknowledge in Block 19.

12. Para. 00100-6 Award will be made as a whole to one bidder; that bidder must be determined by the Contracting Officer (KO) to be RESPONSIBLE per FAR 9.104. Very shortly after bid opening the apparent low bidder will be sent an email asking for specific information to help the KO make the responsibility determination. The response time to provide the information is going to be very short to ensure the government has sufficient time to make the award on or before 30 September 2017.

13. Three line items. One for each year. Bid Schedule includes Bid Items with quantities under each of the Line Items. The quantities are the maximum amounts that

14. Provisions and clauses – Provisions are conditions used in solicitations and apply before contract award. Clauses are conditions in both solicitations and contracts and apply before and after contract award. The VAST majority of provisions and clauses in this solicitation are included by reference only; that means, we’ve only given you the Number, the title and the date. It is up to you to go online to the website provided – www.farsite.hill.af.mil – and look up each one whether FAR and DFARS).

15. Questions are due by close of business on September 5, 2017.

16. Liquidated Damage are applicable to this contract, see clause 52.211-12. The amount will be determined on an individual task order basis.

17. WAGE Determination, PA50, Heavy Dredging, 01/27/2017. If it is updated, an amendment will be issued.