Charleroi Locks and Dam
River Chamber Completion
IGE
BIDDER 1 - URS Energy and
Construction, Inc.
BIDDER 2 - Charleroi Constructors - a
Joint Venture
BIDDER 3 - Trumbull Corporation &
Brayman Construction Corporation, A
Joint Venture
Item Description
Bid
Schedule
Quantity Unit Unit Price Total Unit Price Corrected Total Unit Price Total Unit Price Total
BASE CONTRACT, MONOLITHS M-1 TO M-7
0001 REIMBURSEMENT FOR ACTUAL
PERFORMANCE AND PAYMENT
BONDS PREMIUMS, BASE CONTRACT
1 JOB $432,910.00 $432,910.00 $456,300.00 $456,300.00 $611,000.00 $611,000.00 $500,000.00 $500,000.00
0002 DIGITAL PROGRESS IMAGES,
MONTHLY, BASE CONTRACT
34 SET $630.00 $21,420.00 $400.00 $13,600.00 $275.00 $9,350.00 $270.00 $9,180.00
0003 MOBILIZATION AND DEMOBILIZATION,
BASE CONTRACT
1 JOB $586,800.00 $586,800.00 $10,000,000.00 $10,000,000.00 $2,000,000.00 $2,000,000.00 $1,045,000.00 $1,045,000.00
0004 REIMBURSEMENT FOR REPAIRS AT
GOVERNMENT FIELD OFFICES, BASE
CONTRACT
1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
0005 FURNISH AND INSTALL SHEET
PILING, COFFERBOX MONOLITHS M-1
TO M-7
15,093 LINEAR
FEET
$109.40 $1,651,174.20 $200.00 $3,018,600.00 $180.00 $2,716,740.00 $175.00 $2,641,275.00
0006 FURNISH AND INSTALL KING PILES,
COFFERBOX MONOLITHS M-1 TO M-7
9,408 LINEAR
FEET
$864.20 $8,130,393.60 $950.00 $8,937,600.00 $650.00 $6,115,200.00 $875.00 $8,232,000.00
0007 DYNAMIC PILE TESTING,
COFFERBOX MONOLITHS M-1 TO M-7
7 EACH $2,050.00 $14,350.00 $16,000.00 $112,000.00 $5,500.00 $38,500.00 $4,900.00 $34,300.00
0008 FURNISH AND INSTALL STRUCTURAL
STEEL, COFFERBOX MONOLITHS M-1
TO M-7
670,544 POUNDS $11.50 $7,711,256.00 $10.50 $7,040,712.00 $8.00 $5,364,352.00 $8.50 $5,699,624.00
0009 REMOVE SHEET PILING, COFFERBOX
MONOLITHS M-1 TO M-7
9,320 LINEAR
FEET
$32.20 $300,104.00 $250.00 $2,330,000.00 $65.00 $605,800.00 $45.00 $419,400.00
0010 REMOVE KING PILES, COFFERBOX
MONOLITHS M-1 TO M-7
6,662 LINEAR
FEET
$32.40 $215,848.80 $320.00 $2,131,840.00 $50.00 $333,100.00 $85.00 $566,270.00
0011 REMOVE STRUCTURAL STEEL,
COFFERBOX MONOLITHS M-1 TO M-7
639,144 POUNDS $0.34 $217,308.96 $1.25 $798,930.00 $1.45 $926,758.80 $1.10 $703,058.40
0012 MODIFY UPSTREAM PROTECTION
CELL FOR COFFERBOX BRACES
1 JOB $56,545.00 $56,545.00 $150,000.00 $150,000.00 $105,000.00 $105,000.00 $50,000.00 $50,000.00
0013 UNDERWATER ALLUVIUM
EXCAVATION INSIDE COFFERBOX
MONOLITHS M-1 TO M-7
7,680 CUBIC
YARDS
$244.40 $1,876,992.00 $350.00 $2,688,000.00 $350.00 $2,688,000.00 $215.00 $1,651,200.00
0014 COFFERBOX DEWATERING
MONOLITH M-1
1 JOB $187,510.00 $187,510.00 $500,000.00 $500,000.00 $275,000.00 $275,000.00 $450,000.00 $450,000.00
0015 COFFERBOX DEWATERING
MONOLITH M-7
1 JOB $185,900.00 $185,900.00 $500,000.00 $500,000.00 $275,000.00 $275,000.00 $200,000.00 $200,000.00
0016 COFFERBOX DEWATERING
MONOLITHS M-2 TO M-6
1 JOB $293,800.00 $293,800.00 $500,000.00 $500,000.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00
0017 COMPENSATION FOR FLOODING
AND EVACUATION, COFFERBOXES M-
1 OR M-7
2 EACH $120,000.00 $240,000.00 $120,000.00 $240,000.00 $120,000.00 $240,000.00 $120,000.00 $240,000.00
0018 COMPENSATION FOR FLOODING
AND EVACUATION, COFFERBOXES M-
2 TO M-6
1 EACH $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00
0019 PRE-EXCAVATION MIDDLE WALL
UPSTREAM
7,900 CUBIC
YARDS
$57.80 $456,620.00 $80.00 $632,000.00 $105.00 $829,500.00 $160.00 $1,264,000.00
0020 FIELD DEMONSTRATION, MIDDLE
WALL FOUNDATION DRILLED SHAFT
1 JOB $378,730.00 $378,730.00 $800,000.00 $800,000.00 $300,000.00 $300,000.00 $2,800,000.00 $2,800,000.00
0021 78" DIA. PERMANENT CASING, 72-
INCH DIA. MW FOUNDATION DRILLED
SHAFTS, MONOLITHS M-1 TO M-7
695 LINEAR
FEET
$2,905.00 $2,018,975.00 $10,000.00 $6,950,000.00 $6,000.00 $4,170,000.00 $3,500.00 $2,432,500.00
0022 SOIL EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-1 TO M-7
884 LINEAR
FEET
$295.60 $261,310.40 $1,000.00 $884,000.00 $760.00 $671,840.00 $175.00 $154,700.00
0023 ROCK EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-1 TO M-7
1,922 LINEAR
FEET
$1,823.00 $3,503,806.00 $4,000.00 $7,688,000.00 $1,800.00 $3,459,600.00 $1,200.00 $2,306,400.00
0024 REINFORCING STEEL, MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-1 TO M-7
1,703,868 POUNDS $3.76 $6,406,543.68 $2.00 $3,407,736.00 $1.75 $2,981,769.00 $3.10 $5,281,990.80
0025 ACCESS TUBES, CROSSHOLE SONIC
LOGGING, MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-1
TO M-7
15,565 LINEAR
FEET
$11.80 $183,667.00 $20.00 $311,300.00 $48.00 $747,120.00 $15.00 $233,475.00
0026 DELIVER AND PLACE GOVERNMENT-
FURNISHED CONCRETE, MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-1 TO M-7
2,842 CUBIC
YARDS
$30.95 $87,971.04 $899.89 $2,557,800.00 $1,000.00 $2,842,000.00 $125.00 $355,250.00
0027 CROSSHOLE SONIC LOGGING (CSL)
MW FOUNDATION DRILLED SHAFTS,
MONOLITHS M-1 TO M-7
46 EACH $2,155.00 $99,130.00 $8,000.00 $368,000.00 $1,400.00 $64,400.00 $690.00 $31,740.00
0028 CORING OF MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-1
TO M-7
403 LINEAR
FEET
$121.30 $48,823.25 $1,001.24 $403,000.00 $300.00 $120,900.00 $300.00 $120,900.00
0029 FURNISH AND INSTALL UPSTREAM
MITER GATE EMBEDDED GUDGEON
ANCHORAGE FRAMES
4 EACH $40,365.00 $161,460.00 $25,000.00 $100,000.00 $80,000.00 $320,000.00 $40,000.00 $160,000.00
0030 FURNISH, INSTALL, REMOVE AND
STORE UPSTREAM BULKHEAD
RECESS FILLERS
1 JOB $100,900.00 $100,900.00 $150,000.00 $150,000.00 $175,000.00 $175,000.00 $140,000.00 $140,000.00
0031 FIELD DEMONSTRATION, TREMIE
FOUNDATION PLACEMENT
1 JOB $961,140.00 $961,140.00 $3,500,000.00 $3,500,000.00 $1,200,000.00 $1,200,000.00 $4,400,000.00 $4,400,000.00
0032 FURNISH AND INSTALL TREMIE
CONCRETE PARTITIONS,
COFFERBOX MONOLITHS M-1 TO M-7
160,461 POUNDS $3.81 $611,356.41 $6.00 $962,766.00 $7.50 $1,203,457.50 $9.00 $1,444,149.00
0033 DELIVER AND PLACE GOVERNMENT-
FURNISHED TREMIE CONCRETE,
MONOLITHS M-1 TO M-7
5,850 CUBIC
YARDS
$13.50 $78,975.00 $250.00 $1,462,500.00 $140.00 $819,000.00 $62.00 $362,700.00
0034 DELIVER AND PLACE GOVERNMENT-
FURNISHED CAST-IN-PLACE
CONCRETE, MIDDLE WALL,
MONOLITHS M-1 TO M-7
15,567 CUBIC
YARDS
$165.00 $2,568,555.00 $600.00 $9,340,200.00 $780.00 $12,142,260.00 $350.00 $5,448,450.00
0035 PVC WATERSTOPS, MONOLITHS M-1
TO M-7
590 LINEAR
FEET
$37.75 $22,272.50 $40.00 $23,600.00 $120.00 $70,800.00 $30.00 $17,700.00
0036 COPPER WATERSTOPS, MONOLITHS
M-1 TO M-7
240 LINEAR
FEET
$62.50 $15,000.00 $150.00 $36,000.00 $280.00 $67,200.00 $115.00 $27,600.00
0037 REINFORCING STEEL, MIDDLE WALL,
MONOLITHS M-1 TO M-7
599,622 POUNDS $3.38 $2,026,722.36 $3.00 $1,798,866.00 $4.00 $2,398,488.00 $4.50 $2,698,299.00
0038 INSTALL FLOATING MOORING BITT
ANCHORAGE FRAMES, MONOLITH M-
2 EACH $55,370.00 $110,740.00 $150,000.00 $300,000.00 $60,000.00 $120,000.00 $25,000.00 $50,000.00
0039 FURNISH AND INSTALL LINE HOOKS
AND GUARDS, MONOLITH M-5
10 EACH $5,260.00 $52,600.00 $25,000.00 $250,000.00 $15,000.00 $150,000.00 $6,700.00 $67,000.00
0040 FURNISH AND INSTALL CHECK
POSTS, MONOLITHS M-1 AND M-6
3 EACH $6,095.00 $18,285.00 $15,000.00 $45,000.00 $8,000.00 $24,000.00 $11,000.00 $33,000.00
0041 FURNISH AND INSTALL LOCK
LADDER RECESS METALS,
MONOLITHS M-2 AND M-6
2,619 POUNDS $18.90 $49,499.10 $15.00 $39,285.00 $25.00 $65,475.00 $18.00 $47,142.00
0042 FURNISH AND INSTALL ALUMINUM
RABBET ANGLES, MONOLITHS M-1
TO M-7
498 LINEAR
FEET
$44.05 $21,936.90 $60.00 $29,880.00 $55.00 $27,390.00 $155.00 $77,190.00
0043 FURNISH AND INSTALL ALUMINUM
PLANKING, MONOLITHS M-1 TO M-7
1,003 SQUARE
FEET
$96.30 $96,588.90 $60.00 $60,180.00 $65.00 $65,195.00 $52.00 $52,156.00
0044 FURNISH AND INSTALL ALUMINUM
PLATE WELDED TO ALUMINUM
GRATING, MONOLITHS M-1 TO M-7
64 SQUARE
FEET
$158.60 $10,150.40 $150.00 $9,600.00 $215.00 $13,760.00 $82.00 $5,248.00
0045 FURNISH AND INSTALL CORNER
CASTINGS, MONOLITHS M-1 TO M-7
22 EACH $1,920.00 $42,240.00 $2,200.00 $48,400.00 $3,030.00 $66,660.00 $3,600.00 $79,200.00
0046 FURNISH AND INSTALL CORNER
PROTECTION, MONOLITHS M-1 TO M-
959 LINEAR
FEET
$266.00 $255,094.00 $300.00 $287,700.00 $145.00 $139,055.00 $250.00 $239,750.00
0047 FURNISH AND INSTALL WALL
ARMOR, MONOLITHS M-1 TO M-7
2,982 LINEAR
FEET
$204.10 $608,626.20 $200.00 $596,400.00 $180.00 $536,760.00 $275.00 $820,050.00
0048 FURNISH AND INSTALL MONOLITH
JOINT PROTECTION, MONOLITHS M-
1 TO M-7
277 LINEAR
FEET
$138.80 $38,447.60 $130.00 $36,010.00 $140.00 $38,780.00 $265.00 $73,405.00
0049 TREMIE CONCRETE DEMOLITION,
MONOLITH M-4
43 CUBIC
YARDS
$230.20 $9,898.60 $800.00 $34,400.00 $3,000.00 $129,000.00 $680.00 $29,240.00
0050 FURNISH AND INSTALL EMBEDDED
PINS FOR REMOVABLE HANDRAIL,
MONOLITHS M-1 TO M-7
22 EACH $311.00 $6,842.00 $300.00 $6,600.00 $450.00 $9,900.00 $150.00 $3,300.00
0051 FURNISH AND INSTALL EMBEDDED
METALS, UPSTREAM MITER GATE
1 JOB $234,440.00 $234,440.00 $65,000.00 $65,000.00 $200,000.00 $200,000.00 $155,000.00 $155,000.00
0052 FURNISH AND INSTALL EMBEDDED
METALS, UPSTREAM BULKHEAD
RECESSES
1 JOB $99,750.00 $99,750.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $164,000.00 $164,000.00
0053 FURNISH AND INSTALL
ALTERNATING STAIR TREADS,
MONOLITH M-4
1 EACH $30,265.00 $30,265.00 $190,000.00 $190,000.00 $60,000.00 $60,000.00 $75,000.00 $75,000.00
0054 FURNISH AND INSTALL ACCESS
HATCH, MONOLITH M-4
1 EACH $5,800.00 $5,800.00 $8,000.00 $8,000.00 $12,000.00 $12,000.00 $38,000.00 $38,000.00
0055 FURNISH AND INSTALL WATERTIGHT
MANHOLE COVERS, MONOLITHS M-3
AND M-4
4 EACH $5,400.00 $21,600.00 $8,000.00 $32,000.00 $4,200.00 $16,800.00 $13,500.00 $54,000.00
0056 NOT USED
0057 FURNISH AND INSTALL ELECTRICAL
AND MECHANICAL SYSTEMS
EMBEDDED ITEMS, BASE CONTRACT
1 JOB $193,500.00 $193,500.00 $450,000.00 $450,000.00 $500,000.00 $500,000.00 $1,050,000.00 $1,050,000.00
0058 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING,
TESTING AND REPORTING, VICTORY
HOLLOW SITE, BASE CONTRACT
23 MONTHS $10,280.00 $236,440.00 $30,000.00 $690,000.00 $5,000.00 $115,000.00 $5,000.00 $115,000.00
0059 CLEANING OF SEDIMENT BASIN NO.
1, VICTORY HOLLOW SITE, BASE
CONTRACT
4 EACH $11,535.00 $46,140.00 $65,000.00 $260,000.00 $11,400.00 $45,600.00 $10,000.00 $40,000.00
0060 CLEANING OF SEDIMENT BASIN NO.
2, VICTORY HOLLOW SITE, BASE
CONTRACT
3 EACH $17,305.00 $51,915.00 $50,000.00 $150,000.00 $11,400.00 $34,200.00 $20,000.00 $60,000.00
0061 CLEARING, VICTORY HOLLOW SITE,
BASE CONTRACT
5 ACRE $5,035.00 $25,175.00 $4,000.00 $20,000.00 $15,000.00 $75,000.00 $7,200.00 $36,000.00
0062 SILT FENCE, VICTORY HOLLOW SITE,
BASE CONTRACT
500 LINEAR
FEET
$12.60 $6,300.00 $10.00 $5,000.00 $13.50 $6,750.00 $6.60 $3,300.00
0063 WEIGHTED SEDIMENT FILTER TUBE,
VICTORY HOLLOW SITE, BASE
CONTRACT
1,000 LINEAR
FEET
$9.65 $9,650.00 $16.00 $16,000.00 $5.00 $5,000.00 $11.00 $11,000.00
0064 TEMPORARY SEEDING, VICTORY
HOLLOW SITE, BASE CONTRACT
10 ACRE $2,965.00 $29,650.00 $5,000.00 $50,000.00 $1,200.00 $12,000.00 $1,200.00 $12,000.00
0065 PERMANENT SEEDING, VICTORY
HOLLOW SITE, BASE CONTRACT
5 ACRE $4,740.00 $23,700.00 $8,000.00 $40,000.00 $1,690.00 $8,450.00 $1,500.00 $7,500.00
0066AA PDT NO. 2A SURFACE COURSE,
FIRST 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE, BASE
CONTRACT
1,000 SQUARE
YARDS
$7.30 $7,300.00 $150.00 $150,000.00 $13.50 $13,500.00 $6.50 $6,500.00
0066AB PDT NO. 2A SURFACE COURSE, ALL
OVER 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE, BASE
CONTRACT
500 SQUARE
YARDS
$7.70 $3,850.00 $150.00 $75,000.00 $13.50 $6,750.00 $6.50 $3,250.00
0067 TRAFFIC CONTROL, VICTORY
HOLLOW SITE
1 JOB $323,880.00 $323,880.00 $25,000.00 $25,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00
0068 OFFLOAD, PROCESS AND
TRANSPORT EXCAVATED MATERIAL
FROM M-22 TO M-27 CONTRACT
5,900 CUBIC
YARDS
$63.10 $372,290.00 $60.00 $354,000.00 $65.00 $383,500.00 $40.00 $236,000.00
0069 BRIDGE MODIFICATIONS, VICTORY
HOLLOW SITE
1 JOB $107,600.00 $107,600.00 $250,000.00 $250,000.00 $300,000.00 $300,000.00 $60,000.00 $60,000.00
0070 AS-BUILT DRAWINGS, BASE
CONTRACT
1 JOB $231,000.00 $231,000.00 $60,000.00 $60,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
0071 FURNISH AND INSTALL ALUMINUM
GRATING, MONOLITHS M-3
30 SQUARE
FEET
$184.00 $5,520.00 $350.00 $10,500.00 $235.00 $7,050.00 $375.00 $11,250.00
0072 ENVIRONMENTAL FIELD TECHNICIAN
COMPLIANCE REPRESENTATIVE,
BASE CONTRACT
34 MONTHS $10,390.00 $353,260.00 $25,000.00 $850,000.00 $13,000.00 $442,000.00 $5,000.00 $170,000.00
TOTAL, BASE CONTRACT ITEMS 0001
THROUGH 0072
$46,294,243.90 $86,877,305.00 $61,796,710.30 $56,735,642.20
AWARDABLE OPTION 1, MONOLITHS M-11 TO M-16
1001 REIMBURSEMENT FOR ACTUAL
PERFORMANCE AND PAYMENT
BONDS PREMIUMS, AWARDABLE
OPTION 1
1 JOB $267,425.00 $267,425.00 $286,900.00 $286,900.00 $457,000.00 $457,000.00 $300,000.00 $300,000.00
1002 DIGITAL PROGRESS IMAGES,
MONTHLY, AWARDABLE OPTION 1
7 SET $648.00 $4,536.00 $500.00 $3,500.00 $275.00 $1,925.00 $286.00 $2,002.00
1003 REIMBURSEMENT FOR REPAIRS AT
GOVERNMENT FIELD OFFICES,
AWARDABLE OPTION 1
1 JOB $45,755.00 $45,755.00 $65,000.00 $65,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
1004 FURNISH AND INSTALL SHEET
PILING, COFFERBOX MONOLITHS M-
11 TO M-16
11,390 LINEAR
FEET
$136.80 $1,558,152.00 $210.00 $2,391,900.00 $180.00 $2,050,200.00 $175.00 $1,993,250.00
1005 FURNISH AND INSTALL KING PILES,
COFFERBOXMONOLITHS M-11 TO M-
8,232 LINEAR
FEET
$900.00 $7,408,800.00 $1,000.00 $8,232,000.00 $650.00 $5,350,800.00 $875.00 $7,203,000.00
1006 DYNAMIC PILE TESTING,
COFFERBOX MONOLITHS M-11 TO M-
7 EACH $2,100.00 $14,700.00 $20,000.00 $140,000.00 $5,500.00 $38,500.00 $4,900.00 $34,300.00
1007 FURNISH AND INSTALL STRUCTURAL
STEEL, COFFERBOX MONOLITHS M-
11 TO M-16
562,752 POUNDS $11.75 $6,612,336.00 $12.00 $6,753,024.00 $8.00 $4,502,016.00 $8.50 $4,783,392.00
1008 REMOVE SHEET PILING, COFFERBOX
MONOLITHS M-11 TO M-16
5,846 LINEAR
FEET
$35.60 $208,117.60 $350.00 $2,046,100.00 $65.00 $379,990.00 $45.00 $263,070.00
1009 REMOVE KING PILES, COFFERBOX
MONOLITHS M-11 TO M-16
4,200 LINEAR
FEET
$34.15 $143,430.00 $400.00 $1,680,000.00 $50.00 $210,000.00 $85.00 $357,000.00
1010 REMOVE STRUCTURAL STEEL,
COFFERBOX MONOLITHS M-11 TO M-
492,292 POUNDS $0.48 $236,300.16 $1.25 $615,365.00 $1.45 $713,823.40 $1.10 $541,521.20
1011 UNDERWATER ALLUVIUM
EXCAVATION INSIDE COFFERBOX
MONOLITHS M-11 TO M-16
6,270 CUBIC
YARDS
$251.35 $1,575,964.50 $450.00 $2,821,500.00 $350.00 $2,194,500.00 $215.00 $1,348,050.00
1012 COFFERBOX DEWATERING
MONOLITH M-11
1 JOB $171,050.00 $171,050.00 $155,000.00 $155,000.00 $275,000.00 $275,000.00 $200,000.00 $200,000.00
1013 COFFERBOX DEWATERING
MONOLITH M-16
1 JOB $171,050.00 $171,050.00 $155,000.00 $155,000.00 $275,000.00 $275,000.00 $200,000.00 $200,000.00
1014 COFFERBOX DEWATERING
MONOLITHS M-12 TO M-15
1 JOB $291,920.00 $291,920.00 $255,000.00 $255,000.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00
1015 COMPENSATION FOR FLOODING
AND EVACUATION, COFFERBOXES M-
11 OR M-16
2 EACH $115,000.00 $230,000.00 $115,000.00 $400,000.00 $115,000.00 $230,000.00 $115,000.00 $230,000.00
1016 COMPENSATION FOR FLOODING
AND EVACUATION, COFFERBOXES M-
12 TO M-15
1 EACH $400,000.00 $400,000.00 $400,000.00 $600,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00
1017 78" DIA. PERMANENT CASING, 72-
INCH DIA. MW FOUNDATION DRILLED
SHAFTS, MONOLITHS M-11 TO M-16
589 LINEAR
FEET
$2,998.00 $1,765,822.00 $10,000.00 $5,890,000.00 $6,000.00 $3,534,000.00 $3,500.00 $2,061,500.00
1018 SOIL EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-11 TO M-16
722 LINEAR
FEET
$304.50 $219,849.00 $900.00 $649,800.00 $760.00 $548,720.00 $175.00 $126,350.00
1019 ROCK EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-11 TO M-16
1,596 LINEAR
FEET
$1,857.00 $2,963,772.00 $2,950.00 $4,708,200.00 $1,800.00 $2,872,800.00 $1,200.00 $1,915,200.00
1020 REINFORCING STEEL, MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-11 TO M-16
1,041,200 POUNDS $3.91 $4,071,092.00 $2.00 $2,082,400.00 $1.75 $1,822,100.00 $3.10 $3,227,720.00
1021 ACCESS TUBES, CROSSHOLE SONIC
LOGGING, MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-11
TO M-16
12,996 LINEAR
FEET
$12.30 $159,850.80 $20.00 $259,920.00 $48.00 $623,808.00 $15.00 $194,940.00
1022 DELIVER AND PLACE GOVERNMENT-
FURNISHED CONCRETE, MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-11 TO M-16
2,375 CUBIC
YARDS
$27.45 $65,193.75 $600.00 $1,425,000.00 $1,000.00 $2,375,000.00 $175.00 $415,625.00
1023 CROSSHOLE SONIC LOGGING (CSL)
MW FOUNDATION DRILLED SHAFTS,
MONOLITHS M-11 TO M-16
38 EACH $2,170.00 $82,460.00 $8,000.00 $304,000.00 $1,400.00 $53,200.00 $690.00 $26,220.00
1024 CORING OF MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-11
TO M-16
345 LINEAR
FEET
$162.65 $56,114.25 $900.00 $310,500.00 $300.00 $103,500.00 $300.00 $103,500.00
1025 FURNISH AND INSTALL TREMIE
CONCRETE PARTITIONS,
COFFERBOX MONOLITHS M-11 TO M-
123,321 POUNDS $3.98 $490,817.58 $6.00 $739,926.00 $7.50 $924,907.50 $9.00 $1,109,889.00
1026 DELIVER AND PLACE GOVERNMENT-
FURNISHED TREMIE CONCRETE,
MONOLITHS M-11 TO M-16
4,960 CUBIC
YARDS
$12.20 $60,512.00 $200.00 $992,000.00 $140.00 $694,400.00 $62.00 $307,520.00
1027 DELIVER AND PLACE GOVERNMENT-
FURNISHED CAST-IN-PLACE
CONCRETE, MIDDLE WALL,
MONOLITHS M-11 TO M-16
13,410 CUBIC
YARDS
$153.60 $2,059,776.00 $425.00 $5,699,250.00 $780.00 $10,459,800.00 $320.00 $4,291,200.00
1028 PVC WATERSTOPS, MONOLITHS M-
11 TO M-16
590 LINEAR
FEET
$38.70 $22,833.00 $35.00 $20,650.00 $120.00 $70,800.00 $30.00 $17,700.00
1029 REINFORCING STEEL, MIDDLE WALL,
MONOLITHS M-11 TO M-16
418,021 POUNDS $3.48 $1,454,713.08 $2.25 $940,547.25 $4.00 $1,672,084.00 $4.50 $1,881,094.50
1030 FURNISH AND INSTALL LOCK
LADDER RECESS METALS,
MONOLITH M-13
1,337 POUNDS $28.90 $38,639.30 $30.00 $40,110.00 $25.00 $33,425.00 $18.00 $24,066.00
1031 FURNISH AND INSTALL ALUMINUM
RABBET ANGLES, MONOLITHS M-11
TO M-16
489 LINEAR
FEET
$45.85 $22,420.65 $80.00 $39,120.00 $55.00 $26,895.00 $155.00 $75,795.00
1032 FURNISH AND INSTALL ALUMINUM
PLANKING, MONOLITHS M-11 TO M-16
917 SQUARE
FEET
$92.25 $84,574.80 $85.02 $77,945.00 $65.00 $59,605.00 $52.00 $47,684.00
1033 FURNISH AND INSTALL CORNER
CASTINGS, MONOLITHS M-11 TO M-16
4 EACH $2,079.00 $8,316.00 $2,000.00 $8,000.00 $3,030.00 $12,120.00 $3,600.00 $14,400.00
1034 FURNISH AND INSTALL CORNER
PROTECTION, MONOLITHS M-11 TO M-
587 LINEAR
FEET
$264.00 $155,020.80 $249.91 $146,750.00 $145.00 $85,115.00 $250.00 $146,750.00
1035 FURNISH AND INSTALL WALL
ARMOR, MONOLITHS M-11 TO M-16
408 LINEAR
FEET
$221.00 $90,168.00 $175.00 $71,400.00 $180.00 $73,440.00 $275.00 $112,200.00
1036 FURNISH AND INSTALL MONOLITH
JOINT PROTECTION, MONOLITHS M-
11 TO M-16
665 LINEAR
FEET
$135.00 $89,748.00 $250.08 $166,250.00 $140.00 $93,100.00 $265.00 $176,225.00
1037 FURNISH AND INSTALL EMBEDDED
PINS FOR REMOVABLE HANDRAIL,
MONOLITHS M-11 TO M-16
4 EACH $327.30 $1,309.20 $300.00 $1,200.00 $450.00 $1,800.00 $150.00 $600.00
1038 FURNISH AND INSTALL ELECTRICAL
AND MECHANICAL SYSTEMS
EMBEDDED ITEMS, OPTION 1
1 JOB $42,700.00 $42,700.00 $160,000.00 $160,000.00 $500,000.00 $500,000.00 $157,331.06 $157,331.06
1039 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING,
TESTING AND REPORTING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
7 MONTHS $10,525.00 $73,675.00 $30,000.00 $210,000.00 $5,000.00 $35,000.00 $3,301.95 $23,113.65
1040 CLEANING OF SEDIMENT BASIN NO.
1, VICTORY HOLLOW SITE,
AWARDABLE OPTION 1
1 EACH $11,810.00 $11,810.00 $55,000.00 $55,000.00 $11,400.00 $11,400.00 $10,000.00 $10,000.00
1041 CLEANING OF SEDIMENT BASIN NO.
2, VICTORY HOLLOW SITE,
AWARDABLE OPTION 1
1 EACH $17,702.00 $17,702.00 $50,000.00 $50,000.00 $11,400.00 $11,400.00 $20,000.00 $20,000.00
1042 CLEARING, VICTORY HOLLOW SITE,
AWARDABLE OPTION 1
5 ACRE $5,154.00 $25,770.00 $4,000.00 $20,000.00 $15,000.00 $75,000.00 $7,200.00 $36,000.00
1043 SILT FENCE, VICTORY HOLLOW SITE,
AWARDABLE OPTION 1
500 LINEAR
FEET
$12.85 $6,425.00 $10.00 $5,000.00 $13.50 $6,750.00 $6.60 $3,300.00
1044 WEIGHTED SEDIMENT FILTER TUBE,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 1
1,000 LINEAR
FEET
$9.85 $9,850.00 $15.00 $15,000.00 $5.00 $5,000.00 $11.00 $11,000.00
1045 TEMPORARY SEEDING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
10 ACRE $3,035.00 $30,350.00 $5,000.00 $50,000.00 $1,200.00 $12,000.00 $1,200.00 $12,000.00
1046 PERMANENT SEEDING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
5 ACRE $4,855.00 $24,275.00 $8,000.00 $40,000.00 $1,690.00 $8,450.00 $1,500.00 $7,500.00
1047AA PDT NO. 2A SURFACE COURSE,
FIRST 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 1
1,000 SQUARE
YARDS
$7.50 $7,500.00 $150.00 $150,000.00 $13.50 $13,500.00 $6.50 $6,500.00
1047AB PDT NO. 2A SURFACE COURSE, ALL
OVER 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 1
500 SQUARE
YARDS
$7.90 $3,950.00 $150.00 $75,000.00 $13.50 $6,750.00 $6.50 $3,250.00
1048 AS-BUILT DRAWINGS, AWARDABLE
OPTION 1
1 JOB $160,315.00 $160,315.00 $45,000.00 $45,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00
1049 MOBILIZATION AND DEMOBILIZATION,
AWARDABLE OPTION 1
1 JOB $399,210.00 $399,210.00 $2,400,000.00 $2,400,000.00 $1,500,000.00 $1,500,000.00 $10,000.00 $10,000.00
1050 ENVIRONMENTAL FIELD TECHNICIAN
COMPLIANCE REPRESENTATIVE,
AWARDABLE OPTION 1
7 MONTHS $10,640.00 $74,480.00 $25,000.00 $175,000.00 $13,000.00 $91,000.00 $10,500.00 $73,500.00
TOTAL, AWARDABLE OPTION ITEMS
1001 THROUGH 1050
$34,190,550.47 $54,623,257.25 $46,165,623.90 $34,775,258.41
AWARDABLE OPTION 2, MONOLITHS M-8 TO M-10
2001 REIMBURSEMENT FOR ACTUAL
PERFORMANCE AND PAYMENT
BONDS PREMIUMS, AWARDABLE
OPTION 2
1 JOB $254,200.00 $254,200.00 $200,100.00 $200,100.00 $414,000.00 $414,000.00 $275,000.00 $275,000.00
2002 DIGITAL PROGRESS IMAGES,
MONTHLY, AWARDABLE OPTION 2
9 SET $660.00 $5,940.00 $2,000.00 $18,000.00 $275.00 $2,475.00 $298.33 $2,684.97
2003 DIGITAL AERIAL PROGRESS IMAGES,
QUARTERLY, AWARDABLE OPTION 2
5 SET $1,555.00 $7,775.00 $8,000.00 $40,000.00 $630.00 $3,150.00 $614.00 $3,070.00
2004 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING,
TESTING AND REPORTING,
CONCRETE BATCH PLANT,
AWARDABLE OPTION 2
16 MONTHS $9,970.00 $159,520.00 $25,000.00 $400,000.00 $5,000.00 $80,000.00 $4,201.47 $67,223.52
2005 CLEANING OF SEDIMENT BASIN NO.
1, CONCRETE BATCH PLANT,
AWARDABLE OPTION 2
2 EACH $24,150.00 $48,300.00 $17,345.00 $34,690.00 $12,500.00 $25,000.00 $13,000.00 $26,000.00
2006 CLEANING OF SEDIMENT BASIN NO.
2, CONCRETE BATCH PLANT,
AWARDABLE OPTION 2
3 EACH $20,280.00 $60,840.00 $25,223.00 $75,669.00 $12,500.00 $37,500.00 $13,000.00 $39,000.00
2007 CLEAN SEEP, CONCRETE BATCH
PLANT, AWARDABLE OPTION 2
4 EACH $10,840.00 $43,360.00 $23,785.00 $95,140.00 $6,700.00 $26,800.00 $7,000.00 $28,000.00
2008 MAINTAIN CONCRETE TESTING LAB,
AWARDABLE OPTION 2
16 MONTHS $16,170.00 $258,720.00 $6,186.00 $98,976.00 $10,300.00 $164,800.00 $3,000.00 $48,000.00
2009 INITIAL BATCH PLANT SETUP AND
TRIAL OPERATION
1 JOB $330,840.00 $330,840.00 $32,979.00 $32,979.00 $60,000.00 $60,000.00 $136,636.17 $136,636.17
2010 MONTHLY MAINTENANCE OF BATCH
PLANT AND CONVEYOR SYSTEMS,
AWARDABLE OPTION 2
16 MONTHS $16,630.00 $266,080.00 $41,335.00 $661,360.00 $110,000.00 $1,760,000.00 $100,000.00 $1,600,000.00
2011 REIMBURSEMENT FOR REPAIR OF
BATCH PLANT AND CONVEYOR
EQUIPMENT, AWARDABLE OPTION 2
1 JOB $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00
2012 MAINTAIN GOVERNMENT FIELD
OFFICES, AWARDABLE OPTION 2
16 MONTHS $8,625.00 $138,000.00 $5,421.00 $86,736.00 $3,500.00 $56,000.00 $7,000.00 $112,000.00
2013 REIMBURSEMENT FOR REPAIRS AT
GOVERNMENT FIELD OFFICES,
AWARDABLE OPTION 2
1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
2014 MAINTAIN DOWNSTREAM RIVER
CHAMBER CLOSURE, AWARDABLE
OPTION 2
1 JOB $13,000.00 $13,000.00 $46,183.00 $46,183.00 $50,000.00 $50,000.00 $120,000.00 $120,000.00
2015 FURNISH AND INSTALL SHEET
PILING, COFFERBOX MONOLITHS M-8
TO M-10
2,223 LINEAR
FEET
$138.75 $308,441.25 $700.00 $1,556,100.00 $180.00 $400,140.00 $175.00 $389,025.00
2016 FURNISH AND INSTALL KING PILES,
COFFERBOX MONOLITHS M-8 TO M-
2,520 LINEAR
FEET
$894.00 $2,252,880.00 $830.00 $2,091,600.00 $650.00 $1,638,000.00 $875.00 $2,205,000.00
2017 DYNAMIC PILE TESTING,
COFFERBOX MONOLITHS M-8 TO M-
5 EACH $2,610.00 $13,050.00 $12,429.00 $62,145.00 $5,500.00 $27,500.00 $4,900.00 $24,500.00
2018 FURNISH AND INSTALL STRUCTURAL
STEEL, COFFERBOX MONOLITHS M-8
TO M-10
205,618 POUNDS $12.30 $2,529,101.40 $8.15 $1,675,786.70 $8.00 $1,644,944.00 $8.50 $1,747,753.00
2019 REMOVE SHEET PILING, COFFERBOX
MONOLITHS M-8 TO M-10
2,449 LINEAR
FEET
$27.90 $68,327.10 $254.00 $622,046.00 $65.00 $159,185.00 $45.00 $110,205.00
2020 REMOVE KING PILES, COFFERBOX
MONOLITHS M-8 TO M-10
2,898 LINEAR
FEET
$31.05 $89,982.90 $242.00 $701,316.00 $50.00 $144,900.00 $85.00 $246,330.00
2021 REMOVE STRUCTURAL STEEL,
COFFERBOX MONOLITHS M-8 TO M-
260,950 POUNDS $0.78 $203,541.00 $1.00 $260,950.00 $1.45 $378,377.50 $1.10 $287,045.00
2022 UNDERWATER ALLUVIUM
EXCAVATION INSIDE COFFERBOX
MONOLITHS M-8 TO M-10
2,920 CUBIC
YARDS
$260.40 $760,368.00 $439.00 $1,281,880.00 $350.00 $1,022,000.00 $215.00 $627,800.00
2023 COFFERBOX DEWATERING
MONOLITHS M-8 TO M-10
1 JOB $199,545.00 $199,545.00 $394,698.00 $394,698.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00
2024 COMPENSATION FOR FLOODING
AND EVACUATION, COFFERBOX M-8
TO M-10
1 EACH $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00
2025 FIELD DEMONSTRATIONS, NON-
COFFERBOX SHEET PILE SUPPORT
SYSTEM (SECANT WALL)
1 JOB $181,000.00 $181,000.00 $900,000.00 $900,000.00 $500,000.00 $500,000.00 $1,800,000.00 $1,800,000.00
2026 NON-COFFERBOX SHEET PILE
SUPPORT SYSTEM, PRIMARY
(LAGGING) SECANT PILES
1,840 LINEAR
FEET
$1,480.00 $2,723,200.00 $2,400.00 $4,416,000.00 $1,900.00 $3,496,000.00 $640.00 $1,177,600.00
2027 NON-COFFERBOX SHEET PILE
SUPPORT SYSTEM, SECONDARY
(STRUCTURAL) SECANT PILES
1,940 LINEAR
FEET
$2,365.00 $4,588,100.00 $2,100.00 $4,074,000.00 $3,225.00 $6,256,500.00 $2,000.00 $3,880,000.00
2028 NON-COFFERBOX SHEET PILE
SUPPORT SYSTEM, CORING SECANT
PILES
25 EACH $2,725.00 $68,125.00 $12,002.00 $300,050.00 $12,400.00 $310,000.00 $6,427.61 $160,690.25
2029 MIDDLE WALL CONTROL TOWER
STRUCTURE
1 JOB $2,694,300.00 $2,694,300.00 $2,000,000.00 $2,000,000.00 $4,000,000.00 $4,000,000.00 $3,500,000.00 $3,500,000.00
2030 MIDDLE WALL CONTROL SHELTERS
STRUCTURES
2 EACH $713,000.00 $1,426,000.00 $240,873.00 $481,746.00 $250,000.00 $500,000.00 $700,000.00 $1,400,000.00
2031 78" DIA. PERMANENT CASING, 72-
INCH DIA. MW FOUNDATION DRILLED
SHAFTS, MONOLITHS M-8 TO M-10
273 LINEAR
FEET
$2,445.00 $667,485.00 $7,500.00 $2,047,500.00 $6,000.00 $1,638,000.00 $3,500.00 $955,500.00
2032 SOIL EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-8 TO M-10
336 LINEAR
FEET
$320.60 $107,721.60 $857.00 $287,952.00 $760.00 $255,360.00 $175.00 $58,800.00
2033 ROCK EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-8 TO M-10
762 LINEAR
FEET
$1,871.00 $1,425,702.00 $1,809.00 $1,378,458.00 $1,800.00 $1,371,600.00 $1,200.00 $914,400.00
2034 REINFORCING STEEL, MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-8 TO M-10
493,200 POUNDS $3.68 $1,814,976.00 $2.00 $986,400.00 $1.75 $863,100.00 $3.10 $1,528,920.00
2035 ACCESS TUBES, CROSSHOLE SONIC
LOGGING, MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-8
TO M-10
6,156 LINEAR
FEET
$13.25 $81,567.00 $15.00 $92,340.00 $48.00 $295,488.00 $15.00 $92,340.00
2036 PRODUCE CONCRETE AND DELIVER
TO STUB WALL, MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-8
TO M-10
1,124 CUBIC
YARDS
$269.60 $303,030.40 $136.00 $152,864.00 $220.00 $247,280.00 $70.00 $78,680.00
2037 DELIVER AND PLACE CONCRETE,
MW FOUNDATION DRILLED SHAFTS,
MONOLITHS M-8 TO M-10
1,124 CUBIC
YARDS
$28.50 $32,034.00 $367.00 $412,508.00 $1,000.00 $1,124,000.00 $175.00 $196,700.00
2038 CROSSHOLE SONIC LOGGING (CSL)
MW FOUNDATION DRILLED SHAFTS,
MONOLITHS M-8 TO M-10
18 EACH $2,155.00 $38,790.00 $6,277.00 $112,986.00 $1,400.00 $25,200.00 $690.00 $12,420.00
2039 CORING OF MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-8
TO M-10
173 LINEAR
FEET
$253.50 $43,728.75 $483.40 $83,386.00 $400.00 $69,200.00 $300.00 $51,900.00
2040 AA PORTLAND CEMENT, AWARDABLE
OPTION 2, FIRST 665 TONS
665 TONS $332.10 $220,846.50 $244.00 $162,260.00 $250.00 $166,250.00 $375.00 $249,375.00
2040 AB PORTLAND CEMENT, AWARDABLE
OPTION 2, ALL OVER 665 TONS
305 TONS $332.40 $101,382.00 $428.00 $130,540.00 $250.00 $76,250.00 $250.00 $76,250.00
2041 AA POZZOLAN, AWARDABLE OPTION 2,
FIRST 300 TONS
300 TONS $101.20 $30,360.00 $67.00 $20,100.00 $120.00 $36,000.00 $140.00 $42,000.00
2041 AB POZZOLAN, AWARDABLE OPTION 2,
ALL OVER 300 TONS
345 TONS $101.35 $34,965.75 $75.00 $25,875.00 $120.00 $41,400.00 $90.00 $31,050.00
2042 AA GROUND GRANULATED BLAST
FURNACE SLAG, AWARDABALE
OPTION 2, FIRST 260 TONS
260 TONS $214.75 $55,835.00 $200.00 $52,000.00 $200.00 $52,000.00 $220.00 $57,200.00
2042 AB GROUND GRANULATED BLAST
FURNACE SLAG, AWARDABALE
OPTION 2, ALL OVER 260 TONS
620 TONS $214.75 $133,145.00 $241.00 $149,420.00 $200.00 $124,000.00 $160.00 $99,200.00
2043 SILICA FUME, AWARDABLE OPTION 2 42 TONS $1,547.70 $65,003.40 $1,421.00 $59,682.00 $1,275.00 $53,550.00 $1,000.00 $42,000.00
2044 ANTI-WASHOUT ADMIXTURE,
AWARDABLE OPTION 2
3,050 GALLONS $52.40 $159,820.00 $39.00 $118,950.00 $45.00 $137,250.00 $45.00 $137,250.00
2045 LIMESTONE POWDER, AWARDABLE
OPTION 2
435 TONS $108.45 $47,175.75 $89.00 $38,715.00 $97.00 $42,195.00 $115.00 $50,025.00
2046 FURNISH AND INSTALL TREMIE
CONCRETE PARTITIONS, MONOLITHS
M-8 TO M-10
82,214 POUNDS $4.07 $334,610.98 $5.00 $411,070.00 $7.50 $616,605.00 $9.00 $739,926.00
2047 PRODUCE TREMIE CONCRETE AND
DELIVER TO STUB WALL,
MONOLITHS M-8 TO M-10
2,300 CUBIC
YARDS
$124.00 $285,200.00 $148.00 $340,400.00 $150.00 $345,000.00 $70.00 $161,000.00
2048 DELIVER AND PLACE TREMIE
CONCRETE, MONOLITHS M-8 TO M-10
2,300 CUBIC
YARDS
$14.50 $33,350.00 $275.00 $632,500.00 $140.00 $322,000.00 $85.00 $195,500.00
2049 CAST-IN-PLACE CONCRETE, MIDDLE
WALL, MONOLITHS M-8 TO M-10
6,315 CUBIC
YARDS
$304.60 $1,923,549.00 $350.00 $2,210,250.00 $780.00 $4,925,700.00 $500.00 $3,157,500.00
2050 PVC WATERSTOPS, MONOLITHS M-8
TO M-10
170 LINEAR
FEET
$46.65 $7,930.50 $31.00 $5,270.00 $120.00 $20,400.00 $30.00 $5,100.00
2051 REINFORCING STEEL, MIDDLE WALL,
MONOLITHS M-8 TO M-10
218,921 POUNDS $3.55 $777,169.55 $2.00 $437,842.00 $4.00 $875,684.00 $4.50 $985,144.50
2052 INSTALL FLOATING MOORING BITT
ANCHORAGE FRAMES, MONOLITH M-
2 EACH $57,850.00 $115,700.00 $142,002.00 $284,004.00 $60,000.00 $120,000.00 $25,000.00 $50,000.00
2053 FURNISH AND INSTALL LINE HOOKS
AND GUARDS, MONOLITH M-9
10 EACH $5,495.00 $54,950.00 $21,750.00 $217,500.00 $15,000.00 $150,000.00 $6,700.00 $67,000.00
2054 FURNISH AND INSTALL CHECK
POSTS, MONOLITH M-9
2 EACH $6,560.00 $13,120.00 $13,484.00 $26,968.00 $8,000.00 $16,000.00 $11,000.00 $22,000.00
2055 FURNISH AND INSTALL ALUMINUM
RABBET ANGLES, MONOLITHS M-8
TO M-10
240 LINEAR
FEET
$34.55 $8,285.09 $92.08 $22,080.00 $55.00 $13,200.00 $155.00 $37,200.00
2056 FURNISH AND INSTALL ALUMINUM
PLANKING, MONOLITHS M-8 TO M-10
433 SQUARE
FEET
$96.55 $41,835.12 $55.96 $24,248.00 $65.00 $28,145.00 $52.00 $22,516.00
2057 FURNISH AND INSTALL CORNER
CASTINGS, MONOLITHS M-8 TO M-10
4 EACH $2,121.00 $8,484.00 $2,434.00 $9,736.00 $3,030.00 $12,120.00 $3,600.00 $14,400.00
2058 FURNISH AND INSTALL CORNER
PROTECTION, MONOLITHS M-8 TO M-
393 LINEAR
FEET
$296.00 $116,387.20 $207.89 $81,744.00 $145.00 $56,985.00 $250.00 $98,250.00
2059 FURNISH AND INSTALL WALL
ARMOR, MONOLITHS M-8 TO M-10
485 LINEAR
FEET
$234.55 $113,756.75 $184.00 $89,240.00 $180.00 $87,300.00 $275.00 $133,375.00
2060 FURNISH AND INSTALL MONOLITH
JOINT PROTECTION, MONOLITHS M-8
TO M-10
332 LINEAR
FEET
$129.95 $43,195.38 $135.84 $45,153.22 $140.00 $46,480.00 $265.00 $87,980.00
2061 ADAS TURNOVER 1 JOB $29,700.00 $29,700.00 $46,558.00 $46,558.00 $250,000.00 $250,000.00 $10,000.00 $10,000.00
2062 INSTRUMENTATION MONITORING
PROGRAM, AWARDABLE OPTION 2
10 MONTHS $17,660.00 $176,600.00 $8,646.00 $86,460.00 $16,500.00 $165,000.00 $8,000.00 $80,000.00
2063 FURNISH AND INSTALL ELECTRICAL
AND MECHANICAL SYSTEMS
EMBEDDED ITEMS, OPTION 2
1 JOB $1,660.00 $1,660.00 $28,795.00 $28,795.00 $100,000.00 $100,000.00 $1,159.27 $1,159.27
2064 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING,
TESTING AND REPORTING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
9 MONTHS $10,740.00 $96,660.00 $21,948.00 $197,532.00 $5,000.00 $45,000.00 $3,301.95 $29,717.55
2065 CLEANING OF SEDIMENT BASIN NO.
1, VICTORY HOLLOW SITE,
AWARDABLE OPTION 2
2 EACH $12,050.00 $24,100.00 $13,663.00 $27,326.00 $11,750.00 $23,500.00 $10,000.00 $20,000.00
2066 CLEANING OF SEDIMENT BASIN NO.
2, VICTORY HOLLOW SITE,
AWARDABLE OPTION 2
2 EACH $18,080.00 $36,160.00 $47,352.00 $94,704.00 $11,750.00 $23,500.00 $20,000.00 $40,000.00
2067 CLEARING, VICTORY HOLLOW SITE,
AWARDABLE OPTION 2
5 ACRE $5,260.00 $26,300.00 $3,326.00 $16,630.00 $15,000.00 $75,000.00 $7,200.00 $36,000.00
2068 SILT FENCE, VICTORY HOLLOW SITE,
AWARDABLE OPTION 2
500 LINEAR
FEET
$13.15 $6,575.00 $8.00 $4,000.00 $13.50 $6,750.00 $6.60 $3,300.00
2069 WEIGHTED SEDIMENT FILTER TUBE,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 2
1,000 LINEAR
FEET
$10.05 $10,050.00 $13.00 $13,000.00 $5.00 $5,000.00 $11.00 $11,000.00
2070 TEMPORARY SEEDING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
15 ACRE $3,095.00 $46,425.00 $3,991.00 $59,865.00 $1,200.00 $18,000.00 $1,200.00 $18,000.00
2071 PERMANENT SEEDING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
5 ACRE $4,955.00 $24,775.00 $6,651.00 $33,255.00 $1,690.00 $8,450.00 $1,500.00 $7,500.00
2072AA PDT NO. 2A SURFACE COURSE,
FIRST 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 2
1,000 SQUARE
YARDS
$7.65 $7,650.00 $133.00 $133,000.00 $13.50 $13,500.00 $6.50 $6,500.00
2072AB PDT NO. 2A SURFACE COURSE, ALL
OVER 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 2
500 SQUARE
YARDS
$8.05 $4,025.00 $133.00 $66,500.00 $13.50 $6,750.00 $6.50 $3,250.00
2073 AS-BUILT DRAWINGS, AWARDABLE
OPTION 2
1 JOB $270,200.00 $270,200.00 $39,907.00 $39,907.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00
2074 PRODUCE CONCRETE AND DELIVER
TO STUB WALL, NON-COFFERBOX
SHEET PILE SUPPORT SYSTEM
860 CUBIC
YARDS
$1,470.00 $1,264,200.00 $142.00 $122,120.00 $500.00 $430,000.00 $100.00 $86,000.00
2075 DELIVER AND PLACE CONCRETE,
NON-COFFERBOX SHEET PILE
SUPPORT SYSTEM
860 CUBIC
YARDS
$425.40 $365,844.00 $547.00 $470,420.00 $1,200.00 $1,032,000.00 $175.00 $150,500.00
2076 CONCRETE PRODUCTION MANAGER,
AWARDABLE OPTION 2
16 MONTHS $16,075.00 $257,200.00 $48,746.00 $779,936.00 $36,500.00 $584,000.00 $19,974.04 $319,584.64
2077 MOBILIZATION AND DEMOBILIZATION,
AWARDABLE OPTION 2
1 JOB $507,140.00 $507,140.00 $1,600,000.00 $1,600,000.00 $1,000,000.00 $1,000,000.00 $10,000.00 $10,000.00
2078 ENVIRONMENTAL FIELD TECHNICIAN
COMPLIANCE REPRESENTATIVE,
AWARDABLE OPTION 2
9 MONTHS $10,855.00 $97,695.00 $20,917.00 $188,253.00 $13,000.00 $117,000.00 $10,900.00 $98,100.00
TOTAL, OPTION 2 ITEMS 2001
THROUGH 2078
$32,516,587.37 $38,096,351.00 $42,274,463.50 $31,955,075.87
AWARDABLE OPTION 3, MONOLITHS M-17 TO M-21
3001 REIMBURSEMENT FOR ACTUAL
PERFORMANCE AND PAYMENT
BONDS PREMIUMS, AWARDABLE
OPTION 3
1 JOB $182,630.00 $182,630.00 $160,000.00 $160,000.00 $350,000.00 $350,000.00 $237,000.00 $237,000.00
3002 DIGITAL PROGRESS IMAGES,
MONTHLY, AWARDABLE OPTION 3
1 SET $660.00 $660.00 $353.00 $353.00 $275.00 $275.00 $298.33 $298.33
3003 DIGITAL AERIAL PROGRESS IMAGES,
QUARTERLY, AWARDABLE OPTION 3
1 SET $1,555.00 $1,555.00 $728.00 $728.00 $630.00 $630.00 $614.00 $614.00
3004 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING,
TESTING AND REPORTING,
CONCRETE BATCH PLANT,
AWARDABLE OPTION 3
1 MONTHS $9,975.00 $9,975.00 $19,239.00 $19,239.00 $5,000.00 $5,000.00 $4,201.47 $4,201.47
3005 CLEANING OF SEDIMENT BASIN NO.
1, CONCRETE BATCH PLANT,
AWARDABLE OPTION 3
5 EACH $24,150.00 $120,750.00 $11,788.00 $58,940.00 $12,500.00 $62,500.00 $13,000.00 $65,000.00
3006 CLEANING OF SEDIMENT BASIN NO.
2, CONCRETE BATCH PLANT,
AWARDABLE OPTION 3
1 EACH $20,280.00 $20,280.00 $22,711.00 $22,711.00 $12,500.00 $12,500.00 $13,000.00 $13,000.00
3007 CLEAN SEEP, CONCRETE BATCH
PLANT, AWARDABLE OPTION 3
1 EACH $10,840.00 $10,840.00 $21,233.00 $21,233.00 $6,700.00 $6,700.00 $7,000.00 $7,000.00
3008 MAINTAIN CONCRETE TESTING LAB,
AWARDABLE OPTION 3
1 MONTHS $16,170.00 $16,170.00 $5,534.00 $5,534.00 $10,300.00 $10,300.00 $3,000.00 $3,000.00
3009 MONTHLY MAINTENANCE OF BATCH
PLANT AND CONVEYOR SYSTEMS,
AWARDABLE OPTION 3
1 MONTHS $20,290.00 $20,290.00 $65,791.00 $65,791.00 $110,000.00 $110,000.00 $100,000.00 $100,000.00
3010 REIMBURSEMENT FOR REPAIR OF
BATCH PLANT AND CONVEYOR
EQUIPMENT, AWARDABLE OPTION 3
1 JOB $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00
3011 MAINTAIN GOVERNMENT FIELD
OFFICES, AWARDABLE OPTION 3
1 MONTHS $8,625.00 $8,625.00 $4,850.00 $4,850.00 $3,500.00 $3,500.00 $7,000.00 $7,000.00
3012 REIMBURSEMENT FOR REPAIRS AT
GOVERNMENT FIELD OFFICES,
AWARDABLE OPTION 3
1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
3013 MAINTAIN DOWNSTREAM RIVER
CHAMBER CLOSURE, AWARDABLE
OPTION 3
1 JOB $12,935.00 $12,935.00 $15,383.00 $15,383.00 $81,000.00 $81,000.00 $44,632.76 $44,632.76
3014 FURNISH AND INSTALL SHEET
PILING, COFFERBOX MONOLITHS M-
17 TO M-21
7,488 LINEAR
FEET
$109.10 $816,940.80 $210.00 $1,572,480.00 $180.00 $1,347,840.00 $175.00 $1,310,400.00
3015 FURNISH AND INSTALL KING PILES,
COFFERBOX MONOLITHS M-17 TO M-
4,410 LINEAR
FEET
$893.25 $3,939,232.50 $1,000.00 $4,410,000.00 $650.00 $2,866,500.00 $875.00 $3,858,750.00
3016 DYNAMIC PILE TESTING,
COFFERBOX MONOLITHS M-17 TO M-
6 EACH $2,340.00 $14,040.00 $10,578.00 $63,468.00 $5,500.00 $33,000.00 $4,900.00 $29,400.00
3017 FURNISH AND INSTALL STRUCTURAL
STEEL, COFFERBOX MONOLITHS M-
17 TO M-21
241,120 POUNDS $11.80 $2,845,216.00 $15.00 $3,616,800.00 $8.00 $1,928,960.00 $8.50 $2,049,520.00
3018 REMOVE SHEET PILING, COFFERBOX
MONOLITHS M-17 TO M-21
6,794 LINEAR
FEET
$31.00 $210,614.00 $112.00 $760,928.00 $65.00 $441,610.00 $45.00 $305,730.00
3019 REMOVE KING PILES, COFFERBOX
MONOLITHS M-17 TO M-21
4,284 LINEAR
FEET
$44.50 $190,638.00 $275.00 $1,178,100.00 $50.00 $214,200.00 $85.00 $364,140.00
3020 REMOVE STRUCTURAL STEEL,
COFFERBOX MONOLITHS M-17 TO M-
402,229 POUNDS $0.62 $249,381.98 $1.00 $402,229.00 $1.45 $583,232.05 $1.10 $442,451.90
3021 UNDERWATER ALLUVIUM
EXCAVATION INSIDE COFFERBOX
MONOLITHS M-17 TO M-21
4,550 CUBIC
YARDS
$258.00 $1,173,900.00 $368.00 $1,674,400.00 $350.00 $1,592,500.00 $215.00 $978,250.00
3022 COFFERBOX DEWATERING,
MONOLITHS M-17 TO M-21
1 JOB $210,430.00 $210,430.00 $327,918.00 $327,918.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00
3023 COMPENSATION FOR FLOODING
AND EVACUATION, COFFERBOX M-17
TO M-21
1 EACH $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00
3024 78" DIA. PERMANENT CASING, 72-
INCH DIA. MW FOUNDATION DRILLED
SHAFTS, MONOLITHS M-17 TO M-21
495 LINEAR
FEET
$2,129.00 $1,053,855.00 $5,107.00 $2,527,965.00 $6,000.00 $2,970,000.00 $3,500.00 $1,732,500.00
3025 SOIL EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-17 TO M-21
600 LINEAR
FEET
$303.00 $181,800.00 $539.00 $323,400.00 $760.00 $456,000.00 $175.00 $105,000.00
3026 ROCK EXCAVATION, 72-INCH DIA. MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-17 TO M-21
1,230 LINEAR
FEET
$1,930.00 $2,373,900.00 $1,404.00 $1,726,920.00 $1,800.00 $2,214,000.00 $1,200.00 $1,476,000.00
3027 REINFORCING STEEL, MW
FOUNDATION DRILLED SHAFTS,
MONOLITHS M-17 TO M-21
822,000 POUNDS $3.34 $2,745,480.00 $1.50 $1,233,000.00 $1.75 $1,438,500.00 $3.10 $2,548,200.00
3028 ACCESS TUBES, CROSSHOLE SONIC
LOGGING, MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-17
TO M-21
10,260 LINEAR
FEET
$12.50 $128,250.00 $13.00 $133,380.00 $48.00 $492,480.00 $15.00 $153,900.00
3029 PRODUCE CONCRETE AND DELIVER
TO STUB WALL, MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-17
TO M-21
1,880 CUBIC
YARDS
$268.80 $505,344.00 $109.00 $204,920.00 $220.00 $413,600.00 $70.00 $131,600.00
3030 DELIVER AND PLACE CONCRETE,
MW FOUNDATION DRILLED SHAFTS,
MONOLITHS M-17 TO M-21
1,880 CUBIC
YARDS
$29.25 $54,990.00 $295.00 $554,600.00 $1,000.00 $1,880,000.00 $175.00 $329,000.00
3031 CROSSHOLE SONIC LOGGING (CSL)
MW FOUNDATION DRILLED SHAFTS,
MONOLITHS M-17 TO M-21
30 EACH $2,180.00 $65,400.00 $5,054.00 $151,620.00 $1,400.00 $42,000.00 $690.00 $20,700.00
3032 CORING OF MW FOUNDATION
DRILLED SHAFTS, MONOLITHS M-17
TO M-21
288 LINEAR
FEET
$186.40 $53,590.00 $404.70 $116,352.00 $300.00 $86,400.00 $300.00 $86,400.00
3033 AA PORTLAND CEMENT,AWARDABLE
OPTION 3, FIRST 1.105 TONS
1,105 TONS $332.00 $366,860.00 $197.00 $217,685.00 $250.00 $276,250.00 $375.00 $414,375.00
3033 AB PORTLAND CEMENT,AWARDABLE
OPTION 3, ALL OVER 1.105 TONS
380 TONS $332.00 $126,160.00 $260.00 $98,800.00 $250.00 $95,000.00 $250.00 $95,000.00
3034 AA POZZOLAN, AWARDABLE OPTION 3,
FIRST 500 TONS
500 TONS $101.20 $50,600.00 $54.00 $27,000.00 $120.00 $60,000.00 $140.00 $70,000.00
3034 AB POZZOLAN, AWARDABLE OPTION 3,
ALL OVER 500 TONS
450 TONS $101.20 $45,540.00 $66.00 $29,700.00 $120.00 $54,000.00 $90.00 $40,500.00
3035 AA GROUND GRANULATED BLAST
FURNACE SLAG, AWARDABLE
OPTION 3, FIRST 430 TONS
430 TONS $214.75 $92,342.50 $161.00 $69,230.00 $200.00 $86,000.00 $220.00 $94,600.00
3035 AB GROUND GRANULATED BLAST
FURNACE SLAG, AWARDABLE
OPTION 3, ALL OVER 430 TONS
750 TONS $214.75 $161,062.50 $188.00 $141,000.00 $200.00 $150,000.00 $160.00 $120,000.00
3036 SILICA FUME, AWARDABLE OPTION 3 67 TONS $1,555.00 $104,185.00 $961.00 $64,387.00 $1,275.00 $85,425.00 $1,000.00 $67,000.00
3037 ANTI-WASHOUT ADMIXTURE,
AWARDABLE OPTION 3
3,885 GALLONS $52.40 $203,574.00 $34.00 $132,090.00 $45.00 $174,825.00 $45.00 $174,825.00
3038 LIMESTONE POWDER, AWARDABLE
OPTION 3
595 TONS $108.45 $64,527.75 $77.00 $45,815.00 $97.00 $57,715.00 $115.00 $68,425.00
3039 FURNISH AND INSTALL TREMIE
CONCRETE PARTITIONS,
COFFERBOX MONOLITHS M-22 TO M-
164,428 POUNDS $4.07 $669,221.96 $4.00 $657,712.00 $7.50 $1,233,210.00 $9.00 $1,479,852.00
3040 PRODUCE TREMIE CONCRETE AND
DELIVER TO STUB WALL,
MONOLITHS M-17 TO M-21
3,650 CUBIC
YARDS
$126.40 $461,360.00 $131.00 $478,150.00 $150.00 $547,500.00 $70.00 $255,500.00
3041 DELIVER AND PLACE TREMIE
CONCRETE, MONOLITHS M-17 TO M-
3,650 CUBIC
YARDS
$14.55 $53,107.50 $242.00 $883,300.00 $140.00 $511,000.00 $100.00 $365,000.00
3042 CAST-IN-PLACE CONCRETE, MIDDLE
WALL, MONOLITHS M-17 TO M-21
10,521 CUBIC
YARDS
$263.40 $2,771,231.40 $315.00 $3,314,115.00 $780.00 $8,206,380.00 $500.00 $5,260,500.00
3043 PVC WATERSTOPS, MONOLITHS M-
17 TO M-21
336 LINEAR
FEET
$43.45 $14,599.20 $24.00 $8,064.00 $120.00 $40,320.00 $30.00 $10,080.00
3044 REINFORCING STEEL, MIDDLE WALL,
MONOLITHS M-17 TO M-21
358,391 POUNDS $3.54 $1,268,704.14 $1.20 $430,069.20 $4.00 $1,433,564.00 $4.50 $1,612,759.50
3045 INSTALL FLOATING MOORING BITT
ANCHORAGE FRAMES, MONOLITH M-
2 EACH $57,850.00 $115,700.00 $85,443.00 $170,886.00 $60,000.00 $120,000.00 $25,000.00 $50,000.00
3046 FURNISH AND INSTALL LINE HOOKS
AND GUARDS, MONOLITH M-19
10 EACH $5,495.00 $54,950.00 $7,440.00 $74,400.00 $15,000.00 $150,000.00 $6,700.00 $67,000.00
3047 FURNISH AND INSTALL CHECK
POSTS, MONOLITH M-19
2 EACH $6,560.00 $13,120.00 $17,890.00 $35,780.00 $8,000.00 $16,000.00 $11,000.00 $22,000.00
3048 FURNISH AND INSTALL LOCK
LADDER RECESS METALS,
MONOLITH M-20
2,079 POUNDS $15.65 $32,536.35 $16.00 $33,264.00 $20.00 $41,580.00 $18.00 $37,422.00
3049 FURNISH AND INSTALL ALUMINUM
RABBET ANGLES, MONOLITHS M-17
TO M-21
392 LINEAR
FEET
$40.35 $15,809.13 $75.04 $29,400.00 $55.00 $21,560.00 $155.00 $60,760.00
3050 FURNISH AND INSTALL ALUMINUM
PLANKING, MONOLITHS M-17 TO M-21
718 SQUARE
FEET
$89.70 $64,431.51 $47.98 $34,464.00 $65.00 $46,670.00 $52.00 $37,336.00
3051 FURNISH AND INSTALL CORNER
CASTINGS, MONOLITHS M-17 TO M-21
12 EACH $1,976.00 $23,712.00 $1,851.00 $22,212.00 $3,030.00 $36,360.00 $3,600.00 $43,200.00
3052 FURNISH AND INSTALL CORNER
PROTECTION, MONOLITHS M-17 TO M-
729 LINEAR
FEET
$289.25 $210,863.25 $160.00 $116,640.00 $145.00 $105,705.00 $250.00 $182,250.00
3053 FURNISH AND INSTALL WALL
ARMOR, MONOLITHS M-17 TO M-21
895 LINEAR
FEET
$215.10 $192,600.54 $135.94 $121,720.00 $180.00 $161,100.00 $275.00 $246,125.00
3054 FURNISH AND INSTALL MONOLITH
JOINT PROTECTION, MONOLITHS M-
17 TO M-21
499 LINEAR
FEET
$130.70 $65,167.02 $99.08 $49,401.00 $140.00 $69,860.00 $265.00 $132,235.00
3055 FURNISH AND INSTALL EMBEDDED
PINS FOR REMOVABLE HANDRAIL,
MONOLITHS M-17 TO M-21
4 EACH $334.00 $1,336.00 $187.00 $748.00 $430.00 $1,720.00 $150.00 $600.00
3056 INSTRUMENTATION MONITORING
PROGRAM, AWARDABLE OPTION 3
1 MONTHS $17,660.00 $17,660.00 $12,854.00 $12,854.00 $14,000.00 $14,000.00 $6,000.00 $6,000.00
3057 FURNISH AND INSTALL ELECTRICAL
SYSTEMS EMBEDDED ITEMS,
OPTION 3
1 JOB $840.00 $840.00 $26,534.00 $26,534.00 $50,000.00 $50,000.00 $1,159.27 $1,159.27
3058 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING,
TESTING AND REPORTING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
1 MONTHS $10,740.00 $10,740.00 $17,674.00 $17,674.00 $5,000.00 $5,000.00 $3,301.95 $3,301.95
3059 CLEANING OF SEDIMENT BASIN NO.
1, VICTORY HOLLOW SITE,
AWARDABLE OPTION 3
1 EACH $12,055.00 $12,055.00 $17,457.00 $17,457.00 $11,750.00 $11,750.00 $10,000.00 $10,000.00
3060 CLEANING OF SEDIMENT BASIN NO.
2, VICTORY HOLLOW SITE,
AWARDABLE OPTION 3
1 EACH $18,080.00 $18,080.00 $60,290.00 $60,290.00 $14,060.00 $14,060.00 $20,000.00 $20,000.00
3061 CLEARING, VICTORY HOLLOW SITE,
AWARDABLE OPTION 3
10 ACRE $4,545.00 $45,450.00 $2,678.00 $26,780.00 $3,000.00 $30,000.00 $7,200.00 $72,000.00
3062 SILT FENCE, VICTORY HOLLOW SITE,
AWARDABLE OPTION 3
500 LINEAR
FEET
$13.15 $6,575.00 $6.00 $3,000.00 $13.50 $6,750.00 $6.60 $3,300.00
3063 WEIGHTED SEDIMENT FILTER TUBE,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 3
1,000 LINEAR
FEET
$10.05 $10,050.00 $11.00 $11,000.00 $5.00 $5,000.00 $11.00 $11,000.00
3064 TEMPORARY SEEDING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
10 ACRE $3,095.00 $30,950.00 $3,214.00 $32,140.00 $1,300.00 $13,000.00 $1,200.00 $12,000.00
3065 PERMANENT SEEDING, VICTORY
HOLLOW SITE, AWARDABLE OPTION
5 ACRE $4,955.00 $24,775.00 $5,356.00 $26,780.00 $1,800.00 $9,000.00 $1,500.00 $7,500.00
3066AA PDT NO. 2A SURFACE COURSE,
FIRST 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 3
1,000 SQUARE
YARDS
$7.65 $7,650.00 $107.00 $107,000.00 $13.50 $13,500.00 $6.50 $6,500.00
3066AB PDT NO. 2A SURFACE COURSE, ALL
OVER 1,000 SQUARE YARDS,
VICTORY HOLLOW SITE,
AWARDABLE OPTION 3
500 SQUARE
YARDS
$8.05 $4,025.00 $107.00 $53,500.00 $13.50 $6,750.00 $6.50 $3,250.00
3067 AS-BUILT DRAWINGS, AWARDABLE
OPTION 3
1 JOB $163,580.00 $163,580.00 $32,135.00 $32,135.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00
3068 CONCRETE PRODUCTION MANAGER,
AWARDABLE OPTION 3
1 MONTHS $16,075.00 $16,075.00 $39,253.00 $39,253.00 $36,500.00 $36,500.00 $19,974.04 $19,974.04
3069 MOBILIZATION AND DEMOBILIZATION,
AWARDABLE OPTION 3
1 JOB $123,230.00 $123,230.00 $862,074.00 $862,074.00 $600,000.00 $600,000.00 $10,000.00 $10,000.00
3070 ENVIRONMENTAL FIELD TECHNICIAN
COMPLIANCE REPRESENTATIVE,
AWARDABLE OPTION 3
1 MONTHS $10,855.00 $10,855.00 $16,844.00 $16,844.00 $13,000.00 $13,000.00 $10,900.00 $10,900.00
TOTAL, OPTION 3 ITEMS, 3001
THROUGH 3070
$25,438,604.03 $30,459,589.20 $35,358,281.05 $28,312,918.22
AWARDABLE OPTION 4 - IN-CHAMBER WORK
4001 REIMBURSEMENT FOR ACTUAL
PERFORMANCE AND PAYMENT
BONDS PREMIUMS, AWARDABLE
OPTION 4
1 JOB $482,240.00 $482,240.00 $372,300.00 $372,300.00 $828,000.00 $828,000.00 $515,000.00 $515,000.00
4002 DIGITAL PROGRESS IMAGES,
MONTHLY, AWARDABLE OPTION 4
21 SET $685.00 $14,385.00 $380.00 $7,980.00 $275.00 $5,775.00 $328.00 $6,888.00
4003 DIGITAL AERIAL PROGRESS IMAGES,
QUARTERLY, AWARDABLE OPTION 4
7 SET $1,610.00 $11,270.00 $780.00 $5,460.00 $630.00 $4,410.00 $674.67 $4,722.69
4004 ENVIRONMENTAL COMPLIANCE
MEASUREMENTS, SAMPLING,
TESTING AND REPORTING,
CONCRETE BATCH PLANT,
AWARDABLE OPTION 4
21 MONTHS $10,325.00 $216,825.00 $19,239.00 $404,019.00 $5,000.00 $105,000.00 $4,201.47 $88,230.87
4005 CLEANING OF SEDIMENT BASIN NO.
1, CONCRETE BATCH PLANT,
AWARDABLE OPTION 4
8 EACH $25,000.00 $200,000.00 $18,250.00 $146,000.00 $12,900.00 $103,200.00 $13,000.00 $104,000.00
4006 CLEANING OF SEDIMENT BASIN NO.
2, CONCRETE BATCH PLANT
4 EACH $20,995.00 $83,980.00 $21,950.00 $87,800.00 $12,900.00 $51,600.00 $13,000.00 $52,000.00
4007 CLEAN SEEP, CONCRETE BATCH
PLANT, AWARDABLE OPTION 4
5 EACH $11,220.00 $56,100.00 $21,233.00 $106,165.00 $6,700.00 $33,500.00 $7,000.00 $35,000.00
4008 MAINTAIN CONCRETE TESTING LAB,
AWARDABLE OPTION 4
20 MONTHS $16,735.00 $334,700.00 $5,534.00 $110,680.00 $6,300.00 $126,000.00 $3,000.00 $60,000.00
4009 MONTHLY MAINTENANCE OF BATCH
PLANT AND CONVEYOR SYSTEMS,
AWARDABLE OPTION 4
20 MONTHS $21,150.00 $423,000.00 $50,579.00 $1,011,580.00 $110,000.00 $2,200,000.00 $100,000.00 $2,000,000.00
4010 REIMBURSEMENT FOR REPAIR OF
BATCH PLANT AND CONVEYOR
EQUIPMENT, AWARDABLE OPTION 4
1 JOB $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00
4011 MAINTAIN GOVERNMENT FIELD
OFFICES, AWARDABLE OPTION 4
20 MONTHS $8,930.00 $178,600.00 $4,850.00 $97,000.00 $3,500.00 $70,000.00 $7,000.00 $140,000.00
4012 REIMBURSEMENT FOR REPAIRS AT
GOVERNMENT FIELD OFFICES,
AWARDABLE OPTION 4
1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00
4013 MODIFICATIONS TO EXISTING RIVER
WALL AND EXISTING MIDDLE WALL
FOR CONNECTION OF EMPTYING
CULVERTS
1 JOB $67,490.00 $67,490.00 $79,943.00 $79,943.00 $115,000.00 $115,000.00 $96,915.49 $96,915.49
4014 MODIFICATIONS TO EXISTING RIVER
WALL AND NEW MIDDLE WALL FOR
UPSTREAM SILLS AND FILLING
SYSTEM
1 JOB $120,750.00 $120,750.00 $314,456.00 $314,456.00 $350,000.00 $350,000.00 $392,319.30 $392,319.30
4015 MISCELLANEOUS MODIFICATIONS TO
EXISTING STUB WALL
1 JOB $740.00 $740.00 $44,362.00 $44,362.00 $25,000.00 $25,000.00 $48,298.95 $48,298.95
4016 MODIFY FLOATING MOORING BITT,
STUB WALL
1 JOB $452,895.00 $452,895.00 $371,079.00 $371,079.00 $350,000.00 $350,000.00 $297,943.65 $297,943.65
4017 REMOVE EXISTING CONCRETE
FOOTING, STUB WALL
372 CUBIC
YARDS
$595.60 $221,563.20 $93.00 $34,596.00 $23.00 $8,556.00 $436.50 $162,378.00
4018 REMOVE EXISTING PORT PLUGS AND
CONSTRUCT NEW PORT PLUGS,
STUB WALL
3 EACH $17,955.00 $53,865.00 $6,874.00 $20,622.00 $4,000.00 $12,000.00 $7,645.15 $22,935.45
4019 REPAIR CHAMBER FACE OF STUB
WALL AT FIXED WEIR
2,150 SQUARE
FEET
$10.85 $23,327.50 $20.00 $43,000.00 $15.00 $32,250.00 $16.60 $35,690.00
4020 CONSTRUCT NEW UTILITY TRENCH,
STUB WALL
224 LINEAR
FEET
$2,390.00 $535,360.00 $1,493.00 $334,432.00 $2,150.00 $481,600.00 $1,564.67 $350,486.08
4021 CLEAN AND RESEAL MONOLITH
JOINTS, STUB WALL
603 LINEAR
FEET
$12.75 $7,688.25 $35.00 $21,105.00 $26.00 $15,678.00 $46.30 $27,918.90
4022 CLEAN AND PAINT EXISTING
FERROUS SURFACES, STUB WALL
1 JOB $14,665.00 $14,665.00 $41,839.00 $41,839.00 $19,000.00 $19,000.00 $100,000.00 $100,000.00
4023 INSTALL ROCK ANCHORS, STUB
WALL
2,160 LINEAR
FEET
$1,170.00 $2,527,200.00 $1,021.00 $2,205,360.00 $380.00 $820,800.00 $680.00 $1,468,800.00
4024 DEMOLITION OF ORIGINAL RIVER
WALL, PORTION OF LOWER GUARD
WALL AND FIXED WEIR, AND
STABILIZATION PILES
1 JOB $1,920,000.00 $1,920,000.00 $2,799,132.00 $2,799,132.00 $3,500,000.00 $3,500,000.00 $2,800,000.00 $2,800,000.00
4025 DEMOLITION OF ORIGINAL RIVER
WALL SUPPORT CELL, DIAPHRAGM
WALL, AND SHEET PILE CUTOFF
WALL
1 JOB $2,411,000.00 $2,411,000.00 $2,534,950.00 $2,534,950.00 $1,400,000.00 $1,400,000.00 $1,973,967.97 $1,973,967.97
4026 REMOVAL OF STABILIZATION
STRUTS
1 JOB $30,775.00 $30,775.00 $61,663.00 $61,663.00 $20,000.00 $20,000.00 $33,418.81 $33,418.81
4027…
This is the start of the file's text. The full file is on GovTribe.