Charleroi Locks and Dam

River Chamber Completion

IGE

BIDDER 1 - URS Energy and

Construction, Inc.

BIDDER 2 - Charleroi Constructors - a

Joint Venture

BIDDER 3 - Trumbull Corporation &

Brayman Construction Corporation, A

Joint Venture

Item Description

Bid

Schedule

Quantity Unit Unit Price Total Unit Price Corrected Total Unit Price Total Unit Price Total

BASE CONTRACT, MONOLITHS M-1 TO M-7

0001 REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT

BONDS PREMIUMS, BASE CONTRACT

1 JOB $432,910.00 $432,910.00 $456,300.00 $456,300.00 $611,000.00 $611,000.00 $500,000.00 $500,000.00

0002 DIGITAL PROGRESS IMAGES,

MONTHLY, BASE CONTRACT

34 SET $630.00 $21,420.00 $400.00 $13,600.00 $275.00 $9,350.00 $270.00 $9,180.00

0003 MOBILIZATION AND DEMOBILIZATION,

BASE CONTRACT

1 JOB $586,800.00 $586,800.00 $10,000,000.00 $10,000,000.00 $2,000,000.00 $2,000,000.00 $1,045,000.00 $1,045,000.00

0004 REIMBURSEMENT FOR REPAIRS AT

GOVERNMENT FIELD OFFICES, BASE

CONTRACT

1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00

0005 FURNISH AND INSTALL SHEET

PILING, COFFERBOX MONOLITHS M-1

TO M-7

15,093 LINEAR

FEET

$109.40 $1,651,174.20 $200.00 $3,018,600.00 $180.00 $2,716,740.00 $175.00 $2,641,275.00

0006 FURNISH AND INSTALL KING PILES,

COFFERBOX MONOLITHS M-1 TO M-7

9,408 LINEAR

FEET

$864.20 $8,130,393.60 $950.00 $8,937,600.00 $650.00 $6,115,200.00 $875.00 $8,232,000.00

0007 DYNAMIC PILE TESTING,

COFFERBOX MONOLITHS M-1 TO M-7

7 EACH $2,050.00 $14,350.00 $16,000.00 $112,000.00 $5,500.00 $38,500.00 $4,900.00 $34,300.00

0008 FURNISH AND INSTALL STRUCTURAL

STEEL, COFFERBOX MONOLITHS M-1

TO M-7

670,544 POUNDS $11.50 $7,711,256.00 $10.50 $7,040,712.00 $8.00 $5,364,352.00 $8.50 $5,699,624.00

0009 REMOVE SHEET PILING, COFFERBOX

MONOLITHS M-1 TO M-7

9,320 LINEAR

FEET

$32.20 $300,104.00 $250.00 $2,330,000.00 $65.00 $605,800.00 $45.00 $419,400.00

0010 REMOVE KING PILES, COFFERBOX

MONOLITHS M-1 TO M-7

6,662 LINEAR

FEET

$32.40 $215,848.80 $320.00 $2,131,840.00 $50.00 $333,100.00 $85.00 $566,270.00

0011 REMOVE STRUCTURAL STEEL,

COFFERBOX MONOLITHS M-1 TO M-7

639,144 POUNDS $0.34 $217,308.96 $1.25 $798,930.00 $1.45 $926,758.80 $1.10 $703,058.40

0012 MODIFY UPSTREAM PROTECTION

CELL FOR COFFERBOX BRACES

1 JOB $56,545.00 $56,545.00 $150,000.00 $150,000.00 $105,000.00 $105,000.00 $50,000.00 $50,000.00

0013 UNDERWATER ALLUVIUM

EXCAVATION INSIDE COFFERBOX

MONOLITHS M-1 TO M-7

7,680 CUBIC

YARDS

$244.40 $1,876,992.00 $350.00 $2,688,000.00 $350.00 $2,688,000.00 $215.00 $1,651,200.00

0014 COFFERBOX DEWATERING

MONOLITH M-1

1 JOB $187,510.00 $187,510.00 $500,000.00 $500,000.00 $275,000.00 $275,000.00 $450,000.00 $450,000.00

0015 COFFERBOX DEWATERING

MONOLITH M-7

1 JOB $185,900.00 $185,900.00 $500,000.00 $500,000.00 $275,000.00 $275,000.00 $200,000.00 $200,000.00

0016 COFFERBOX DEWATERING

MONOLITHS M-2 TO M-6

1 JOB $293,800.00 $293,800.00 $500,000.00 $500,000.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00

0017 COMPENSATION FOR FLOODING

AND EVACUATION, COFFERBOXES M-

1 OR M-7

2 EACH $120,000.00 $240,000.00 $120,000.00 $240,000.00 $120,000.00 $240,000.00 $120,000.00 $240,000.00

0018 COMPENSATION FOR FLOODING

AND EVACUATION, COFFERBOXES M-

2 TO M-6

1 EACH $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00

0019 PRE-EXCAVATION MIDDLE WALL

UPSTREAM

7,900 CUBIC

YARDS

$57.80 $456,620.00 $80.00 $632,000.00 $105.00 $829,500.00 $160.00 $1,264,000.00

0020 FIELD DEMONSTRATION, MIDDLE

WALL FOUNDATION DRILLED SHAFT

1 JOB $378,730.00 $378,730.00 $800,000.00 $800,000.00 $300,000.00 $300,000.00 $2,800,000.00 $2,800,000.00

0021 78" DIA. PERMANENT CASING, 72-

INCH DIA. MW FOUNDATION DRILLED

SHAFTS, MONOLITHS M-1 TO M-7

695 LINEAR

FEET

$2,905.00 $2,018,975.00 $10,000.00 $6,950,000.00 $6,000.00 $4,170,000.00 $3,500.00 $2,432,500.00

0022 SOIL EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-1 TO M-7

884 LINEAR

FEET

$295.60 $261,310.40 $1,000.00 $884,000.00 $760.00 $671,840.00 $175.00 $154,700.00

0023 ROCK EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-1 TO M-7

1,922 LINEAR

FEET

$1,823.00 $3,503,806.00 $4,000.00 $7,688,000.00 $1,800.00 $3,459,600.00 $1,200.00 $2,306,400.00

0024 REINFORCING STEEL, MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-1 TO M-7

1,703,868 POUNDS $3.76 $6,406,543.68 $2.00 $3,407,736.00 $1.75 $2,981,769.00 $3.10 $5,281,990.80

0025 ACCESS TUBES, CROSSHOLE SONIC

LOGGING, MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-1

TO M-7

15,565 LINEAR

FEET

$11.80 $183,667.00 $20.00 $311,300.00 $48.00 $747,120.00 $15.00 $233,475.00

0026 DELIVER AND PLACE GOVERNMENT-

FURNISHED CONCRETE, MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-1 TO M-7

2,842 CUBIC

YARDS

$30.95 $87,971.04 $899.89 $2,557,800.00 $1,000.00 $2,842,000.00 $125.00 $355,250.00

0027 CROSSHOLE SONIC LOGGING (CSL)

MW FOUNDATION DRILLED SHAFTS,

MONOLITHS M-1 TO M-7

46 EACH $2,155.00 $99,130.00 $8,000.00 $368,000.00 $1,400.00 $64,400.00 $690.00 $31,740.00

0028 CORING OF MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-1

TO M-7

403 LINEAR

FEET

$121.30 $48,823.25 $1,001.24 $403,000.00 $300.00 $120,900.00 $300.00 $120,900.00

0029 FURNISH AND INSTALL UPSTREAM

MITER GATE EMBEDDED GUDGEON

ANCHORAGE FRAMES

4 EACH $40,365.00 $161,460.00 $25,000.00 $100,000.00 $80,000.00 $320,000.00 $40,000.00 $160,000.00

0030 FURNISH, INSTALL, REMOVE AND

STORE UPSTREAM BULKHEAD

RECESS FILLERS

1 JOB $100,900.00 $100,900.00 $150,000.00 $150,000.00 $175,000.00 $175,000.00 $140,000.00 $140,000.00

0031 FIELD DEMONSTRATION, TREMIE

FOUNDATION PLACEMENT

1 JOB $961,140.00 $961,140.00 $3,500,000.00 $3,500,000.00 $1,200,000.00 $1,200,000.00 $4,400,000.00 $4,400,000.00

0032 FURNISH AND INSTALL TREMIE

CONCRETE PARTITIONS,

COFFERBOX MONOLITHS M-1 TO M-7

160,461 POUNDS $3.81 $611,356.41 $6.00 $962,766.00 $7.50 $1,203,457.50 $9.00 $1,444,149.00

0033 DELIVER AND PLACE GOVERNMENT-

FURNISHED TREMIE CONCRETE,

MONOLITHS M-1 TO M-7

5,850 CUBIC

YARDS

$13.50 $78,975.00 $250.00 $1,462,500.00 $140.00 $819,000.00 $62.00 $362,700.00

0034 DELIVER AND PLACE GOVERNMENT-

FURNISHED CAST-IN-PLACE

CONCRETE, MIDDLE WALL,

MONOLITHS M-1 TO M-7

15,567 CUBIC

YARDS

$165.00 $2,568,555.00 $600.00 $9,340,200.00 $780.00 $12,142,260.00 $350.00 $5,448,450.00

0035 PVC WATERSTOPS, MONOLITHS M-1

TO M-7

590 LINEAR

FEET

$37.75 $22,272.50 $40.00 $23,600.00 $120.00 $70,800.00 $30.00 $17,700.00

0036 COPPER WATERSTOPS, MONOLITHS

M-1 TO M-7

240 LINEAR

FEET

$62.50 $15,000.00 $150.00 $36,000.00 $280.00 $67,200.00 $115.00 $27,600.00

0037 REINFORCING STEEL, MIDDLE WALL,

MONOLITHS M-1 TO M-7

599,622 POUNDS $3.38 $2,026,722.36 $3.00 $1,798,866.00 $4.00 $2,398,488.00 $4.50 $2,698,299.00

0038 INSTALL FLOATING MOORING BITT

ANCHORAGE FRAMES, MONOLITH M-

2 EACH $55,370.00 $110,740.00 $150,000.00 $300,000.00 $60,000.00 $120,000.00 $25,000.00 $50,000.00

0039 FURNISH AND INSTALL LINE HOOKS

AND GUARDS, MONOLITH M-5

10 EACH $5,260.00 $52,600.00 $25,000.00 $250,000.00 $15,000.00 $150,000.00 $6,700.00 $67,000.00

0040 FURNISH AND INSTALL CHECK

POSTS, MONOLITHS M-1 AND M-6

3 EACH $6,095.00 $18,285.00 $15,000.00 $45,000.00 $8,000.00 $24,000.00 $11,000.00 $33,000.00

0041 FURNISH AND INSTALL LOCK

LADDER RECESS METALS,

MONOLITHS M-2 AND M-6

2,619 POUNDS $18.90 $49,499.10 $15.00 $39,285.00 $25.00 $65,475.00 $18.00 $47,142.00

0042 FURNISH AND INSTALL ALUMINUM

RABBET ANGLES, MONOLITHS M-1

TO M-7

498 LINEAR

FEET

$44.05 $21,936.90 $60.00 $29,880.00 $55.00 $27,390.00 $155.00 $77,190.00

0043 FURNISH AND INSTALL ALUMINUM

PLANKING, MONOLITHS M-1 TO M-7

1,003 SQUARE

FEET

$96.30 $96,588.90 $60.00 $60,180.00 $65.00 $65,195.00 $52.00 $52,156.00

0044 FURNISH AND INSTALL ALUMINUM

PLATE WELDED TO ALUMINUM

GRATING, MONOLITHS M-1 TO M-7

64 SQUARE

FEET

$158.60 $10,150.40 $150.00 $9,600.00 $215.00 $13,760.00 $82.00 $5,248.00

0045 FURNISH AND INSTALL CORNER

CASTINGS, MONOLITHS M-1 TO M-7

22 EACH $1,920.00 $42,240.00 $2,200.00 $48,400.00 $3,030.00 $66,660.00 $3,600.00 $79,200.00

0046 FURNISH AND INSTALL CORNER

PROTECTION, MONOLITHS M-1 TO M-

959 LINEAR

FEET

$266.00 $255,094.00 $300.00 $287,700.00 $145.00 $139,055.00 $250.00 $239,750.00

0047 FURNISH AND INSTALL WALL

ARMOR, MONOLITHS M-1 TO M-7

2,982 LINEAR

FEET

$204.10 $608,626.20 $200.00 $596,400.00 $180.00 $536,760.00 $275.00 $820,050.00

0048 FURNISH AND INSTALL MONOLITH

JOINT PROTECTION, MONOLITHS M-

1 TO M-7

277 LINEAR

FEET

$138.80 $38,447.60 $130.00 $36,010.00 $140.00 $38,780.00 $265.00 $73,405.00

0049 TREMIE CONCRETE DEMOLITION,

MONOLITH M-4

43 CUBIC

YARDS

$230.20 $9,898.60 $800.00 $34,400.00 $3,000.00 $129,000.00 $680.00 $29,240.00

0050 FURNISH AND INSTALL EMBEDDED

PINS FOR REMOVABLE HANDRAIL,

MONOLITHS M-1 TO M-7

22 EACH $311.00 $6,842.00 $300.00 $6,600.00 $450.00 $9,900.00 $150.00 $3,300.00

0051 FURNISH AND INSTALL EMBEDDED

METALS, UPSTREAM MITER GATE

1 JOB $234,440.00 $234,440.00 $65,000.00 $65,000.00 $200,000.00 $200,000.00 $155,000.00 $155,000.00

0052 FURNISH AND INSTALL EMBEDDED

METALS, UPSTREAM BULKHEAD

RECESSES

1 JOB $99,750.00 $99,750.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $164,000.00 $164,000.00

0053 FURNISH AND INSTALL

ALTERNATING STAIR TREADS,

MONOLITH M-4

1 EACH $30,265.00 $30,265.00 $190,000.00 $190,000.00 $60,000.00 $60,000.00 $75,000.00 $75,000.00

0054 FURNISH AND INSTALL ACCESS

HATCH, MONOLITH M-4

1 EACH $5,800.00 $5,800.00 $8,000.00 $8,000.00 $12,000.00 $12,000.00 $38,000.00 $38,000.00

0055 FURNISH AND INSTALL WATERTIGHT

MANHOLE COVERS, MONOLITHS M-3

AND M-4

4 EACH $5,400.00 $21,600.00 $8,000.00 $32,000.00 $4,200.00 $16,800.00 $13,500.00 $54,000.00

0056 NOT USED

0057 FURNISH AND INSTALL ELECTRICAL

AND MECHANICAL SYSTEMS

EMBEDDED ITEMS, BASE CONTRACT

1 JOB $193,500.00 $193,500.00 $450,000.00 $450,000.00 $500,000.00 $500,000.00 $1,050,000.00 $1,050,000.00

0058 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING,

TESTING AND REPORTING, VICTORY

HOLLOW SITE, BASE CONTRACT

23 MONTHS $10,280.00 $236,440.00 $30,000.00 $690,000.00 $5,000.00 $115,000.00 $5,000.00 $115,000.00

0059 CLEANING OF SEDIMENT BASIN NO.

1, VICTORY HOLLOW SITE, BASE

CONTRACT

4 EACH $11,535.00 $46,140.00 $65,000.00 $260,000.00 $11,400.00 $45,600.00 $10,000.00 $40,000.00

0060 CLEANING OF SEDIMENT BASIN NO.

2, VICTORY HOLLOW SITE, BASE

CONTRACT

3 EACH $17,305.00 $51,915.00 $50,000.00 $150,000.00 $11,400.00 $34,200.00 $20,000.00 $60,000.00

0061 CLEARING, VICTORY HOLLOW SITE,

BASE CONTRACT

5 ACRE $5,035.00 $25,175.00 $4,000.00 $20,000.00 $15,000.00 $75,000.00 $7,200.00 $36,000.00

0062 SILT FENCE, VICTORY HOLLOW SITE,

BASE CONTRACT

500 LINEAR

FEET

$12.60 $6,300.00 $10.00 $5,000.00 $13.50 $6,750.00 $6.60 $3,300.00

0063 WEIGHTED SEDIMENT FILTER TUBE,

VICTORY HOLLOW SITE, BASE

CONTRACT

1,000 LINEAR

FEET

$9.65 $9,650.00 $16.00 $16,000.00 $5.00 $5,000.00 $11.00 $11,000.00

0064 TEMPORARY SEEDING, VICTORY

HOLLOW SITE, BASE CONTRACT

10 ACRE $2,965.00 $29,650.00 $5,000.00 $50,000.00 $1,200.00 $12,000.00 $1,200.00 $12,000.00

0065 PERMANENT SEEDING, VICTORY

HOLLOW SITE, BASE CONTRACT

5 ACRE $4,740.00 $23,700.00 $8,000.00 $40,000.00 $1,690.00 $8,450.00 $1,500.00 $7,500.00

0066AA PDT NO. 2A SURFACE COURSE,

FIRST 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE, BASE

CONTRACT

1,000 SQUARE

YARDS

$7.30 $7,300.00 $150.00 $150,000.00 $13.50 $13,500.00 $6.50 $6,500.00

0066AB PDT NO. 2A SURFACE COURSE, ALL

OVER 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE, BASE

CONTRACT

500 SQUARE

YARDS

$7.70 $3,850.00 $150.00 $75,000.00 $13.50 $6,750.00 $6.50 $3,250.00

0067 TRAFFIC CONTROL, VICTORY

HOLLOW SITE

1 JOB $323,880.00 $323,880.00 $25,000.00 $25,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00

0068 OFFLOAD, PROCESS AND

TRANSPORT EXCAVATED MATERIAL

FROM M-22 TO M-27 CONTRACT

5,900 CUBIC

YARDS

$63.10 $372,290.00 $60.00 $354,000.00 $65.00 $383,500.00 $40.00 $236,000.00

0069 BRIDGE MODIFICATIONS, VICTORY

HOLLOW SITE

1 JOB $107,600.00 $107,600.00 $250,000.00 $250,000.00 $300,000.00 $300,000.00 $60,000.00 $60,000.00

0070 AS-BUILT DRAWINGS, BASE

CONTRACT

1 JOB $231,000.00 $231,000.00 $60,000.00 $60,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00

0071 FURNISH AND INSTALL ALUMINUM

GRATING, MONOLITHS M-3

30 SQUARE

FEET

$184.00 $5,520.00 $350.00 $10,500.00 $235.00 $7,050.00 $375.00 $11,250.00

0072 ENVIRONMENTAL FIELD TECHNICIAN

COMPLIANCE REPRESENTATIVE,

BASE CONTRACT

34 MONTHS $10,390.00 $353,260.00 $25,000.00 $850,000.00 $13,000.00 $442,000.00 $5,000.00 $170,000.00

TOTAL, BASE CONTRACT ITEMS 0001

THROUGH 0072

$46,294,243.90 $86,877,305.00 $61,796,710.30 $56,735,642.20

AWARDABLE OPTION 1, MONOLITHS M-11 TO M-16

1001 REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT

BONDS PREMIUMS, AWARDABLE

OPTION 1

1 JOB $267,425.00 $267,425.00 $286,900.00 $286,900.00 $457,000.00 $457,000.00 $300,000.00 $300,000.00

1002 DIGITAL PROGRESS IMAGES,

MONTHLY, AWARDABLE OPTION 1

7 SET $648.00 $4,536.00 $500.00 $3,500.00 $275.00 $1,925.00 $286.00 $2,002.00

1003 REIMBURSEMENT FOR REPAIRS AT

GOVERNMENT FIELD OFFICES,

AWARDABLE OPTION 1

1 JOB $45,755.00 $45,755.00 $65,000.00 $65,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00

1004 FURNISH AND INSTALL SHEET

PILING, COFFERBOX MONOLITHS M-

11 TO M-16

11,390 LINEAR

FEET

$136.80 $1,558,152.00 $210.00 $2,391,900.00 $180.00 $2,050,200.00 $175.00 $1,993,250.00

1005 FURNISH AND INSTALL KING PILES,

COFFERBOXMONOLITHS M-11 TO M-

8,232 LINEAR

FEET

$900.00 $7,408,800.00 $1,000.00 $8,232,000.00 $650.00 $5,350,800.00 $875.00 $7,203,000.00

1006 DYNAMIC PILE TESTING,

COFFERBOX MONOLITHS M-11 TO M-

7 EACH $2,100.00 $14,700.00 $20,000.00 $140,000.00 $5,500.00 $38,500.00 $4,900.00 $34,300.00

1007 FURNISH AND INSTALL STRUCTURAL

STEEL, COFFERBOX MONOLITHS M-

11 TO M-16

562,752 POUNDS $11.75 $6,612,336.00 $12.00 $6,753,024.00 $8.00 $4,502,016.00 $8.50 $4,783,392.00

1008 REMOVE SHEET PILING, COFFERBOX

MONOLITHS M-11 TO M-16

5,846 LINEAR

FEET

$35.60 $208,117.60 $350.00 $2,046,100.00 $65.00 $379,990.00 $45.00 $263,070.00

1009 REMOVE KING PILES, COFFERBOX

MONOLITHS M-11 TO M-16

4,200 LINEAR

FEET

$34.15 $143,430.00 $400.00 $1,680,000.00 $50.00 $210,000.00 $85.00 $357,000.00

1010 REMOVE STRUCTURAL STEEL,

COFFERBOX MONOLITHS M-11 TO M-

492,292 POUNDS $0.48 $236,300.16 $1.25 $615,365.00 $1.45 $713,823.40 $1.10 $541,521.20

1011 UNDERWATER ALLUVIUM

EXCAVATION INSIDE COFFERBOX

MONOLITHS M-11 TO M-16

6,270 CUBIC

YARDS

$251.35 $1,575,964.50 $450.00 $2,821,500.00 $350.00 $2,194,500.00 $215.00 $1,348,050.00

1012 COFFERBOX DEWATERING

MONOLITH M-11

1 JOB $171,050.00 $171,050.00 $155,000.00 $155,000.00 $275,000.00 $275,000.00 $200,000.00 $200,000.00

1013 COFFERBOX DEWATERING

MONOLITH M-16

1 JOB $171,050.00 $171,050.00 $155,000.00 $155,000.00 $275,000.00 $275,000.00 $200,000.00 $200,000.00

1014 COFFERBOX DEWATERING

MONOLITHS M-12 TO M-15

1 JOB $291,920.00 $291,920.00 $255,000.00 $255,000.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00

1015 COMPENSATION FOR FLOODING

AND EVACUATION, COFFERBOXES M-

11 OR M-16

2 EACH $115,000.00 $230,000.00 $115,000.00 $400,000.00 $115,000.00 $230,000.00 $115,000.00 $230,000.00

1016 COMPENSATION FOR FLOODING

AND EVACUATION, COFFERBOXES M-

12 TO M-15

1 EACH $400,000.00 $400,000.00 $400,000.00 $600,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00

1017 78" DIA. PERMANENT CASING, 72-

INCH DIA. MW FOUNDATION DRILLED

SHAFTS, MONOLITHS M-11 TO M-16

589 LINEAR

FEET

$2,998.00 $1,765,822.00 $10,000.00 $5,890,000.00 $6,000.00 $3,534,000.00 $3,500.00 $2,061,500.00

1018 SOIL EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-11 TO M-16

722 LINEAR

FEET

$304.50 $219,849.00 $900.00 $649,800.00 $760.00 $548,720.00 $175.00 $126,350.00

1019 ROCK EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-11 TO M-16

1,596 LINEAR

FEET

$1,857.00 $2,963,772.00 $2,950.00 $4,708,200.00 $1,800.00 $2,872,800.00 $1,200.00 $1,915,200.00

1020 REINFORCING STEEL, MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-11 TO M-16

1,041,200 POUNDS $3.91 $4,071,092.00 $2.00 $2,082,400.00 $1.75 $1,822,100.00 $3.10 $3,227,720.00

1021 ACCESS TUBES, CROSSHOLE SONIC

LOGGING, MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-11

TO M-16

12,996 LINEAR

FEET

$12.30 $159,850.80 $20.00 $259,920.00 $48.00 $623,808.00 $15.00 $194,940.00

1022 DELIVER AND PLACE GOVERNMENT-

FURNISHED CONCRETE, MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-11 TO M-16

2,375 CUBIC

YARDS

$27.45 $65,193.75 $600.00 $1,425,000.00 $1,000.00 $2,375,000.00 $175.00 $415,625.00

1023 CROSSHOLE SONIC LOGGING (CSL)

MW FOUNDATION DRILLED SHAFTS,

MONOLITHS M-11 TO M-16

38 EACH $2,170.00 $82,460.00 $8,000.00 $304,000.00 $1,400.00 $53,200.00 $690.00 $26,220.00

1024 CORING OF MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-11

TO M-16

345 LINEAR

FEET

$162.65 $56,114.25 $900.00 $310,500.00 $300.00 $103,500.00 $300.00 $103,500.00

1025 FURNISH AND INSTALL TREMIE

CONCRETE PARTITIONS,

COFFERBOX MONOLITHS M-11 TO M-

123,321 POUNDS $3.98 $490,817.58 $6.00 $739,926.00 $7.50 $924,907.50 $9.00 $1,109,889.00

1026 DELIVER AND PLACE GOVERNMENT-

FURNISHED TREMIE CONCRETE,

MONOLITHS M-11 TO M-16

4,960 CUBIC

YARDS

$12.20 $60,512.00 $200.00 $992,000.00 $140.00 $694,400.00 $62.00 $307,520.00

1027 DELIVER AND PLACE GOVERNMENT-

FURNISHED CAST-IN-PLACE

CONCRETE, MIDDLE WALL,

MONOLITHS M-11 TO M-16

13,410 CUBIC

YARDS

$153.60 $2,059,776.00 $425.00 $5,699,250.00 $780.00 $10,459,800.00 $320.00 $4,291,200.00

1028 PVC WATERSTOPS, MONOLITHS M-

11 TO M-16

590 LINEAR

FEET

$38.70 $22,833.00 $35.00 $20,650.00 $120.00 $70,800.00 $30.00 $17,700.00

1029 REINFORCING STEEL, MIDDLE WALL,

MONOLITHS M-11 TO M-16

418,021 POUNDS $3.48 $1,454,713.08 $2.25 $940,547.25 $4.00 $1,672,084.00 $4.50 $1,881,094.50

1030 FURNISH AND INSTALL LOCK

LADDER RECESS METALS,

MONOLITH M-13

1,337 POUNDS $28.90 $38,639.30 $30.00 $40,110.00 $25.00 $33,425.00 $18.00 $24,066.00

1031 FURNISH AND INSTALL ALUMINUM

RABBET ANGLES, MONOLITHS M-11

TO M-16

489 LINEAR

FEET

$45.85 $22,420.65 $80.00 $39,120.00 $55.00 $26,895.00 $155.00 $75,795.00

1032 FURNISH AND INSTALL ALUMINUM

PLANKING, MONOLITHS M-11 TO M-16

917 SQUARE

FEET

$92.25 $84,574.80 $85.02 $77,945.00 $65.00 $59,605.00 $52.00 $47,684.00

1033 FURNISH AND INSTALL CORNER

CASTINGS, MONOLITHS M-11 TO M-16

4 EACH $2,079.00 $8,316.00 $2,000.00 $8,000.00 $3,030.00 $12,120.00 $3,600.00 $14,400.00

1034 FURNISH AND INSTALL CORNER

PROTECTION, MONOLITHS M-11 TO M-

587 LINEAR

FEET

$264.00 $155,020.80 $249.91 $146,750.00 $145.00 $85,115.00 $250.00 $146,750.00

1035 FURNISH AND INSTALL WALL

ARMOR, MONOLITHS M-11 TO M-16

408 LINEAR

FEET

$221.00 $90,168.00 $175.00 $71,400.00 $180.00 $73,440.00 $275.00 $112,200.00

1036 FURNISH AND INSTALL MONOLITH

JOINT PROTECTION, MONOLITHS M-

11 TO M-16

665 LINEAR

FEET

$135.00 $89,748.00 $250.08 $166,250.00 $140.00 $93,100.00 $265.00 $176,225.00

1037 FURNISH AND INSTALL EMBEDDED

PINS FOR REMOVABLE HANDRAIL,

MONOLITHS M-11 TO M-16

4 EACH $327.30 $1,309.20 $300.00 $1,200.00 $450.00 $1,800.00 $150.00 $600.00

1038 FURNISH AND INSTALL ELECTRICAL

AND MECHANICAL SYSTEMS

EMBEDDED ITEMS, OPTION 1

1 JOB $42,700.00 $42,700.00 $160,000.00 $160,000.00 $500,000.00 $500,000.00 $157,331.06 $157,331.06

1039 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING,

TESTING AND REPORTING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

7 MONTHS $10,525.00 $73,675.00 $30,000.00 $210,000.00 $5,000.00 $35,000.00 $3,301.95 $23,113.65

1040 CLEANING OF SEDIMENT BASIN NO.

1, VICTORY HOLLOW SITE,

AWARDABLE OPTION 1

1 EACH $11,810.00 $11,810.00 $55,000.00 $55,000.00 $11,400.00 $11,400.00 $10,000.00 $10,000.00

1041 CLEANING OF SEDIMENT BASIN NO.

2, VICTORY HOLLOW SITE,

AWARDABLE OPTION 1

1 EACH $17,702.00 $17,702.00 $50,000.00 $50,000.00 $11,400.00 $11,400.00 $20,000.00 $20,000.00

1042 CLEARING, VICTORY HOLLOW SITE,

AWARDABLE OPTION 1

5 ACRE $5,154.00 $25,770.00 $4,000.00 $20,000.00 $15,000.00 $75,000.00 $7,200.00 $36,000.00

1043 SILT FENCE, VICTORY HOLLOW SITE,

AWARDABLE OPTION 1

500 LINEAR

FEET

$12.85 $6,425.00 $10.00 $5,000.00 $13.50 $6,750.00 $6.60 $3,300.00

1044 WEIGHTED SEDIMENT FILTER TUBE,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 1

1,000 LINEAR

FEET

$9.85 $9,850.00 $15.00 $15,000.00 $5.00 $5,000.00 $11.00 $11,000.00

1045 TEMPORARY SEEDING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

10 ACRE $3,035.00 $30,350.00 $5,000.00 $50,000.00 $1,200.00 $12,000.00 $1,200.00 $12,000.00

1046 PERMANENT SEEDING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

5 ACRE $4,855.00 $24,275.00 $8,000.00 $40,000.00 $1,690.00 $8,450.00 $1,500.00 $7,500.00

1047AA PDT NO. 2A SURFACE COURSE,

FIRST 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 1

1,000 SQUARE

YARDS

$7.50 $7,500.00 $150.00 $150,000.00 $13.50 $13,500.00 $6.50 $6,500.00

1047AB PDT NO. 2A SURFACE COURSE, ALL

OVER 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 1

500 SQUARE

YARDS

$7.90 $3,950.00 $150.00 $75,000.00 $13.50 $6,750.00 $6.50 $3,250.00

1048 AS-BUILT DRAWINGS, AWARDABLE

OPTION 1

1 JOB $160,315.00 $160,315.00 $45,000.00 $45,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00

1049 MOBILIZATION AND DEMOBILIZATION,

AWARDABLE OPTION 1

1 JOB $399,210.00 $399,210.00 $2,400,000.00 $2,400,000.00 $1,500,000.00 $1,500,000.00 $10,000.00 $10,000.00

1050 ENVIRONMENTAL FIELD TECHNICIAN

COMPLIANCE REPRESENTATIVE,

AWARDABLE OPTION 1

7 MONTHS $10,640.00 $74,480.00 $25,000.00 $175,000.00 $13,000.00 $91,000.00 $10,500.00 $73,500.00

TOTAL, AWARDABLE OPTION ITEMS

1001 THROUGH 1050

$34,190,550.47 $54,623,257.25 $46,165,623.90 $34,775,258.41

AWARDABLE OPTION 2, MONOLITHS M-8 TO M-10

2001 REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT

BONDS PREMIUMS, AWARDABLE

OPTION 2

1 JOB $254,200.00 $254,200.00 $200,100.00 $200,100.00 $414,000.00 $414,000.00 $275,000.00 $275,000.00

2002 DIGITAL PROGRESS IMAGES,

MONTHLY, AWARDABLE OPTION 2

9 SET $660.00 $5,940.00 $2,000.00 $18,000.00 $275.00 $2,475.00 $298.33 $2,684.97

2003 DIGITAL AERIAL PROGRESS IMAGES,

QUARTERLY, AWARDABLE OPTION 2

5 SET $1,555.00 $7,775.00 $8,000.00 $40,000.00 $630.00 $3,150.00 $614.00 $3,070.00

2004 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING,

TESTING AND REPORTING,

CONCRETE BATCH PLANT,

AWARDABLE OPTION 2

16 MONTHS $9,970.00 $159,520.00 $25,000.00 $400,000.00 $5,000.00 $80,000.00 $4,201.47 $67,223.52

2005 CLEANING OF SEDIMENT BASIN NO.

1, CONCRETE BATCH PLANT,

AWARDABLE OPTION 2

2 EACH $24,150.00 $48,300.00 $17,345.00 $34,690.00 $12,500.00 $25,000.00 $13,000.00 $26,000.00

2006 CLEANING OF SEDIMENT BASIN NO.

2, CONCRETE BATCH PLANT,

AWARDABLE OPTION 2

3 EACH $20,280.00 $60,840.00 $25,223.00 $75,669.00 $12,500.00 $37,500.00 $13,000.00 $39,000.00

2007 CLEAN SEEP, CONCRETE BATCH

PLANT, AWARDABLE OPTION 2

4 EACH $10,840.00 $43,360.00 $23,785.00 $95,140.00 $6,700.00 $26,800.00 $7,000.00 $28,000.00

2008 MAINTAIN CONCRETE TESTING LAB,

AWARDABLE OPTION 2

16 MONTHS $16,170.00 $258,720.00 $6,186.00 $98,976.00 $10,300.00 $164,800.00 $3,000.00 $48,000.00

2009 INITIAL BATCH PLANT SETUP AND

TRIAL OPERATION

1 JOB $330,840.00 $330,840.00 $32,979.00 $32,979.00 $60,000.00 $60,000.00 $136,636.17 $136,636.17

2010 MONTHLY MAINTENANCE OF BATCH

PLANT AND CONVEYOR SYSTEMS,

AWARDABLE OPTION 2

16 MONTHS $16,630.00 $266,080.00 $41,335.00 $661,360.00 $110,000.00 $1,760,000.00 $100,000.00 $1,600,000.00

2011 REIMBURSEMENT FOR REPAIR OF

BATCH PLANT AND CONVEYOR

EQUIPMENT, AWARDABLE OPTION 2

1 JOB $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00

2012 MAINTAIN GOVERNMENT FIELD

OFFICES, AWARDABLE OPTION 2

16 MONTHS $8,625.00 $138,000.00 $5,421.00 $86,736.00 $3,500.00 $56,000.00 $7,000.00 $112,000.00

2013 REIMBURSEMENT FOR REPAIRS AT

GOVERNMENT FIELD OFFICES,

AWARDABLE OPTION 2

1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00

2014 MAINTAIN DOWNSTREAM RIVER

CHAMBER CLOSURE, AWARDABLE

OPTION 2

1 JOB $13,000.00 $13,000.00 $46,183.00 $46,183.00 $50,000.00 $50,000.00 $120,000.00 $120,000.00

2015 FURNISH AND INSTALL SHEET

PILING, COFFERBOX MONOLITHS M-8

TO M-10

2,223 LINEAR

FEET

$138.75 $308,441.25 $700.00 $1,556,100.00 $180.00 $400,140.00 $175.00 $389,025.00

2016 FURNISH AND INSTALL KING PILES,

COFFERBOX MONOLITHS M-8 TO M-

2,520 LINEAR

FEET

$894.00 $2,252,880.00 $830.00 $2,091,600.00 $650.00 $1,638,000.00 $875.00 $2,205,000.00

2017 DYNAMIC PILE TESTING,

COFFERBOX MONOLITHS M-8 TO M-

5 EACH $2,610.00 $13,050.00 $12,429.00 $62,145.00 $5,500.00 $27,500.00 $4,900.00 $24,500.00

2018 FURNISH AND INSTALL STRUCTURAL

STEEL, COFFERBOX MONOLITHS M-8

TO M-10

205,618 POUNDS $12.30 $2,529,101.40 $8.15 $1,675,786.70 $8.00 $1,644,944.00 $8.50 $1,747,753.00

2019 REMOVE SHEET PILING, COFFERBOX

MONOLITHS M-8 TO M-10

2,449 LINEAR

FEET

$27.90 $68,327.10 $254.00 $622,046.00 $65.00 $159,185.00 $45.00 $110,205.00

2020 REMOVE KING PILES, COFFERBOX

MONOLITHS M-8 TO M-10

2,898 LINEAR

FEET

$31.05 $89,982.90 $242.00 $701,316.00 $50.00 $144,900.00 $85.00 $246,330.00

2021 REMOVE STRUCTURAL STEEL,

COFFERBOX MONOLITHS M-8 TO M-

260,950 POUNDS $0.78 $203,541.00 $1.00 $260,950.00 $1.45 $378,377.50 $1.10 $287,045.00

2022 UNDERWATER ALLUVIUM

EXCAVATION INSIDE COFFERBOX

MONOLITHS M-8 TO M-10

2,920 CUBIC

YARDS

$260.40 $760,368.00 $439.00 $1,281,880.00 $350.00 $1,022,000.00 $215.00 $627,800.00

2023 COFFERBOX DEWATERING

MONOLITHS M-8 TO M-10

1 JOB $199,545.00 $199,545.00 $394,698.00 $394,698.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00

2024 COMPENSATION FOR FLOODING

AND EVACUATION, COFFERBOX M-8

TO M-10

1 EACH $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00 $265,000.00

2025 FIELD DEMONSTRATIONS, NON-

COFFERBOX SHEET PILE SUPPORT

SYSTEM (SECANT WALL)

1 JOB $181,000.00 $181,000.00 $900,000.00 $900,000.00 $500,000.00 $500,000.00 $1,800,000.00 $1,800,000.00

2026 NON-COFFERBOX SHEET PILE

SUPPORT SYSTEM, PRIMARY

(LAGGING) SECANT PILES

1,840 LINEAR

FEET

$1,480.00 $2,723,200.00 $2,400.00 $4,416,000.00 $1,900.00 $3,496,000.00 $640.00 $1,177,600.00

2027 NON-COFFERBOX SHEET PILE

SUPPORT SYSTEM, SECONDARY

(STRUCTURAL) SECANT PILES

1,940 LINEAR

FEET

$2,365.00 $4,588,100.00 $2,100.00 $4,074,000.00 $3,225.00 $6,256,500.00 $2,000.00 $3,880,000.00

2028 NON-COFFERBOX SHEET PILE

SUPPORT SYSTEM, CORING SECANT

PILES

25 EACH $2,725.00 $68,125.00 $12,002.00 $300,050.00 $12,400.00 $310,000.00 $6,427.61 $160,690.25

2029 MIDDLE WALL CONTROL TOWER

STRUCTURE

1 JOB $2,694,300.00 $2,694,300.00 $2,000,000.00 $2,000,000.00 $4,000,000.00 $4,000,000.00 $3,500,000.00 $3,500,000.00

2030 MIDDLE WALL CONTROL SHELTERS

STRUCTURES

2 EACH $713,000.00 $1,426,000.00 $240,873.00 $481,746.00 $250,000.00 $500,000.00 $700,000.00 $1,400,000.00

2031 78" DIA. PERMANENT CASING, 72-

INCH DIA. MW FOUNDATION DRILLED

SHAFTS, MONOLITHS M-8 TO M-10

273 LINEAR

FEET

$2,445.00 $667,485.00 $7,500.00 $2,047,500.00 $6,000.00 $1,638,000.00 $3,500.00 $955,500.00

2032 SOIL EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-8 TO M-10

336 LINEAR

FEET

$320.60 $107,721.60 $857.00 $287,952.00 $760.00 $255,360.00 $175.00 $58,800.00

2033 ROCK EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-8 TO M-10

762 LINEAR

FEET

$1,871.00 $1,425,702.00 $1,809.00 $1,378,458.00 $1,800.00 $1,371,600.00 $1,200.00 $914,400.00

2034 REINFORCING STEEL, MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-8 TO M-10

493,200 POUNDS $3.68 $1,814,976.00 $2.00 $986,400.00 $1.75 $863,100.00 $3.10 $1,528,920.00

2035 ACCESS TUBES, CROSSHOLE SONIC

LOGGING, MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-8

TO M-10

6,156 LINEAR

FEET

$13.25 $81,567.00 $15.00 $92,340.00 $48.00 $295,488.00 $15.00 $92,340.00

2036 PRODUCE CONCRETE AND DELIVER

TO STUB WALL, MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-8

TO M-10

1,124 CUBIC

YARDS

$269.60 $303,030.40 $136.00 $152,864.00 $220.00 $247,280.00 $70.00 $78,680.00

2037 DELIVER AND PLACE CONCRETE,

MW FOUNDATION DRILLED SHAFTS,

MONOLITHS M-8 TO M-10

1,124 CUBIC

YARDS

$28.50 $32,034.00 $367.00 $412,508.00 $1,000.00 $1,124,000.00 $175.00 $196,700.00

2038 CROSSHOLE SONIC LOGGING (CSL)

MW FOUNDATION DRILLED SHAFTS,

MONOLITHS M-8 TO M-10

18 EACH $2,155.00 $38,790.00 $6,277.00 $112,986.00 $1,400.00 $25,200.00 $690.00 $12,420.00

2039 CORING OF MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-8

TO M-10

173 LINEAR

FEET

$253.50 $43,728.75 $483.40 $83,386.00 $400.00 $69,200.00 $300.00 $51,900.00

2040 AA PORTLAND CEMENT, AWARDABLE

OPTION 2, FIRST 665 TONS

665 TONS $332.10 $220,846.50 $244.00 $162,260.00 $250.00 $166,250.00 $375.00 $249,375.00

2040 AB PORTLAND CEMENT, AWARDABLE

OPTION 2, ALL OVER 665 TONS

305 TONS $332.40 $101,382.00 $428.00 $130,540.00 $250.00 $76,250.00 $250.00 $76,250.00

2041 AA POZZOLAN, AWARDABLE OPTION 2,

FIRST 300 TONS

300 TONS $101.20 $30,360.00 $67.00 $20,100.00 $120.00 $36,000.00 $140.00 $42,000.00

2041 AB POZZOLAN, AWARDABLE OPTION 2,

ALL OVER 300 TONS

345 TONS $101.35 $34,965.75 $75.00 $25,875.00 $120.00 $41,400.00 $90.00 $31,050.00

2042 AA GROUND GRANULATED BLAST

FURNACE SLAG, AWARDABALE

OPTION 2, FIRST 260 TONS

260 TONS $214.75 $55,835.00 $200.00 $52,000.00 $200.00 $52,000.00 $220.00 $57,200.00

2042 AB GROUND GRANULATED BLAST

FURNACE SLAG, AWARDABALE

OPTION 2, ALL OVER 260 TONS

620 TONS $214.75 $133,145.00 $241.00 $149,420.00 $200.00 $124,000.00 $160.00 $99,200.00

2043 SILICA FUME, AWARDABLE OPTION 2 42 TONS $1,547.70 $65,003.40 $1,421.00 $59,682.00 $1,275.00 $53,550.00 $1,000.00 $42,000.00

2044 ANTI-WASHOUT ADMIXTURE,

AWARDABLE OPTION 2

3,050 GALLONS $52.40 $159,820.00 $39.00 $118,950.00 $45.00 $137,250.00 $45.00 $137,250.00

2045 LIMESTONE POWDER, AWARDABLE

OPTION 2

435 TONS $108.45 $47,175.75 $89.00 $38,715.00 $97.00 $42,195.00 $115.00 $50,025.00

2046 FURNISH AND INSTALL TREMIE

CONCRETE PARTITIONS, MONOLITHS

M-8 TO M-10

82,214 POUNDS $4.07 $334,610.98 $5.00 $411,070.00 $7.50 $616,605.00 $9.00 $739,926.00

2047 PRODUCE TREMIE CONCRETE AND

DELIVER TO STUB WALL,

MONOLITHS M-8 TO M-10

2,300 CUBIC

YARDS

$124.00 $285,200.00 $148.00 $340,400.00 $150.00 $345,000.00 $70.00 $161,000.00

2048 DELIVER AND PLACE TREMIE

CONCRETE, MONOLITHS M-8 TO M-10

2,300 CUBIC

YARDS

$14.50 $33,350.00 $275.00 $632,500.00 $140.00 $322,000.00 $85.00 $195,500.00

2049 CAST-IN-PLACE CONCRETE, MIDDLE

WALL, MONOLITHS M-8 TO M-10

6,315 CUBIC

YARDS

$304.60 $1,923,549.00 $350.00 $2,210,250.00 $780.00 $4,925,700.00 $500.00 $3,157,500.00

2050 PVC WATERSTOPS, MONOLITHS M-8

TO M-10

170 LINEAR

FEET

$46.65 $7,930.50 $31.00 $5,270.00 $120.00 $20,400.00 $30.00 $5,100.00

2051 REINFORCING STEEL, MIDDLE WALL,

MONOLITHS M-8 TO M-10

218,921 POUNDS $3.55 $777,169.55 $2.00 $437,842.00 $4.00 $875,684.00 $4.50 $985,144.50

2052 INSTALL FLOATING MOORING BITT

ANCHORAGE FRAMES, MONOLITH M-

2 EACH $57,850.00 $115,700.00 $142,002.00 $284,004.00 $60,000.00 $120,000.00 $25,000.00 $50,000.00

2053 FURNISH AND INSTALL LINE HOOKS

AND GUARDS, MONOLITH M-9

10 EACH $5,495.00 $54,950.00 $21,750.00 $217,500.00 $15,000.00 $150,000.00 $6,700.00 $67,000.00

2054 FURNISH AND INSTALL CHECK

POSTS, MONOLITH M-9

2 EACH $6,560.00 $13,120.00 $13,484.00 $26,968.00 $8,000.00 $16,000.00 $11,000.00 $22,000.00

2055 FURNISH AND INSTALL ALUMINUM

RABBET ANGLES, MONOLITHS M-8

TO M-10

240 LINEAR

FEET

$34.55 $8,285.09 $92.08 $22,080.00 $55.00 $13,200.00 $155.00 $37,200.00

2056 FURNISH AND INSTALL ALUMINUM

PLANKING, MONOLITHS M-8 TO M-10

433 SQUARE

FEET

$96.55 $41,835.12 $55.96 $24,248.00 $65.00 $28,145.00 $52.00 $22,516.00

2057 FURNISH AND INSTALL CORNER

CASTINGS, MONOLITHS M-8 TO M-10

4 EACH $2,121.00 $8,484.00 $2,434.00 $9,736.00 $3,030.00 $12,120.00 $3,600.00 $14,400.00

2058 FURNISH AND INSTALL CORNER

PROTECTION, MONOLITHS M-8 TO M-

393 LINEAR

FEET

$296.00 $116,387.20 $207.89 $81,744.00 $145.00 $56,985.00 $250.00 $98,250.00

2059 FURNISH AND INSTALL WALL

ARMOR, MONOLITHS M-8 TO M-10

485 LINEAR

FEET

$234.55 $113,756.75 $184.00 $89,240.00 $180.00 $87,300.00 $275.00 $133,375.00

2060 FURNISH AND INSTALL MONOLITH

JOINT PROTECTION, MONOLITHS M-8

TO M-10

332 LINEAR

FEET

$129.95 $43,195.38 $135.84 $45,153.22 $140.00 $46,480.00 $265.00 $87,980.00

2061 ADAS TURNOVER 1 JOB $29,700.00 $29,700.00 $46,558.00 $46,558.00 $250,000.00 $250,000.00 $10,000.00 $10,000.00

2062 INSTRUMENTATION MONITORING

PROGRAM, AWARDABLE OPTION 2

10 MONTHS $17,660.00 $176,600.00 $8,646.00 $86,460.00 $16,500.00 $165,000.00 $8,000.00 $80,000.00

2063 FURNISH AND INSTALL ELECTRICAL

AND MECHANICAL SYSTEMS

EMBEDDED ITEMS, OPTION 2

1 JOB $1,660.00 $1,660.00 $28,795.00 $28,795.00 $100,000.00 $100,000.00 $1,159.27 $1,159.27

2064 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING,

TESTING AND REPORTING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

9 MONTHS $10,740.00 $96,660.00 $21,948.00 $197,532.00 $5,000.00 $45,000.00 $3,301.95 $29,717.55

2065 CLEANING OF SEDIMENT BASIN NO.

1, VICTORY HOLLOW SITE,

AWARDABLE OPTION 2

2 EACH $12,050.00 $24,100.00 $13,663.00 $27,326.00 $11,750.00 $23,500.00 $10,000.00 $20,000.00

2066 CLEANING OF SEDIMENT BASIN NO.

2, VICTORY HOLLOW SITE,

AWARDABLE OPTION 2

2 EACH $18,080.00 $36,160.00 $47,352.00 $94,704.00 $11,750.00 $23,500.00 $20,000.00 $40,000.00

2067 CLEARING, VICTORY HOLLOW SITE,

AWARDABLE OPTION 2

5 ACRE $5,260.00 $26,300.00 $3,326.00 $16,630.00 $15,000.00 $75,000.00 $7,200.00 $36,000.00

2068 SILT FENCE, VICTORY HOLLOW SITE,

AWARDABLE OPTION 2

500 LINEAR

FEET

$13.15 $6,575.00 $8.00 $4,000.00 $13.50 $6,750.00 $6.60 $3,300.00

2069 WEIGHTED SEDIMENT FILTER TUBE,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 2

1,000 LINEAR

FEET

$10.05 $10,050.00 $13.00 $13,000.00 $5.00 $5,000.00 $11.00 $11,000.00

2070 TEMPORARY SEEDING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

15 ACRE $3,095.00 $46,425.00 $3,991.00 $59,865.00 $1,200.00 $18,000.00 $1,200.00 $18,000.00

2071 PERMANENT SEEDING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

5 ACRE $4,955.00 $24,775.00 $6,651.00 $33,255.00 $1,690.00 $8,450.00 $1,500.00 $7,500.00

2072AA PDT NO. 2A SURFACE COURSE,

FIRST 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 2

1,000 SQUARE

YARDS

$7.65 $7,650.00 $133.00 $133,000.00 $13.50 $13,500.00 $6.50 $6,500.00

2072AB PDT NO. 2A SURFACE COURSE, ALL

OVER 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 2

500 SQUARE

YARDS

$8.05 $4,025.00 $133.00 $66,500.00 $13.50 $6,750.00 $6.50 $3,250.00

2073 AS-BUILT DRAWINGS, AWARDABLE

OPTION 2

1 JOB $270,200.00 $270,200.00 $39,907.00 $39,907.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00

2074 PRODUCE CONCRETE AND DELIVER

TO STUB WALL, NON-COFFERBOX

SHEET PILE SUPPORT SYSTEM

860 CUBIC

YARDS

$1,470.00 $1,264,200.00 $142.00 $122,120.00 $500.00 $430,000.00 $100.00 $86,000.00

2075 DELIVER AND PLACE CONCRETE,

NON-COFFERBOX SHEET PILE

SUPPORT SYSTEM

860 CUBIC

YARDS

$425.40 $365,844.00 $547.00 $470,420.00 $1,200.00 $1,032,000.00 $175.00 $150,500.00

2076 CONCRETE PRODUCTION MANAGER,

AWARDABLE OPTION 2

16 MONTHS $16,075.00 $257,200.00 $48,746.00 $779,936.00 $36,500.00 $584,000.00 $19,974.04 $319,584.64

2077 MOBILIZATION AND DEMOBILIZATION,

AWARDABLE OPTION 2

1 JOB $507,140.00 $507,140.00 $1,600,000.00 $1,600,000.00 $1,000,000.00 $1,000,000.00 $10,000.00 $10,000.00

2078 ENVIRONMENTAL FIELD TECHNICIAN

COMPLIANCE REPRESENTATIVE,

AWARDABLE OPTION 2

9 MONTHS $10,855.00 $97,695.00 $20,917.00 $188,253.00 $13,000.00 $117,000.00 $10,900.00 $98,100.00

TOTAL, OPTION 2 ITEMS 2001

THROUGH 2078

$32,516,587.37 $38,096,351.00 $42,274,463.50 $31,955,075.87

AWARDABLE OPTION 3, MONOLITHS M-17 TO M-21

3001 REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT

BONDS PREMIUMS, AWARDABLE

OPTION 3

1 JOB $182,630.00 $182,630.00 $160,000.00 $160,000.00 $350,000.00 $350,000.00 $237,000.00 $237,000.00

3002 DIGITAL PROGRESS IMAGES,

MONTHLY, AWARDABLE OPTION 3

1 SET $660.00 $660.00 $353.00 $353.00 $275.00 $275.00 $298.33 $298.33

3003 DIGITAL AERIAL PROGRESS IMAGES,

QUARTERLY, AWARDABLE OPTION 3

1 SET $1,555.00 $1,555.00 $728.00 $728.00 $630.00 $630.00 $614.00 $614.00

3004 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING,

TESTING AND REPORTING,

CONCRETE BATCH PLANT,

AWARDABLE OPTION 3

1 MONTHS $9,975.00 $9,975.00 $19,239.00 $19,239.00 $5,000.00 $5,000.00 $4,201.47 $4,201.47

3005 CLEANING OF SEDIMENT BASIN NO.

1, CONCRETE BATCH PLANT,

AWARDABLE OPTION 3

5 EACH $24,150.00 $120,750.00 $11,788.00 $58,940.00 $12,500.00 $62,500.00 $13,000.00 $65,000.00

3006 CLEANING OF SEDIMENT BASIN NO.

2, CONCRETE BATCH PLANT,

AWARDABLE OPTION 3

1 EACH $20,280.00 $20,280.00 $22,711.00 $22,711.00 $12,500.00 $12,500.00 $13,000.00 $13,000.00

3007 CLEAN SEEP, CONCRETE BATCH

PLANT, AWARDABLE OPTION 3

1 EACH $10,840.00 $10,840.00 $21,233.00 $21,233.00 $6,700.00 $6,700.00 $7,000.00 $7,000.00

3008 MAINTAIN CONCRETE TESTING LAB,

AWARDABLE OPTION 3

1 MONTHS $16,170.00 $16,170.00 $5,534.00 $5,534.00 $10,300.00 $10,300.00 $3,000.00 $3,000.00

3009 MONTHLY MAINTENANCE OF BATCH

PLANT AND CONVEYOR SYSTEMS,

AWARDABLE OPTION 3

1 MONTHS $20,290.00 $20,290.00 $65,791.00 $65,791.00 $110,000.00 $110,000.00 $100,000.00 $100,000.00

3010 REIMBURSEMENT FOR REPAIR OF

BATCH PLANT AND CONVEYOR

EQUIPMENT, AWARDABLE OPTION 3

1 JOB $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00

3011 MAINTAIN GOVERNMENT FIELD

OFFICES, AWARDABLE OPTION 3

1 MONTHS $8,625.00 $8,625.00 $4,850.00 $4,850.00 $3,500.00 $3,500.00 $7,000.00 $7,000.00

3012 REIMBURSEMENT FOR REPAIRS AT

GOVERNMENT FIELD OFFICES,

AWARDABLE OPTION 3

1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00

3013 MAINTAIN DOWNSTREAM RIVER

CHAMBER CLOSURE, AWARDABLE

OPTION 3

1 JOB $12,935.00 $12,935.00 $15,383.00 $15,383.00 $81,000.00 $81,000.00 $44,632.76 $44,632.76

3014 FURNISH AND INSTALL SHEET

PILING, COFFERBOX MONOLITHS M-

17 TO M-21

7,488 LINEAR

FEET

$109.10 $816,940.80 $210.00 $1,572,480.00 $180.00 $1,347,840.00 $175.00 $1,310,400.00

3015 FURNISH AND INSTALL KING PILES,

COFFERBOX MONOLITHS M-17 TO M-

4,410 LINEAR

FEET

$893.25 $3,939,232.50 $1,000.00 $4,410,000.00 $650.00 $2,866,500.00 $875.00 $3,858,750.00

3016 DYNAMIC PILE TESTING,

COFFERBOX MONOLITHS M-17 TO M-

6 EACH $2,340.00 $14,040.00 $10,578.00 $63,468.00 $5,500.00 $33,000.00 $4,900.00 $29,400.00

3017 FURNISH AND INSTALL STRUCTURAL

STEEL, COFFERBOX MONOLITHS M-

17 TO M-21

241,120 POUNDS $11.80 $2,845,216.00 $15.00 $3,616,800.00 $8.00 $1,928,960.00 $8.50 $2,049,520.00

3018 REMOVE SHEET PILING, COFFERBOX

MONOLITHS M-17 TO M-21

6,794 LINEAR

FEET

$31.00 $210,614.00 $112.00 $760,928.00 $65.00 $441,610.00 $45.00 $305,730.00

3019 REMOVE KING PILES, COFFERBOX

MONOLITHS M-17 TO M-21

4,284 LINEAR

FEET

$44.50 $190,638.00 $275.00 $1,178,100.00 $50.00 $214,200.00 $85.00 $364,140.00

3020 REMOVE STRUCTURAL STEEL,

COFFERBOX MONOLITHS M-17 TO M-

402,229 POUNDS $0.62 $249,381.98 $1.00 $402,229.00 $1.45 $583,232.05 $1.10 $442,451.90

3021 UNDERWATER ALLUVIUM

EXCAVATION INSIDE COFFERBOX

MONOLITHS M-17 TO M-21

4,550 CUBIC

YARDS

$258.00 $1,173,900.00 $368.00 $1,674,400.00 $350.00 $1,592,500.00 $215.00 $978,250.00

3022 COFFERBOX DEWATERING,

MONOLITHS M-17 TO M-21

1 JOB $210,430.00 $210,430.00 $327,918.00 $327,918.00 $600,000.00 $600,000.00 $200,000.00 $200,000.00

3023 COMPENSATION FOR FLOODING

AND EVACUATION, COFFERBOX M-17

TO M-21

1 EACH $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00 $410,000.00

3024 78" DIA. PERMANENT CASING, 72-

INCH DIA. MW FOUNDATION DRILLED

SHAFTS, MONOLITHS M-17 TO M-21

495 LINEAR

FEET

$2,129.00 $1,053,855.00 $5,107.00 $2,527,965.00 $6,000.00 $2,970,000.00 $3,500.00 $1,732,500.00

3025 SOIL EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-17 TO M-21

600 LINEAR

FEET

$303.00 $181,800.00 $539.00 $323,400.00 $760.00 $456,000.00 $175.00 $105,000.00

3026 ROCK EXCAVATION, 72-INCH DIA. MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-17 TO M-21

1,230 LINEAR

FEET

$1,930.00 $2,373,900.00 $1,404.00 $1,726,920.00 $1,800.00 $2,214,000.00 $1,200.00 $1,476,000.00

3027 REINFORCING STEEL, MW

FOUNDATION DRILLED SHAFTS,

MONOLITHS M-17 TO M-21

822,000 POUNDS $3.34 $2,745,480.00 $1.50 $1,233,000.00 $1.75 $1,438,500.00 $3.10 $2,548,200.00

3028 ACCESS TUBES, CROSSHOLE SONIC

LOGGING, MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-17

TO M-21

10,260 LINEAR

FEET

$12.50 $128,250.00 $13.00 $133,380.00 $48.00 $492,480.00 $15.00 $153,900.00

3029 PRODUCE CONCRETE AND DELIVER

TO STUB WALL, MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-17

TO M-21

1,880 CUBIC

YARDS

$268.80 $505,344.00 $109.00 $204,920.00 $220.00 $413,600.00 $70.00 $131,600.00

3030 DELIVER AND PLACE CONCRETE,

MW FOUNDATION DRILLED SHAFTS,

MONOLITHS M-17 TO M-21

1,880 CUBIC

YARDS

$29.25 $54,990.00 $295.00 $554,600.00 $1,000.00 $1,880,000.00 $175.00 $329,000.00

3031 CROSSHOLE SONIC LOGGING (CSL)

MW FOUNDATION DRILLED SHAFTS,

MONOLITHS M-17 TO M-21

30 EACH $2,180.00 $65,400.00 $5,054.00 $151,620.00 $1,400.00 $42,000.00 $690.00 $20,700.00

3032 CORING OF MW FOUNDATION

DRILLED SHAFTS, MONOLITHS M-17

TO M-21

288 LINEAR

FEET

$186.40 $53,590.00 $404.70 $116,352.00 $300.00 $86,400.00 $300.00 $86,400.00

3033 AA PORTLAND CEMENT,AWARDABLE

OPTION 3, FIRST 1.105 TONS

1,105 TONS $332.00 $366,860.00 $197.00 $217,685.00 $250.00 $276,250.00 $375.00 $414,375.00

3033 AB PORTLAND CEMENT,AWARDABLE

OPTION 3, ALL OVER 1.105 TONS

380 TONS $332.00 $126,160.00 $260.00 $98,800.00 $250.00 $95,000.00 $250.00 $95,000.00

3034 AA POZZOLAN, AWARDABLE OPTION 3,

FIRST 500 TONS

500 TONS $101.20 $50,600.00 $54.00 $27,000.00 $120.00 $60,000.00 $140.00 $70,000.00

3034 AB POZZOLAN, AWARDABLE OPTION 3,

ALL OVER 500 TONS

450 TONS $101.20 $45,540.00 $66.00 $29,700.00 $120.00 $54,000.00 $90.00 $40,500.00

3035 AA GROUND GRANULATED BLAST

FURNACE SLAG, AWARDABLE

OPTION 3, FIRST 430 TONS

430 TONS $214.75 $92,342.50 $161.00 $69,230.00 $200.00 $86,000.00 $220.00 $94,600.00

3035 AB GROUND GRANULATED BLAST

FURNACE SLAG, AWARDABLE

OPTION 3, ALL OVER 430 TONS

750 TONS $214.75 $161,062.50 $188.00 $141,000.00 $200.00 $150,000.00 $160.00 $120,000.00

3036 SILICA FUME, AWARDABLE OPTION 3 67 TONS $1,555.00 $104,185.00 $961.00 $64,387.00 $1,275.00 $85,425.00 $1,000.00 $67,000.00

3037 ANTI-WASHOUT ADMIXTURE,

AWARDABLE OPTION 3

3,885 GALLONS $52.40 $203,574.00 $34.00 $132,090.00 $45.00 $174,825.00 $45.00 $174,825.00

3038 LIMESTONE POWDER, AWARDABLE

OPTION 3

595 TONS $108.45 $64,527.75 $77.00 $45,815.00 $97.00 $57,715.00 $115.00 $68,425.00

3039 FURNISH AND INSTALL TREMIE

CONCRETE PARTITIONS,

COFFERBOX MONOLITHS M-22 TO M-

164,428 POUNDS $4.07 $669,221.96 $4.00 $657,712.00 $7.50 $1,233,210.00 $9.00 $1,479,852.00

3040 PRODUCE TREMIE CONCRETE AND

DELIVER TO STUB WALL,

MONOLITHS M-17 TO M-21

3,650 CUBIC

YARDS

$126.40 $461,360.00 $131.00 $478,150.00 $150.00 $547,500.00 $70.00 $255,500.00

3041 DELIVER AND PLACE TREMIE

CONCRETE, MONOLITHS M-17 TO M-

3,650 CUBIC

YARDS

$14.55 $53,107.50 $242.00 $883,300.00 $140.00 $511,000.00 $100.00 $365,000.00

3042 CAST-IN-PLACE CONCRETE, MIDDLE

WALL, MONOLITHS M-17 TO M-21

10,521 CUBIC

YARDS

$263.40 $2,771,231.40 $315.00 $3,314,115.00 $780.00 $8,206,380.00 $500.00 $5,260,500.00

3043 PVC WATERSTOPS, MONOLITHS M-

17 TO M-21

336 LINEAR

FEET

$43.45 $14,599.20 $24.00 $8,064.00 $120.00 $40,320.00 $30.00 $10,080.00

3044 REINFORCING STEEL, MIDDLE WALL,

MONOLITHS M-17 TO M-21

358,391 POUNDS $3.54 $1,268,704.14 $1.20 $430,069.20 $4.00 $1,433,564.00 $4.50 $1,612,759.50

3045 INSTALL FLOATING MOORING BITT

ANCHORAGE FRAMES, MONOLITH M-

2 EACH $57,850.00 $115,700.00 $85,443.00 $170,886.00 $60,000.00 $120,000.00 $25,000.00 $50,000.00

3046 FURNISH AND INSTALL LINE HOOKS

AND GUARDS, MONOLITH M-19

10 EACH $5,495.00 $54,950.00 $7,440.00 $74,400.00 $15,000.00 $150,000.00 $6,700.00 $67,000.00

3047 FURNISH AND INSTALL CHECK

POSTS, MONOLITH M-19

2 EACH $6,560.00 $13,120.00 $17,890.00 $35,780.00 $8,000.00 $16,000.00 $11,000.00 $22,000.00

3048 FURNISH AND INSTALL LOCK

LADDER RECESS METALS,

MONOLITH M-20

2,079 POUNDS $15.65 $32,536.35 $16.00 $33,264.00 $20.00 $41,580.00 $18.00 $37,422.00

3049 FURNISH AND INSTALL ALUMINUM

RABBET ANGLES, MONOLITHS M-17

TO M-21

392 LINEAR

FEET

$40.35 $15,809.13 $75.04 $29,400.00 $55.00 $21,560.00 $155.00 $60,760.00

3050 FURNISH AND INSTALL ALUMINUM

PLANKING, MONOLITHS M-17 TO M-21

718 SQUARE

FEET

$89.70 $64,431.51 $47.98 $34,464.00 $65.00 $46,670.00 $52.00 $37,336.00

3051 FURNISH AND INSTALL CORNER

CASTINGS, MONOLITHS M-17 TO M-21

12 EACH $1,976.00 $23,712.00 $1,851.00 $22,212.00 $3,030.00 $36,360.00 $3,600.00 $43,200.00

3052 FURNISH AND INSTALL CORNER

PROTECTION, MONOLITHS M-17 TO M-

729 LINEAR

FEET

$289.25 $210,863.25 $160.00 $116,640.00 $145.00 $105,705.00 $250.00 $182,250.00

3053 FURNISH AND INSTALL WALL

ARMOR, MONOLITHS M-17 TO M-21

895 LINEAR

FEET

$215.10 $192,600.54 $135.94 $121,720.00 $180.00 $161,100.00 $275.00 $246,125.00

3054 FURNISH AND INSTALL MONOLITH

JOINT PROTECTION, MONOLITHS M-

17 TO M-21

499 LINEAR

FEET

$130.70 $65,167.02 $99.08 $49,401.00 $140.00 $69,860.00 $265.00 $132,235.00

3055 FURNISH AND INSTALL EMBEDDED

PINS FOR REMOVABLE HANDRAIL,

MONOLITHS M-17 TO M-21

4 EACH $334.00 $1,336.00 $187.00 $748.00 $430.00 $1,720.00 $150.00 $600.00

3056 INSTRUMENTATION MONITORING

PROGRAM, AWARDABLE OPTION 3

1 MONTHS $17,660.00 $17,660.00 $12,854.00 $12,854.00 $14,000.00 $14,000.00 $6,000.00 $6,000.00

3057 FURNISH AND INSTALL ELECTRICAL

SYSTEMS EMBEDDED ITEMS,

OPTION 3

1 JOB $840.00 $840.00 $26,534.00 $26,534.00 $50,000.00 $50,000.00 $1,159.27 $1,159.27

3058 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING,

TESTING AND REPORTING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

1 MONTHS $10,740.00 $10,740.00 $17,674.00 $17,674.00 $5,000.00 $5,000.00 $3,301.95 $3,301.95

3059 CLEANING OF SEDIMENT BASIN NO.

1, VICTORY HOLLOW SITE,

AWARDABLE OPTION 3

1 EACH $12,055.00 $12,055.00 $17,457.00 $17,457.00 $11,750.00 $11,750.00 $10,000.00 $10,000.00

3060 CLEANING OF SEDIMENT BASIN NO.

2, VICTORY HOLLOW SITE,

AWARDABLE OPTION 3

1 EACH $18,080.00 $18,080.00 $60,290.00 $60,290.00 $14,060.00 $14,060.00 $20,000.00 $20,000.00

3061 CLEARING, VICTORY HOLLOW SITE,

AWARDABLE OPTION 3

10 ACRE $4,545.00 $45,450.00 $2,678.00 $26,780.00 $3,000.00 $30,000.00 $7,200.00 $72,000.00

3062 SILT FENCE, VICTORY HOLLOW SITE,

AWARDABLE OPTION 3

500 LINEAR

FEET

$13.15 $6,575.00 $6.00 $3,000.00 $13.50 $6,750.00 $6.60 $3,300.00

3063 WEIGHTED SEDIMENT FILTER TUBE,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 3

1,000 LINEAR

FEET

$10.05 $10,050.00 $11.00 $11,000.00 $5.00 $5,000.00 $11.00 $11,000.00

3064 TEMPORARY SEEDING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

10 ACRE $3,095.00 $30,950.00 $3,214.00 $32,140.00 $1,300.00 $13,000.00 $1,200.00 $12,000.00

3065 PERMANENT SEEDING, VICTORY

HOLLOW SITE, AWARDABLE OPTION

5 ACRE $4,955.00 $24,775.00 $5,356.00 $26,780.00 $1,800.00 $9,000.00 $1,500.00 $7,500.00

3066AA PDT NO. 2A SURFACE COURSE,

FIRST 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 3

1,000 SQUARE

YARDS

$7.65 $7,650.00 $107.00 $107,000.00 $13.50 $13,500.00 $6.50 $6,500.00

3066AB PDT NO. 2A SURFACE COURSE, ALL

OVER 1,000 SQUARE YARDS,

VICTORY HOLLOW SITE,

AWARDABLE OPTION 3

500 SQUARE

YARDS

$8.05 $4,025.00 $107.00 $53,500.00 $13.50 $6,750.00 $6.50 $3,250.00

3067 AS-BUILT DRAWINGS, AWARDABLE

OPTION 3

1 JOB $163,580.00 $163,580.00 $32,135.00 $32,135.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00

3068 CONCRETE PRODUCTION MANAGER,

AWARDABLE OPTION 3

1 MONTHS $16,075.00 $16,075.00 $39,253.00 $39,253.00 $36,500.00 $36,500.00 $19,974.04 $19,974.04

3069 MOBILIZATION AND DEMOBILIZATION,

AWARDABLE OPTION 3

1 JOB $123,230.00 $123,230.00 $862,074.00 $862,074.00 $600,000.00 $600,000.00 $10,000.00 $10,000.00

3070 ENVIRONMENTAL FIELD TECHNICIAN

COMPLIANCE REPRESENTATIVE,

AWARDABLE OPTION 3

1 MONTHS $10,855.00 $10,855.00 $16,844.00 $16,844.00 $13,000.00 $13,000.00 $10,900.00 $10,900.00

TOTAL, OPTION 3 ITEMS, 3001

THROUGH 3070

$25,438,604.03 $30,459,589.20 $35,358,281.05 $28,312,918.22

AWARDABLE OPTION 4 - IN-CHAMBER WORK

4001 REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT

BONDS PREMIUMS, AWARDABLE

OPTION 4

1 JOB $482,240.00 $482,240.00 $372,300.00 $372,300.00 $828,000.00 $828,000.00 $515,000.00 $515,000.00

4002 DIGITAL PROGRESS IMAGES,

MONTHLY, AWARDABLE OPTION 4

21 SET $685.00 $14,385.00 $380.00 $7,980.00 $275.00 $5,775.00 $328.00 $6,888.00

4003 DIGITAL AERIAL PROGRESS IMAGES,

QUARTERLY, AWARDABLE OPTION 4

7 SET $1,610.00 $11,270.00 $780.00 $5,460.00 $630.00 $4,410.00 $674.67 $4,722.69

4004 ENVIRONMENTAL COMPLIANCE

MEASUREMENTS, SAMPLING,

TESTING AND REPORTING,

CONCRETE BATCH PLANT,

AWARDABLE OPTION 4

21 MONTHS $10,325.00 $216,825.00 $19,239.00 $404,019.00 $5,000.00 $105,000.00 $4,201.47 $88,230.87

4005 CLEANING OF SEDIMENT BASIN NO.

1, CONCRETE BATCH PLANT,

AWARDABLE OPTION 4

8 EACH $25,000.00 $200,000.00 $18,250.00 $146,000.00 $12,900.00 $103,200.00 $13,000.00 $104,000.00

4006 CLEANING OF SEDIMENT BASIN NO.

2, CONCRETE BATCH PLANT

4 EACH $20,995.00 $83,980.00 $21,950.00 $87,800.00 $12,900.00 $51,600.00 $13,000.00 $52,000.00

4007 CLEAN SEEP, CONCRETE BATCH

PLANT, AWARDABLE OPTION 4

5 EACH $11,220.00 $56,100.00 $21,233.00 $106,165.00 $6,700.00 $33,500.00 $7,000.00 $35,000.00

4008 MAINTAIN CONCRETE TESTING LAB,

AWARDABLE OPTION 4

20 MONTHS $16,735.00 $334,700.00 $5,534.00 $110,680.00 $6,300.00 $126,000.00 $3,000.00 $60,000.00

4009 MONTHLY MAINTENANCE OF BATCH

PLANT AND CONVEYOR SYSTEMS,

AWARDABLE OPTION 4

20 MONTHS $21,150.00 $423,000.00 $50,579.00 $1,011,580.00 $110,000.00 $2,200,000.00 $100,000.00 $2,000,000.00

4010 REIMBURSEMENT FOR REPAIR OF

BATCH PLANT AND CONVEYOR

EQUIPMENT, AWARDABLE OPTION 4

1 JOB $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00

4011 MAINTAIN GOVERNMENT FIELD

OFFICES, AWARDABLE OPTION 4

20 MONTHS $8,930.00 $178,600.00 $4,850.00 $97,000.00 $3,500.00 $70,000.00 $7,000.00 $140,000.00

4012 REIMBURSEMENT FOR REPAIRS AT

GOVERNMENT FIELD OFFICES,

AWARDABLE OPTION 4

1 JOB $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00

4013 MODIFICATIONS TO EXISTING RIVER

WALL AND EXISTING MIDDLE WALL

FOR CONNECTION OF EMPTYING

CULVERTS

1 JOB $67,490.00 $67,490.00 $79,943.00 $79,943.00 $115,000.00 $115,000.00 $96,915.49 $96,915.49

4014 MODIFICATIONS TO EXISTING RIVER

WALL AND NEW MIDDLE WALL FOR

UPSTREAM SILLS AND FILLING

SYSTEM

1 JOB $120,750.00 $120,750.00 $314,456.00 $314,456.00 $350,000.00 $350,000.00 $392,319.30 $392,319.30

4015 MISCELLANEOUS MODIFICATIONS TO

EXISTING STUB WALL

1 JOB $740.00 $740.00 $44,362.00 $44,362.00 $25,000.00 $25,000.00 $48,298.95 $48,298.95

4016 MODIFY FLOATING MOORING BITT,

STUB WALL

1 JOB $452,895.00 $452,895.00 $371,079.00 $371,079.00 $350,000.00 $350,000.00 $297,943.65 $297,943.65

4017 REMOVE EXISTING CONCRETE

FOOTING, STUB WALL

372 CUBIC

YARDS

$595.60 $221,563.20 $93.00 $34,596.00 $23.00 $8,556.00 $436.50 $162,378.00

4018 REMOVE EXISTING PORT PLUGS AND

CONSTRUCT NEW PORT PLUGS,

STUB WALL

3 EACH $17,955.00 $53,865.00 $6,874.00 $20,622.00 $4,000.00 $12,000.00 $7,645.15 $22,935.45

4019 REPAIR CHAMBER FACE OF STUB

WALL AT FIXED WEIR

2,150 SQUARE

FEET

$10.85 $23,327.50 $20.00 $43,000.00 $15.00 $32,250.00 $16.60 $35,690.00

4020 CONSTRUCT NEW UTILITY TRENCH,

STUB WALL

224 LINEAR

FEET

$2,390.00 $535,360.00 $1,493.00 $334,432.00 $2,150.00 $481,600.00 $1,564.67 $350,486.08

4021 CLEAN AND RESEAL MONOLITH

JOINTS, STUB WALL

603 LINEAR

FEET

$12.75 $7,688.25 $35.00 $21,105.00 $26.00 $15,678.00 $46.30 $27,918.90

4022 CLEAN AND PAINT EXISTING

FERROUS SURFACES, STUB WALL

1 JOB $14,665.00 $14,665.00 $41,839.00 $41,839.00 $19,000.00 $19,000.00 $100,000.00 $100,000.00

4023 INSTALL ROCK ANCHORS, STUB

WALL

2,160 LINEAR

FEET

$1,170.00 $2,527,200.00 $1,021.00 $2,205,360.00 $380.00 $820,800.00 $680.00 $1,468,800.00

4024 DEMOLITION OF ORIGINAL RIVER

WALL, PORTION OF LOWER GUARD

WALL AND FIXED WEIR, AND

STABILIZATION PILES

1 JOB $1,920,000.00 $1,920,000.00 $2,799,132.00 $2,799,132.00 $3,500,000.00 $3,500,000.00 $2,800,000.00 $2,800,000.00

4025 DEMOLITION OF ORIGINAL RIVER

WALL SUPPORT CELL, DIAPHRAGM

WALL, AND SHEET PILE CUTOFF

WALL

1 JOB $2,411,000.00 $2,411,000.00 $2,534,950.00 $2,534,950.00 $1,400,000.00 $1,400,000.00 $1,973,967.97 $1,973,967.97

4026 REMOVAL OF STABILIZATION

STRUTS

1 JOB $30,775.00 $30,775.00 $61,663.00 $61,663.00 $20,000.00 $20,000.00 $33,418.81 $33,418.81