Certified_Final_Volume_1_-_Technical_Specifications_RTA_W911WN-15-B-0005.pdf

PDF 6 MB Posted

Attached to
River Chamber Completion at Charleroi Locks and Dam, Monongahela River, PA
Solicitation number
W911WN15B0005
Issued by

About this file

Technical Specifications - Volume 1

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911WN-15-B-0005

River Chamber Completion Charleroi Locks and Dam Monongahela River, PA

Certified Final Documents RTA – W911WN-15-B-0005 Volume 1 - Technical Specifications June 2015

Charleroi Locks and Dam, Completion of River Chamber

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 13.00 08 SUMMARY OF WORK - BASE CONTRACT AND AWARDABLE OPTIONS

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 32 01.00 10 PROJECT SCHEDULE

01 32 23.00 08 SURVEY AND ALIGNMENT CONTROL

01 32 33.00 08 DIGITAL PROGRESS IMAGES

01 33 00 SUBMITTAL PROCEDURES

01 35 00.00 08 SPECIAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.00 08 USACE QUALITY CONTROL

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 50 00.10 UTILITY COORDINATION

01 52 13.10 08 TEMPORARY CONSTRUCTION FACILITIES

01 52 13.20 08 GOVERNMENT FACILITIES

01 54 00.00 08 GOVERNMENT EQUIPMENT TO BE USED IN PERFORMANCE OF CONTRACT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23.00 10 STORMWATER POLLUTION PREVENTION MEASURES

01 62 35.00 06 RECYCLED / RECOVERED MATERIALS

01 73 19.00 08 GOVERNMENT-FURNISHED PROPERTY

01 74 19.10 08 OPERATION OF VICTORY HOLLOW SITE

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 02.00 15 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS)

01 78 23 OPERATION AND MAINTENANCE DATA

01 94 13.00 08 CLOSURE OF LAND CHAMBER

DIVISION 02 - EXISTING CONDITIONS

02 32 16.00 08 SAMPLING, ANALYSES, AND STAGING OF SEDIMENT MATERIALS

02 41 00.00 08 DEMOLITION

02 42 00.00 08 DISPOSAL OF MATERIALS

02 81 00.00 08 REMOVAL OF REGULATED AND HAZARDOUS WASTES

DIVISION 03 - CONCRETE

03 05 00.00 08 GOVERNMENT FURNISHED CONCRETE DURING CONTRACT OVERLAP

PERIOD WITH MONOLITHS M-22 TO M-27 CONTRACT

03 05 10.00 08 OPERATION AND MAINTENANCE OF CONCRETE BATCH PLANT

03 11 13.00 08 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 15 10.00 03 CONCRETE: WATERWAY SIGNS

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 08 CONCRETE: GENERAL REQUIREMENTS

03 30 00.20 08 CONCRETE: FIELD DEMONSTRATIONS

03 30 00.50 08 CONCRETE: MATERIALS

03 30 00.51 08 CONCRETE: MIXTURE PROPORTIONING

03 30 00.52 08 CONCRETE: PRODUCTION AND TRANSPORT

03 30 00.53 08 CONCRETE: PLACEMENT REQUIREMENTS

03 30 00.54 08 CONCRETE: CAST-IN-PLACE

03 31 23.00 08 CONCRETE: DRILLED SHAFTS

03 37 06.00 08 JET GROUTING: LOWER GUIDEWALL STABILIZATION

03 37 26.10 08 CONCRETE: UNDERWATER AND FLOWABLE

03 70 00.00 08 CONCRETE: MASS

DIVISION 05 - METALS

PROJECT TABLE OF CONTENTS Page 1 Certified Final Technical Specifications RTA - W911WN-15-B-0005

05 05 23.00 06 WELDING, STRUCTURAL

05 12 00.00 03 STRUCTURAL STEEL: WATERWAY SIGNS

05 12 00.00 06 STRUCTURAL STEEL: MIDDLE WALL BUILDINGS

05 12 33.00 08 TEMPORARY GIRDER SUPPORT AND JACKING

05 14 00.13 03 WELDING STRUCTURAL ALUMINUM FRAMING: WATERWAY SIGNS

05 30 00.00 06 STEEL DECKS: MIDDLE WALL BUILDINGS

05 40 00.00 06 COLD-FORMED METAL FRAMING: MIDDLE WALL BUILDINGS

05 50 01.00 04 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP

FABRICATED ITEMS FOR FOOTBRIDGE, MECHANICAL SHAFT

PLATFORMS AND HANDRAILS, AND CONDENSATE UNIT PLATFORM

05 50 13.00 03 MISCELLANEOUS METAL FABRICATIONS: WATERWAY SIGNS

05 50 13.01 04 ELASTOMERIC BEARINGS FOR FOOTBRIDGE

05 50 14.00 08 STRUCTURAL METAL FABRICATIONS

05 50 15.00 08 CIVIL WORKS FABRICATIONS

05 51 00.00 06 METAL STAIRS

05 51 33.00 06 METAL LADDERS

05 59 13.01 04 STRUCTURAL STEEL FOR FOOTBRIDGE, CONDENSATE UNIT PLATFORM

AND CORBELS

05 59 13.13 05 FABRICATION OF MITER GATE GUDGEON EMBEDDED ANCHORAGE

FRAMES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00.00 02 WOOD SEAL: LOWER GUIDEWALL STABILIZATION

06 10 00.00 06 ROUGH CARPENTRY

06 41 16.00 06 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16.00 06 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 SOUND AND SPRAY FOAM INSULATION

07 25 00.00 06 BUILDING AIR BARRIER SYSTEM

07 60 00.00 06 FLASHING AND SHEET METAL

07 61 13.00 06 HYDROKINETIC (WATER-SHEDDING) STANDING SEAM METAL ROOFING

SYSTEM (HK SSMRS)

07 84 00.00 06 FIRESTOPPING

07 92 00.00 06 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13.00 06 STEEL DOORS AND FRAMES

08 14 00.00 06 WOOD DOORS

08 51 13.00 06 ALUMINUM WINDOWS

08 71 00.00 06 DOOR HARDWARE

08 81 00.00 06 GLAZING

DIVISION 09 - FINISHES

09 22 00.00 06 SUPPORTS FOR GYPSUM BOARD

09 29 00.00 06 GYPSUM BOARD

09 30 00.00 06 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00.00 06 ACOUSTICAL CEILINGS

09 65 00.00 06 RESILIENT FLOORING

09 68 00.00 06 CARPET

09 69 13.00 06 RIGID GRID ACCESS FLOORING

09 90 00.00 06 PAINTS AND COATINGS

09 97 01.00 10 METALLIZING: HYDRAULIC STRUCTURES

09 97 02 PAINTING: HYDRAULIC STRUCTURES

PROJECT TABLE OF CONTENTS Page 2

DIVISION 10 - SPECIALTIES

10 14 01.00 03 EXTERIOR SIGNAGE: WATERWAY SIGNS

10 14 01.00 06 EXTERIOR SIGNAGE FOR MIDDLE WALL BUILDINGS

10 14 02.00 06 INTERIOR SIGNAGE

10 28 13.00 06 TOILET ACCESSORIES

10 30 00.00 06 EXTERIOR SUN CONTROL DEVICES

10 44 16.00 06 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 21 00.00 06 WINDOW BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION

13 06 30.20 08 MIDDLE WALL CONTROL TOWER

13 06 30.30 08 MIDDLE WALL CONTROL SHELTERS

13 51 00.10 08 INSTRUMENTATION

DIVISION 22 - PLUMBING

22 00 00.00 06 PLUMBING, GENERAL PURPOSE

22 11 13.00 08 SERVICE WATER SYSTEM

22 11 16.00 08 POTABLE WATER DISTRIBUTION PIPING SYSTEM

22 13 16.00 08 SANITARY SEWAGE PIPING SYSTEMS

22 13 29.00 06 SANITARY SEWERAGE PUMPS

22 14 29.00 08 CULVERT, GALLERY AND SUMP DEWATERING SYSTEMS

22 15 19.19 08 AIR COMPRESSOR

22 61 00.00 08 COMPRESSED AIR PIPING SYSTEMS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00.00 06 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING OF HVAC

23 07 00.00 06 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 82 00.00 06 TERMINAL HEATING UNITS

23 82 02.00 06 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 19.00 10 INSULATED WIRE AND CABLE

26 20 00.00 06 ELECTRICAL DISTRIBUTION SYSTEM

26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS

26 28 01.00 08 ARC FLASH RISK ASSESSMENT

ANALYSIS/SHORT-CIRCUIT/COORDINATION STUDY

26 29 23.00 08 VARIABLE-FREQUENCY MOTOR CONTROLLER

26 36 23.00 08 AUTOMATIC TRANSFER SWITCH

26 41 00.00 06 LIGHTNING PROTECTION SYSTEM

26 51 00.00 06 INTERIOR LIGHTING

26 56 00.00 08 EXTERIOR LIGHTING

26 90 00.00 08 CONTROL AND INSTRUMENTATION

26 91 00.00 08 PROGRAMMABLE LOGIC CONTROLLER

26 92 00.00 08 PERSONAL COMPUTERS AND NETWORKS

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

PROJECT TABLE OF CONTENTS Page 3

27 13 23.00 40 COMMUNICATIONS OPTICAL BACKBONE CABLING

27 21 10.00 10 FIBER OPTIC DATA TRANSMISSION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 16 00.00 06 BASIC INTRUSION DETECTION SYSTEMS (IDS)

28 23 23.00 10 CLOSED CIRCUIT TELEVISION SYSTEMS

28 31 64.00 06 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 02 PROJECT SURVEYS: LOWER GUIDEWALL STABILIZATION

31 00 00 EARTHWORK

31 05 22.00 02 GEOTEXTILES USED AS FILTERS: LOWER GUIDEWALL STABILIZATION

31 09 16.23 08 DYNAMIC PILE TESTING

31 23 00.00 02 EXCAVATION AND FILL: LOWER GUIDEWALL STABILIZATION

31 23 19.00 08 COFFER AREA DEWATERING AND FLOODING

31 41 16.00 02 METAL SHEET PILING: LOWER GUIDEWALL STABILIZATION

31 41 16 METAL SHEET PILING

31 52 13.00 08 COFFERDAMS AND CLOSURES

31 52 13.10 FILL MATERIALS

31 62 16.16 08 STEEL H-PILES AND KING PILES

31 62 16.23 08 COMBINATION WALL SYSTEM

31 62 16.26 08 DRILLED PILES

31 63 26.00 08 DRILLED SHAFTS

31 63 29.00 03 DRILLED PIERS: WATERWAY SIGNS

31 63 41.00 14 NON-COFFERBOX SHEET PILE SUPPORT SYSTEM

31 68 13.00 08 PERMANENT ROCK ANCHORS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 19.00 08 SEEDING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 01 41.10 08 ELECTRO-HYDRAULIC MITER GATE MACHINERY

35 01 41.20 08 ELECTRO-HYDRAULIC FILLING AND EMPTYING VALVE MACHINERY

35 05 50.09 08 RIVER WALL MODIFICATIONS

35 08 40.00 08 FULLY INTEGRATED SYSTEMS TEST

35 20 14.10 08 MAINTENANCE BULKHEADS

35 20 16.33 MITER GATES

35 20 19.23 08 INSTALLATION OF FILLING AND EMPTYING VALVES AND BULKHEADS

35 20 23.00 02 DREDGING: LOWER GUIDEWALL STABILIZATION

35 20 23.10 UNDERWATER EXCAVATION

35 20 23.15 08 LOCK EXCAVATION AND BACKFILL

35 49 23.23 08 COFFERBOX WALLS

35 79 26.00 08 INSTALL REMAINING GUARD WALL COMPONENTS

DIVISION 40 - PROCESS INTEGRATION

40 41 13.13 08 HEAT TRACING FOR PIPING

40 42 13.19 08 UTILITY PIPING INSULATION

40 95 00 PROCESS CONTROL

DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT

44 01 50.10 WATER TREATMENT UNITS, OPERATION, MONITORING & REPORTING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

PROJECT TABLE OF CONTENTS Page 5

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 13.00 08

SUMMARY OF WORK - BASE CONTRACT AND AWARDABLE OPTIONS

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.1.1 Coordination with M-22 to M-27 Contractor

1.1.2 Future Land Chamber

1.2 BASE CONTRACT

1.3 AWARDABLE OPTION ONE

1.4 AWARDABLE OPTION TWO

1.5 AWARDABLE OPTION THREE

1.6 AWARDABLE OPTION FOUR

1.7 AWARDABLE OPTION FIVE

1.8 PAYMENT FOR FEATURES OF WORK THAT CONTINUE THROUGHOUT THE CONTRACT

PERIOD

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 13.00 08 Page 1

SECTION 01 11 13.00 08

SUMMARY OF WORK - BASE CONTRACT AND AWARDABLE OPTIONS

PART 1 GENERAL

1.1 GENERAL INFORMATION

This contract has been divided into a base contract and five awardable options. Award of the awardable options will be made in accordance with Section 00800 SPECIAL CONTRACT REQUIREMENTS, Addendum paragraph AWARDABLE OPTIONS. The work to be completed under each portion of the contract is shown on Contract Drawings A4/95 through A4/99. These drawings illustrate the direct lock construction area features contained within each portion of the contract, and provide construction sequence restrictions to specific features due to the order of the work. Additional information is provided in the various series within Contract Drawings that further refines the construction sequences restrictions. The following paragraphs are additional supplemental information to be used in conjunction with the information shown on the Contract Drawings. Actual work to be performed under the base contract and each option shall be as identified on the drawings. The Contractor shall fully understand and correlate the entire drawing folio in order to construct features whereby some items may be required to be installed as part of the overall feature or payment is incidental to the overall feature. For example as part of the lock wall features many embedded items must be installed during the concrete wall constructions, to include but not be limited to, wall metals and features, hatches, grating, top of wall metals, supporting foundation for other features, various mechanical embedments, various electrical embedments and other items needed to support features to be completed during a subsequent contract option

1.1.1 Coordination with M-22 to M-27 Contractor

The work under this contract will be performed concurrently with work under the Charleroi River Chamber Completion, Monoliths M-22 to M-27 - Contract No. W911WN-14-C-0003. This contract will be referred to as "Monoliths M-22 to M-27 contract". The Batch Plant area and Victory Hollow Site will initially be operated and maintained by the contractor for M-22 to M-27 contract.

The M-22 to M-27 contractor will operate and maintain the Batch Plant and associated conveyor system and water treatment system, produce concrete and deliver it to the Existing River Wall (Stub Wall) for the Base Contract abd Awardable Option 1. The M-22 to M-27 Contractor may also produce drilled shaft and tremie concrete for Awardable Options 2 and 3 if these options are awarded prior to completion of concrete production under the M-22 toM-27 contract. See Section 01 35 00.00 08 SPECIAL PROCEDURES, paragraph

ANTICIPATED ACTION DATES.

The M-22 to M-27 contractor will operate the Victory Hollow Site until these facilities are turned over to the Government, and subsequently turned over to the Contractor for operation as specified in Section 01 35 00.00 08 SPECIAL PROCEDURES, paragraph ANTICIPATED ACTION DATES. Upon turnover of the Victory HOllow Site, the Contractor will be responsible for offloading and processing remaining material excavated under the M-22 to M-27 contract.

SECTION 01 11 13.00 08 Page 2

After turnover of the Batch Plant, Fixed Conveyor, and portable conveyor units and Victory Hollow facilities to the Contractor, the Contractor will become responsible for operation and maintenance of these facilities, including environmental compliance features. The M-22 to M-27 contractor will also maintain Government facilities and provide quarterly aerial photographs during this period. See Section 01 35 00.00 08 SPECIAL PROCEDURES, paragraph WORK UNDER OTHER CONTRACTS for more detailed information.

1.1.2 Future Land Chamber

Miscellaneous metal items for the future Land Chamber are included in the base contract and awardable options because they are embedded in the concrete of the new Middle Wall. These items include, but are not limited to, the following:

a. Wall armor, monolith joint protection, and corner protection

b. Check posts and line hooks

c. Government-furnished floating mooring bitt embedded anchorages (Government-furnished floating mooring bitt assemblies shall not be installed, but shall be stored at the project as specified.

d. Ladder recesses

e. Embedded anchorages for miter gates.

f. Embedded items for miter gate quoin posts

g. Embedded portion of automatic gate latches

h. Embedded metals for maintenance bulkhead recesses (bulkhead recess fillers will not be furnished)

i. Embedded pipe sleeves for Land Chamber operating equipment

j. Embedded duct banks and conduits

1.2 BASE CONTRACT

The Base Contract consists of completion of new Middle Wall monoliths M1 through M7. Specific features of work under the base contract include, but are not limited to the following:

a. Pre-excavate for monoliths M-1 through M-7

b. Construct foundation drilled shafts, cofferboxes and Monoliths M-1 through M-7. Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.

c. Inspect, inventory, measure and develop condition report of all Government-furnished materials.

1.3 AWARDABLE OPTION ONE

Awardable Option One consists of completion of new Middle Wall monoliths M11 through M16. Specific features of work under Awardable Option One

SECTION 01 11 13.00 08 Page 3 include, but are not limited to the following:

a. Construct foundation drilled shafts, cofferboxes and Monoliths M-11 through M-16. Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.

1.4 AWARDABLE OPTION TWO

Awardable Option Two consists of completion of new Middle Wall monoliths M8 through M10 and construction of the Middle Wall Control Tower and Control Shelters (structures only). Specific features of work under Awardable Option Two include, but are not limited to the following:

a. Construct foundation drilled shafts, cofferboxes and Monoliths M-8 through M-10. Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.

b. Construct Middle Wall Control Tower on Monolith M-12

c. Construct Middle Wall Control Shelters on Monoliths M-3 and M-22

d. Install non-cofferbox sheet pile support wall at new River Wall monoliths R-8 through R-10, R-13 through R-18, R-26 through R-28, and R-33 through R-35

1.5 AWARDABLE OPTION THREE

Awardable Option Three consists of completion of new Middle Wall monoliths M17 through M21. Specific features of work under the Awardable Option Three include, but are not limited to the following:

Construct foundation drilled shafts, cofferboxes and Monoliths M-17 through M-21. Construction of monoliths includes all concrete, reinforcing steel, waterstops, and associated embedded metal items.

1.6 AWARDABLE OPTION FOUR

Awardable Option Four consists of construction of the River Chamber Cofferdam and completion of River Chamber work within the dewatered cofferdam. Specific features of work under Awardable Option Four include, but are not limited to the following:

a. Construct upstream cofferdam

b. Temporarily raise Monoliths R-33 through R-35 to EL 749.

c. Install Government-furnished river side Emptying Valve bulkheads

d. Install Construction Instrumentation

e. Construct downstream cofferdam

f. Dewater the coffer area

g. Demolition remainder of original River Wall, Fixed Crest Weir, diaphragm cells and support cells

h. Excavate alluvium and rock for emptying and filling culverts

SECTION 01 11 13.00 08 Page 4

i. Construct modifications to River Wall Stub Wall

j. Construct splash pad at downstream coffer closure

k. Construct cap on no-cofferbox sheet pile support wall

l. Construct River Wall facing and complete top of River Wall

m. Construct upper miter sill and bulkhead sill

n. Construct emptying and filling culverts

o. Construct lower miter/bulkhead sill

p. Install pintle base, pintle, wall quoin posts and sill seal angle

q. Remove tremie concrete, remaining portion of lower portions of cofferbox sheets, and culvert concrete bulkheads at River Chamber faces of new River Wall

r. Construct chamber floor protection system

s. Flood the coffer area

t. Remove upstream cofferdam

1.7 AWARDABLE OPTION FIVE

Awardable Option Five consists of completion of new River Chamber including operating machinery, power, lighting and control works, Middle Wall Control Shelters, completion of the Upper and Lower Guard Walls, stabilizing the Lower Guide Wall, and closure of the existing Land Chamber. Specific features of work under Awardable Option Five include, but are not limited to the following:

a. Install Government-furnished miter gates and adjust quoin post and sill seal

b. Install waterway signs upstream and downstream of the lock

c. Construct Control Tower and Control Shelters utilities, building systems, and interior finishes

d. Fabricate and install new footbridges

e. Install Government-furnished bulkheads in upstream slots and dewater the River Chamber

f. Adjust miter gates, quoins and sills and stress miter gate diagonals

g. Install electrical and mechanical systems for lock and verify operation

h. Install guard fence, handrails, and top of wall features and waterway signs on lock structure

i. Install permanent instrumentation

j. Flood River Chamber area

SECTION 01 11 13.00 08 Page 5

k. Remove emptying valve bulkheads

l. Remove downstream cofferdam

m. Complete Upper and Lower Guard Walls, including structural and electrical features

n. Test maintenance bulkheads in lower slots

o. Construct bulkhead storage area and place bulkhead units in storage

p. Install downstream Land Chamber closure

q. Remove Land Chamber miter gates, culvert valves, and operating equipment, including hydraulic fluids and service utilities

r. Install upstream Land Chamber closure

s. Construct Lower Guide Wall stabilization features

1.8 PAYMENT FOR FEATURES OF WORK THAT CONTINUE THROUGHOUT THE CONTRACT

PERIOD

Some features of work which commences under the Base Contract will continue throughout the entire contract period, including Option periods. The quantities in the Price Schedule for these features have time-dependent units of measures such as Sets, Each, or Months. Examples of these items include, but are not limited to:

Digital Progress Images Digital Aerial Images Environmental Compliance Measurements, Sampling, Testing And Reporting, Concrete Batch Plant Maintain Concrete Testing Lab Monthly Maintenance Of Batch Plant And Conveyor Systems Maintain Government Field Offices Monitoring Instrumentation Environmental Compliance Measurements, Sampling, Testing And Reporting, Victory Hollow Site

Payment for these items will be made at the appropriate contract Job price, except that payment will not be made under both the Base Contract and Option periods, or under two or more Option periods, for the same period of time. Payment will be made under the Base Contract or first Option period for which payment is specified until that quantity is completed. Payment will then be made under the next awarded Option until that quantity is completed.

The following example is provided to clarify this procedure, and is not intended to reflect actual contract payment items or periods. Assuming the following Contract Line Item Numbers (CLIN's)represent the work features for which payment is to be made:

SECTION 01 11 13.00 08 Page 6

CONTRACT LINE ITEM NUMBERS

Item Description Quantity Unit

0010 (BASE CONTRACT) ENVIRONMENTAL

COMPLIANCE MEASUREMENTS, SAMPLING,

TESTING AND REPORTING, CONCRETE BATCH

PLANT

36 MONTHS

1010 (AWARDABLE OPTION ONE) ENVIRONMENTAL

COMPLIANCE MEASUREMENTS, SAMPLING,

TESTING AND REPORTING, CONCRETE BATCH

PLANT

24 MONTHS

2010 (AWARDABLE OPTION TWO) ENVIRONMENTAL

COMPLIANCE MEASUREMENTS, SAMPLING,

TESTING AND REPORTING CONCRETE BATCH

24 MONTHS

0011 (BASE CONTRACT) CLEANING OF SEDIMENT

BASIN NO. 1, CONCRETE BATCH PLANT

6 EACH

1011 (AWARDABLE OPTION ONE) CLEANING OF

SEDIMENT BASIN NO. 1, CONCRETE BATCH

PLANT

4 EACH

2011 (AWARDABLE OPTION TWO) CLEANING OF

SEDIMENT BASIN NO. 1, CONCRETE BATCH

PLANT

4 EACH

CONTRACT PERIODS

CONTRACT

PORTION

NOTICE

TO

CONTRACT

TIME

COMPLETION

DATE EXPLANATION

BASE CONTRACT 10/1/2015 1,095 9/30/2018

AWARDABLE

OPTION ONE

10/1/2015 720 9/19/2020 Contract completion extended full period

AWARDABLE

OPTION TWO

12/1/2014 720 5/20/2020 Contract completion extended one year

QUANTITIES TO BE PAID

Item Quantity

Unit EXPLANATION Original Final

0010 36 36 MONTHS 10/1/2015 to 9/30/2018

1010 24 24 MONTHS 10/1/2018 to 9/19/2020

2010 24 12 MONTHS 9/20/2020 to 9/19/2021

0011 6 6 EACH 10/1/2015 to 9/30/2018

SECTION 01 11 13.00 08 Page 7

QUANTITIES TO BE PAID

Item Quantity

Unit EXPLANATION Original Final

1011 4 4 EACH 10/1/2018 to 9/19/2020

2011 4 2 EACH 9/20/2020 to 9/19/2021

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

NOT USED

-- End of Section --

SECTION 01 11 13.00 08 Page 8

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 REFERENCES

1.2 JOB PAYMENT ITEMS

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.1.3 Payment Item

1.2.2 Modifications to Upstream Protection Cell

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.2.3 Payment Items

1.2.3 Concrete Batch Plant Setup and Mothballing

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.3.3 Payment Items

1.2.4 Reimbursement For Repair Of Government Facilities

1.2.4.1 Payment

1.2.4.2 Unit of Measure

1.2.4.3 Payment Items

1.2.5 Maintain Downstream River Chamber Closure

1.2.5.1 Payment

1.2.5.2 Unit of Measure

1.2.5.3 Payment Item

1.2.6 Cofferbox, Cofferdam, and Chamber Dewatering and Flooding

1.2.6.1 Payment

1.2.6.2 Unit of Measure

1.2.6.3 Payment Items

1.2.7 Field Demonstrations

1.2.7.1 Payment

1.2.7.2 Unit of Measure

1.2.7.3 Payment Items

1.2.8 Bulkhead Recess Fillers

1.2.8.1 Payment

1.2.8.2 Unit of Measure

1.2.8.3 Payment Items

1.2.9 Miscellaneous Metals, Miter Gate and Bulkhead Recesses

1.2.9.1 Payment

1.2.9.2 Unit of Measure

1.2.9.3 Payment Items

1.2.10 Instrumentation Installation, Maintenance, Modification, Automation and Decommissioning

1.2.10.1 Payment

1.2.10.2 Unit of Measure

1.2.10.3 Payment Items

1.2.11 Embedded Items for Electrical and Mechanical Systems

SECTION 01 22 00.00 10 Page 1

1.2.11.1 Payment

1.2.11.2 Unit of Measure

1.2.11.3 Payment Items

1.2.12 Temporary Traffic Control

1.2.12.1 Payment

1.2.12.2 Unit of Measure

1.2.12.3 Payment Items

1.2.13 Bridge Modification

1.2.13.1 Payment

1.2.13.2 Unit of Measure

1.2.13.3 Payment Items

1.2.14 Middle Wall Control Tower

1.2.14.1 Payment

1.2.14.2 Unit of Measure

1.2.14.3 Payment Items

1.2.15 Modifications to New River Wall and New Middle Wall

1.2.15.1 Payment

1.2.15.2 Unit of Measure

1.2.15.3 Payment Items

1.2.16 Stub Wall Floating Mooring Bitt

1.2.16.1 Payment

1.2.16.2 Unit of Measure

1.2.16.3 Payment Item

1.2.17 Cleaning and Painting Existing Ferrous Metal on Stub Wall

1.2.17.1 Payment

1.2.17.2 Unit of Measure

1.2.17.3 Payment Item

1.2.18 Demolition

1.2.18.1 Payment

1.2.18.2 Unit of Measure

1.2.18.3 Payment Items

1.2.19 Temporary Diversion Wall

1.2.19.1 Payment

1.2.19.2 Unit of Measure

1.2.19.3 Payment Items

1.2.20 Cofferdams and Closures

1.2.20.1 Payment

1.2.20.2 Unit of Measure

1.2.20.3 Payment Items

1.2.21 Upper Bulkhead Sills Drilled Piles and Struts

1.2.21.1 Payment

1.2.21.2 Unit of Measure

1.2.21.3 Payment Items

1.2.22 Wall Protection Plates, Middle and River Walls

1.2.22.1 Payment

1.2.22.2 Unit of Measure

1.2.22.3 Payment Items

1.2.23 Repair of Government Furnished Property

1.2.23.1 Payment

1.2.23.2 Unit of Measure

1.2.24 Filling and Emptying Valves

1.2.24.1 Payment

1.2.24.2 Unit of Measure

1.2.24.3 Payment Items

1.2.25 Culvert, Gallery And Sump Dewatering Systems

1.2.25.1 Payment

1.2.25.2 Unit of Measure

1.2.25.3 Payment Item

1.2.26 Footbridges

SECTION 01 22 00.00 10 Page 2

1.2.26.1 Payment

1.2.26.2 Unit of Measure

1.2.26.3 Payment Item

1.2.27 Miter Gates

1.2.27.1 Payment

1.2.27.2 Unit of Measure

1.2.27.3 Payment Items

1.2.28 Maintenance Bulklheads

1.2.28.1 Payment

1.2.28.2 Unit of Measure

1.2.28.3 Payment Items

1.2.29 Completion of Upper and Lower Guard Walls

1.2.29.1 Payment

1.2.29.2 Unit of Measure

1.2.29.3 Payment Items

1.2.30 Handrailing

1.2.30.1 Payment

1.2.30.2 Unit of Measure

1.2.30.3 Payment Item

1.2.31 Headwalls

1.2.31.1 Payment

1.2.31.2 Unit of Measure

1.2.31.3 Payment Item

1.2.32 Piping Systems

1.2.32.1 Payment

1.2.32.2 Unit of Measure

1.2.32.3 Payment Item

1.2.33 Electrical Work

1.2.33.1 Payment

1.2.33.2 Unit of Measure

1.2.33.3 Payment Item

1.2.34 Perform Operational Testing of Lock Systems

1.2.34.1 Payment

1.2.34.2 Unit of Measure

1.2.34.3 Payment Item

1.2.35 Concrete Jersey Barriers

1.2.35.1 Payment

1.2.35.2 Unit of Measure

1.2.35.3 Payment Item

1.2.36 Land Chamber Closure Items

1.2.36.1 Payment

1.2.36.2 Unit of Measure

1.2.36.3 Payment Items

1.2.37 Upper Guide Wall Storage Area

1.2.37.1 Payment

1.2.37.2 Unit of Measure

1.2.37.3 Payment Item

1.2.38 Sampling And Testing Material Excavated Behind Guide Walls

1.2.38.1 Payment

1.2.38.2 Unit of Measure

1.2.38.3 Payment Item

1.2.39 Chamber Marker And Caution Edge Of Sill Signs

1.2.39.1 Payment

1.2.39.2 Unit of Measure

1.2.39.3 Payment Item

1.2.40 Preparation of Final As-Built Drawings

1.2.40.1 Payment

1.2.40.2 Unit of Measure

1.3 UNIT PRICE PAYMENT ITEMS

SECTION 01 22 00.00 10 Page 3

1.3.1 Digital Progress Images

1.3.1.1 Payment

1.3.1.2 Measurement

1.3.1.3 Unit of Measure

1.3.1.4 Payment Items

1.3.2 Environmental Compliance Measurement, Sampling, Testing and

Reporting

1.3.2.1 Payment

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.2.4 Payment Items

1.3.3 Cleaning Sediment Basin

1.3.3.1 Payment

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

1.3.3.4 Payment Items

1.3.4 Cleaning Seep, Concrete Batch Plant

1.3.4.1 Payment

1.3.4.2 Measurement

1.3.4.3 Unit of Measure

1.3.4.4 Payment Items

1.3.5 Maintain Government Facilities and Government Access

1.3.5.1 Payment

1.3.5.2 Measurement

1.3.5.3 Unit of Measure

1.3.5.4 Payment Items

1.3.6 Batch Plant And Conveyor Operation And Maintenance

1.3.6.1 Payment

1.3.6.2 Measurement

1.3.6.3 Unit of Measure

1.3.6.4 Payment Items

1.3.7 Steel Piling

1.3.7.1 Payment

1.3.7.2 Measurement

1.3.7.3 Unit of Measure

1.3.7.4 Payment Items

1.3.8 Dynamic Pile Testing

1.3.8.1 Payment

1.3.8.2 Measurement

1.3.8.3 Unit of Measure

1.3.8.4 Payment Items

1.3.9 Cofferbox Structural Steel

1.3.9.1 Payment

1.3.9.2 Measurement

1.3.9.3 Unit of Measure

1.3.9.4 Payment Items

1.3.10 Underwater Excavation

1.3.10.1 Payment

1.3.10.2 Measurement

1.3.10.3 Unit of Measure

1.3.10.4 Payment Items

1.3.11 Compensation for Flooding of Cofferboxes and Cofferdams

1.3.11.1 Payment

1.3.11.2 Measurement

1.3.11.3 Unit of Measure

1.3.11.4 Payment Items

1.3.12 Middle Wall Control Shelters

1.3.12.1 Payment

1.3.12.2 Unit of Measure

SECTION 01 22 00.00 10 Page 4

1.3.12.3 Payment Items

1.3.13 Permanent Casing, Drilled Shafts

1.3.13.1 Payment

1.3.13.2 Measurement

1.3.13.3 Unit of Measure

1.3.13.4 Payment Items

1.3.14 Soil and Rock Excavation, Drilled Shafts

1.3.14.1 Payment

1.3.14.2 Measurement

1.3.14.3 Unit of Measure

1.3.14.4 Payment Items

1.3.15 Reinforcing Steel

1.3.15.1 Payment

1.3.15.2 Measurement

1.3.15.3 Unit of Measure

1.3.15.4 Payment Items

1.3.16 Access Tubes, Crosshole Sonic Logging

1.3.16.1 Payment

1.3.16.2 Measurement

1.3.16.3 Unit of Measure

1.3.16.4 Payment Items

1.3.17 Transportation and Placement of Concrete

1.3.17.1 Payment

1.3.17.2 Measurement

1.3.17.3 Unit of Measure

1.3.17.4 Payment Items

1.3.18 Concrete Production, Delivery and Placement

1.3.18.1 Payment

1.3.18.2 Measurement

1.3.18.3 Unit of Measure

1.3.18.4 Payment Items

1.3.19 Crosshole Sonic Logging

1.3.19.1 Payment

1.3.19.2 Measurement

1.3.19.3 Unit of Measure

1.3.19.4 Payment Items

1.3.20 Coring of Drilled Shafts

1.3.20.1 Payment

1.3.20.2 Measurement

1.3.20.3 Unit of Measure

1.3.20.4 Payment Items

1.3.21 Portland Cement

1.3.21.1 Payment

1.3.21.2 Measurement

1.3.21.3 Unit of Measure

1.3.21.4 Payment Items

1.3.22 Pozzolan (Fly Ash)

1.3.22.1 Payment

1.3.22.2 Measurement

1.3.22.3 Unit of Measure

1.3.22.4 Payment Items

1.3.23 Ground Granulated Blast Furnace Slag (GGBFS)

1.3.23.1 Payment

1.3.23.2 Measurement

1.3.23.3 Unit of Measure

1.3.23.4 Payment Items

1.3.24 Silica Fume

1.3.24.1 Payment

1.3.24.2 Measurement

SECTION 01 22 00.00 10 Page 5

1.3.24.3 Unit of Measure

1.3.24.4 Payment Items

1.3.25 Anti-Washout Admixture

1.3.25.1 Payment

1.3.25.2 Measurement

1.3.25.3 Unit of Measure

1.3.25.4 Payment Items

1.3.26 Limestone Powder

1.3.26.1 Payment

1.3.26.2 Measurement

1.3.26.3 Unit of Measure

1.3.26.4 Payment Items

1.3.27 Miter Gate Embedded Gudgeon Anchorages

1.3.27.1 Payment

1.3.27.2 Measurement

1.3.27.3 Unit of Measure

1.3.27.4 Payment Items

1.3.28 Waterstops

1.3.28.1 Payment

1.3.28.2 Measurement

1.3.28.3 Unit of Measure

1.3.28.4 Payment Items

1.3.29 Floating Mooring Bitts

1.3.29.1 Payment

1.3.29.2 Measurement

1.3.29.3 Unit of Measure

1.3.29.4 Payment Items

1.3.30 Line Hooks and Guards

1.3.30.1 Payment

1.3.30.2 Measurement

1.3.30.3 Unit of Measure

1.3.30.4 Payment Items

1.3.31 Check Posts

1.3.31.1 Payment

1.3.31.2 Measurement

1.3.31.3 Unit of Measure

1.3.31.4 Payment Items

1.3.32 Ladder Recesses

1.3.32.1 Payment

1.3.32.2 Measurement

1.3.32.3 Unit of Measure

1.3.32.4 Payment Items

1.3.33 Aluminum Rabbet Angles

1.3.33.1 Payment

1.3.33.2 Measurement

1.3.33.3 Unit of Measure

1.3.33.4 Payment Items

1.3.34 Aluminum Planking, Grating and Plate

1.3.34.1 Payment

1.3.34.2 Measurement

1.3.34.3 Unit of Measure

1.3.34.4 Payment Item

1.3.35 Corner Castings

1.3.35.1 Payment

1.3.35.2 Measurement

1.3.35.3 Unit of Measure

1.3.35.4 Payment Items

1.3.36 Corner Protection

1.3.36.1 Payment

SECTION 01 22 00.00 10 Page 6

1.3.36.2 Measurement

1.3.36.3 Unit of Measure

1.3.36.4 Payment Items

1.3.37 Wall Armor and Monolith Joint Protection

1.3.37.1 Payment

1.3.37.2 Measurement

1.3.37.3 Unit of Measure

1.3.37.4 Payment Items

1.3.38 Remove Existing Concrete Footing and Tremie Concrete

1.3.38.1 Payment

1.3.38.2 Measurement

1.3.38.3 Unit of Measure

1.3.38.4 Payment Item

1.3.39 Embedded Pins for Removable Handrail

1.3.39.1 Payment

1.3.39.2 Measurement

1.3.39.3 Unit of Measure

1.3.39.4 Payment Items

1.3.40 Instrumentation Monitoring Program

1.3.40.1 Payment

1.3.40.2 Measurement

1.3.40.3 Unit of Measure

1.3.40.4 Payment Items

1.3.41 Clearing of Victory Hollow Site

1.3.41.1 Payment

1.3.41.2 Measurement

1.3.41.3 Unit of Measure

1.3.41.4 Payment Items

1.3.42 Silt Fences

1.3.42.1 Payment

1.3.42.2 Payment

1.3.42.3 Unit of Measure

1.3.42.4 Payment Items

1.3.43 Weighted Sediment Filter Tube

1.3.43.1 Payment

1.3.43.2 Payment

1.3.43.3 Unit of Measure

1.3.43.4 Payment Items

1.3.44 Seeding, Victory Hollow Site

1.3.44.1 Payment

1.3.44.2 Measurement

1.3.44.3 Unit of Measure

1.3.44.4 Payment Items

1.3.45 Haul Road Surfacing Repair, Victory Hollow Site

1.3.45.1 Payment

1.3.45.2 Measurement

1.3.45.3 Unit of Measure

1.3.45.4 Payment Items

1.3.46 Process Excavated Material From M-22 to M-27 Contract

1.3.46.1 Payment

1.3.46.2 Measurement

1.3.46.3 Unit of Measure

1.3.46.4 Payment Items

1.3.47 Alternating Stair Treads

1.3.47.1 Payment

1.3.47.2 Measurement

1.3.47.3 Unit of Measure

1.3.47.4 Payment Item

1.3.48 Access Hatches

SECTION 01 22 00.00 10 Page 7

1.3.48.1 Payment

1.3.48.2 Measurement

1.3.48.3 Unit of Measure

1.3.48.4 Payment Item

1.3.49 Watertight Manhole Cover

1.3.49.1 Payment

1.3.49.2 Measurement

1.3.49.3 Unit of Measure

1.3.49.4 Payment Item

1.3.50 Non-Cofferbox Sheet Pile Support (Secant Piles)

1.3.50.1 Payment

1.3.50.2 Measurement

1.3.50.3 Unit of Measure

1.3.50.4 Payment Items

1.3.51 Non-Cofferbox Sheet Pile Support System, Coring Secant Piles

1.3.51.1 Payment

1.3.51.2 Measurement

1.3.51.3 Unit of Measure

1.3.51.4 Payment Item

1.3.52 Remove Existing Port Plugs and Construct New Port Plugs, Stub

Wall

1.3.52.1 Payment

1.3.52.2 Measurement

1.3.52.3 Unit of Measure

1.3.52.4 Payment Item

1.3.53 Repair Chamber Face of Stub Wall at Fixed Weir

1.3.53.1 Payment

1.3.53.2 Measurement

1.3.53.3 Unit of Measure

1.3.53.4 Payment Item

1.3.54 Utility Trench on Stub Wall

1.3.54.1 Payment

1.3.54.2 Measurement

1.3.54.3 Unit of Measure

1.3.54.4 Payment Item

1.3.55 Clean and Reseal Monolith Joints

1.3.55.1 Payment

1.3.55.2 Measurement

1.3.55.3 Unit of Measure

1.3.55.4 Payment Item

1.3.56 Install Rock Anchors, Stub Wall

1.3.56.1 Payment

1.3.56.2 Measurement

1.3.56.3 Unit of Measure

1.3.56.4 Payment Item

1.3.57 Remove Concrete for Middle Wall Baffles

1.3.57.1 Payment

1.3.57.2 Measurement

1.3.57.3 Unit of Measure

1.3.57.4 Payment Item

1.3.58 Excavation

1.3.58.1 Payment

1.3.58.2 Measurement

1.3.58.3 Unit of Measure

1.3.58.4 Payment Items

1.3.59 Dental Concrete

1.3.59.1 Payment

1.3.59.2 Measurement

1.3.59.3 Unit of Measure

SECTION 01 22 00.00 10 Page 8

1.3.59.4 Payment Items

1.3.60 Rock Fill and Berm

1.3.60.1 Payment

1.3.60.2 Measurement

1.3.60.3 Unit of Measure

1.3.61 Helper Towboat

1.3.61.1 Payment

1.3.61.2 Measurement

1.3.61.3 Unit of Measure

1.3.61.4 Payment Items

1.3.62 Anchor Bars for Lock Floor

1.3.62.1 Payment

1.3.62.2 Measurement

1.3.62.3 Unit of Measure

1.3.62.4 Payment Items

1.3.63 Intake Screen Assemblies

1.3.63.1 Payment

1.3.63.2 Measurement

1.3.63.3 Unit of Measure

1.3.63.4 Payment Item

1.3.64 Furnish and Install Gate Operating Machinery

1.3.64.1 Payment

1.3.64.2 Measurement

1.3.64.3 Unit of Measure

1.3.64.4 Payment Item

1.3.65 Handrail, Guard Fence, and Safety Chains

1.3.65.1 Payment

1.3.65.2 Measurement

1.3.65.3 Unit of Measure

1.3.65.4 Payment Items

1.3.66 Spring Gate Assembly

1.3.66.1 Payment

1.3.66.2 Measurement

1.3.66.3 Unit of Measure

1.3.66.4 Payment Item

1.3.67 Jet Grouting, Land Chamber Closure

1.3.67.1 Payment

1.3.67.2 Measurement

1.3.67.3 Unit of Measure

1.3.67.4 Payment Item

1.3.68 Closure Cell Fill, Land Chamber Closure

1.3.68.1 Payment

1.3.68.2 Measurement

1.3.68.3 Unit of Measure

1.3.68.4 Payment Item

1.3.69 Disposal of Materials Excavated Behind Guide Walls

1.3.69.1 Payment

1.3.69.2 Measurement

1.3.69.3 Unit of Measure

1.3.69.4 Payment Items

1.3.70 Safety Critical Waterway Signs

1.3.70.1 Payment

1.3.70.2 Measurement

1.3.70.3 Unit of Measure

1.3.70.4 Payment Items

1.4 UNIT PRICES FOR FABRICATED METAL ITEMS

1.4.1 Payment

1.4.2 Measurement

SECTION 01 22 00.00 10 Page 9

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 10

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A615/A615M (2014) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

1.2 JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract Job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular Job or unit price payment item, shall be included in the listed Job item most closely associated with the work involved. The Job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization, as defined in Section 00800 SPECIAL CONTRACT REQUIREMENTS, DFARS 252.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION. Payment will only be made for demobilization upon completion of the contract work, consisting of the base contract and any awardable options that may be awarded. For example, if the Base Contract and Awardable Options 1 and 2 are awarded, payment for demobilization will only be made upon completion of Awardable Option 2 contract work.

1.2.1.2 Unit of Measure

Unit of measure: Job.

1.2.1.3 Payment Item

0003 MOBILIZATION AND DEMOBILIZATION, BASE CONTRACT

SECTION 01 22 00.00 10 Page 11

1.2.2 Modifications to Upstream Protection Cell

1.2.2.1 Payment

Payment shall constitute full compensation for all labor, equipment, material and supply costs to modify the existing Upstream Protection Cell for installation of struts for Cofferbox M-1, including, but not be limited to, removal of protection stone and cell fill, construction of concrete struts, and backfilling with cell fill and protection stone as shown on the drawings and as specified.

1.2.2.2 Unit of Measure

Unit of measure: Job.

1.2.2.3 Payment Items

0012 MODIFY UPSTREAM PROTECTION CELL FOR COFFERBOX BRACES

1.2.3 Concrete Batch Plant Setup and Mothballing

1.2.3.1 Payment

Payment for INITIAL BATCH PLANT SETUP AND TRIAL OPERATION shall include all costs associated with setup of the Government-furnished concrete batch plant shall constitute full compensation for all labor, equipment, material and supply costs to inspect, adjust, perform routine maintenance, and produce trial batches of concrete to verify compliance with the specification requirements, as specified in Section 03 30 00.52 08 CONCRETE: PRODUCTION AND TRANSPORT. No separate payment will be made for materials required to produce the trial batches, and all costs of materials used shall be included in the Job price. Payment shall also include the costs of all utilities required for the performing the work.

Payment for SHUTDOWN AND MOTHBALLING OF BATCH PLANT AT END OF CONSTRUCTION shall include all costs associated with shutdown and mothballing of the Government-furnished concrete batch plant at the end of the contract period shall constitute full compensation for all labor, equipment, material and supply costs to inspect, perform routine maintenance, clean, drain systems, and shut the batch plant and conveyors systems, as specified in Section 03 05 10.00 08 OPERATION AND MAINTENANCE OF CONCRETE BATCH PLANT. Payment shall also include the costs of all utilities required for the performing the work.

1.2.3.2 Unit of Measure

Unit of measure: Job.

1.2.3.3 Payment Items

2009 INITIAL BATCH PLANT SETUP AND TRIAL OPERATION

5011 SHUTDOWN AND MOTHBALLING OF BATCH PLANT AT END OF CONSTRUCTION

1.2.4 Reimbursement For Repair Of Government Facilities

1.2.4.1 Payment

Payment for reimbursement for repair of batch plant and conveyor equipment, as specified in Section 03 05 10.00 08 OPERATION AND MAINTENANCE OF

SECTION 01 22 00.00 10 Page 12

CONCRETE BATCH PLANT, and repair of Government facilities as specified in Section 01 52 13.20 08 GOVERNMENT FACILITIES, shall constitute full compensation for all labor, equipment, material and supply costs to repair the equipment as directed by the Contracting Officer, and any other costs in connection with this item of work. Reimbursement shall be made based on invoices submitted by the Contractor for items of work directed by the Contracting Officer. Invoices shall include a breakdown of labor, equipment, materials and supplies utilized for the repairs, as well as an explanation of any differences between the approved estimates and the final invoices.

Insert amount indicated for each item for bidding purposes. The Contractor will be reimbursed the actual costs only, as established by invoice.

1.2.4.2 Unit of Measure

Unit of measure: Job.

1.2.4.3 Payment Items

0004 REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, BASE

CONTRACT (Insert $40,000)

1003 REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE

OPTION 1 (Insert $40,000)

2011 REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT,

OPTION 2 (Insert $25,000)

2013 REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE

OPTION 2 (Insert $40,000)

3010 REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT,

OPTION 3 (Insert $25,000)

3012 REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE

OPTION 3 (Insert $40,000)

4010 REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT,

OPTION 4 (Insert $25,000)

4012 REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE

OPTION 4 (Insert $40,000)

5010 REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT,

OPTION 5 (Insert $10,000)

5013 REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE

OPTION 5 (Insert $40,000)

1.2.5 Maintain Downstream River Chamber Closure

1.2.5.1 Payment

Payment for maintaining the existing temporary River Wall raising consisting of sandbags on Monoliths R-26 through R-28 and R-33 through R-35 to elevation 747, as specified in Section 31 52 13.00 08 COFFERDAMS AND CLOSURES, shall constitute full compensation for all labor, equipment, material and supply costs to complete this item of work, as shown and as specified.

1.2.5.2 Unit of Measure

Unit of measure: Job.

1.2.5.3 Payment Item

2014 MAINTAIN DOWNSTREAM RIVER CHAMBER CLOSURE, AWARDABLE OPTION 2

SECTION 01 22 00.00 10 Page 13

3013 MAINTAIN DOWNSTREAM RIVER CHAMBER CLOSURE, AWARDABLE OPTION 3

1.2.6 Cofferbox, Cofferdam, and Chamber Dewatering and Flooding

1.2.6.1 Payment

Payment for dewatering shall constitute full compensation for all labor, equipment, material and supply costs for the initial dewatering the cofferboxes, cofferdam, or chamber and continuous dewatering of these areas, including installing, removing, transporting, and storing valve and chamber maintenance bulkheads, as shown on the contract drawings and specified in Section 31 23 19.00 08 COFFER AREA DEWATERING AND FLOODING.

Payment for these items shall also include costs for all advanced planning and engineering; and all other incidental costs in connection with these aspects of the work under this contract.

Payment for flooding shall constitute full compensation for all labor, equipment, material and supply costs for the intentional flooding the cofferdam or chamber (not associated with a high water event), as specified in Section 31 23 19.00 08 COFFER AREA DEWATERING AND FLOODING. No separate payment will be made for intentional flooding cofferboxes (not associated with a high water event). Payment for these items shall include all incidental costs in connection with these aspects of the work under this contract. Compensation for flooding of coffer areas related to high water events is measured and paid under paragraph Compensation for Flooding of Cofferboxes.

1.2.6.2 Unit of Measure

Unit of measure: Job.

1.2.6.3 Payment Items

0014 COFFERBOX DEWATERING, MONOLITH M-1

0015 COFFERBOX DEWATERING, MONOLITH M-7

0016 COFFERBOX DEWATERING, MONOLITHS M-2 TO M-6

1012 COFFERBOX DEWATERING, MONOLITH M-11

1013 COFFERBOX DEWATERING, MONOLITH M-16

1014 COFFERBOX DEWATERING, MONOLITHS M-12 TO M-15

2023 COFFERBOX DEWATERING, MONOLITHS M-8 TO M-10

3022 COFFERBOX DEWATERING, MONOLITHS M-17 TO M-21

4031 DEWATER RIVER CHAMBER COFFERDAM

4033 FLOOD RIVER CHAMBER COFFERDAM

5014 DEWATER RIVER CHAMBER

5016 FLOOD RIVER CHAMBER

1.2.7 Field Demonstrations

1.2.7.1 Payment

Payment for the field demonstrations shall constitute full compensation for all labor, equipment, material and supply costs to perform the field demonstrations as specified in Section 03 30 00.20 08 CONCRETE: FIELD DEMONSTRATIONS, including demonstration drilled shaft, demonstration Middle Wall tremie foundation placement, demonstration non-cofferbox sheet pile support system, and jet grouting, and shall include costs of all component materials and construction and testing requirements. Payment shall include all advanced planning and engineering; furnishing and installing component materials; testing; removal of the demonstration components as specified, SECTION 01 22 00.00 10 Page 14 and all other incidental costs in connection with this item of work. No additional payment will be made for correcting any part of or replacing any deficient items, and payment will only be made after completion of successful demonstrations which are found to be acceptable by the Government.

1.2.7.2 Unit of Measure

Unit of measure: Job.

1.2.7.3 Payment Items

0020 FIELD DEMONSTRATION, MIDDLE WALL FOUNDATION DRILLED SHAFT

0031 FIELD DEMONSTRATION, TREMIE FOUNDATION PLACEMENT

2025 FIELD DEMONSTRATIONS, NON-COFFERBOX SHEET PILE SUPPORT SYSTEM

(SECANT WALL)

5058 FIELD DEMONSTRATION, JET GROUTING

1.2.8 Bulkhead Recess Fillers

1.2.8.1 Payment

Payment for the bulkhead recess fillers shall constitute full compensation for all labor, equipment, material and supply costs to fabricate, deliver and install as shown on the contract drawings and specified, including, all metalwork fabrication, shop assembly, delivery and field erection. These payments shall also include all costs required for testing of materials and products incorporated into the work; required shop and field tests;

painting; temporary scaffolds and supports; all advanced planning and engineering; and all other incidental costs to furnish and install the items, as shown on the contract drawings and specified.

1.2.8.2 Unit of Measure

Unit of measure: Job.

1.2.8.3 Payment Items

0030 FURNISH, INSTALL, REMOVE AND STORE UPSTREAM BULKHEAD RECESS

FILLERS

5054 TRANSPORT AND INSTALL UPSTREAM AND DOWNSTREAM BULKHEAD RECESS

FILLERS

1.2.9 Miscellaneous Metals, Miter Gate and Bulkhead Recesses

1.2.9.1 Payment

Payment for furnishing, fabricating and installing miscellaneous steel and delivering and installing Government-furnished items shall constitute full compensation for fabricating or delivering and installing the items as shown and specified. Payment for miter gate recesses shall include embedded metals and other materials required for installation of Government-furnished quoin posts and embedded metals for future Land Chamber gate recesses. The Item "Furnish And Install Miscellaneous Items, Upstream Miter Sill" shall include, but not be limited to, hoist beam, hangers, bulkhead plugs, guide extensions, aluminum curbing angle, and aluminum planking, Payment shall include all labor, equipment, materials and supplies to complete these items of work.

SECTION 01 22 00.00 10 Page 15

1.2.9.2 Unit of Measure

Unit of measure: Job.

1.2.9.3 Payment Items

0051 FURNISH AND INSTALL EMBEDDED METALS, UPSTREAM MITER GATE

0052 FURNISH AND INSTALL EMBEDDED METALS, UPSTREAM BULKHEAD RECESSES

4043 INSTALLATION OF GOVERNMENT-FURNISHED SILL SEAL ANGLE, WALL QUOIN

POSTS, PINTLE BASE AND PINTLE, UPSTREAM

4044 INSTALLATION OF GOVERNMENT-FURNISHED SILL SEAL ANGLE, WALL QUOIN

POSTS, PINTLE BASES AND PINTLES, DOWNSTREAM

4075 FURNISH AND INSTALL EMBEDDED METALS, DOWNSTREAM BULKHEAD RECESS,

MONOLITH R-33

4076 FURNISH AND INSTALL MAINTENANCE BULKHEAD AND MITER GATE SILL

METALS, DOWNSTREAM

4077 FURNISH AND INSTALL MAINTENANCE BULKHEAD SILL METALS, UPSTREAM

4078 FURNISH AND INSTALL MISCELLANEOUS ITEMS, UPSTREAM MITER SILL

1.2.10 Instrumentation Installation, Maintenance, Modification, Automation and Decommissioning

1.2.10.1 Payment

Payment will be made for costs associated with furnishing and installing new instrumentation; furnishing and installing automation features;

developing and maintaining the file transfer protocol site; modification of instrumentation; maintaining and repairing instrumentation, decommissioning of instrumentation and surveying existing instrumentation in accordance with Section 13 51 00.10 08 INSTRUMENTATION. Work included under the various line items for instrumentation shall be made under the Contract Option shown, based on the sequencing described under Section 13 51 00.10 08 INSTRUMENTATION, paragraph SEQUENCING AND SCHEDULING (and subparagraphs).

1.2.10.2 Unit of Measure

Unit of measure: Job.

1.2.10.3 Payment Items

0056 INSTRUMENTATION, BASE CONTRACT

2061 ADAS TURNOVER

4084 INSTRUMENTATION, AWARDABLE AWARDABLE OPTION 4

5085 INSTRUMENTATION, AWARDABLE OPTION 5

1.2.11 Embedded Items for Electrical and Mechanical Systems

1.2.11.1 Payment

Payment for furnishing embedded components of compressed air, service water, potable water, and Culvert, gallery and sump dewatering piping systems and electrical power and control systems, including but not limited to embedded pipes, pipe sleeves, conduit, pull boxes, light pole anchor bolts, and gate recess deicing system, shall constitute full compensation for all labor, equipment, material and supply costs to furnish and install the embedded piping, fittings, and conduits, including capping lines as required. These items are shown on the A27 and A29 series contract drawings.

SECTION 01 22 00.00 10 Page 16

1.2.11.2 Unit of Measure

Unit of measure: Job.

1.2.11.3 Payment Items

0057 FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED

ITEMS, BASE CONTRACT

1038 FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED

ITEMS, AWARDABLE OPTION 1

2063 FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED

ITEMS, AWARDABLE OPTION 2

3057 FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED

ITEMS, AWARDABLE OPTION 3

4086 FURNISH AND INSTALL ELECTRICAL SYSTEMS EMBEDDED ITEMS, AWARDABLE

OPTION 4

1.2.12 Temporary Traffic Control

1.2.12.1 Payment

Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs for providing flaggers or furnishing and installing the traffic control device and/or traffic signs at the Government-furnished disposal area. Payment shall include electrical service to the traffic control device.

1.2.12.2 Unit of Measure

Unit of measure: Job.

1.2.12.3 Payment Items

0067 TRAFFIC CONTROL, VICTORY HOLLOW SITE

1.2.13 Bridge Modification

1.2.13.1 Payment

Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs to repair the West abutment bridge seat of the existing bridge on the Victory Hollow Site haul road as shown and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .