Sheet1
| Charleroi Locks and Dam |
| River Chamber Completion |
Item Description Quantity Unit Unit Price Total
BASE CONTRACT, MONOLITHS M-1 TO M-7
| 0001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION 1 | 1 | JOB | $______.__ | $______.__ |
| 0002 | DIGITAL PROGRESS IMAGES, MONTHLY, BASE CONTRACT | 34 | SET | $______.__ | $______.__ |
| 0003 | MOBILIZATION AND DEMOBILIZATION, BASE CONTRACT | 1 | JOB | $______.__ | $______.__ |
| 0004 | REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, BASE CONTRACT | 1 | JOB | $40,000.00 | $40,000.00 |
| 0005 | FURNISH AND INSTALL SHEET PILING, COFFERBOX MONOLITHS M-1 TO M-7 | 15,093 | LINEAR FEET | $______.__ | $______.__ |
| 0006 | FURNISH AND INSTALL KING PILES, COFFERBOX MONOLITHS M-1 TO M-7 | 9,408 | LINEAR FEET | $______.__ | $______.__ |
| 0007 | DYNAMIC PILE TESTING, COFFERBOX MONOLITHS M-1 TO M-7 | 7 | EACH | $______.__ | $______.__ |
| 0008 | FURNISH AND INSTALL STRUCTURAL STEEL, COFFERBOX MONOLITHS M-1 TO M-7 | 670,544 | POUNDS | $______.__ | $______.__ |
| 0009 | REMOVE SHEET PILING, COFFERBOX MONOLITHS M-1 TO M-7 | 9,320 | LINEAR FEET | $______.__ | $______.__ |
| 0010 | REMOVE KING PILES, COFFERBOX MONOLITHS M-1 TO M-7 | 6,662 | LINEAR FEET | $______.__ | $______.__ |
| 0011 | REMOVE STRUCTURAL STEEL, COFFERBOX MONOLITHS M-1 TO M-7 | 639,144 | POUNDS | $______.__ | $______.__ |
| 0012 | MODIFY UPSTREAM PROTECTION CELL FOR COFFERBOX BRACES | 1 | JOB | $______.__ | $______.__ |
| 0013 | UNDERWATER ALLUVIUM EXCAVATION INSIDE COFFERBOX MONOLITHS M-1 TO M-7 | 7,680 | CUBIC YARDS | $______.__ | $______.__ |
| 0014 | COFFERBOX DEWATERING MONOLITH M-1 | 1 | JOB | $______.__ | $______.__ |
| 0015 | COFFERBOX DEWATERING MONOLITH M-7 | 1 | JOB | $______.__ | $______.__ |
| 0016 | COFFERBOX DEWATERING MONOLITHS M-2 TO M-6 | 1 | JOB | $______.__ | $______.__ |
| 0017 | COMPENSATION FOR FLOODING AND EVACUATION, COFFERBOXES M-1 OR M-7 | 2 | EACH | $120,000.00 | $240,000.00 |
| 0018 | COMPENSATION FOR FLOODING AND EVACUATION, COFFERBOXES M-2 TO M-6 | 1 | EACH | $400,000.00 | $400,000.00 |
| 0019 | PRE-EXCAVATION MIDDLE WALL UPSTREAM | 7,900 | CUBIC YARDS | $______.__ | $______.__ |
| 0020 | FIELD DEMONSTRATION, MIDDLE WALL FOUNDATION DRILLED SHAFT | 1 | JOB | $______.__ | $______.__ |
| 0021 | 78" DIA. PERMANENT CASING, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 695 | LINEAR FEET | $______.__ | $______.__ |
| 0022 | SOIL EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 884 | LINEAR FEET | $______.__ | $______.__ |
| 0023 | ROCK EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 1,922 | LINEAR FEET | $______.__ | $______.__ |
| 0024 | REINFORCING STEEL, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 1,703,868 | POUNDS | $______.__ | $______.__ |
| 0025 | ACCESS TUBES, CROSSHOLE SONIC LOGGING, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 15,565 | LINEAR FEET | $______.__ | $______.__ |
| 0026 | DELIVER AND PLACE GOVERNMENT-FURNISHED CONCRETE, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 2,842 | CUBIC YARDS | $______.__ | $______.__ |
| 0027 | CROSSHOLE SONIC LOGGING (CSL) MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 46 | EACH | $______.__ | $______.__ |
| 0028 | CORING OF MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-1 TO M-7 | 403 | LINEAR FEET | $______.__ | $______.__ |
| 0029 | FURNISH AND INSTALL UPSTREAM MITER GATE EMBEDDED GUDGEON ANCHORAGE FRAMES | 4 | EACH | $______.__ | $______.__ |
| 0030 | FURNISH, INSTALL, REMOVE AND STORE UPSTREAM BULKHEAD RECESS FILLERS | 1 | JOB | $______.__ | $______.__ |
| 0031 | FIELD DEMONSTRATION, TREMIE FOUNDATION PLACEMENT | 1 | JOB | $______.__ | $______.__ |
| 0032 | FURNISH AND INSTALL TREMIE CONCRETE PARTITIONS, COFFERBOX MONOLITHS M-1 TO M-7 | 160,461 | POUNDS | $______.__ | $______.__ |
| 0033 | DELIVER AND PLACE GOVERNMENT-FURNISHED TREMIE CONCRETE, MONOLITHS M-1 TO M-7 | 5,850 | CUBIC YARDS | $______.__ | $______.__ |
| 0034 | DELIVER AND PLACE GOVERNMENT-FURNISHED CAST-IN-PLACE CONCRETE, MIDDLE WALL, MONOLITHS M-1 TO M-7 | 15,567 | CUBIC YARDS | $______.__ | $______.__ |
| 0035 | PVC WATERSTOPS, MONOLITHS M-1 TO M-7 | 590 | LINEAR FEET | $______.__ | $______.__ |
| 0036 | COPPER WATERSTOPS, MONOLITHS M-1 TO M-7 | 240 | LINEAR FEET | $______.__ | $______.__ |
| 0037 | REINFORCING STEEL, MIDDLE WALL, MONOLITHS M-1 TO M-7 | 599,622 | POUNDS | $______.__ | $______.__ |
| 0038 | INSTALL FLOATING MOORING BITT ANCHORAGE FRAMES, MONOLITH M-5 | 2 | EACH | $______.__ | $______.__ |
| 0039 | FURNISH AND INSTALL LINE HOOKS AND GUARDS, MONOLITH M-5 | 10 | EACH | $______.__ | $______.__ |
| 0040 | FURNISH AND INSTALL CHECK POSTS, MONOLITHS M-1 AND M-6 | 3 | EACH | $______.__ | $______.__ |
| 0041 | FURNISH AND INSTALL LOCK LADDER RECESS METALS, MONOLITHS M-2 AND M-6 | 2,619 | POUNDS | $______.__ | $______.__ |
| 0042 | FURNISH AND INSTALL ALUMINUM RABBET ANGLES, MONOLITHS M-1 TO M-7 | 498 | LINEAR FEET | $______.__ | $______.__ |
| 0043 | FURNISH AND INSTALL ALUMINUM PLANKING, MONOLITHS M-1 TO M-7 | 1,003 | SQUARE FEET | $______.__ | $______.__ |
| 0044 | FURNISH AND INSTALL ALUMINUM PLATE WELDED TO ALUMINUM GRATING, MONOLITHS M-1 TO M-7 | 64 | SQUARE FEET | $______.__ | $______.__ |
| 0045 | FURNISH AND INSTALL CORNER CASTINGS, MONOLITHS M-1 TO M-7 | 22 | EACH | $______.__ | $______.__ |
| 0046 | FURNISH AND INSTALL CORNER PROTECTION, MONOLITHS M-1 TO M-7 | 959 | LINEAR FEET | $______.__ | $______.__ |
| 0047 | FURNISH AND INSTALL WALL ARMOR, MONOLITHS M-1 TO M-7 | 2,982 | LINEAR FEET | $______.__ | $______.__ |
| 0048 | FURNISH AND INSTALL MONOLITH JOINT PROTECTION, MONOLITHS M-1 TO M-7 | 277 | LINEAR FEET | $______.__ | $______.__ |
| 0049 | TREMIE CONCRETE DEMOLITION, MONOLITH M-4 | 43 | CUBIC YARDS | ||
| 0050 | FURNISH AND INSTALL EMBEDDED PINS FOR REMOVABLE HANDRAIL, MONOLITHS M-1 TO M-7 | 22 | EACH | $______.__ | $______.__ |
| 0051 | FURNISH AND INSTALL EMBEDDED METALS, UPSTREAM MITER GATE | 1 | JOB | $______.__ | $______.__ |
| 0052 | FURNISH AND INSTALL EMBEDDED METALS, UPSTREAM BULKHEAD RECESSES | 1 | JOB | $______.__ | $______.__ |
| 0053 | FURNISH AND INSTALL ALTERNATING STAIR TREADS, MONOLITH M-4 | 1 | EACH | $______.__ | $______.__ |
| 0054 | FURNISH AND INSTALL ACCESS HATCH, MONOLITH M-4 | 1 | EACH | $______.__ | $______.__ |
| 0055 | FURNISH AND INSTALL WATERTIGHT MANHOLE COVERS, MONOLITHS M-3 AND M-4 | 4 | EACH | $______.__ | $______.__ |
| 0056 | NOT USED | ||||
| 0057 | FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED ITEMS, BASE CONTRACT | 1 | JOB | $______.__ | $______.__ |
| 0058 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, VICTORY HOLLOW SITE, BASE CONTRACT | 23 | MONTHS | $______.__ | $______.__ |
| 0059 | CLEANING OF SEDIMENT BASIN NO. 1, VICTORY HOLLOW SITE, BASE CONTRACT | 4 | EACH | $______.__ | $______.__ |
| 0060 | CLEANING OF SEDIMENT BASIN NO. 2, VICTORY HOLLOW SITE, BASE CONTRACT | 3 | EACH | $______.__ | $______.__ |
| 0061 | CLEARING, VICTORY HOLLOW SITE, BASE CONTRACT | 5 | ACRE | $______.__ | $______.__ |
| 0062 | SILT FENCE, VICTORY HOLLOW SITE, BASE CONTRACT | 500 | LINEAR FEET | $______.__ | $______.__ |
| 0063 | WEIGHTED SEDIMENT FILTER TUBE, VICTORY HOLLOW SITE, BASE CONTRACT | 1,000 | LINEAR FEET | $______.__ | $______.__ |
| 0064 | TEMPORARY SEEDING, VICTORY HOLLOW SITE, BASE CONTRACT | 10 | ACRE | $______.__ | $______.__ |
| 0065 | PERMANENT SEEDING, VICTORY HOLLOW SITE, BASE CONTRACT | 5 | ACRE | $______.__ | $______.__ |
| 0066AA | PDT NO. 2A SURFACE COURSE, FIRST 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, BASE CONTRACT | 1,000 | SQUARE YARDS | $______.__ | $______.__ |
| 0066AB | PDT NO. 2A SURFACE COURSE, ALL OVER 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, BASE CONTRACT | 500 | SQUARE YARDS | $______.__ | $______.__ |
| 0067 | TRAFFIC CONTROL, VICTORY HOLLOW SITE | 1 | JOB | $______.__ | $______.__ |
| 0068 | OFFLOAD, PROCESS AND TRANSPORT EXCAVATED MATERIAL FROM M-22 TO M-27 CONTRACT | 5,900 | CUBIC YARDS | $______.__ | $______.__ |
| 0069 | BRIDGE MODIFICATIONS, VICTORY HOLLOW SITE | 1 | JOB | $______.__ | $______.__ |
| 0070 | AS-BUILT DRAWINGS, BASE CONTRACT | 1 | JOB | $______.__ | $______.__ |
| 0071 | FURNISH AND INSTALL ALUMINUM GRATING, MONOLITHS M-3 | 30 | SQUARE FEET | $______.__ | $______.__ |
| 0072 | ENVIRONMENTAL FIELD TECHNICIAN COMPLIANCE REPRESENTATIVE, BASE CONTRACT | 34 | MONTHS | $______.__ | $______.__ |
| TOTAL, BASE CONTRACT ITEMS 0001 THROUGH 0072 | $______.__ |
AWARDABLE OPTION 1, MONOLITHS M-11 TO M-16
| 1001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION 1 | 1 | JOB | $______.__ | $______.__ |
| 1002 | DIGITAL PROGRESS IMAGES, MONTHLY, AWARDABLE OPTION 1 | 7 | SET | $______.__ | $______.__ |
| 1003 | REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 1 | 1 | JOB | $40,000.00 | $40,000.00 |
| 1004 | FURNISH AND INSTALL SHEET PILING, COFFERBOX MONOLITHS M-11 TO M-16 | 11,390 | LINEAR FEET | $______.__ | $______.__ |
| 1005 | FURNISH AND INSTALL KING PILES, COFFERBOXMONOLITHS M-11 TO M-16 | 8,232 | LINEAR FEET | $______.__ | $______.__ |
| 1006 | DYNAMIC PILE TESTING, COFFERBOX MONOLITHS M-11 TO M-16 | 7 | EACH | $______.__ | $______.__ |
| 1007 | FURNISH AND INSTALL STRUCTURAL STEEL, COFFERBOX MONOLITHS M-11 TO M-16 | 562,752 | POUNDS | $______.__ | $______.__ |
| 1008 | REMOVE SHEET PILING, COFFERBOX MONOLITHS M-11 TO M-16 | 5,846 | LINEAR FEET | $______.__ | $______.__ |
| 1009 | REMOVE KING PILES, COFFERBOX MONOLITHS M-11 TO M-16 | 4,200 | LINEAR FEET | $______.__ | $______.__ |
| 1010 | REMOVE STRUCTURAL STEEL, COFFERBOX MONOLITHS M-11 TO M-16 | 492,292 | POUNDS | $______.__ | $______.__ |
| 1011 | UNDERWATER ALLUVIUM EXCAVATION INSIDE COFFERBOX MONOLITHS M-11 TO M-16 | 6,270 | CUBIC YARDS | $______.__ | $______.__ |
| 1012 | COFFERBOX DEWATERING MONOLITH M-11 | 1 | JOB | $______.__ | $______.__ |
| 1013 | COFFERBOX DEWATERING MONOLITH M-16 | 1 | JOB | $______.__ | $______.__ |
| 1014 | COFFERBOX DEWATERING MONOLITHS M-12 TO M-15 | 1 | JOB | $______.__ | $______.__ |
| 1015 | COMPENSATION FOR FLOODING AND EVACUATION, COFFERBOXES M-11 OR M-16 | 2 | EACH | $115,000.00 | $230,000.00 |
| 1016 | COMPENSATION FOR FLOODING AND EVACUATION, COFFERBOXES M-12 TO M-15 | 1 | EACH | $400,000.00 | $400,000.00 |
| 1017 | 78" DIA. PERMANENT CASING, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 589 | LINEAR FEET | $______.__ | $______.__ |
| 1018 | SOIL EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 722 | LINEAR FEET | $______.__ | $______.__ |
| 1019 | ROCK EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 1,596 | LINEAR FEET | $______.__ | $______.__ |
| 1020 | REINFORCING STEEL, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 1,041,200 | POUNDS | $______.__ | $______.__ |
| 1021 | ACCESS TUBES, CROSSHOLE SONIC LOGGING, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 12,996 | LINEAR FEET | $______.__ | $______.__ |
| 1022 | DELIVER AND PLACE GOVERNMENT-FURNISHED CONCRETE, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 2,375 | CUBIC YARDS | $______.__ | $______.__ |
| 1023 | CROSSHOLE SONIC LOGGING (CSL) MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 38 | EACH | $______.__ | $______.__ |
| 1024 | CORING OF MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-11 TO M-16 | 345 | LINEAR FEET | $______.__ | $______.__ |
| 1025 | FURNISH AND INSTALL TREMIE CONCRETE PARTITIONS, COFFERBOX MONOLITHS M-11 TO M-16 | 123,321 | POUNDS | $______.__ | $______.__ |
| 1026 | DELIVER AND PLACE GOVERNMENT-FURNISHED TREMIE CONCRETE, MONOLITHS M-11 TO M-16 | 4,960 | CUBIC YARDS | $______.__ | $______.__ |
| 1027 | DELIVER AND PLACE GOVERNMENT-FURNISHED CAST-IN-PLACE CONCRETE, MIDDLE WALL, MONOLITHS M-11 TO M-16 | 13,410 | CUBIC YARDS | $______.__ | $______.__ |
| 1028 | PVC WATERSTOPS, MONOLITHS M-11 TO M-16 | 590 | LINEAR FEET | $______.__ | $______.__ |
| 1029 | REINFORCING STEEL, MIDDLE WALL, MONOLITHS M-11 TO M-16 | 418,021 | POUNDS | $______.__ | $______.__ |
| 1030 | FURNISH AND INSTALL LOCK LADDER RECESS METALS, MONOLITH M-13 | 1,337 | POUNDS | $______.__ | $______.__ |
| 1031 | FURNISH AND INSTALL ALUMINUM RABBET ANGLES, MONOLITHS M-11 TO M-16 | 489 | LINEAR FEET | $______.__ | $______.__ |
| 1032 | FURNISH AND INSTALL ALUMINUM PLANKING, MONOLITHS M-11 TO M-16 | 917 | SQUARE FEET | $______.__ | $______.__ |
| 1033 | FURNISH AND INSTALL CORNER CASTINGS, MONOLITHS M-11 TO M-16 | 4 | EACH | $______.__ | $______.__ |
| 1034 | FURNISH AND INSTALL CORNER PROTECTION, MONOLITHS M-11 TO M-16 | 587 | LINEAR FEET | $______.__ | $______.__ |
| 1035 | FURNISH AND INSTALL WALL ARMOR, MONOLITHS M-11 TO M-16 | 408 | LINEAR FEET | $______.__ | $______.__ |
| 1036 | FURNISH AND INSTALL MONOLITH JOINT PROTECTION, MONOLITHS M-11 TO M-16 | 665 | LINEAR FEET | $______.__ | $______.__ |
| 1037 | FURNISH AND INSTALL EMBEDDED PINS FOR REMOVABLE HANDRAIL, MONOLITHS M-11 TO M-16 | 4 | EACH | $______.__ | $______.__ |
| 1038 | FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED ITEMS, OPTION 1 | 1 | JOB | $______.__ | $______.__ |
| 1039 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 7 | MONTHS | $______.__ | $______.__ |
| 1040 | CLEANING OF SEDIMENT BASIN NO. 1, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 1 | EACH | $______.__ | $______.__ |
| 1041 | CLEANING OF SEDIMENT BASIN NO. 2, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 1 | EACH | $______.__ | $______.__ |
| 1042 | CLEARING, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 5 | ACRE | $______.__ | $______.__ |
| 1043 | SILT FENCE, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 500 | LINEAR FEET | $______.__ | $______.__ |
| 1044 | WEIGHTED SEDIMENT FILTER TUBE, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 1,000 | LINEAR FEET | $______.__ | $______.__ |
| 1045 | TEMPORARY SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 10 | ACRE | $______.__ | $______.__ |
| 1046 | PERMANENT SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 5 | ACRE | $______.__ | $______.__ |
| 1047AA | PDT NO. 2A SURFACE COURSE, FIRST 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 1,000 | SQUARE YARDS | $______.__ | $______.__ |
| 1047AB | PDT NO. 2A SURFACE COURSE, ALL OVER 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 1 | 500 | SQUARE YARDS | $______.__ | $______.__ |
| 1048 | AS-BUILT DRAWINGS, AWARDABLE OPTION 1 | 1 | JOB | $______.__ | $______.__ |
| 1049 | MOBILIZATION AND DEMOBILIZATION, AWARDABLE OPTION 1 | 1 | JOB | $______.__ | $______.__ |
| 1050 | ENVIRONMENTAL FIELD TECHNICIAN COMPLIANCE REPRESENTATIVE, AWARDABLE OPTION 1 | 7 | MONTHS | $______.__ | $______.__ |
TOTAL, AWARDABLE OPTION ITEMS 1001 THROUGH 1050 $______.__
AWARDABLE OPTION 2, MONOLITHS M-8 TO M-10
| 2001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION 2 | 1 | JOB | $______.__ | $______.__ |
| 2002 | DIGITAL PROGRESS IMAGES, MONTHLY, AWARDABLE OPTION 2 | 9 | SET | $______.__ | $______.__ |
| 2003 | DIGITAL AERIAL PROGRESS IMAGES, QUARTERLY, AWARDABLE OPTION 2 | 5 | SET | $______.__ | $______.__ |
| 2004 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, CONCRETE BATCH PLANT, AWARDABLE OPTION 2 | 16 | MONTHS | $______.__ | $______.__ |
| 2005 | CLEANING OF SEDIMENT BASIN NO. 1, CONCRETE BATCH PLANT, AWARDABLE OPTION 2 | 2 | EACH | $______.__ | $______.__ |
| 2006 | CLEANING OF SEDIMENT BASIN NO. 2, CONCRETE BATCH PLANT, AWARDABLE OPTION 2 | 3 | EACH | $______.__ | $______.__ |
| 2007 | CLEAN SEEP, CONCRETE BATCH PLANT, AWARDABLE OPTION 2 | 4 | EACH | $______.__ | $______.__ |
| 2008 | MAINTAIN CONCRETE TESTING LAB, AWARDABLE OPTION 2 | 16 | MONTHS | $______.__ | $______.__ |
| 2009 | INITIAL BATCH PLANT SETUP AND TRIAL OPERATION | 1 | JOB | $______.__ | $______.__ |
| 2010 | MONTHLY MAINTENANCE OF BATCH PLANT AND CONVEYOR SYSTEMS, AWARDABLE OPTION 2 | 16 | MONTHS | $______.__ | $______.__ |
| 2011 | REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT, AWARDABLE OPTION 2 | 1 | JOB | $25,000.00 | $25,000.00 |
| 2012 | MAINTAIN GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 2 | 16 | MONTHS | $______.__ | $______.__ |
| 2013 | REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 2 | 1 | JOB | $40,000.00 | $40,000.00 |
| 2014 | MAINTAIN DOWNSTREAM RIVER CHAMBER CLOSURE, AWARDABLE OPTION 2 | 1 | JOB | $______.__ | $______.__ |
| 2015 | FURNISH AND INSTALL SHEET PILING, COFFERBOX MONOLITHS M-8 TO M-10 | 2,223 | LINEAR FEET | $______.__ | $______.__ |
| 2016 | FURNISH AND INSTALL KING PILES, COFFERBOX MONOLITHS M-8 TO M-10 | 2,520 | LINEAR FEET | $______.__ | $______.__ |
| 2017 | DYNAMIC PILE TESTING, COFFERBOX MONOLITHS M-8 TO M-10 | 5 | EACH | $______.__ | $______.__ |
| 2018 | FURNISH AND INSTALL STRUCTURAL STEEL, COFFERBOX MONOLITHS M-8 TO M-10 | 205,618 | POUNDS | $______.__ | $______.__ |
| 2019 | REMOVE SHEET PILING, COFFERBOX MONOLITHS M-8 TO M-10 | 2,449 | LINEAR FEET | $______.__ | $______.__ |
| 2020 | REMOVE KING PILES, COFFERBOX MONOLITHS M-8 TO M-10 | 2,898 | LINEAR FEET | $______.__ | $______.__ |
| 2021 | REMOVE STRUCTURAL STEEL, COFFERBOX MONOLITHS M-8 TO M-10 | 260,950 | POUNDS | $______.__ | $______.__ |
| 2022 | UNDERWATER ALLUVIUM EXCAVATION INSIDE COFFERBOX MONOLITHS M-8 TO M-10 | 2,920 | CUBIC YARDS | $______.__ | $______.__ |
| 2023 | COFFERBOX DEWATERING MONOLITHS M-8 TO M-10 | 1 | JOB | $______.__ | $______.__ |
| 2024 | COMPENSATION FOR FLOODING AND EVACUATION, COFFERBOX M-8 TO M-10 | 1 | EACH | $265,000.00 | $265,000.00 |
| 2025 | FIELD DEMONSTRATIONS, NON-COFFERBOX SHEET PILE SUPPORT SYSTEM (SECANT WALL) | 1 | JOB | $______.__ | $______.__ |
| 2026 | NON-COFFERBOX SHEET PILE SUPPORT SYSTEM, PRIMARY (LAGGING) SECANT PILES | 1,840 | LINEAR FEET | $______.__ | $______.__ |
| 2027 | NON-COFFERBOX SHEET PILE SUPPORT SYSTEM, SECONDARY (STRUCTURAL) SECANT PILES | 1,940 | LINEAR FEET | $______.__ | $______.__ |
| 2028 | NON-COFFERBOX SHEET PILE SUPPORT SYSTEM, CORING SECANT PILES | 25 | EACH | $______.__ | $______.__ |
| 2029 | MIDDLE WALL CONTROL TOWER STRUCTURE | 1 | JOB | $______.__ | $______.__ |
| 2030 | MIDDLE WALL CONTROL SHELTERS STRUCTURES | 2 | EACH | $______.__ | $______.__ |
| 2031 | 78" DIA. PERMANENT CASING, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 273 | LINEAR FEET | $______.__ | $______.__ |
| 2032 | SOIL EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 336 | LINEAR FEET | $______.__ | $______.__ |
| 2033 | ROCK EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 762 | LINEAR FEET | $______.__ | $______.__ |
| 2034 | REINFORCING STEEL, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 493,200 | POUNDS | $______.__ | $______.__ |
| 2035 | ACCESS TUBES, CROSSHOLE SONIC LOGGING, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 6,156 | LINEAR FEET | $______.__ | $______.__ |
| 2036 | PRODUCE CONCRETE AND DELIVER TO STUB WALL, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 1,124 | CUBIC YARDS | $______.__ | $______.__ |
| 2037 | DELIVER AND PLACE CONCRETE, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 1,124 | CUBIC YARDS | $______.__ | $______.__ |
| 2038 | CROSSHOLE SONIC LOGGING (CSL) MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 18 | EACH | $______.__ | $______.__ |
| 2039 | CORING OF MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-8 TO M-10 | 173 | LINEAR FEET | $______.__ | $______.__ |
| 2040 AA | PORTLAND CEMENT, AWARDABLE OPTION 2, FIRST 665 TONS | 665 | TONS | $______.__ | $______.__ |
| 2040 AB | PORTLAND CEMENT, AWARDABLE OPTION 2, ALL OVER 665 TONS | 305 | TONS | $______.__ | $______.__ |
| 2041 AA | POZZOLAN, AWARDABLE OPTION 2, FIRST 300 TONS | 300 | TONS | $______.__ | $______.__ |
| 2041 AB | POZZOLAN, AWARDABLE OPTION 2, ALL OVER 300 TONS | 345 | TONS | $______.__ | $______.__ |
| 2042 AA | GROUND GRANULATED BLAST FURNACE SLAG, AWARDABALE OPTION 2, FIRST 260 TONS | 260 | TONS | $______.__ | $______.__ |
| 2042 AB | GROUND GRANULATED BLAST FURNACE SLAG, AWARDABALE OPTION 2, ALL OVER 260 TONS | 620 | TONS | $______.__ | $______.__ |
| 2043 | SILICA FUME, AWARDABLE OPTION 2 | 42 | TONS | $______.__ | $______.__ |
| 2044 | ANTI-WASHOUT ADMIXTURE, AWARDABLE OPTION 2 | 3,050 | GALLONS | $______.__ | $______.__ |
| 2045 | LIMESTONE POWDER, AWARDABLE OPTION 2 | 435 | TONS | $______.__ | $______.__ |
| 2046 | FURNISH AND INSTALL TREMIE CONCRETE PARTITIONS, MONOLITHS M-8 TO M-10 | 82,214 | POUNDS | $______.__ | $______.__ |
| 2047 | PRODUCE TREMIE CONCRETE AND DELIVER TO STUB WALL, MONOLITHS M-8 TO M-10 | 2,300 | CUBIC YARDS | $______.__ | $______.__ |
| 2048 | DELIVER AND PLACE TREMIE CONCRETE, MONOLITHS M-8 TO M-10 | 2,300 | CUBIC YARDS | $______.__ | $______.__ |
| 2049 | CAST-IN-PLACE CONCRETE, MIDDLE WALL, MONOLITHS M-8 TO M-10 | 6,315 | CUBIC YARDS | $______.__ | $______.__ |
| 2050 | PVC WATERSTOPS, MONOLITHS M-8 TO M-10 | 170 | LINEAR FEET | $______.__ | $______.__ |
| 2051 | REINFORCING STEEL, MIDDLE WALL, MONOLITHS M-8 TO M-10 | 218,921 | POUNDS | $______.__ | $______.__ |
| 2052 | INSTALL FLOATING MOORING BITT ANCHORAGE FRAMES, MONOLITH M-9 | 2 | EACH | $______.__ | $______.__ |
| 2053 | FURNISH AND INSTALL LINE HOOKS AND GUARDS, MONOLITH M-9 | 10 | EACH | $______.__ | $______.__ |
| 2054 | FURNISH AND INSTALL CHECK POSTS, MONOLITH M-9 | 2 | EACH | $______.__ | $______.__ |
| 2055 | FURNISH AND INSTALL ALUMINUM RABBET ANGLES, MONOLITHS M-8 TO M-10 | 240 | LINEAR FEET | $______.__ | $______.__ |
| 2056 | FURNISH AND INSTALL ALUMINUM PLANKING, MONOLITHS M-8 TO M-10 | 433 | SQUARE FEET | $______.__ | $______.__ |
| 2057 | FURNISH AND INSTALL CORNER CASTINGS, MONOLITHS M-8 TO M-10 | 4 | EACH | $______.__ | $______.__ |
| 2058 | FURNISH AND INSTALL CORNER PROTECTION, MONOLITHS M-8 TO M-10 | 393 | LINEAR FEET | $______.__ | $______.__ |
| 2059 | FURNISH AND INSTALL WALL ARMOR, MONOLITHS M-8 TO M-10 | 485 | LINEAR FEET | $______.__ | $______.__ |
| 2060 | FURNISH AND INSTALL MONOLITH JOINT PROTECTION, MONOLITHS M-8 TO M-10 | 332 | LINEAR FEET | $______.__ | $______.__ |
| 2061 | ADAS TURNOVER | 1 | JOB | $______.__ | $______.__ |
| 2062 | INSTRUMENTATION MONITORING PROGRAM, AWARDABLE OPTION 2 | 10 | MONTHS | $______.__ | $______.__ |
| 2063 | FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED ITEMS, OPTION 2 | 1 | JOB | $______.__ | $______.__ |
| 2064 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 9 | MONTHS | $______.__ | $______.__ |
| 2065 | CLEANING OF SEDIMENT BASIN NO. 1, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 2 | EACH | $______.__ | $______.__ |
| 2066 | CLEANING OF SEDIMENT BASIN NO. 2, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 2 | EACH | $______.__ | $______.__ |
| 2067 | CLEARING, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 5 | ACRE | $______.__ | $______.__ |
| 2068 | SILT FENCE, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 500 | LINEAR FEET | $______.__ | $______.__ |
| 2069 | WEIGHTED SEDIMENT FILTER TUBE, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 1,000 | LINEAR FEET | $______.__ | $______.__ |
| 2070 | TEMPORARY SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 15 | ACRE | $______.__ | $______.__ |
| 2071 | PERMANENT SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 5 | ACRE | $______.__ | $______.__ |
| 2072AA | PDT NO. 2A SURFACE COURSE, FIRST 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 1,000 | SQUARE YARDS | $______.__ | $______.__ |
| 2072AB | PDT NO. 2A SURFACE COURSE, ALL OVER 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 500 | SQUARE YARDS | $______.__ | $______.__ |
| 2073 | AS-BUILT DRAWINGS, AWARDABLE OPTION 2 | 1 | JOB | $______.__ | $______.__ |
| 2074 | PRODUCE CONCRETE AND DELIVER TO STUB WALL, NON-COFFERBOX SHEET PILE SUPPORT SYSTEM | 860 | CUBIC YARDS | $______.__ | $______.__ |
| 2075 | DELIVER AND PLACE CONCRETE, NON-COFFERBOX SHEET PILE SUPPORT SYSTEM | 860 | CUBIC YARDS | $______.__ | $______.__ |
| 2076 | CONCRETE PRODUCTION MANAGER, AWARDABLE OPTION 2 | 16 | MONTHS | $______.__ | $______.__ |
| 2077 | MOBILIZATION AND DEMOBILIZATION, AWARDABLE OPTION 2 | 1 | JOB | $______.__ | $______.__ |
| 2078 | ENVIRONMENTAL FIELD TECHNICIAN COMPLIANCE REPRESENTATIVE, AWARDABLE OPTION 2 | 9 | MONTHS | $______.__ | $______.__ |
TOTAL, OPTION 2 ITEMS 2001 THROUGH 2078 $______.__
AWARDABLE OPTION 3, MONOLITHS M-17 TO M-21
| 3001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION 3 | 1 | JOB | $______.__ | $______.__ |
| 3002 | DIGITAL PROGRESS IMAGES, MONTHLY, AWARDABLE OPTION 3 | 1 | SET | $______.__ | $______.__ |
| 3003 | DIGITAL AERIAL PROGRESS IMAGES, QUARTERLY, AWARDABLE OPTION 3 | 1 | SET | $______.__ | $______.__ |
| 3004 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, CONCRETE BATCH PLANT, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
| 3005 | CLEANING OF SEDIMENT BASIN NO. 1, CONCRETE BATCH PLANT, AWARDABLE OPTION 3 | 5 | EACH | $______.__ | $______.__ |
| 3006 | CLEANING OF SEDIMENT BASIN NO. 2, CONCRETE BATCH PLANT, AWARDABLE OPTION 3 | 1 | EACH | $______.__ | $______.__ |
| 3007 | CLEAN SEEP, CONCRETE BATCH PLANT, AWARDABLE OPTION 3 | 1 | EACH | $______.__ | $______.__ |
| 3008 | MAINTAIN CONCRETE TESTING LAB, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
| 3009 | MONTHLY MAINTENANCE OF BATCH PLANT AND CONVEYOR SYSTEMS, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
| 3010 | REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT, AWARDABLE OPTION 3 | 1 | JOB | $25,000.00 | $25,000.00 |
| 3011 | MAINTAIN GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
| 3012 | REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 3 | 1 | JOB | $40,000.00 | $40,000.00 |
| 3013 | MAINTAIN DOWNSTREAM RIVER CHAMBER CLOSURE, AWARDABLE OPTION 3 | 1 | JOB | $______.__ | $______.__ |
| 3014 | FURNISH AND INSTALL SHEET PILING, COFFERBOX MONOLITHS M-17 TO M-21 | 7,488 | LINEAR FEET | $______.__ | $______.__ |
| 3015 | FURNISH AND INSTALL KING PILES, COFFERBOX MONOLITHS M-17 TO M-21 | 4,410 | LINEAR FEET | $______.__ | $______.__ |
| 3016 | DYNAMIC PILE TESTING, COFFERBOX MONOLITHS M-17 TO M-21 | 6 | EACH | $______.__ | $______.__ |
| 3017 | FURNISH AND INSTALL STRUCTURAL STEEL, COFFERBOX MONOLITHS M-17 TO M-21 | 241,120 | POUNDS | $______.__ | $______.__ |
| 3018 | REMOVE SHEET PILING, COFFERBOX MONOLITHS M-17 TO M-21 | 6,794 | LINEAR FEET | $______.__ | $______.__ |
| 3019 | REMOVE KING PILES, COFFERBOX MONOLITHS M-17 TO M-21 | 4,284 | LINEAR FEET | $______.__ | $______.__ |
| 3020 | REMOVE STRUCTURAL STEEL, COFFERBOX MONOLITHS M-17 TO M-21 | 402,229 | POUNDS | $______.__ | $______.__ |
| 3021 | UNDERWATER ALLUVIUM EXCAVATION INSIDE COFFERBOX MONOLITHS M-17 TO M-21 | 4,550 | CUBIC YARDS | $______.__ | $______.__ |
| 3022 | COFFERBOX DEWATERING, MONOLITHS M-17 TO M-21 | 1 | JOB | $______.__ | $______.__ |
| 3023 | COMPENSATION FOR FLOODING AND EVACUATION, COFFERBOX M-17 TO M-21 | 1 | EACH | $410,000.00 | $410,000.00 |
| 3024 | 78" DIA. PERMANENT CASING, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 495 | LINEAR FEET | $______.__ | $______.__ |
| 3025 | SOIL EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 600 | LINEAR FEET | $______.__ | $______.__ |
| 3026 | ROCK EXCAVATION, 72-INCH DIA. MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 1,230 | LINEAR FEET | $______.__ | $______.__ |
| 3027 | REINFORCING STEEL, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 822,000 | POUNDS | $______.__ | $______.__ |
| 3028 | ACCESS TUBES, CROSSHOLE SONIC LOGGING, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 10,260 | LINEAR FEET | $______.__ | $______.__ |
| 3029 | PRODUCE CONCRETE AND DELIVER TO STUB WALL, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 1,880 | CUBIC YARDS | $______.__ | $______.__ |
| 3030 | DELIVER AND PLACE CONCRETE, MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 1,880 | CUBIC YARDS | $______.__ | $______.__ |
| 3031 | CROSSHOLE SONIC LOGGING (CSL) MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 30 | EACH | $______.__ | $______.__ |
| 3032 | CORING OF MW FOUNDATION DRILLED SHAFTS, MONOLITHS M-17 TO M-21 | 288 | LINEAR FEET | $______.__ | $______.__ |
| 3033 AA | PORTLAND CEMENT,AWARDABLE OPTION 3, FIRST 1.105 TONS | 1,105 | TONS | $______.__ | $______.__ |
| 3033 AB | PORTLAND CEMENT,AWARDABLE OPTION 3, ALL OVER 1.105 TONS | 380 | TONS | $______.__ | $______.__ |
| 3034 AA | POZZOLAN, AWARDABLE OPTION 3, FIRST 500 TONS | 500 | TONS | $______.__ | $______.__ |
| 3034 AB | POZZOLAN, AWARDABLE OPTION 3, ALL OVER 500 TONS | 450 | TONS | $______.__ | $______.__ |
| 3035 AA | GROUND GRANULATED BLAST FURNACE SLAG, AWARDABLE OPTION 3, FIRST 430 TONS | 430 | TONS | $______.__ | $______.__ |
| 3035 AB | GROUND GRANULATED BLAST FURNACE SLAG, AWARDABLE OPTION 3, ALL OVER 430 TONS | 750 | TONS | $______.__ | $______.__ |
| 3036 | SILICA FUME, AWARDABLE OPTION 3 | 67 | TONS | $______.__ | $______.__ |
| 3037 | ANTI-WASHOUT ADMIXTURE, AWARDABLE OPTION 3 | 3,885 | GALLONS | $______.__ | $______.__ |
| 3038 | LIMESTONE POWDER, AWARDABLE OPTION 3 | 595 | TONS | $______.__ | $______.__ |
| 3039 | FURNISH AND INSTALL TREMIE CONCRETE PARTITIONS, COFFERBOX MONOLITHS M-22 TO M-27 | 164,428 | POUNDS | $______.__ | $______.__ |
| 3040 | PRODUCE TREMIE CONCRETE AND DELIVER TO STUB WALL, MONOLITHS M-17 TO M-21 | 3,650 | CUBIC YARDS | $______.__ | $______.__ |
| 3041 | DELIVER AND PLACE TREMIE CONCRETE, MONOLITHS M-17 TO M-21 | 3,650 | CUBIC YARDS | $______.__ | $______.__ |
| 3042 | CAST-IN-PLACE CONCRETE, MIDDLE WALL, MONOLITHS M-17 TO M-21 | 10,521 | CUBIC YARDS | $______.__ | $______.__ |
| 3043 | PVC WATERSTOPS, MONOLITHS M-17 TO M-21 | 336 | LINEAR FEET | $______.__ | $______.__ |
| 3044 | REINFORCING STEEL, MIDDLE WALL, MONOLITHS M-17 TO M-21 | 358,391 | POUNDS | $______.__ | $______.__ |
| 3045 | INSTALL FLOATING MOORING BITT ANCHORAGE FRAMES, MONOLITH M-19 | 2 | EACH | $______.__ | $______.__ |
| 3046 | FURNISH AND INSTALL LINE HOOKS AND GUARDS, MONOLITH M-19 | 10 | EACH | $______.__ | $______.__ |
| 3047 | FURNISH AND INSTALL CHECK POSTS, MONOLITH M-19 | 2 | EACH | $______.__ | $______.__ |
| 3048 | FURNISH AND INSTALL LOCK LADDER RECESS METALS, MONOLITH M-20 | 2,079 | POUNDS | $______.__ | $______.__ |
| 3049 | FURNISH AND INSTALL ALUMINUM RABBET ANGLES, MONOLITHS M-17 TO M-21 | 392 | LINEAR FEET | $______.__ | $______.__ |
| 3050 | FURNISH AND INSTALL ALUMINUM PLANKING, MONOLITHS M-17 TO M-21 | 718 | SQUARE FEET | $______.__ | $______.__ |
| 3051 | FURNISH AND INSTALL CORNER CASTINGS, MONOLITHS M-17 TO M-21 | 12 | EACH | $______.__ | $______.__ |
| 3052 | FURNISH AND INSTALL CORNER PROTECTION, MONOLITHS M-17 TO M-21 | 729 | LINEAR FEET | $______.__ | $______.__ |
| 3053 | FURNISH AND INSTALL WALL ARMOR, MONOLITHS M-17 TO M-21 | 895 | LINEAR FEET | $______.__ | $______.__ |
| 3054 | FURNISH AND INSTALL MONOLITH JOINT PROTECTION, MONOLITHS M-17 TO M-21 | 499 | LINEAR FEET | $______.__ | $______.__ |
| 3055 | FURNISH AND INSTALL EMBEDDED PINS FOR REMOVABLE HANDRAIL, MONOLITHS M-17 TO M-21 | 4 | EACH | $______.__ | $______.__ |
| 3056 | INSTRUMENTATION MONITORING PROGRAM, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
| 3057 | FURNISH AND INSTALL ELECTRICAL SYSTEMS EMBEDDED ITEMS, OPTION 3 | 1 | JOB | $______.__ | $______.__ |
| 3058 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
| 3059 | CLEANING OF SEDIMENT BASIN NO. 1, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 1 | EACH | $______.__ | $______.__ |
| 3060 | CLEANING OF SEDIMENT BASIN NO. 2, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 1 | EACH | $______.__ | $______.__ |
| 3061 | CLEARING, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 10 | ACRE | $______.__ | $______.__ |
| 3062 | SILT FENCE, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 500 | LINEAR FEET | $______.__ | $______.__ |
| 3063 | WEIGHTED SEDIMENT FILTER TUBE, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 1,000 | LINEAR FEET | $______.__ | $______.__ |
| 3064 | TEMPORARY SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 10 | ACRE | $______.__ | $______.__ |
| 3065 | PERMANENT SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 2 | 5 | ACRE | $______.__ | $______.__ |
| 3066AA | PDT NO. 2A SURFACE COURSE, FIRST 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 1,000 | SQUARE YARDS | $______.__ | $______.__ |
| 3066AB | PDT NO. 2A SURFACE COURSE, ALL OVER 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 3 | 500 | SQUARE YARDS | $______.__ | $______.__ |
| 3067 | AS-BUILT DRAWINGS, AWARDABLE OPTION 3 | 1 | JOB | $______.__ | $______.__ |
| 3068 | CONCRETE PRODUCTION MANAGER, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
| 3069 | MOBILIZATION AND DEMOBILIZATION, AWARDABLE OPTION 3 | 1 | JOB | $______.__ | $______.__ |
| 3070 | ENVIRONMENTAL FIELD TECHNICIAN COMPLIANCE REPRESENTATIVE, AWARDABLE OPTION 3 | 1 | MONTHS | $______.__ | $______.__ |
TOTAL, OPTION 3 ITEMS, 3001 THROUGH 3070 $______.__
AWARDABLE OPTION 4 - IN-CHAMBER WORK
| 4001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION 4 | 1 | JOB | $______.__ | $______.__ |
| 4002 | DIGITAL PROGRESS IMAGES, MONTHLY, AWARDABLE OPTION 4 | 21 | SET | $______.__ | $______.__ |
| 4003 | DIGITAL AERIAL PROGRESS IMAGES, QUARTERLY, AWARDABLE OPTION 4 | 7 | SET | $______.__ | $______.__ |
| 4004 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, CONCRETE BATCH PLANT, AWARDABLE OPTION 4 | 21 | MONTHS | $______.__ | $______.__ |
| 4005 | CLEANING OF SEDIMENT BASIN NO. 1, CONCRETE BATCH PLANT, AWARDABLE OPTION 4 | 8 | EACH | $______.__ | $______.__ |
| 4006 | CLEANING OF SEDIMENT BASIN NO. 2, CONCRETE BATCH PLANT | 4 | EACH | $______.__ | $______.__ |
| 4007 | CLEAN SEEP, CONCRETE BATCH PLANT, AWARDABLE OPTION 4 | 5 | EACH | $______.__ | $______.__ |
| 4008 | MAINTAIN CONCRETE TESTING LAB, AWARDABLE OPTION 4 | 20 | MONTHS | $______.__ | $______.__ |
| 4009 | MONTHLY MAINTENANCE OF BATCH PLANT AND CONVEYOR SYSTEMS, AWARDABLE OPTION 4 | 20 | MONTHS | $______.__ | $______.__ |
| 4010 | REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT, AWARDABLE OPTION 4 | 1 | JOB | $25,000.00 | $25,000.00 |
| 4011 | MAINTAIN GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 4 | 20 | MONTHS | $______.__ | $______.__ |
| 4012 | REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 4 | 1 | JOB | $40,000.00 | $40,000.00 |
| 4013 | MODIFICATIONS TO EXISTING RIVER WALL AND EXISTING MIDDLE WALL FOR CONNECTION OF EMPTYING CULVERTS | 1 | JOB | $______.__ | $______.__ |
| 4014 | MODIFICATIONS TO EXISTING RIVER WALL AND NEW MIDDLE WALL FOR UPSTREAM SILLS AND FILLING SYSTEM | 1 | JOB | $______.__ | $______.__ |
| 4015 | MISCELLANEOUS MODIFICATIONS TO EXISTING STUB WALL | 1 | JOB | $______.__ | $______.__ |
| 4016 | MODIFY FLOATING MOORING BITT, STUB WALL | 1 | JOB | $______.__ | $______.__ |
| 4017 | REMOVE EXISTING CONCRETE FOOTING, STUB WALL | 372 | CUBIC YARDS | $______.__ | $______.__ |
| 4018 | REMOVE EXISTING PORT PLUGS AND CONSTRUCT NEW PORT PLUGS, STUB WALL | 3 | EACH | $______.__ | $______.__ |
| 4019 | REPAIR CHAMBER FACE OF STUB WALL AT FIXED WEIR | 2,150 | SQUARE FEET | $______.__ | $______.__ |
| 4020 | CONSTRUCT NEW UTILITY TRENCH, STUB WALL | 224 | LINEAR FEET | $______.__ | $______.__ |
| 4021 | CLEAN AND RESEAL MONOLITH JOINTS, STUB WALL | 603 | LINEAR FEET | $______.__ | $______.__ |
| 4022 | CLEAN AND PAINT EXISTING FERROUS SURFACES, STUB WALL | 1 | JOB | $______.__ | $______.__ |
| 4023 | INSTALL ROCK ANCHORS, STUB WALL | 2,160 | LINEAR FEET | $______.__ | $______.__ |
| 4024 | DEMOLITION OF ORIGINAL RIVER WALL, PORTION OF LOWER GUARD WALL AND FIXED WEIR, AND STABILIZATION PILES | 1 | JOB | $______.__ | $______.__ |
| 4025 | DEMOLITION OF ORIGINAL RIVER WALL SUPPORT CELL, DIAPHRAGM WALL, AND SHEET PILE CUTOFF WALL | 1 | JOB | $______.__ | $______.__ |
| 4026 | REMOVAL OF STABILIZATION STRUTS | 1 | JOB | $______.__ | $______.__ |
| 4027 | REMOVE TREMIE CONCRETE AND COFFERBOX PILING, MIDDLE WALL BAFFLES | 284 | CUBIC YARDS | $______.__ | $______.__ |
| 4028 | CONSTRUCT TEMPORARY DIVERSION WALL, UPPER GUARD WALL | 1 | JOB | $______.__ | $______.__ |
| 4029 | CONSTRUCT UPSTREAM COFFERDAM | 1 | JOB | $______.__ | $______.__ |
| 4030 | CONSTRUCT DOWNSTREAM COFFERDAM AND SPLASH PAD | 1 | JOB | $______.__ | $______.__ |
| 4031 | DEWATER RIVER CHAMBER COFFERDAM | 1 | JOB | $______.__ | $______.__ |
| 4032 | COMPENSATION FOR FLOODING AND EVACUATION, RIVER CHAMBER COFFERDAM | 1 | EACH | $820,000.00 | $820,000.00 |
| 4033 | FLOOD RIVER CHAMBER COFFERDAM | 1 | JOB | $______.__ | $______.__ |
| 4034 | REMOVE UPSTREAM COFFERDAM | 1 | JOB | $______.__ | $______.__ |
| 4035 | ALLUVIUM EXCAVATION, LOCK CHAMBER | 50,830 | CUBIC YARDS | $______.__ | $______.__ |
| 4036 | ROCK EXCAVATION, LOCK CHAMBER | 3,965 | CUBIC YARDS | $______.__ | $______.__ |
| 4037 | UPPER BULKHEAD SILL DRILLED PILES AND STRUTS | 1 | JOB | $______.__ | $______.__ |
| 4038 | DENTAL CONCRETE | 20 | CUBIC YARDS | $______.__ | $______.__ |
| 4039 | CONCRETE FILL, LOCK CHAMBER | 6,600 | CUBIC YARDS | $______.__ | $______.__ |
| 4040 | ROCK FILL, LOCK CHAMBER | 7,360 | CUBIC YARDS | $______.__ | $______.__ |
| 4041 | BERM MATERIAL, UPPER BULKHEAD SILL | 1,400 | CUBIC YARDS | $______.__ | $______.__ |
| 4042 | REIMBURSEMENT FOR REPAIR OF GOVERNMENT FURNISHED PROPERTY, AWARDABLE OPTION 4 | 1 | JOB | $50,000.00 | $50,000.00 |
| 4043 | INSTALLATION OF GOVERNMENT-FURNISHED SILL SEAL ANGLE, WALL QUOIN POSTS, PINTLE BASE AND PINTLE, UPSTREAM | 1 | JOB | $______.__ | $______.__ |
| 4044 | INSTALLATION OF GOVERNMENT-FURNISHED SILL SEAL ANGLE, WALL QUOIN POSTS, PINTLE BASES AND PINTLES, DOWNSTREAM | 1 | JOB | $______.__ | $______.__ |
| 4045 | CAST-IN-PLACE CONCRETE, RIVER WALL FACING, MONOLITHS R-8 TO R-10, R-13 TO R-18, R-26 TO R-28, AND R-33 TO R-35 | 5,737 | CUBIC YARDS | $______.__ | $______.__ |
| 4046 | CAST-IN-PLACE CONCRETE, SILLS | 12,790 | CUBIC YARDS | $______.__ | $______.__ |
| 4047 | CONCRETE, FILLING AND EMPTYING CULVERTS | 11,310 | CUBIC YARDS | $______.__ | $______.__ |
| 4048 | CONCRETE, LOCK CHAMBER FLOOR SLABS, UPPER SILL | 484 | CUBIC YARDS | $______.__ | $______.__ |
| 4049 | CONCRETE, BAFFLES | 130 | CUBIC YARDS | $______.__ | $______.__ |
| 4050 | FURNISH AND INSTALL WALL PROTECTION PLATES, MIDDLE AND RIVER WALLS | 1 | JOB | $______.__ | $______.__ |
| 4051 | PORTLAND CEMENT, AWARDABLE OPTION 4 | 5,538 | TONS | $______.__ | $______.__ |
| 4052 | POZZOLAN, AWARDABLE OPTION 4 | 1,534 | TONS | $______.__ | $______.__ |
| 4053 | GROUND GRANULATED BLAST FURNACE SLAG, AWARDABLE OPTION 4 | 2,322 | TONS | $______.__ | $______.__ |
| 4054 | SILICA FUME, AWARDABLE OPTION 4 | 9 | TONS | $______.__ | $______.__ |
| 4055 | LIMESTONE POWDER, AWARDABLE OPTION 4 | 64 | TONS | $______.__ | $______.__ |
| 4056 | PVC WATERSTOPS, AWARDABLE OPTION 4 | 860 | LINEAR FEET | $______.__ | $______.__ |
| 4057 | RETROFIT PVC WATERSTOPS, AWARDABLE OPTION 4 | 125 | LINEAR FEET | $______.__ | $______.__ |
| 4058 | REINFORCING STEEL AND DOWELS, RIVER WALL FACING | 588,220 | POUNDS | $______.__ | $______.__ |
| 4059 | REINFORCING STEEL, SILLS | 219,640 | POUNDS | $______.__ | $______.__ |
| 4060 | REINFORCING STEEL, FILLING AND EMPTYING CULVERTS | 1,098,300 | POUNDS | $______.__ | $______.__ |
| 4061 | REINFORCING STEEL, LOCK CHAMBER FLOOR SLABS | 107,840 | POUNDS | $______.__ | $______.__ |
| 4062 | REINFORCING STEEL, BAFFLES | 22,050 | POUNDS | $______.__ | $______.__ |
| 4063 | INSTALL FLOATING MOORING BITT ANCHORAGE FRAMES, MONOLITHS R-13, R-14, R-17, AND R-27 | 4 | EACH | $______.__ | $______.__ |
| 4064 | FURNISH AND INSTALL LINE HOOKS AND GUARDS, MONOLITHS R-13, R-14, R-17, AND R-27 | 20 | EACH | $______.__ | $______.__ |
| 4065 | FURNISH AND INSTALL CHECK POSTS, MONOLITHS R-13, R-14, R-17, R-20, R-24, R-27, R-28, R-33, AND R-35 | 9 | EACH | $______.__ | $______.__ |
| 4066 | FURNISH AND INSTALL LOCK LADDER RECESSE METALS, MONOLITHS R-9, R-14, R-28, AND R-33 | 1,964 | POUNDS | $______.__ | $______.__ |
| 4067 | FURNISH AND INSTALL ALUMINUM RABBET ANGLES, MONOLITHS R-9, R-10, AND R-13 to R-28 | 1,056 | LINEAR FEET | $______.__ | $______.__ |
| 4068 | FURNISH AND INSTALL ALUMINUM PLANKING, MONOLITHS R-9, R-10, AND R-13 to R-28 | 1,813 | EACH | $______.__ | $______.__ |
| 4069 | FURNISH AND INSTALL CORNER CASTINGS, MONOLITHS R-8 TO R-10, R-13 TO R-18, R-21, R-26 TO-28, AND R-33 TO R-35 | 22 | EACH | $______.__ | $______.__ |
| 4070 | FURNISH AND INSTALL CORNER PROTECTION, MONOLITHS R-8 TO R-10, R-13 TO R-18, R-21, R-26 TO-28, AND R-35 TO R-38 | 1,245 | LINEAR FEET | $______.__ | $______.__ |
| 4071 | FURNISH AND INSTALL WALL ARMOR, MONOLITHS R-8 TO R-10, R-13 TO R-18, R-21, R-26 TO-28, AND R-35 TO R-38 | 2,899 | LINEAR FEET | $______.__ | $______.__ |
| 4072 | FURNISH AND INSTALL MONOLITH JOINT PROTECTION, MONOLITHS R-13 TO R-18, AND R-26 TO-28 | 471 | LINEAR FEET | $______.__ | $______.__ |
| 4073 | EMBEDDED PINS FOR REMOVABLE HANDRAIL, MONOLITHS R-13 TO R-18, AND R-26 TO-28 | 8 | EACH | $______.__ | $______.__ |
| 4074 | ANCHOR BARS, LOCK FLOOR SLABS AT UPPER SILLS | 171 | EACH | $______.__ | $______.__ |
| 4075 | FURNISH AND INSTALL EMBEDDED METALS, DOWNSTREAM BULKHEAD RECESS, MONOLITH R-33 | 1 | JOB | $______.__ | $______.__ |
| 4076 | FURNISH AND INSTALL MAINTENANCE BULKHEAD AND MITER GATE SILL METALS, DOWNSTREAM | 1 | JOB | $______.__ | $______.__ |
| 4077 | FURNISH AND INSTALL MAINTENANCE BULKHEAD SILL METALS, UPSTREAM | 1 | JOB | $______.__ | $______.__ |
| 4078 | FURNISH AND INSTALL MISCELLANEOUS ITEMS, UPSTREAM MITER SILL | 1 | JOB | $______.__ | $______.__ |
| 4079 | DELIVER AND INSTALL FILLING VALVES, LINERS AND BULKHEADS | 1 | JOB | $______.__ | $______.__ |
| 4080 | FILLING VALVE GALLERY EMPTYING AND CULVERT DEWATERING SYSTEMS | 1 | JOB | $______.__ | $______.__ |
| 4081 | EMPTYING VALVE GALLERY DEWATERING SYSTEM | 1 | JOB | $______.__ | $______.__ |
| 4082 | INTAKE SCREEN ASSEMBLIES | 8 | EACH | $______.__ | $______.__ |
| 4083 | FURNISH AND INSTALL ALTERNATING STAIR TREADS, MONOLITH R-12 | 1 | EACH | $______.__ | $______.__ |
| 4084 | INSTRUMENTATION, AWARDABLE OPTION 4 | 1 | JOB | $______.__ | $______.__ |
| 4085 | INSTRUMENTATION MONITORING PROGRAM, AWARDABLE OPTION 4 | 25 | MONTHS | $______.__ | $______.__ |
| 4086 | FURNISH AND INSTALL ELECTRICAL AND MECHANICAL SYSTEMS EMBEDDED ITEMS, AWARDABLE OPTION 4 | 1 | JOB | $______.__ | $______.__ |
| 4087 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 24 | MONTHS | $______.__ | $______.__ |
| 4088 | CLEANING OF SEDIMENT BASIN NO. 1, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 4 | EACH | $______.__ | $______.__ |
| 4089 | CLEANING OF SEDIMENT BASIN NO. 2, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 4 | EACH | $______.__ | $______.__ |
| 4090 | CLEARING, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 12 | ACRE | $______.__ | $______.__ |
| 4091 | SILT FENCE, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 1,000 | LINEAR FEET | $______.__ | $______.__ |
| 4092 | WEIGHTED SEDIMENT FILTER TUBE, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 3,000 | LINEAR FEET | $______.__ | $______.__ |
| 4093 | TEMPORARY SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 12 | ACRE | $______.__ | $______.__ |
| 4094 | PERMANENT SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 5 | ACRE | $______.__ | $______.__ |
| 4095 AA | PDT NO. 2A SURFACE COURSE, FIRST 3,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 3,000 | SQUARE YARDS | $______.__ | $______.__ |
| 4095 AB | PDT NO. 2A SURFACE COURSE, ALL OVER 3,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 4 | 1,500 | SQUARE YARDS | $______.__ | $______.__ |
| 4096 | AS-BUILT DRAWINGS, AWARDABLE OPTION 4 | 1 | JOB | $______.__ | $______.__ |
| 4097 | TEMPORARY RAISE EXISTING RIVER WALL MONOLITHS R-26 THROUGH R-28 AND R-33 THROUGH R-35 | 1 | JOB | $______.__ | $______.__ |
| 4098 | FURNISH AND INSTALL ALUMINUM PLATE WELDED TO ALUMINUM GRATING, MONOLITHS R-10 AND R-33 | 33 | SQUARE FEET | $______.__ | $______.__ |
| 4099 | FURNISH AND INSTALL ALUMINUM GRATING, MONOLITHS R-11 AND R-31 | 30 | SQUARE FEET | $______.__ | $______.__ |
| 4100 | MODIFICATIONS TO EXISTING RIVER WALL AND EXISTING MIDDLE WALL FOR DOWNSTREAM COMBINATION SILL | 1 | JOB | $______.__ | $______.__ |
| 4101 | CONCRETE PRODUCTION MANAGER, AWARDABLE OPTION 4 | 20 | MONTHS | $______.__ | $______.__ |
| 4102 | MOBILIZATION AND DEMOBILIZATION, AWARDABLE OPTION 4 | 1 | JOB | $______.__ | $______.__ |
| 4103 | ENVIRONMENTAL FIELD TECHNICIAN COMPLIANCE REPRESENTATIVE, AWARDABLE OPTION 4 | 21 | MONTHS | $______.__ | $______.__ |
TOTAL, AWARDABLE OPTION 4 ITEMS 4001 THROUGH 4103 $______.__
AWARDABLE OPTION 5 - RIVER CHAMBER COMPLETION
| 5001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION 5 | 1 | JOB | $______.__ | $______.__ |
| 5002 | DIGITAL PROGRESS IMAGES, MONTHLY, AWARDABLE OPTION 5 | 13 | SET | $______.__ | $______.__ |
| 5003 | DIGITAL AERIAL PROGRESS IMAGES, QUARTERLY, AWARDABLE OPTION 5 | 4 | SET | $______.__ | $______.__ |
| 5004 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, CONCRETE BATCH PLANT, AWARDABLE OPTION 5 | 13 | MONTHS | $______.__ | $______.__ |
| 5005 | CLEANING OF SEDIMENT BASIN NO. 1, CONCRETEBATCH PLANT, AWARDABLE OPTION 5 | 5 | EACH | $______.__ | $______.__ |
| 5006 | CLEANING OF SEDIMENT BASIN NO. 2, CONCRETE BATCH PLANT, AWARDABLE OPTION 5 | 2 | EACH | $______.__ | $______.__ |
| 5007 | CLEAN SEEP, CONCRETE BATCH PLANT, AWARDABLE OPTION 5 | 3 | EACH | $______.__ | $______.__ |
| 5008 | MAINTAIN CONCRETE TESTING LAB, AWARDABLE OPTION 5 | 10 | MONTHS | $______.__ | $______.__ |
| 5009 | MONTHLY MAINTENANCE OF BATCH PLANT AND CONVEYOR SYSTEMS, AWARDABLE OPTION 5 | 10 | MONTHS | $______.__ | $______.__ |
| 5010 | REIMBURSEMENT FOR REPAIR OF BATCH PLANT AND CONVEYOR EQUIPMENT, AWARDABLE OPTION 5 | 1 | JOB | $10,000.00 | $10,000.00 |
| 5011 | SHUTDOWN AND MOTHBALLING OF BATCH PLANT AT END OF CONSTRUCTION | 1 | JOB | $______.__ | $______.__ |
| 5012 | MAINTAIN GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 5 | 10 | MONTHS | $______.__ | $______.__ |
| 5013 | REIMBURSEMENT FOR REPAIRS AT GOVERNMENT FIELD OFFICES, AWARDABLE OPTION 5 | 1 | JOB | $40,000.00 | $40,000.00 |
| 5014 | DEWATER RIVER CHAMBER | 1 | JOB | $______.__ | $______.__ |
| 5015 | COMPENSATION FOR FLOODING AND EVACUATION, RIVER CHAMBER | 1 | EACH | $290,000.00 | $290,000.00 |
| 5016 | FLOOD RIVER CHAMBER | 1 | JOB | $______.__ | $______.__ |
| 5017 | REMOVE DOWNSTREAM COFFERDAM AND SPLASH PAD | 1 | JOB | $______.__ | $______.__ |
| 5018 | FABRICATE, DELIVER AND INSTALL FOOTBRIDGES | 1 | JOB | $______.__ | $______.__ |
| 5019 | MIDDLE WALL CONTROL TOWER UTILITIES AND BUILDING SYSTEMS | 1 | JOB | $______.__ | $______.__ |
| 5020 | MIDDLE WALL CONTROL SHELTERS HEATING AND VENTILATION | 2 | EACH | $______.__ | $______.__ |
| 5021 | DREDGING, LOWER APPROACH | 16,670 | CUBIC YARDS | $______.__ | $______.__ |
| 5022 | REIMBURSEMENT FOR REPAIR OF GOVERNMENT FURNISHED PROPERTY, AWARDABLE OPTION 5 | 1 | JOB | $50,000.00 | $50,000.00 |
| 5023 | DELIVER AND INSTALL LOWER MITER GATE LEAVES | 1 | JOB | $______.__ | $______.__ |
| 5024 | DELIVER AND INSTALL UPPER MITER GATE LEAVES | 1 | JOB | $______.__ | $______.__ |
| 5025 | DELIVER, INSTALL AND STORE UPSTREAM MAINTENANCE BULKHEADS UNITS | 1 | JOB | $______.__ | $______.__ |
| 5026 | DELIVER, INSTALL AND STORE DOWNSTREAM MAINTENANCE BULKHEADS UNITS | 1 | JOB | $______.__ | $______.__ |
| 5027 | FURNISH AND INSTALL GATE OPERATING MACHINERY | 4 | EACH | $______.__ | $______.__ |
| 5028 | REMOVE TEMPORARY DIVERSION WALL, UPPER GUARD WALL | 1 | JOB | $______.__ | $______.__ |
| 5029 | INSTALL GOVERNMENT-FURNISHED ITEMS AND COMPLETE CONSTRUCTION OF UPPER GUARD WALL | 1 | JOB | $______.__ | $______.__ |
| 5030 | INSTALL GOVERNMENT-FURNISHED ITEMS AND COMPLETE CONSTRUCTION OF LOWER GUARD WALL | 1 | JOB | $______.__ | $______.__ |
| 5031 | HELPER BOAT | 5 | DAYS | $______.__ | $______.__ |
| 5032 | DEMOLITION OF CONCRETE FOUNDATION, LOWER GUIDEWALL STABILIZATION | 1 | JOB | $______.__ | $______.__ |
| 5033 | EXCAVATION, LOWER GUIDEWALL STABILIZATION | 13,540 | CUBIC YARDS | $______.__ | $______.__ |
| 5034 | HANDRAILING, LOWER GUIDEWALL STABILIZATION | 1 | JOB | $______.__ | $______.__ |
| 5035 | STONE BERM, LOWER GUIDEWALL STABILIZATION | 13,560 | CUBIC YARDS | $______.__ | $______.__ |
| 5036 | EROSION CONTROL STONE, LOWER GUIDEWALL STABILIZATION | 105 | CUBIC YARDS | $______.__ | $______.__ |
| 5037 | DREDGING, LOWER GUIDEWALL STABILIZATION AND LAND CHAMBER CLOSURE | 3,200 | CUBIC YARDS | $______.__ | $______.__ |
| 5038 | HEADWALLS | 1 | JOB | $______.__ | $______.__ |
| 5039 | SEEDING, LOWER GUIDEWALL STABILIZATION | 0.5 | ACRE | $______.__ | $______.__ |
| 5040 | FINAL INSTALLATION OF FLOATING MOORING BITTS | 11 | EACH | $______.__ | $______.__ |
| 5041 | FURNISH AND INSTALL ALUMINUM HANDRAIL | 377 | LINEAR FEET | $______.__ | $______.__ |
| 5042 | FURNISH AND INSTALL GUARD FENCE | 6,276 | LINEAR FEET | $______.__ | $______.__ |
| 5043 | FURNISH AND INSTALL SAFETY CHAIN | 195 | LINEAR FEET | $______.__ | $______.__ |
| 5044 | FURNISH AND INSTALL SPRING GATE ASSEMBLY | 3 | EACH | $______.__ | $______.__ |
| 5045 | INSTALL EMPTYING VALVES | 1 | JOB | $______.__ | $______.__ |
| 5046 | INSTALL FILLING VALVES | 1 | JOB | $______.__ | $______.__ |
| 5047 | FURNISH AND INSTALL FILLING VALVE OPERATING MACHINERY | 1 | JOB | $______.__ | $______.__ |
| 5048 | FURNISH AND INSTALL EMPTYING VALVE OPERATING MACHINERY | 1 | JOB | $______.__ | $______.__ |
| 5049 | COMPRESSED AIR PIPING SYSTEM | 1 | JOB | $______.__ | $______.__ |
| 5050 | POTABLE WATER PIPING SYSTEM | 1 | JOB | $______.__ | $______.__ |
| 5051 | SERVICE WATER PIPING SYSTEM | 1 | JOB | $______.__ | $______.__ |
| 5052 | SEWAGE PIPING SYSTEM | 1 | JOB | $______.__ | $______.__ |
| 5053 | ELECTRICAL WORK | 1 | JOB | $______.__ | $______.__ |
| 5054 | TRANSPORT AND INSTALL UPSTREAM AND DOWNSTREAM BULKHEAD RECESS FILLERS | 1 | JOB | $______.__ | $______.__ |
| 5055 | PERFORM OPERATIONAL TESTING OF LOCK SYSTEMS | 1 | JOB | $______.__ | $______.__ |
| 5056 | CONCRETE, LAND CHAMBER CLOSURE | 573 | CUBIC YARDS | $______.__ | $______.__ |
| 5057 | CONCRETE JERSEY BARRIERS, LAND CHAMBER CLOSURE | 1 | JOB | $______.__ | $______.__ |
| 5058 | FIELD DEMONSTRATION, JET GROUTING | 1 | JOB | $______.__ | $______.__ |
| 5059 | JET GROUTING, LAND CHAMBER CLOSURE | 1,650 | CUBIC YARDS | $______.__ | $______.__ |
| 5060 | INSTALL SHEET PILE, LAND CHAMBER CLOSURE | 28,055 | LINEAR FEET | $______.__ | $______.__ |
| 5061 | CLOSURE CELL FILL, LAND CHAMBER CLOSURE | 10,310 | CUBIC YARDS | $______.__ | $______.__ |
| 5062 | CLOSURE SEALS, LAND CHAMBER CLOSURE | 1 | JOB | $______.__ | $______.__ |
| 5063 | INSTALL SHEET PILE SEEPAGE BARRIER, LAND CHAMBER CLOSURE | 2,088 | LINEAR FEET | $______.__ | $______.__ |
| 5064 | SEEPAGE BARRIER CONCRETE SEAL, LAND CHAMBER CLOSURE | 50 | CUBIC YARDS | $______.__ | $______.__ |
| 5065 | REMOVE MITER GATES | 1 | JOB | $______.__ | $______.__ |
| 5066 | REMOVE OPERATING MACHINERY | 1 | JOB | $______.__ | $______.__ |
| 5067 | DRAIN AND REMOVE OR CAP UTILITY LINES | 1 | JOB | $______.__ | $______.__ |
| 5068 | REMOVE M-22 CLOSURE AT ORIGINAL MIDDLE WALL | 1 | JOB | $______.__ | $______.__ |
| 5069 | SECURE FILLING AND EMPTYING VALVES IN ORIGINAL MIDDLE AND LAND WALLS | 1 | JOB | $______.__ | $______.__ |
| 5070 | DEMOLITION OF BOX BEAM STORAGE SEATS | 1 | JOB | $______.__ | $______.__ |
| 5071 | DEMOLITION OF STANDBY GENERATOR AND STANDBY GENERATOR SUPPORT | 1 | JOB | $______.__ | $______.__ |
| 5072 | CONSTRUCT BULKHEAD STORAGE AREA AT UPPER GUIDE WALL | 1 | JOB | $______.__ | $______.__ |
| 5073 | SAMPLING AND TESTING MATERIAL EXCAVATED BEHIND GUIDE WALLS | 1 | JOB | $______.__ | $______.__ |
| 5074 | PLACEMENT OF MATERIAL EXCAVATED BEHIND GUIDE WALLS AT VICTORY HOLLOW SITE | 6,770 | CUBIC YARDS | $______.__ | $______.__ |
| 5075 | DISPOSAL OF MATERIAL EXCAVATED BEHIND GUIDE WALLS AT PERMITTED FACILITY | 7,455 | CUBIC YARDS | $______.__ | $______.__ |
| 5076 | ARRIVAL POINT SIGNS, UPSTREAM AND DOWNSTREAM MOORING CELLS | 2 | EACH | $______.__ | $______.__ |
| 5077 | WARNING-DAM AHEAD SIGN, UPSTREAM MOORING CELL | 1 | EACH | $______.__ | $______.__ |
| 5078 | WARNING-DAM AHEAD SIGN, UPSTREAM LEFT BANK | 1 | EACH | $______.__ | $______.__ |
| 5079 | RESTRICTED-NO BOATS HERE TO DAM SIGN, UPSTREAM AND DOWNSTREAM GUARD WALL ENDCELLS | 2 | EACH | $______.__ | $______.__ |
| 5080 | RESTRICTED-NO BOATS HERE TO DAM SIGN, UPSTREAM AND DOWNSTREAM LEFT BANK | 2 | EACH | $______.__ | $______.__ |
| 5081 | LOCK (ARROW) SIGNS, UPSTREAM AND DOWNSTREAM | 2 | EACH | $______.__ | $______.__ |
| 5082 | WARNING WHEN SIREN SOUNDS SIGN, DOWNSTREAM RIVER WALL | 1 | EACH | $______.__ | $______.__ |
| 5083 | BRADDOCK AND MAXWELL GATE OPENING SIGNS | 2 | EACH | $______.__ | $______.__ |
| 5084 | CHAMBER MARKER AND CAUTION EDGE OF SILL SIGNS | 1 | JOB | $______.__ | $______.__ |
| 5085 | DECOMMISSION ADAS SYSTEM | 1 | JOB | $______.__ | $______.__ |
| 5086 | INSTRUMENTATION MONITORING PROGRAM, OPTION 5 | 5 | MONTHS | $______.__ | $______.__ |
| 5087 | NOT USED | ||||
| 5088 | NOT USED | ||||
| 5089 | NOT USED | ||||
| 5090 | ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 13 | MONTHS | $______.__ | $______.__ |
| 5091 | CLEANING OF SEDIMENT BASIN NO. 1, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 2 | EACH | $______.__ | $______.__ |
| 5092 | CLEANING OF SEDIMENT BASIN NO. 2, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 2 | EACH | $______.__ | $______.__ |
| 5093 | CLEARING, VICTORY HOLLOW SITE, AWARDABLE OPTION 5, AWARDABLE OPTION 5 | 2 | ACRE | $______.__ | $______.__ |
| 5094 | SILT FENCE, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 500 | LINEAR FEET | $______.__ | $______.__ |
| 5095 | WEIGHTED SEDIMENT FILTER TUBE, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 1,000 | LINEAR FEET | $______.__ | $______.__ |
| 5096 | TEMPORARY SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 2 | ACRE | $______.__ | $______.__ |
| 5097 | PERMANENT SEEDING, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 2 | ACRE | $______.__ | $______.__ |
| 5098 AA | PDT NO. 2A SURFACE COURSE, FIRST 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 1,000 | SQUARE YARDS | $______.__ | $______.__ |
| 5098 AB | PDT NO. 2A SURFACE COURSE, ALL OVER 1,000 SQUARE YARDS, VICTORY HOLLOW SITE, AWARDABLE OPTION 5 | 500 | SQUARE YARDS | $______.__ | $______.__ |
| 5099 | AS-BUILT DRAWINGS, AWARDABLE OPTION 5 | 1 | JOB | $______.__ | $______.__ |
| 5100 | PROCESS CONTROLS | 1 | JOB | $______.__ | $______.__ |
| 5101 | CONCRETE PRODUCTION MANAGER, AWARDABLE OPTION 5 | 10 | MONTHS | $______.__ | $______.__ |
| 5102 | MOBILIZATION AND DEMOBILIZATION, AWARDABLE OPTION 5 | 1 | JOB | $______.__ | $______.__ |
| 5103 | DISPOSAL OF WASTE HYDRAULIC OIL | 2,000 | GAL | $______.__ | $______.__ |
| 5104 | ENVIRONMENTAL FIELD TECHNICIAN COMPLIANCE REPRESENTATIVE, AWARDABLE OPTION 5 | 13 | MONTHS | $______.__ | $______.__ |
TOTAL, AWARDABLE OPTION 5 ITEMS 5001 THROUGH 5104 $______.__
TOTAL, BASE CONTRACT PLUS AWARDABLE OPTIONS $______.__
&P of &N Revised by Amendment 0001