W81ET493104438
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re: Pine Hollow Stream Removal Project This amendment to the solicitation addresses the follow ing: 1. Provide a list of attendees for the Pre-bid Site Visit;
2. Provide answ ers to questions; 3. Extend the Bid Opening Date; 4. Incorporate FAR clause 52.219-14, Limitations on Subcontracting; 5.
Incorporate a revised Wage Determination; 6. Incorproate revised Specif ication Sections; 7. Provide clarification on Draw ings.
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-May-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-10-B-0010
X 9B. DATED (SEE ITEM 11)
30-Apr-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-May-2010
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-10-B-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
ATTENDEES TO PRE-BID SITE VISI
Kathy Jo Macks CM Marks Inc.
Brendan Bovard Independence Excavating
Rachael Caton IAP Adam Potes Kokosing Construction Charles Merlo Merlo Construction
Don Lassiter A. Merante Construction Milton Lenhart Alcosan Brad Duda Baker Engineering Frank Zottola FJZCI Vince Smith Set Inc.
Doug Susang Set Inc.
Ron Klonowski Gregori Construction Jack Cargnoni Independent
QUESTIONS AND ANSWERS
Q1. Section 04 45 01 page 7, Item 3.4.4 CQC Personnel- In addition to the CQC Manager being on-site full time with no other duties, this paragraph requires the Civil and Geotechnical Engineer “be physically present at the construction site during work on their areas of responsibility”. Even though the specs allow a single individual, who is qualified in both disciplines, to meet this requirement, civil and geotechnical work is going on continuously from start to finish of the Project and, therefore, this paragraph appears to require another full-time, dedicated and expensive person on site at all times, in addition to the CQC Manager. For the most part, construction will be underway at one location along the pipe run. Please confirm or clarify what is required.
A1. Specification Section 01 45 01 has been revised to eliminate the Civil Engineer requirement; the CQC Manger can do this job. For the Geotech engineer on the CQC staff, a note was added to Specification Section 01 45 01, paragraph 3.4.4, clarifying this individual must meet the additional requirements as spelled out in 31 00 00, Para
3.4.2. Specification Section 31 00 00, the last sentence of Paragraph 3.4.2 has been revised changed last sentence to say the meetings are set up by the Contractor.
Also section 01 45 01, Para 3.4.5; The Contractors Association of Western PA does not sponsor the course. The requirement was added that valid certificates must be less than 5 years old.
Q2. In our experience, we have had to staff what is called a quality control individual. This person was to be employed and paid by us, but there position was as a representative of the army corp. Our interpretation of the specifications manual leads us to believe we need to employ a staff of at least two individuals. Is this correct and does the army corp. have a referral list for these certified individuals.
A2. The requirements for CQC personnel are specified in Section 01 45 01.
Q3. Sheet 6/49, detail on Trench and Bedding Backfill for Sanitary Sewer. Please define “Native Screened Material” and the screening size.
A3. This portion of the detail refers to sewer installations beyond the limits of paved areas, in which the native materials excavated from the trench may be used as backfill above the pipe zone. The material properties must meet the requirements as outlined in PennDOT publication 408, Section 206 Embankment. In section 206.2, the specific properties of applicable native materials are indicated. The reference has been included in Specification section 31 00 00, paragraph 3.9.1.3(b).
Q4. How will the “Low Bidder” be selected, i.e. Base Bid or Base Bid + Options?
A4. The “Low Bidder” will be determined in accordance with solicitation provision 252.236-7007, entitled “Additive or Deductive Items” (See pages 74 & 75 of the solicitation). Also, see page 3 stating, “Additive A will be awarded all inclusive.”
Q5. What is the percentage of the work that must be performed in the situation where a small business subcontracts work to a large business?
A5. FAR clause 52.219-14, entitled “Limitations on Subcontracting” has been incorporated to address this question.
Q6. We could not find Section 01 45 04.10 06 as listed in the Table of Contents for the Technical Specifications.
A6. This listing was eliminated in the revised Table of Contents.
Q7. Note #2 on sheet 10 of 49 says that "All exposed steel shall be galvanized." We assume that this is limited to the steel associated with the trash screens only. Please confirm that the manhole covers and frames, as well as the inlet grates and frames are not to be galvanized.
A7. This is correct.
Q8. Sheet 10 of 49 says that the manholes covers and frames should be Neenah 1556-A, however this is a bottom-flanged, surface mounted frame and cannot be recessed. We shall assume that the top-flanged, recessed Neenah R6067 or equal will be an acceptable basis of design. Please confirm or provide a recessed basis of design.
A8. The Neenah R6067 is acceptable. This designation will be corrected on the drawing.
Q9. Please provide a basis of design for the "2'x4' Inlet Grate/Frames (Recessed)" required for Intake Structure #2.
A9. The recessed frame at Intake Structure #2 should be installed as illustrated on RC-34 of PennDOT Pub #72.
The following note will be added to Drawing Sheet No. 12 of 49: “RECESSED 2’ X 4’ INLET GRATE/FRAME
SHALL BE AS SHOWN ON PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATION
72M, RC-34M FOR TYPE M INLET.WITH STRUCTURAL STEEL GRATE.
Q10. CONTECH has been asked by several bidders on this project to evaluate the 60” HDPE pipe run and possibly provide a VE alternate. I would like to formally seek your approval to quote an alternate 60” pipe. This alternate would be 60”, 14 gage, aluminized, spiral rib pipe. The service life of HDPE pipe per DM-2 is 50 years. The service life of 14 gage Aluminized (ALT2) is 50 yrs per Penn DOT DM-2 table 10.7.31. (100 years for 12 gage.)
The manning’s “n” of spiral ribbed pipe is 0.012 and structurally it exceeds the capabilities of 60” HDPE. We can manufacture fully welded elbows, fittings and Manhole risers with steps or ladders. We would provide 2 pc Levee Bands with flat gaskets at each joint.
A10. All bids must be based upon the materials as specified in the specifications, which would be the HDPE and related fittings, etc. It is not as simple as just substituting an item or two, as numerous other bid items are designed around the HDPE pipe. Any suggested changes can be addressed after contract award in accordance with the Value Engineering clause (FAR clause 52.248-3-Alt I.)
Q11. The detail for trench excavation shows a pay limit for width of trench. This trench width limit will not be wide enough to accommodate trench boxes or allow for possible cave ins. There is also a bid item for CY. Of backfill stone and SY. of pavement restoration. The question is: will the backfill material and pavement restoration be paid as unit price of material used regardless of trench width or will trench width pay limits dictate allowable quantities of backfill and pavement repair quantities.
A11. Excavation will be measured to the trench pay limits shown on the drawing. No payment will be made for excavation and related backfill outside the pay limits shown. Costs for shoring, additional excavation, and additional backfill resulting from the additional backfill should be included in the costs for the measured excavation.
The specification (Section 31 00 00) has been revised to clarify this.
SPECIFICATION REVISIONS:
The following portions of the specifications are hereby replaced in their with the items included with the Amendment:
1. Table of Contents
2. Section 01 45 01
3. Section 31 00 00
DRAWING REVISIONS (PEN & INK CHANGES):
1. Drawing Sheet No. 10 of 49, in the Intake Structure #1 Isometric View, the designation for “NEENAH 1556-A WITH RECESSED FRAME OR APPROVED EQUAL” is hereby changed to read ‘NEENAH R-
6067 WITH RECESSED FRAME OR APPROVED EQUAL”.
2. The following note is added to Drawing Sheet No. 12 of 49: “RECESSED 2’ X 4’ INLET
GRATE/FRAME SHALL BE AS SHOWN ON PENNSYLVANIA DEPARTMENT OF
TRANSPORTATION PUBLICATION 72M, RC-34M FOR TYPE M INLET.WITH STRUCTURAL
STEEL GRATE.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 03-Jun-2010 11:00 AM to 09-Jun-2010 11:00 AM.
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
52.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for--
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
WAGE DETERMINATION REVISED
General Decision Number: PA100004 04/16/2010 PA4
Superseded General Decision Number: PA20080004
State: Pennsylvania
Construction Types: Heavy and Highway
Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 03/26/2010 3 04/02/2010 4 04/16/2010
BOIL0013-005 01/01/2010
CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND
MIFFLIN COUNTIES
Rates Fringes
BOILERMAKER......................$ 38.08 28.05
BOIL0154-004 06/01/2009
ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA,
CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST,
GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET,
VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES
BOILERMAKER......................$ 36.70 20.82
BOIL0744-003 07/01/2008
ERIE COUNTY
Rates Fringes
BOILERMAKER......................$ 35.34 18.48
BRPA0009-023 12/01/2009
BEAVER COUNTY
Rates Fringes
BRICKLAYER.......................$ 26.40 14.90
BRPA0009-024 12/01/2009
WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps) COUNTY
BRICKLAYER.......................$ 28.30 14.75
BRPA0009-025 12/01/2009
BUTLER, LAWRENCE, AND MERCER COUNTIES
Rates Fringes
BRICKLAYER.......................$ 26.40 14.78
BRPA0009-032 12/01/2009
FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Rostraver Twp) COUNTIES
BRICKLAYER.......................$ 27.55 14.84
BRPA0009-033 12/01/2009
ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp) COUNTIES
BRICKLAYER.......................$ 27.53 14.86
BRPA0009-034 11/01/2009
ERIE COUNTY
Rates Fringes
BRICKLAYER.......................$ 24.89 14.34
CARP2235-005 01/01/2010
Rates Fringes
PILEDRIVERMAN
Piledriverman (welder)......$ 30.25 12.25 Piledriverman...............$ 29.95 12.25
CARP2235-006 01/01/2007
Rates Fringes
Diver............................$ 40.40 10.77 Tender...........................$ 26.93 10.77
CARP2274-001 01/01/2010
Rates Fringes
CARPENTER (ALLEGHENY,
ARMSTRONG, BEAVER, BUTLER,
ERIE, FAYETTE, GREENE,
LAWRENCE, MERCER, WASHINGTON,
AND WESTMORELAND COUNTIES)
Carpenter (Welders).........$ 29.18 12.56 Carpenters..................$ 28.48 12.56
CARPENTER (BEDFORD, BLAIR,
CAMBRIA, CAMERON, CENTRE,
CLARION, CLINTON, CLEARFIELD,
CRAWFORD, ELK, FOREST,
FRANKLIN, FULTON, HUNTINGDON,
INDIANA, JEFFERSON, MCKEAN,
MIFFLIN, POTTER, SOMERSET,
VENANGO, AND WARREN COUNTIES)
Carpenters (Welders).......$ 28.94 12.56 Carpenters..................$ 28.23 12.56
ELEC0005-006 12/25/2009
ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON,
CENTRE (Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES
ELECTRICIAN......................$ 34.26 17.88
ELEC0056-004 06/01/2009
ERIE, FOREST AND WARREN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 25.90 3%+16.32
ELEC0126-005 09/28/2009
ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE,
CLARION, CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON,
INDIANA, JEFFERSON, SOMERSET, WASHINGTON AND WESTMORELAND
Line Construction:
Groundman...................$ 25.24 26.5%+5.55 Lineman.....................$ 42.06 26.5%+5.55 Truck Driver................$ 23.09 26%+5.55 Truck driver................$ 27.34 26.5%+5.55 Winch Truck Operator........$ 24.96 26%+5.55 Winch truck operator........$ 29.44 26.5%+5.55
ELEC0126-007 09/28/2009
FRANKLIN AND MIFFLIN COUNTIES
Rates Fringes
Line Construction:
Groundman...................$ 25.24 26.5+5.55 Lineman.....................$ 42.06 26.5+5.55 Truck Driver................$ 21.36 26%+5.55 Truck driver................$ 27.34 26.5+5.55 Winch Truck Operator........$ 23.10 26%+5.55 Winch truck operator........$ 29.44 26.5+5.55
ELEC0143-007 12/01/2009
FRANKLIN and MIFFLIN COUNTIES
Rates Fringes
ELECTRICIAN......................$ 27.45 14.79
ELEC0712-003 03/02/2009
CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES
ELECTRICIAN......................$ 29.20 17.48
* ELEC0812-008 06/01/2009
CLINTON COUNTY
Rates Fringes
ELECTRICIAN......................$ 25.29 16.35
* ELEC0812-009 06/01/2009
POTTER COUNTY
Rates Fringes
ELECTRICIAN......................$ 26.30 16.38
* ELEC0812-011 06/01/2009
CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)
ELECTRICIAN......................$ 26.30 16.38
ELEC1319-004 08/31/2008
BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST,
LAWRENCE, MCKEAN, MERCER, VENANGO, WARREN AND POTTER COUNTIES
Line Construction:
Groundman...................$ 24.53 17.13 Heavy Equipment Operator....$ 39.17 17.13 Lineman.....................$ 39.57 17.13 Truck Drivers...............$ 25.72 17.13
ENGI0066-016 01/01/2010
Rates Fringes
Power equipment operators:
(ALLEGHENY, ARMSTRONG,
BEAVER, BLAIR, BUTLER,
CAMBRIA, CENTRE, CLARION,
CLEARFIELD, CRAWFORD, ERIE,
ELK, FAYETTE, GREENE,
INDIANA, JEFFERSON, LAWRENCE,
MCKEAN, MERCER, SOMERSET,
VENANGO, WARREN, WASHINGTON,
AND WESTMORELAND COUNTIES)
GROUP 1.....................$ 27.18 14.99
GROUP 2.....................$ 26.92 14.99
GROUP 3.....................$ 23.27 14.99
GROUP 4.....................$ 22.81 14.99
GROUP 5.....................$ 22.56 14.99
Power equipment operators:
(BEDFORD, CAMERON, CLINTON,
FOREST, FRANKLIN, FULTON,
HUNTINGDON, MIFFLIN, AND
POTTER COUNTIES)
GROUP 1.....................$ 26.89 14.99
GROUP 2.....................$ 26.61 14.99
GROUP 3.....................$ 22.97 14.99
GROUP 4.....................$ 22.48 14.99
GROUP 5.....................$ 22.27 14.99
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 - Asphalt Paving Machine (Spreader), Autograde (C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill (similar to Hugh Williams), Central Mix Plant; Cooling Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes (Tower Stationary- Climbing Tower Crane); Derrick; Derrick Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;
Dredge Hydraulic; Elevating Grader; Franki Pile Machine;
Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar), (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;)
Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading Attachment), Mucking Machine (tunnel); Pile Driver Machine;
Pipe Extrusion Machine; Prespliter Drill (self contained);
Refrigeration Plant (soil Stablization) Rough Terrain Crane (25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain Crane (under 25 ton), Scrapers; Shovel-Power; Slip form Paver (C.M.I. and similar); Trenching Machine (30,000 lbs.
and over), Trenching Machine (under 30,000 lb.), Tunnell Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Compactor with blade
GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger (truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; Directional drill over 3,000 lbs thrust; concrete batch plant (electronically synchronized); concrete belt placer (C.M.I. and similar);
concrete finishing machine and spreader, concrete mixer (over 1 cy.) concrete pump (stationary); core drill (truck or skid mtd. - similar to penn drill), dozer (25,000 lbs or less); Ditch Witch Saw, force feedloader; fork lift (lull or similar); grader - power; grease unit opertor (head);
guard rail post driver (truck mounted) guard rail post driver (skid type); hilift (under 4 cy.); skid steer loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage);
minor equipment operator (accumulative four units); mucking machine; multi-head saw (groover); overhead crane; roller -power- asphalt; ross carrier; side boom or tractor mounted boom; shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator.
GROUP 3: Broom Finisher (C.M.I. or similar);
Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker (self-propelled or ridden); Soil Stablizer Machine; Tire Repairman; Tractor (snaking and hauling); Well Driller and Horizontal: Winch or "A" Frame Truck (when hoisting and lowering).
GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1
cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line Machine; Generator; Groute Pump; Heater (Machinical); Hoist (single Drum); Ladavator, Light Plant; Mulching Machine;
Personnel Boat (Powered), Pulverizer, Pumps, Seeding Machine, spray Cure Machine (powered Driven); Subgrader;
Tie Puller; Tugger; Welding Machine (Gas or Diesel).
GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;
Power Broom; Side Delivery Shoulder Spreader (attachment);
IRON0003-001 06/01/2009
ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG,
BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES
IRONWORKER.......................$ 29.43 21.25
IRON0207-002 06/01/2009
LAWRENCE, MERCER, AND VENANGO COUNTIES
Rates Fringes
IRONWORKER.......................$ 26.66 16.83
IRON0348-002 06/01/2009
CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES
IRONWORKER.......................$ 25.33 20.17
IRON0404-008 07/01/2009
FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN
COUNTIES
IRONWORKER, STRUCTURAL...........$ 27.07 21.85
IRON0549-002 12/01/2008
GREENE COUNTY
Rates Fringes
IRONWORKER.......................$ 28.75 10%+15.69
IRON0568-004 05/01/2009
BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western
2/3), AND SOMERSET COUNTIES
Ironworkers:
Sheeter, Bucker-Up..........$ 26.33 12.88 Structural, Ornamental, Reinforcing, Machinery Mover, Rigger & Machinery Erector, Welder, Fence Erector.....................$ 26.08 12.88
IRON0772-001 06/01/2009
BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,
MCKEAN AND POTTER COUNTIES
IRONWORKER.......................$ 24.73 19.94+A
A. HOLIDAYS
The following holidays shall be observed: New Years Day, Goodfriday, Memorial Day, Fourth of July, Labor Day, Veterans Day (Observed the day after Thanksgiving), Thanksgiving Day, Christmas Day.
Any holiday which occurs on Sunday shall be observed the following Monday.
LABO1058-001 01/01/2010
Rates Fringes
LABORER (BEDFORD, CAMERON,
CENTRE, CLINTON, CRAWFORD,
FOREST, FRANKLIN, FULTON,
HUNTINGDON, JEFFERSON,
MIFFLIN, AND POTTER COUNTIES)
GROUP 1.....................$ 23.65 13.55
GROUP 2.....................$ 23.81 13.55
GROUP 3.....................$ 24.30 13.55
GROUP 4.....................$ 24.75 13.55
GROUP 5.....................$ 25.16 13.55
GROUP 6.....................$ 22.00 13.55
GROUP 7.....................$ 24.65 13.55
GROUP 8.....................$ 26.50 13.55
Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND
COUNTIES)
GROUP 1.....................$ 23.75 13.55
GROUP 2.....................$ 23.91 13.55
GROUP 3.....................$ 24.30 13.55
GROUP 4.....................$ 24.75 13.55
GROUP 5.....................$ 25.16 13.55
GROUP 6.....................$ 22.00 13.55
GROUP 7.....................$ 24.75 13.55
GROUP 8.....................$ 26.25 13.55
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman (weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction (Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;
Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street Sweeper, and Wood Chipper; water boy
GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper (tunnel) Fork Lift, (walk behind), Form Setter (Road Forms Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron (Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, All RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING: adzing machine, ballast Router, Bolting Machine, Power Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike Drivers (Manually or hand held tool) Spike Pullers Tamping Machine, Thermitweld
GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;
concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers (including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);
Walk behind ditching machine (trencher or similar);crown screed adjuster and welder
GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)
GROUP 5:High Burner, (Any burning not done from deck), Welder (Pipeline)
GROUP 6: Uniformed Flagperson, Watchman
GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D
GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B
PAIN0021-019 05/01/2009
CLINTON COUNTY
Painters:
Bridge......................$ 25.60 12.05 Brush & Roller..............$ 24.65 12.05 Spray.......................$ 25.65 12.05
PAIN0021-024 05/01/2009
FRANKLIN COUNTY
Rates Fringes
PAINTER
Brush.......................$ 22.17 8.90
PAIN0057-014 08/01/2009
ALLEGHENY, FAYETTE, GREEN, WASHINGTON COUNTIES
Rates Fringes
Painters:
Bridge......................$ 29.81 12.63 Brush & Roller..............$ 27.24 12.63 Spray.......................$ 27.77 12.63
PAIN0057-015 08/01/2009
ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE,
CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA,
JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND
WESTMORELAND COUNTIES
Painters:
Bridge......................$ 29.81 12.63 Brush and Roller............$ 27.24 12.63 Spray.......................$ 27.77 12.63
PAIN0057-022 05/01/2009
Rates Fringes
Painters: (ERIE, McKEAN, AND WARREN (Including Columbus and Freehold twps) COUNTIES) Bridges,Stacks,Towers.......$ 22.52 11.60 Brush and Roller............$ 20.52 11.60 Spray and Sandblasting......$ 21.27 11.60
PAIN0057-027 08/01/2009
CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and
Freehold twps)
PAINTER
Brush and Roller............$ 22.27 12.06
PLAS0526-002 01/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
Beaver, Cameron, Clarion, Crawford, Elk, Forest, Lawrence, McKean, Potter, Venango and Warren Counties....................$ 27.62 13.42 Bedford, Blair, Cambria, Centre, Clinton, Huntingdon, Mifflin and Somerset Counties...........$ 27.62 13.42 All Other Counties..........$ 27.62 13.42
PLUM0027-001 06/01/2009
ALLEGHENY, ARMSTRONG, GREENE (Except extreme Eastern portion), WASHINGTON (Except extreme Eastern portion) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES
Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 33.75 16.37
PLUM0047-005 05/01/2009
BEAVER, BUTLER, MCKEAN, MERCER, VENANGO, CLARION, LAWRENCE,
FOREST, WARREN, CRAWFORD, AND ERIE COUNTIES
(Bridge Drain Pipe)..............$ 34.18 16.90
PLUM0354-005 06/01/2009
BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE,
GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND
WESTMORELAND COUNTIES
(Bridge Drain Pipe)..............$ 28.54 18.48
TEAM0040-001 01/01/2010
Rates Fringes
TRUCK DRIVER (ALLEGHENY,
ARMSTRONG, BEAVER, BLAIR,
BUTLER, CAMBRIA, CENTRE,
CLARFIELD, CRAWFORD, ERIE,
FAYETTE, GREENE, INDIANA,
JEFFERSON, LAWRENCE, MCKEAN,
MERCER, SOMERSET, VENANGO,
WARREN, WASHINGTON, AND
WESTMORELAND)
GROUP 1.....................$ 24.98 $12.04+a+b GROUP 2.....................$ 25.13 $12.11+a+b GROUP 3.....................$ 25.64 $12.37+a+b Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)
GROUP 1.....................$ 24.80 $11.95+a+b GROUP 2.....................$ 24.98 $12.04+a+b GROUP 3.....................$ 25.49 $12.29+a+b
FOOTNOTES: A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate
B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Single Axle (2 axles including steering axle);
Includes partsman and warehoueman
GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)
GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);
Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION