Price Amendment 0003
| Pine Hollow Stream Removal Project - ALCOSAN |
| Kennedy Township, Stowe Township, & McKees Rocks Borough |
| Allegheny County, Pennsylvania |
| SECTION 00010 |
| SUPPLIES OR SERVICES AND PRICES/COSTS |
| BASE CONTRACT ITEMS PHASE 1: STA 0+00 - 51+25 | |||||
| ITEM | DESCRIPTION | QUANTITY | U/M | U/P | AMOUNT |
| 0001 | ARRA - Reimbursement for Actual Performance and Payment Bonds Premium, Base Contract | NOT TO EXCEED | $0.00 | ||
| 0002 | ARRA - Maintenance Bond | 1 | Lump Sum | $0.00 | |
| 0003 | ARRA - Maintenance and Protection of Traffic During Construction | 1 | Lump Sum | $0.00 | |
| 0004 | ARRA - Erosion and Sedimentation Control | 1 | Lump Sum | $0.00 | |
| 0005 | ARRA - ARRA Project Sign | 1 | Lump Sum | $0.00 | |
| 0006 | ARRA - Clearing and Grubbing | 1 | Lump Sum | $0.00 | |
| 0007 | ARRA - Miscellaneous Concrete for Encasement, Pipe Cradles, Slope Anchors, and Pipe Collars | 75 | Cubic Yards | $0.00 | |
| 0008 | ARRA - Milling of Bituminous Pavement Surface, 2" Depth | 18,230 | Square Yards | $0.00 | |
| 0009 | RESERVED | $0.00 | |||
| 0010 | ARRA - Concrete Curb Removal and Replacement | 52 | Linear Feet | $0.00 | |
| 0011 | ARRA - Concrete Sidewalks, Monolithic Curbs (4") and Handicapped Ramps | 10 | Square Yards | $0.00 | |
| 0012 | ARRA - Class 1B Excavation | 3,690 | Cubic Yards | $0.00 | |
| 0013 | ARRA - Class 4 Excavation | 20,000 | Cubic Yards | $0.00 | |
| 0014 | ARRA - Rock Excavation | 4,700 | Cubic Yards | $0.00 | |
| 0015 | ARRA - Off-Site Disposal of Excavated Material | 27,000 | Cubic Yards | $0.00 | |
| 0016 | RESERVED | $0.00 | |||
| 0017 | ARRA - Pavement Subbase (No. 2A) | 8,300 | Square Yards | $0.00 | |
| 0018 | ARRA - Coarse Aggregate No. 2A | 14,720 | Cubic Yards | $0.00 | |
| 0019 | ARRA - Seeding and Soil Supplements-Formula B | 20 | Pounds | $0.00 | |
| 0020 | ARRA - Seeding and Soil Supplements-Formula D | 42 | Pounds | $0.00 | |
| 0021 | ARRA - Mulching - Straw | 2 | Tons | $0.00 | |
| 0022 | RESERVED | $0.00 | |||
| 0023 | ARRA - 4" Yellow Hot Thermoplastic Pavement Markings | 9,154 | Linear Feet | $0.00 | |
| 0024 | ARRA - 6" White Hot Thermoplastic Pavement Markings | 6,442 | Linear Feet | $0.00 | |
| 0025 | ARRA - 12" White Hot Thermoplastic Pavement Markings | 118 | Linear Feet | $0.00 | |
| 0026 | ARRA - Type C Inlet | 1 | Each | $0.00 | |
| 0027 | ARRA - 6" White Waterborne Pavement Markings | 3,200 | Linear Feet | $0.00 | |
| 0028 | ARRA - 4" Yellow Waterborne Pavement Markings | 4,800 | Linear Feet | $0.00 | |
| 0029 | ARRA - Type M Inlet | 15 | Each | $0.00 | |
| 0030 | ARRA - Intake Structure 2 | 1 | Each | $0.00 | |
| 0031 | ARRA - Sanitary Manhole - 4' diam. | 2 | Each | $0.00 | |
| 0032 | ARRA - Access Manhole - 5' diam. | 9 | Each | $0.00 | |
| 0033 | RESERVED | $0.00 | |||
| 0034 | ARRA - Manhole Grade Adjustment | 19 | Each | $0.00 | |
| 0035 | ARRA - Inlet Grade Adjustment | 6 | Each | $0.00 | |
| 0036 | ARRA - 60" HDPE Type S Storm Sewer | 5,100 | Linear Feet | $0.00 | |
| 0037 | ARRA - 15" PVC SDR 26 Storm Sewer | 285 | Linear Feet | $0.00 | |
| 0038 | ARRA - 15" Insertion Tap | 17 | Each | $0.00 | |
| 0039 | ARRA - 60" HDPE Bend (less than or equal to 22 1/2 deg) | 30 | Each | $0.00 | |
| 0040 | ARRA - 60" HDPE Bend (greater than 22 1/2 deg) | 3 | Each | $0.00 | |
| 0041 | Superpave Asphalt Mixture Design, HMA Wearing Course, PG 64-22, 3 to <10 Million ESALS, 9.5 MM Mix, 1 1/2" Depth, SRL-H | 18,230 | Square Yards | $0.00 | |
| 0042 | Superpave Asphalt Mixture Design, HMA Wearing Course (Scratch), PG 64-22, 3 to <10 Million ESALS, 9.5 MM Mix, SRL-L | 565 | Tons | $0.00 | |
| 0043 | Superpave Asphalt Mixture Design, HMA Base Course, PG 64-22, 3 to <10 Million ESALS, 25.0 MM Mix, 6" Depth | 8,300 | Square Yards | $0.00 | |
| 0044 | Superpave Asphalt Mixture Design, HMA Binder Course, PG 64-22, 3 to <10 Million ESALS, 19.0 MM Mix, 2 1/2" Depth | 8,300 | Square Yards | $0.00 | |
| 0045 | Plain Cement Concrete Pavement | 100 | Square Yards | $0.00 | |
| 0046 | RESERVED | $0.00 | |||
| 0047 | RESERVED | $0.00 | |||
| 0048 | RESERVED | $0.00 | |||
| 0049 | RESERVED | $0.00 | |||
| 0050 | RESERVED | $0.00 | |||
| 0051 | RESERVED | $0.00 | |||
| 0052 | RESERVED | $0.00 | |||
| 0053 | Grout Exisitng Pipe, (Bulkhead Existing Line) | 70 | Cubic Yards | $0.00 | |
| 0054 | 4''- 6" PVC SDR 26 Sewer Repair | 440 | Linear Feet | $0.00 | |
| 0055 | RESERVED | $0.00 | |||
| 0056 | RESERVED | $0.00 | |||
| 0057 | Over-Excavation and Backfill with No. 1 Coarse Aggregate | 300 | Cubic Yards | $0.00 | |
| 0058 | Exploratory Excavation Water, Sewer & Gas - Up to 6' Deep | 30 | Each | $0.00 | |
| 0059 | Exploratory Excavation Water, Sewer & Gas - Over 6' Deep | 20 | Each | $0.00 | |
| 0060 | Off-Duty Officer | 120 | Hours | $0.00 | |
| 0061 | Sewer Televising, Dye Testing | 60 | Hours | $0.00 | |
| 0062 | Reset Post Mounted Signs, Type B | 4 | Each | $0.00 | |
| 0063 | Reset Post Mounted Signs, Type F | 2 | Each | $0.00 | |
| 0064 | ARRA - Rip Rap R-5 (24" thick) | 100 | Square Yards | $0.00 | |
| 0065 | ARRA - Geotextile, Class 2, Type A | 70 | Square Yards | $0.00 | |
| 0066 | RESERVED | $0.00 | |||
| 0067 | ARRA - 24" White Hot Thermoplastic Pavement Markings | 20 | Linear Feet | $0.00 | |
| 0068 | ARRA - Intake Structure 1 | 1 | EACH | $0.00 | |
| 0069 | ARRA - Storm Manhole - 5' diam. | 1 | EACH | $0.00 | |
| 0070 | ARRA - 36" Corrug. HDPE Type S Storm Sewer | 115 | Linear Feet | $0.00 | |
| 0071 | Terminal Section, Single | 2 | EACH | $0.00 | |
| 0072 | Type 2-S Guide Rail | 75 | Linear Feet | $0.00 | |
| 0073 | Reimbursement for Water System Modifications | 52000 | Dollar | $ 1.00 | $52,000.00 |
| 0074 | 12" PVC SDR 26 Sewer | 100 | Linear Feet | $0.00 | |
| 0075 | Reimbursement for Natural Gas System Modifications | 85000 | Dollar | $ 1.00 | $85,000.00 |
| TOTAL, Base Contract Items 0001 Through 0075, Inclusive | $137,000.00 |
| AWARDABLE OPTION A ITEMS, PHASE 2: Sta 51.25 to Sta 54+87.64 | |||||
| ITEM | DESCRIPTION | QUANTITY | U/M | U/P | AMOUNT |
| 1001 | Reimbursement for Actual Performance and Payment Bonds Premium, Additive Item | NOT TO EXCEED | $0.00 | ||
| 1002 | Maintenance and Protection of Traffic During Construction | 1 | Lump Sum | $0.00 | |
| 1003 | Erosion and Sedimentation Control | 1 | Lump Sum | $0.00 | |
| 1004 | Clearing and Grubbing | 1 | Lump Sum | $0.00 | |
| 1005 | Miscellaneous Concrete for Encasement, Pipe Cradles, Slope Anchors, and Pipe Collars | 125 | Cubic Yards | $0.00 | |
| 1006 | Maintenance Bond | 1 | Lump Sum | $0.00 | |
| 1007 | Concrete Curb Removal and Replacement | 42 | Linear Feet | $0.00 | |
| 1008 | Concrete Sidewalks, Monolithic Curbs (4") and Handicapped Ramps | 18 | Square Yards | $0.00 | |
| 1009 | RESERVED | ||||
| 1010 | Outfall Structure | 1 | Each | $0.00 | |
| 1011 | Class 4 Excavation | 2,100 | Cubic Yards | $0.00 | |
| 1012 | Rock Excavation | 400 | Cubic Yards | $0.00 | |
| 1013 | Off-Site Disposal of Excavated Material | 750 | Cubic Yards | $0.00 | |
| 1014 | RESERVED | $0.00 | |||
| 1015 | Reimbursement for Water System Adjustments | 2,000 | Dollars | $ 1.00 | $2,000.00 |
| 1016 | Coarse Aggregate No. 2A | 1,000 | Cubic Yards | $0.00 | |
| 1017 | Seeding and Soil Supplements-Formula B | 22 | Pounds | $0.00 | |
| 1018 | Reimbursement for Natural Gas System Adjustments | 5,000 | Dollars | $ 1.00 | $5,000.00 |
| 1019 | Mulching - Straw | 1 | Tons | $0.00 | |
| 1020 | RESERVED | $0.00 | |||
| 1021 | RESERVED | $0.00 | |||
| 1022 | RESERVED | $0.00 | |||
| 1023 | RESERVED | $0.00 | |||
| 1024 | RESERVED | $0.00 | |||
| 1025 | Access Manhole - 5' diam. | 2 | Each | $0.00 | |
| 1026 | 60" HDPE Type S Storm Sewer | 330 | Linear Feet | $0.00 | |
| 1027 | 60" HDPE Bend (less than or equal to 22 1/2 deg) | 1 | Each | $0.00 | |
| 1028 | Over-Excavation and Backfill with No. 1 Coarse Aggregate | 20 | Cubic Yards | $0.00 | |
| 1029 | Exploratory Excavation Water, Sewer & Gas - Up to 6' Deep | 2 | Each | $0.00 | |
| 1030 | Exploratory Excavation Water, Sewer & Gas - Over 6' Deep | 2 | Each | $0.00 | |
| 1031 | Off-Duty Officer | 8 | Hours | $0.00 | |
| 1032 | RESERVED | $0.00 | |||
| 1033 | RESERVED | $0.00 | |||
| 1034 | RESERVED | $0.00 | |||
| 1035 | RESERVED | $0.00 | |||
| 1036 | RESERVED | $0.00 | |||
| 1037 | RESERVED | $0.00 | |||
| 1038 | RESERVED | $0.00 | |||
| 1039 | RESERVED | $0.00 | |||
| 1040 | RESERVED | $0.00 | |||
| 1041 | RESERVED | $0.00 | |||
| 1042 | RESERVED | $0.00 | |||
| 1043 | RESERVED | $0.00 | |||
| 1044 | RESERVED | $0.00 | |||
| 1045 | RESERVED | $0.00 | |||
| 1046 | RESERVED | $0.00 | |||
| 1047 | RESERVED | $0.00 | |||
| 1048 | RESERVED | $0.00 | |||
| 1049 | RESERVED | $0.00 | |||
| 1050 | RESERVED | $0.00 | |||
| 1051 | RESERVED | $0.00 | |||
| 1052 | RESERVED | $0.00 | |||
| 1053 | RESERVED | $0.00 | |||
| 1054 | RESERVED | $0.00 | |||
| 1055 | RESERVED | $0.00 | |||
| 1056 | RESERVED | $0.00 | |||
| 1057 | RESERVED | $0.00 | |||
| 1058 | RESERVED | $0.00 | |||
| 1059 | RESERVED | $0.00 | |||
| 1060 | RESERVED | $0.00 | |||
| TOTAL, Option A Items 1001 Through 1060, Inclusive | $7,000.00 |
TOTAL, Base contract and Option A Items $144,000.00