About this file

Price Schedule Spreadsheet

View the file

Other files

File Type Posted
W911WN-10-C-0016 Pine Hollow.pdf PDF
BidResults for 10B0010.doc DOC document
Amendment 0005.pdf PDF
Pine Hollow sht 10.pdf PDF
Pine Hollow sht 16.pdf PDF
Pine Hollow sht 12.pdf PDF
01 22 00 00 10 Measurement and Payment Am4.pdf PDF
32 12 10 Bit Tack Am4.pdf PDF
Pine Hollow sht 14.pdf PDF
32 30 10 10 Misc Site Work Am4.pdf PDF
Amendment 00004.pdf PDF
01 14 00 Work Restrictions Am4.pdf PDF
Table of ContentsAm4.pdf PDF
Conformed solicitation thru Amend 4 INFO ONLY.pdf PDF
33 41 00 Storm Drainage Am4.pdf PDF
31 00 00 Earthwork Am4.pdf PDF
Pine Hollow sht 19.pdf PDF
Pine Hollow Amend 03.pdf PDF
W911WN-10-B-0010 Amend 2.pdf PDF
31 00 00 Earthwork.pdf PDF
01 45 01.pdf PDF
W911WN-10-B-0010-0001.pdf PDF
Table of Contents.pdf PDF
Pine Hollow Maintenance Bond.pdf PDF
Pine Hollow Appendices A-D.pdf PDF
Pine Hollow Final DWG set-revision2.pdf PDF
Pine Hollow Solicitation.pdf PDF
Pine Hollow Technical Specifications.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Amendment 0003

Pine Hollow Stream Removal Project - ALCOSAN
Kennedy Township, Stowe Township, & McKees Rocks Borough
Allegheny County, Pennsylvania
SECTION 00010
SUPPLIES OR SERVICES AND PRICES/COSTS
BASE CONTRACT ITEMS PHASE 1: STA 0+00 - 51+25
ITEMDESCRIPTIONQUANTITYU/MU/PAMOUNT
0001ARRA - Reimbursement for Actual Performance and Payment Bonds Premium, Base ContractNOT TO EXCEED$0.00
0002ARRA - Maintenance Bond1Lump Sum$0.00
0003ARRA - Maintenance and Protection of Traffic During Construction1Lump Sum$0.00
0004ARRA - Erosion and Sedimentation Control1Lump Sum$0.00
0005ARRA - ARRA Project Sign1Lump Sum$0.00
0006ARRA - Clearing and Grubbing1Lump Sum$0.00
0007ARRA - Miscellaneous Concrete for Encasement, Pipe Cradles, Slope Anchors, and Pipe Collars75Cubic Yards$0.00
0008ARRA - Milling of Bituminous Pavement Surface, 2" Depth18,230Square Yards$0.00
0009RESERVED$0.00
0010ARRA - Concrete Curb Removal and Replacement52Linear Feet$0.00
0011ARRA - Concrete Sidewalks, Monolithic Curbs (4") and Handicapped Ramps10Square Yards$0.00
0012ARRA - Class 1B Excavation3,690Cubic Yards$0.00
0013ARRA - Class 4 Excavation20,000Cubic Yards$0.00
0014ARRA - Rock Excavation4,700Cubic Yards$0.00
0015ARRA - Off-Site Disposal of Excavated Material27,000Cubic Yards$0.00
0016RESERVED$0.00
0017ARRA - Pavement Subbase (No. 2A)8,300Square Yards$0.00
0018ARRA - Coarse Aggregate No. 2A14,720Cubic Yards$0.00
0019ARRA - Seeding and Soil Supplements-Formula B20Pounds$0.00
0020ARRA - Seeding and Soil Supplements-Formula D42Pounds$0.00
0021ARRA - Mulching - Straw2Tons$0.00
0022RESERVED$0.00
0023ARRA - 4" Yellow Hot Thermoplastic Pavement Markings9,154Linear Feet$0.00
0024ARRA - 6" White Hot Thermoplastic Pavement Markings6,442Linear Feet$0.00
0025ARRA - 12" White Hot Thermoplastic Pavement Markings118Linear Feet$0.00
0026ARRA - Type C Inlet1Each$0.00
0027ARRA - 6" White Waterborne Pavement Markings3,200Linear Feet$0.00
0028ARRA - 4" Yellow Waterborne Pavement Markings4,800Linear Feet$0.00
0029ARRA - Type M Inlet15Each$0.00
0030ARRA - Intake Structure 21Each$0.00
0031ARRA - Sanitary Manhole - 4' diam.2Each$0.00
0032ARRA - Access Manhole - 5' diam.9Each$0.00
0033RESERVED$0.00
0034ARRA - Manhole Grade Adjustment19Each$0.00
0035ARRA - Inlet Grade Adjustment6Each$0.00
0036ARRA - 60" HDPE Type S Storm Sewer5,100Linear Feet$0.00
0037ARRA - 15" PVC SDR 26 Storm Sewer285Linear Feet$0.00
0038ARRA - 15" Insertion Tap17Each$0.00
0039ARRA - 60" HDPE Bend (less than or equal to 22 1/2 deg)30Each$0.00
0040ARRA - 60" HDPE Bend (greater than 22 1/2 deg)3Each$0.00
0041Superpave Asphalt Mixture Design, HMA Wearing Course, PG 64-22, 3 to <10 Million ESALS, 9.5 MM Mix, 1 1/2" Depth, SRL-H18,230Square Yards$0.00
0042Superpave Asphalt Mixture Design, HMA Wearing Course (Scratch), PG 64-22, 3 to <10 Million ESALS, 9.5 MM Mix, SRL-L565Tons$0.00
0043Superpave Asphalt Mixture Design, HMA Base Course, PG 64-22, 3 to <10 Million ESALS, 25.0 MM Mix, 6" Depth8,300Square Yards$0.00
0044Superpave Asphalt Mixture Design, HMA Binder Course, PG 64-22, 3 to <10 Million ESALS, 19.0 MM Mix, 2 1/2" Depth8,300Square Yards$0.00
0045Plain Cement Concrete Pavement100Square Yards$0.00
0046RESERVED$0.00
0047RESERVED$0.00
0048RESERVED$0.00
0049RESERVED$0.00
0050RESERVED$0.00
0051RESERVED$0.00
0052RESERVED$0.00
0053Grout Exisitng Pipe, (Bulkhead Existing Line)70Cubic Yards$0.00
00544''- 6" PVC SDR 26 Sewer Repair440Linear Feet$0.00
0055RESERVED$0.00
0056RESERVED$0.00
0057Over-Excavation and Backfill with No. 1 Coarse Aggregate300Cubic Yards$0.00
0058Exploratory Excavation Water, Sewer & Gas - Up to 6' Deep30Each$0.00
0059Exploratory Excavation Water, Sewer & Gas - Over 6' Deep20Each$0.00
0060Off-Duty Officer120Hours$0.00
0061Sewer Televising, Dye Testing60Hours$0.00
0062Reset Post Mounted Signs, Type B4Each$0.00
0063Reset Post Mounted Signs, Type F2Each$0.00
0064ARRA - Rip Rap R-5 (24" thick)100Square Yards$0.00
0065ARRA - Geotextile, Class 2, Type A70Square Yards$0.00
0066RESERVED$0.00
0067ARRA - 24" White Hot Thermoplastic Pavement Markings20Linear Feet$0.00
0068ARRA - Intake Structure 11EACH$0.00
0069ARRA - Storm Manhole - 5' diam.1EACH$0.00
0070ARRA - 36" Corrug. HDPE Type S Storm Sewer115Linear Feet$0.00
0071Terminal Section, Single2EACH$0.00
0072Type 2-S Guide Rail75Linear Feet$0.00
0073Reimbursement for Water System Modifications52000Dollar$ 1.00$52,000.00
007412" PVC SDR 26 Sewer100Linear Feet$0.00
0075Reimbursement for Natural Gas System Modifications85000Dollar$ 1.00$85,000.00
TOTAL, Base Contract Items 0001 Through 0075, Inclusive$137,000.00
AWARDABLE OPTION A ITEMS, PHASE 2: Sta 51.25 to Sta 54+87.64
ITEMDESCRIPTIONQUANTITYU/MU/PAMOUNT
1001Reimbursement for Actual Performance and Payment Bonds Premium, Additive ItemNOT TO EXCEED$0.00
1002Maintenance and Protection of Traffic During Construction1Lump Sum$0.00
1003Erosion and Sedimentation Control1Lump Sum$0.00
1004Clearing and Grubbing1Lump Sum$0.00
1005Miscellaneous Concrete for Encasement, Pipe Cradles, Slope Anchors, and Pipe Collars125Cubic Yards$0.00
1006Maintenance Bond1Lump Sum$0.00
1007Concrete Curb Removal and Replacement42Linear Feet$0.00
1008Concrete Sidewalks, Monolithic Curbs (4") and Handicapped Ramps18Square Yards$0.00
1009RESERVED
1010Outfall Structure1Each$0.00
1011Class 4 Excavation2,100Cubic Yards$0.00
1012Rock Excavation400Cubic Yards$0.00
1013Off-Site Disposal of Excavated Material750Cubic Yards$0.00
1014RESERVED$0.00
1015Reimbursement for Water System Adjustments2,000Dollars$ 1.00$2,000.00
1016Coarse Aggregate No. 2A1,000Cubic Yards$0.00
1017Seeding and Soil Supplements-Formula B22Pounds$0.00
1018Reimbursement for Natural Gas System Adjustments5,000Dollars$ 1.00$5,000.00
1019Mulching - Straw1Tons$0.00
1020RESERVED$0.00
1021RESERVED$0.00
1022RESERVED$0.00
1023RESERVED$0.00
1024RESERVED$0.00
1025Access Manhole - 5' diam.2Each$0.00
102660" HDPE Type S Storm Sewer330Linear Feet$0.00
102760" HDPE Bend (less than or equal to 22 1/2 deg)1Each$0.00
1028Over-Excavation and Backfill with No. 1 Coarse Aggregate20Cubic Yards$0.00
1029Exploratory Excavation Water, Sewer & Gas - Up to 6' Deep2Each$0.00
1030Exploratory Excavation Water, Sewer & Gas - Over 6' Deep2Each$0.00
1031Off-Duty Officer8Hours$0.00
1032RESERVED$0.00
1033RESERVED$0.00
1034RESERVED$0.00
1035RESERVED$0.00
1036RESERVED$0.00
1037RESERVED$0.00
1038RESERVED$0.00
1039RESERVED$0.00
1040RESERVED$0.00
1041RESERVED$0.00
1042RESERVED$0.00
1043RESERVED$0.00
1044RESERVED$0.00
1045RESERVED$0.00
1046RESERVED$0.00
1047RESERVED$0.00
1048RESERVED$0.00
1049RESERVED$0.00
1050RESERVED$0.00
1051RESERVED$0.00
1052RESERVED$0.00
1053RESERVED$0.00
1054RESERVED$0.00
1055RESERVED$0.00
1056RESERVED$0.00
1057RESERVED$0.00
1058RESERVED$0.00
1059RESERVED$0.00
1060RESERVED$0.00
TOTAL, Option A Items 1001 Through 1060, Inclusive$7,000.00

TOTAL, Base contract and Option A Items $144,000.00