Revised Table of Contents

View the file

Other files

File Type Posted
W911WN-10-C-0016 Pine Hollow.pdf PDF
BidResults for 10B0010.doc DOC document
Amendment 0005.pdf PDF
Pine Hollow sht 10.pdf PDF
Pine Hollow sht 16.pdf PDF
Pine Hollow sht 12.pdf PDF
01 22 00 00 10 Measurement and Payment Am4.pdf PDF
32 12 10 Bit Tack Am4.pdf PDF
Pine Hollow sht 14.pdf PDF
32 30 10 10 Misc Site Work Am4.pdf PDF
Amendment 00004.pdf PDF
01 14 00 Work Restrictions Am4.pdf PDF
Price Schedule Amendment 0004.xlsx XLSX spreadsheet
Table of ContentsAm4.pdf PDF
Conformed solicitation thru Amend 4 INFO ONLY.pdf PDF
33 41 00 Storm Drainage Am4.pdf PDF
31 00 00 Earthwork Am4.pdf PDF
Pine Hollow sht 19.pdf PDF
Pine Hollow Amend 03.pdf PDF
W911WN-10-B-0010 Amend 2.pdf PDF
31 00 00 Earthwork.pdf PDF
01 45 01.pdf PDF
W911WN-10-B-0010-0001.pdf PDF
Pine Hollow Maintenance Bond.pdf PDF
Pine Hollow Appendices A-D.pdf PDF
Pine Hollow Final DWG set-revision2.pdf PDF
Pine Hollow Solicitation.pdf PDF
Pine Hollow Technical Specifications.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised by Amendment 0001

PINE HOLLOW STREAM REMOVAL PROJECT – ALCOSAN

KENNEDY TOWNSHIP, STOWE TOWNSHIP, & MCKEES ROCKS BOROUGH

ALLEGHENY COUNTY, PENNSYLVANIA

Section Title

DIVISION 01 – GENERAL REQUIREMENTS

01 10 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 30 00.10 USACE GENERAL REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 32 17 CONSTRUCTION PROGRESS SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01 USACE QUALITY CONTROL

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES

01 50 10 PROJECT SIGNS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 STORM WATER POLLUTION PREVENTION MEASURES

01 78 02.00 15 CONTRACTOR QUALITY CONTROL

DIVISION 02 – EXISTING CONDITIONS

02 42 00 DISPOSAL OF MATERIAL

DIVISION 03 - CONCRETE

03 30 53.10 CONCRETE FOR MINOR STRUCTURES

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 11 16.16 AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS

32 17 23.00 20 PAVEMENT MARKINGS

32 30 10.10 MISCELLANEOUS SITE WORK

32 92 19 SEEDING

DIVISION 33 – UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 41 00 STORM DRAINAGE

APPENDICES

RHEA DRAFT GEOTECHNICAL REPORT

GANNETT FLEMING GEOTECHNICAL REPORT / BORING LOGS

CARDNO TBE TEST REPORT

Revised by Amendment 0001