EXH 4 SOP_WATER DIST.pdf
PDF 11 KB Posted
- Solicitation number
- W911WN10B0003
About this file
Exhibit 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for 10B0003.doc | DOC document | |
| Amen 01 10-B-0003.pdf | ||
| INCUMBENT PRICING.pdf | ||
| Attachment 5 DD2772.pdf | ||
| Exh 1-2 Area Map Mahaney Map.ppt | PPT presentation | |
| Attachment 2.pdf | ||
| Attachment 4 QASP.pdf | ||
| Exh 3 11Shenango Lake Sewage Treatment Plant Location Map.ppt | PPT presentation | |
| Solicitation W911WN-10-B-0003.pdf | ||
| Attach 1 WD 05-2451 5-26-09.pdf | ||
| Attachment 3.pdf | ||
| EXH 5 SOP_SEWAGE TREATMENT.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 4
STANDARD OPERATING PROCEDURE
OPERATIONAL CHECKS: WATER DISTRIBUTION SYSTEM
Equipment shall be checked according to the following schedule:
Site Period Frequency Shenango Recreation Water Tower
1 May through 30 Sept Twice weekly
Shenango Recreation Area 1 Oct through 30 Apr Weekly Mahaney Recreation Complex and Dwellings
1 Jan through 31 Dec Weekly
Mahaney Overlook 1 Apr through 15 Oct Weekly Mahaney Boat Launch Memorial Day through Labor
Day Weekly
Pump, Chlorinator, and heat lamps. Visually inspect for damage and visually and audibly check for problems by switching equipment on and off at least once during each check. Damaged or problem equipment, as indicated by excessive vibration or noise, shall be shut down and repaired immediately.
Electrical and Control Systems. Physically check ground fault receptacles by pushing the reset switch at least once.
Switches and Gauges. Check pressure gauges on the holding tanks to ensure readings are within prescribed limits. If not within limits, inspect for causes and shut down and repair if necessary.
Heat Lamps. Ensure heat lamps are operating.
Exterior of Pipes and Water Holding Tanks: Visually check the exteriors of all pipes in the well pits and holding tank for leakage, weakening of joints, and corrosion.
Pump Operation. Check pressure gauges on the holding tanks to monitor pump operation.
When gauge readings fall outside manufacturer recommended ranges, adjust and repair as necessary.
Mercury Switches Controlling Pumps and Air Compressors: Check mercury switches inside Autocon control panels at indicated sites during the course of operational checks. These switches shall be reset and adjusted as required to ensure proper pumps and compressor operation. One indicator of improper pump operation is readings outside of the acceptable holding tank levels described in manufacturer's recommendations. All adjustments and resetting shall be conducted according to specifications in the Installation and Maintenance Manual.
Autocon Industries Incorporated.