Attachment 3.pdf
PDF 9 KB Posted
- Solicitation number
- W911WN10B0003
About this file
Attachment 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for 10B0003.doc | DOC document | |
| Amen 01 10-B-0003.pdf | ||
| INCUMBENT PRICING.pdf | ||
| Attachment 5 DD2772.pdf | ||
| Exh 1-2 Area Map Mahaney Map.ppt | PPT presentation | |
| Attachment 2.pdf | ||
| Attachment 4 QASP.pdf | ||
| Exh 3 11Shenango Lake Sewage Treatment Plant Location Map.ppt | PPT presentation | |
| EXH 4 SOP_WATER DIST.pdf | ||
| Solicitation W911WN-10-B-0003.pdf | ||
| Attach 1 WD 05-2451 5-26-09.pdf | ||
| EXH 5 SOP_SEWAGE TREATMENT.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
SAMPLE COMPONENTS OF QUALITY CONTROL PLAN
1. Describe inspection process for each section of the contract.
2. List names of inspectors.
3. Describe process to identify deficiencies in quality of services performed before the level of performance is unacceptable.
4. Describe process for retaining records of inspections and corrective actions taken.
5. Accident Prevention:
a. Policy Statement for accident prevention signed by the Contractor (program and enforcement)
b. Emergency phone numbers
c. Equipment inspections
d. Safety training
e. Personal protective equipment required
File details come from the government source that posted it. Updated .