About this file

Attachment 2

View the file

Other files

File Type Posted
BidResults for 10B0003.doc DOC document
Amen 01 10-B-0003.pdf PDF
INCUMBENT PRICING.pdf PDF
Attachment 5 DD2772.pdf PDF
Exh 1-2 Area Map Mahaney Map.ppt PPT presentation
Attachment 4 QASP.pdf PDF
Exh 3 11Shenango Lake Sewage Treatment Plant Location Map.ppt PPT presentation
EXH 4 SOP_WATER DIST.pdf PDF
Solicitation W911WN-10-B-0003.pdf PDF
Attach 1 WD 05-2451 5-26-09.pdf PDF
Attachment 3.pdf PDF
EXH 5 SOP_SEWAGE TREATMENT.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

ITEMS FOR CONTRACTOR TO BRING TO POST-AWARD CONFERENCE

Quality Control Plan. A suggested outline for the Contractor Quality Control Plan is contained in Attachment 3.

Name(s) and contact information for the Contractor's authorized representatives.

Name(s) and contact information for Contractor's Quality Control Inspectors(s).

The name and phone number(s) of Contractor's Emergency Contact.

Preventive Maintenance Plan for Shenango Lake Sewage Treatment Plant (Ref Section 2, para 2.3)

Valid license from the State Board for Certification of Sewage Treatment Plant and Waterworks Operators (Ref: Section 2, para 2.1.3)

Copy of a state police background check for each employee who will be working on Government property (Ref: Section 3, para. 3.7)

File details come from the government source that posted it. Updated .