About this file

Amendment 0002 - Changes in Price Schedule Technical Specs for Task Order and Responses to Questions

View the file

Other files

File Type Posted
W911WN09D0020.pdf PDF
W911WN09D0021.pdf PDF
W911WN09D0019 Task Order 0001.pdf PDF
W911WN09D0022.pdf PDF
W911WN09D0019.pdf PDF
01 50 10.pdf PDF
01 11 00.pdf PDF
01 22 00.00 15.pdf PDF
PROJECT INFORMATION WORKSHEET.doc DOC document
W911WN09R0009 Amendment 0001.doc DOC document
Proposal Data Sheet.doc DOC document
Price Amend1.xls XLS spreadsheet
W911WN-09-R-0009.zip ZIP file
Initial Task Order Request.pdf PDF
W911WN09R0009 Technical Specs for TO.pdf PDF
W911WN09R0009.pdf PDF
Technical Specifications.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

QUESTIONS AND ANSWERS

1. Question - What is the overall width of the Turf Reinforcement Mat? The TRM V-Ditch Note 6 on Plan Page C-508 states a six and a half foot wide TRM, but the typical drawing on the same page shows the mat covering the whole width of the ditch.

Response – Note 6 refers to site improvement at the entrance to the new culvert. The 6.5 feet wide TRM will be placed on the channel bottom starting at the upstream side of the headwall and placed upstream until the full 12.0 feet wide TRM V-Ditch can be installed. The TRM V-Ditch as shown in the typical detail shall be 12.0 feet wide and 450 feet long.

2. Question - Please clarify whether there are to be 1 or 2 new headwalls installed at the spillway access road crossing. Note 1 on Plan Page C-507 seems to indicate 2. However, the drawing on Plan Page C-403 only shows 1 new headwall per the Legend symbol.

Response – The concrete headwall will be constructed at the new culvert inlet and just slush grouted stone protection at the culvert outlet as shown on the details and stated in Note 1 on Drawing C-507.

3. Question - Plan Page C-404, Note 11 states the asphalt overlay to cover the dimensions of 175’ x 14’. Is that the limit of the overlay or is the intention to cover the entire turnaround between Dwelling #1 and Dwelling #2 also?

Response – The asphalt overlay shall be 175 feet long x 14 feet wide. The Contracting Officer will determine the starting point of the 175 feet length. The asphalt on the turnaround between the dwellings will NOT be replaced.

4. Question – How much of the sidewalk at Dwelling #2 must be replaced? The note on Plan Page C-404 states that the contractor is to “replace entire sidewalk in kind”. However, the specification 2.37.2 says to only reconstruct sidewalks disturbed by construction.

Response – The entire sidewalk shall be replaced in kind as stated in the note.

(End of Summary of Changes)